Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP

PLANNING COMMISSION

Meeting Agenda Wednesday, March 6, 2019

7:00 PM

A. Call to Order/ Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log I Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes

1. February 6, 2018 F. Subdivision and Land Development Applications

1. ESKE Development/ Ducklings Early Learning Center G. Conditional Uses and Variances

1. PECO Energy CO. (Modify Existing Conditional Use Approval) H. Ordinance Amendments I. Old Business

1. Goshenville TND Overlay Discussion J. 2019 Goals K. Any Other Matter L. Liaison Reports M. Correspondence

Bold Items indicate new information to review or discuss.

F:\Data\Shared Data\Agendas\Planning Commission\2019\PC AGENDA 03062019.doc

March 6, 2019 PC Meeting

< () ui rn >:: Q rn 0 c .... _

:::> () Li:' - 0:- c 0 ~ 'C ;:: .. "' ~ .!:! ii: Q. .. .. 12. - Application Name ;;- ~ "' Q ESKE Development I Ducklings LD P/F 1/18/2019 PECO Gas Gate cu Sk 2126/2019

Bold= New Application or PC action required

Completed in 2019

East Goshen Township Planning Commission

Application Tracking Log

"' .. u .. IQ .. <( c - ·;;, Q. c 0 w .. a.. 12. :E Cl) "'

c c () ;:: - ;;: a.. " () J:I .. 0 () <( - I- "' Q 0 .s 0 - - t: .. .. 2 "' - - - "' "' "' rn Q Q Q 2/6/2019 2/23/2019 2/23/2019 2/29/2019 2/26/2019 2/28/2019 NA 2/28/2019

F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2019\PC Tracking Log for 03062019.xlsx

.. - .. "' - Q "' Q c .. c 0 - 0 ;:: 2 "' "

'C ;:: "

<( "' 'C .l!! c <( I- Q "' 0 c 'iii I- ...I Cl) .. .. ...I z c Q E c .. z rn ·;: 12. E - 0 "' 0 >< () .. .. 0 w a.. IQ J: Q () 4/3/2019 4/16/2019 NA 5/6/2018 4/3/2019 4/23/2019 4/23/2019 4/26/2019

3/1/2019

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

DRAFT EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING

February 6, 2019

The East Goshen Township Planning Commission held a regular meeting on Wednesday, February 6, 2019 at 7:00 p.m. at the East Goshen Township building. Members present were: Dan Daley, Silvia Shin, Ernest Harkness, Mark Levy and new member Mike Koza. Also present was Mark Gordon, (Township Zoning Officer); Janet Emanuel, (Township Supervisor), and Tom Kilburn (Futurist Committee).

COMMON ACRONYMS:

BOS - Board of Supervisors BC - Brandywine Conservancy CB - Conservancy Board CCPC - Chester Co Planning Commission

A. FORMAL MEETING - 7 p.m.

CPTF - Comprehensive Plan Task Force CVS- Community Visioning Session SWM - Storm Water Management

ZHB - Zoning Hearing Board

1. Ernest called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our first responders, and military. 2. Ernest asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response. 3. Ernest checked the log. 4. The minutes of the January 2, 2019 meeting were approved.

B. SUBDIVISION AND LAND DEVELOPMENT ESKE Development/Ducklings Early Learning Center. - Mark Gordon explained that they haven't received engineering reviews yet so the applicant opted to wait until the March meeting to make their presentation. He acknowledged Debbie Hicks and Mack Reese of 90 I Airport Road. The stream that goes through her property goes through the applicant's property. She is concerned about tree removal and effects on the stream. Mark reviewed the map with them. He mentioned that the applicant did a flood study and will have to get many permits to work in the wetlands. She has a historic property but not close enough for a historic study. The next meeting will be March 6, 2019.

C. OLD BUSINESS Goshen ville TND Overlay Discussion - Mark Gordon reviewed his memo dated January 31, 2019 listing 3 options for the Commission's consideration. After a short discussion, it was decided that the Planning Commission will have a workshop on Wednesday, February 20, 2019 for this topic. Tom Kilburn commented that the residents should have received an outline of this proposal. Mark Gordon commented that there were 2 public meetings and the residents were notified by letter. The residents near the Perakis property came in force to both meetings. The result was that the commercial will be in TND 1 and residential (Perakis) will be in TND2. There will be a hearing when the proposal is ready for approval.

D. ANY OTHER MATTER

1. Westtown Township Comprehensive Plan - Mark Gordon checked land use. Westtown School has open space that they probably won't develop but they have options. Dan mentioned that they are expanding their athletic fields. Dan asked about traffic and road improvements. Mark commented that he didn't see anything critical. He can expand his comments on the West Chester Pike Corridor. Janet commented that Westtown talks more with the Borough about traffic.

PC 2-6-19 draft 1

I E. LIASION REPORTS 2 I. BOS - Janet reported that their focus the past few weeks has been on the Open Space Zoning 3 Ordinance proposal. They received lots of push back from the residents around the properties that would 4 be involved. Ernie feels that they could have put together a written explanation of the proposal at the 5 beginning. People sometimes misinterpret information at public meetings. Janet mentioned that the BOS 6 took a vote of 3 to 2 not to proceed with this. Ernie commended the BOS for having public meetings and 7 feels the response from the residents is positive and shows their concern. 8 9 ADJOURNMENT I 0 There being no further business, Silvia made a motion to adjourn the meeting. Dan seconded the 11 motion. The meeting was adjourned at 8:00 pm. The next regular meeting will be held on 12 Wednesday, March 6, 2019 at 7:00 p.m. 13 NOTE: A workshop meeting will be held on Wednesday February 20, 2019 at 7:00 pm. 14 15 16 Respectfully submitted, ____________________ _ 17 Ruth Kiefer, Recording Secretary

PC 2-6-19 draft 2

Memorandum

East Goshen Township 1580 Paoli Pike

West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: To:

From:

Re:

3/1/2019 Planning Commission . . JI Mark Gordon, Township Zoning Officer l/JA.-{fJ Land Development Application I ESKE Development LLC I Ducklings Early Learning Center

Planning Commission Members,

The Township has received a Land Development Application and plans for 1302 Wilson Drive. This parcel is located in the 1-1 Light Industrial zoning district, has an area of 4 acres and received Conditional Use Approval in 2018 for a Child Daycare Center use.

The applicant proposes to construct+/- 14000 s.f. building with associated playground area, parking, and driveway to accommodate the use.

The Township has received the Township Engineers review, The Fire Marshal's review and the CCPC Review letter for the project. The applicant is in the process of addressing the comments outlined in the review letters and revising their plans accordingly.

STAFF RECOMENDATION

At this time no action is needed by the Planning Commission on this application.

F:\Data\Shared Data\Property Management\53-3\53-3-1.2C {1302 Wilson Dr.)\LD 2019 - Ducklings Early Learning Center\Memo to PC Re. LO App 03012019.doc

EGOST00127

Mark A. Gordon Director of Code Enforcement/Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380

February 27, 2019

RE: ESKE Development, LLC, 1302 Wilson Drive Preliminary/Final Land Development Review

Dear Mark:

One South Church Street

Second Floor West Chester, PA 19382

T: 610-429-8907

F: 610-429-8918

www.pennonl.com

As requested, we have reviewed the following information, regarding the referenced revised submission:

• "Preliminary/Final Land Development Plans for ESKE Development, LLC" (14 sheet) dated January 11, 2019, prepared by D.L. Howell;

• "Stormwater Management Report for Ducklings Early Learning Center" dated January 11, 2019, prepared by D.L. Howell; and

• Application and supplemental documents.

The applicant, ESKE Development, LLC of West Chester, on behalf of the owner, S. Winig Associates of West Chester, is proposing to develop UPI 53-3-1.2C (4.0 acres) with a 14,000 SF child daycare center and 3,000 SF enclosed play area. Associated parking and stormwater management are proposed as well as a stream crossing for the main access to the property. The site is located on the south side of Wilson Drive (T-552) approximately 1,000 feet west of Boot Road (SR 2020), within the 1-1 light Industrial District. The daycare center will be served by public water and public sanitary sewer.

At the Board of Supervisors November 13, 2018 meeting the applicant received conditional use approval for the Child Daycare Center Use on the referenced property with conditions identified in the Board's November

15, 2018 letter.

We offer the following comments:

ZONING

1. The applicant shall confirm that a visual screen for all rooftop structures is provided per §240- 19.F(2).

2. A permit is required from the Township for any construction within the identified floodplain. (§240- 26.B((l)(b))

3. The applicant should provide all information required by §240-26.B(3)(d)[l] with the application.

EGOST00127 Mark A. Gordon, Zoning Officer

February 27, 2019 Page 2

ESKE. 1302 Wilson Drive Land Development

4. The applicant should provide cross sections of the proposed driveway and culvert and the elevation of the base flood on the plan. (§240-26.B{3)(d)[3][c])

5. The width of right-of-way for Wilson Drive shall be indicated on the plans per §240-27.A{3)(a). The Board of Supervisors may require additional right-of-way.

6. A minimum of 5% of a parking area shall be landscaped and continually maintained as such. {§240- 27.C{l)(c)) Please provide a calculation verifying this requirement has been met.

7. Any additional off-street parking needed for the center shall be provided on the same lot as the center. {§240-31.C{3)(i)[3]) The applicant should provide easement language acceptable to the Township Solicitor regarding the proposed parking on the adjacent property.

8. ADA ramps at the handicap parking shall be provided and the necessary details added to the plans. {§240-33.B{7)(b)) Please reference PennDOT standard details.

9. Per §240-33.B{7)(c), three (3) handicap parking spaces are required; only two (2) are proposed.

10. All applicable PaDEP permitting will be required for the proposed crossing of the existing watercourse, wetlands and floodplain. {§240-26.B{4)(b)[l][b], §240-26.B{5)(a)[l] & §240-26.B{7)(b)[5])

11. The applicant should confirm that all proposed utilities such as gas lines, electrical and telephone systems shall be located, elevated (where possible), and constructed to minimize the chances of impairment during a flood. {§240-26.B{S)(c)[4])

12. The applicant should address the requirements of §240-27.E regarding design controls for industrial park districts.

SUBDIVISION AND LAND DEVELOPMENT

13. The applicant is proposing preliminary/final plan approval, therefore a waiver from §205.1 should be requested.

14. Regarding landscaping and lighting: a. We recommend lighting be provided at the entrances to the building for safety purposes. b. The plan should remove the term 'buffer' from the proposed landscaping, as a buffer is not

required per the Code, and has specific, additional requirements that would need to be met. c. The applicant has acknowledged the tree replacement requirements of §206-61.D, however a note stating "Applicant's surveyor located all trees 6

11 DBH and greater, the surveyor did not evaluate whether the existing trees were viable and noninvasive per the definition in SALDO section 205-7. The applicant would like to further evaluate the existing trees with participation from the Township's professional consultants." is provided on Sheet 14. Further review of the tree replacement requirement will occur pending clarification/coordination with the

applicant's engineer. Please note the definition of "wooded lot" (§205-7) and the requirements of §205-61.C & 205-61.D d. Replanting shall occur on the wooded lot that is being developed or at another location within

the Township that is acceptable to the Board of Supervisors. (§205-62.D{8)) The majority of

landscaping is proposed on adjacent property.

EGOST00127 Mark A. Gordon, Zoning Officer

February 27, 2019 Page3 ESKE. 1302 Wilson Drive Land Development

e. The applicant has indicated the existing trees along Wilson Drive satisfy the street tree

requirement of §205-62. The Planning Commission and/or Board of Supervisors should confirm this requirement is adequately addressed; we have no objection.

15. Regarding preliminary and final plan requirements (§205-30 and §205-33), the following should be provided:

a. The name of all abutting or adjacent property owners in the vicinity of the project including

those across Wilson Drive. (§205-30.B(5)) b. The width of Wilson Drive. (§205-30.C(l)(a)) c. Such private deed restrictions and/or a statement of any restrictions previously imposed in accordance with §205-33.C(2). If no such deed restrictions exist or will be imposed, it is recommended a note stating the same be indicated on the plan.

16. A 'will serve' letter regarding the availability of public water shall be provided. (§205-40.E)

17. Sidewalks and/or paths may be required to be installed at the discretion of the Board of Supervisors upon the recommendation of the Planning Commission and Conservancy Board. (§205-56.A) No sidewalks are proposed.

18. A detail for the proposed driveway shall be provided, and the material per §205-57.D(2) included.

19. All lot corners shall be clearly identified by either a monument or an iron pin. (§205-65.B)

STORMWATER MANAGEMENT

20. The disturbed area is greater than one acre. The applicant should provide an NPDES permit. (§195- 17.A(l)(b))

21. Infiltration bed 1 has a stone invert of 431.00 feet. Test pits 3 and 4 were performed within the limits of Infiltration bed 1. The test pit log for Test Pit 3 indicates that, "During excavation, a solid layer of rock was encountered at a depth of approximately 9 feet below existing grade." The existing grade appears to be approximately 442.5 feet which indicates that the rock was encountered at an elevation of approximately 433.5 feet. The infiltration bed 1 invert indicated in the table on the detail on Sheet 6 is 431.00 feet. The infiltration bed does not appear to have the required 24 inches of separation from a limiting zone. The applicant should clarify. (§195-20.J(l))

22. Where roof drains are designed to discharge to infiltration practices, they shall have appropriate measures to prevent clogging by unwanted debris (for example, silt, leaves and vegetation). Such measures shall include but are not limited to leaf traps, gutter guards and cleanouts. (§195-20.0)

23. All infiltration practices shall have appropriate positive overflow controls. The applicant should provide positive overflows in the infiltration beds. (§195-20.P)

24. The peak flow rate of the postconstruction two-year, twenty-four-hour design storm shall be reduced to the predevelopment peak flow rate of the one-year, twenty-four-hour-duration precipitation, using the SCS Type II distribution. The applicant should provide calculations demonstrating conformance with §195-21.A.

EGOST00127 Mark A. Gordon, Zoning Officer

February 27, 2019 Page4 ESKE. 1302 Wilson Drive Land Development

25. Roadway crossings or structures located within designated floodplain areas shall be able to convey runoff from a one-hundred-year design storm consistent with Federal Emergency Management Agency National Flood Insurance Program Floodplain Management Requirements. (§195-24.E)

26. Provide the complete delineation of the flow paths used for calculating the time of concentration for the predevelopment and postconstruction conditions on the drainage area plans. (§195-27.B(14))

27. Identify the person responsible for ongoing inspections, operation, repair, and maintenance of the BMP or conveyance after completion of construction. (§195-27.B(18)(a))

28. Provide operation and maintenance requirements forthe proposed BMP's on the plan. (§195-27.F(l) & §195-37)

29. The applicant is reminded that a Stormwater Management Operation and Maintenance agreement shall be completed. (§195-27.F.2 & §195-38) This document is available on the Township website.

Please sign two copies and return to the Township for authorization by the Board of Supervisors. The Township will then return to the applicant for recording with the plan, at the County. A copy of the time stamped document and proof of recording should then be returned to the Township.

30. The plan should be revised to reflect the latest floodplain study information and location (11/1/18).

TRAFFIC

31. In response to comment #11 from the October 24, 2018 McMahon review letter, Heinrich & Klein Associates has provided right turn lane warrants for the proposed driveway. While warrants are marginally met for a right turn lane, the design engineer notes that widening for a deceleration lane could not be accommodated along the property frontage and would impact the adjacent CALECO property. We recommend the applicant also complete warrant analyses for a left turn lane into the site. The existing road width would likely accommodate a left turn area into the site and/or into the

adjacent MARS driveway. The applicant should provide lane striping alternatives along Wilson Drive to accommodate left turns into each driveway, considering the proposed driveway offset between the site and MARS driveways.

32. The plans should identify the student bus pick-up / drop-off area. The applicant should clarify is private buses will be utilized and stored on-site.

SANITARY SEWER

33. We recommend the building sewer and lateral be increased in size from 4-inch to 6-inch since this is a commercial use and to increase ease of maintenance. (§188-31.B.(3))

34. Township policy prohibits inside drop connections within manholes. To avoid disturbance to the manhole at all, we recommend the lateral connect directly to the sanitary sewer main approximately 5 feet downstream ofthe existing manhole in accordance with the Township's Sewer Lateral/Building Sewer Detail (see attached). The lateral can connect to the main at a 45° angle and run at that slope to the easement line. The downstream cleanout needs to be provided at the easement line. The sewer

can then be run at a consistent slope from the cleanout to the building.

EGOST00127 February 27, 2019 Page 5 ESKE. 1302 Wilson Drive Land Development Mark A. Gordon. Zoning Officer

35. A trap, vent, and building cleanout are required in accordance with the Township's Sewer Lateral/Building Sewer Detail.

36. The elevation view on Sheet 3 of the retaining wall plans, prepared by Shippee Engineering, dated February 1, 2019, indicate the invert elevation of the sewer lateral at the location of the retaining wall as 426.94, which is not consistent with the calculated invert elevation of 428.98, based on the length, design slope, and invert elevations indicated on Sheet 3 of the land development plans.

GENERAL

37. During the conditional use process the applicant indicated parking restriction signage would be provided along the access drive, however no such signage is indicated.

38. We have received the retaining wall plans and calculations and will review following land development approvals. However, we have concerns about the constructability of the retaining wall, notably, the minimal distance between the wall and the floodplain. Additionally, we recommend some form of erosion and scour protection at the bottom of the wall.

39. This review does not include a site signage review; all proposed signs will be review and permitted by Township staff.

40. Where parking is proposed immediately adjacent to sidewalks, we typically recommend curb stops be provided to prevent vehicle overhang and provide pedestrian access.

41. We recommend a crosswalk be provided for the proposed pedestrian crossing of the driveway.

42. The proposed emergency access extends into existing parking spaces on the adjacent sites, potentially limiting its feasibility. A detail for the proposed emergency access should be provided.

43. We recommend the conditions noted in the Board's November 15, 2018 approval be indicated on the record plan.

44. Please additionally note the status of the following reviews/permits: a. NPDES Permit (PaDEP/CCCD) (§195-15.C(2), -16.A, -17.A) - Pending b. Planning Module (PaDEP) (§240-24.F, §205-33.B(22)(a)) - Pending c. Sanitary Sewer (Municipal Authority) - Correspondence has not yet been received d. On-lot Wells (CCHD) - Not applicable e. Highway Occupancy Permit (Penn DOT) - Not applicable f. Fire/Emergency- See emailed comments from Mark Miller g. Historic Resource (Historical Comm.) - Correspondence has not yet been received h. Landscaping (Conservancy Board) - Correspondence has not yet been received i. County Planning - February 14, 2019 letter

EGOST00127 Mark A. Gordon, Zoning Officer

February 27, 2019 Page 6 ESKE, 1302 Wilson Drive Land Development

Should you have any further questions or comments, please contact the undersigned.

Sincerely,

PENNON I

l!L

Nathan M. Cline, PE Township Engineer

cc: Rick Smith, Township Manager (via e-mail) Mark Miller, Director of Public Works (via e-mail)

ESKE Developments, LLC, c/o Anthony Diver, The Tamora Group (via e-mail) John A. Jaros, Esq., Riley Riper Hollin & Colagreco (via e-mail) Joseph Russella, PE, D.L. Howell (via e-mail)

Kristin Camp, Esq., Buckley Brion (via e-mail)

2B STONE BACKFILL (6" M•N.) Vfy£ FITI!NG (SEE DETAIL ABOVE)

SANITARY SEl\>:R MAJN

MORTAR TYPE-11

~CRETE

COLI.AR

SCH. 40 PVC

SWEEP TEE

PVC SDR26 OR SO-I. 40, M1N. •" DIAMETER 28 STONE BEDDING (6" M1N.)

~I '!t• w•

~I ,,

fX.~VITY

•wYf. CONt.IECTION SHALL BE DUCTILE IRON FOR DUCTILE IRON SEWER MAIN AND COUPLING SHALL BE DRESSER smE

GASKElED SOLID V#ALL TRAl-.ISITIQN COUPLING F'ROf.4 PVC/DI TO EX. MATERIAL (DRESSER, RoMAC. OR APPROVED EOUAL)

~CONCRETE CRADLE IF REQUIRED "4 BY TOWNSHIP BASED ON SOIL SEWERAIN CONNECTION QETAIL CONDITIONS ENCOUNTERED t«IT TO SCAI£ NOTE: VfHENEVER POSSIBLE THE SE'lt'ER LATERAL CONNECTION SHOULD BE MADE TO THE EXISTING ~AIN US1NG A wY£ FITTING AND ONE PIPE COUPLING.

~ PVC SCREW-T'tPE CAP

12·-I 1----12· 10'-o" MAx.------1 : MORTAR TYPE-II I

SCH. 40 PVC

SWEEP TEE

•PERMISSION MAY B~- GRANTED TO USE 1X SLOPE (f PER FOOT) IN SPEOAL ORCUMSTAt'4CES I

MUSHROOM VENT CAP

36" MIN. TO TOP OF PIPE

FERNCO 5000 SERIES SlROl\IG BACK (RC) COUPLING OR APPROVED EQUAL 1---0·-o·---1

.. .._ I~".'· ..

...

-----SEWER LATERAL-----+---------! ----------i---EXISTING BUILDING SEWER--

SEWER LAJERAI /BUILQING stWE;R p&TAIL

14DT TO SCALE

EAST GOSHEN TOWNSHIP SEWER LATERAUBUILDING SEWER DETAIL ~

PREPARED BY: PENNONI ASSOCIATES INC.

Newark, DE

DETAIL NO.: CREATED: REVISED:

SS01 2014-09-30 N/A

THE COUNTY OF CHESTER

COMMISSIONERS Michelle Kichline Kathi Cozzone Terence Farrell

B1ian N. O'Leary, AICP Executive Director

Louis F. Smith, Jr., Manager East Goshen Township

1580 Paoli Pike West Chester, PA 19380

PLANNING COMMISSION Government Services Center, Suite 270 601 Westtown Road P. 0. Box 2747 West Chester, PA 19380-0990 (610) 344-6285 Fax (610) 344-6515

February 14, 2019

Re: Preliminary/Final Land Development - Ducklings Early Learning Center # East Goshen Township - LD-01-19-15745

Dear Mr. Smith:

A Preliminary/Final Land Development Plan entitled "Ducklings Early Learning Center", prepared by D.L. Howell & Associates, Inc., and dated January 11, 2019, was received by this office on January 23, 2019. This plan is reviewed by the Chester County Planning Commission in accord with the provisions of Section 502 of the Pennsylvania Municipalities Planning Code. We offer the following comments on the proposed land development for your consideration.

PROJECT SUMMARY:

Location: Site Acreage: Lots/Units: Non-Res. Square Footage: Proposed Land Use: New Parking Spaces: Municipal Land Use Plan Designation: UPI#:

PROPOSAL:

south side of Wilson Drive, east of Airpo1t Road 4.00 1 Lot 13,815 Child Daycare 60 Business Park Industrial 53-3-l.2C

The applicant proposes the construction of a 13,815 square foot early learning center, and 60 parking spaces. The project site, which will be served by public water and public sewer, is located in the I-1 Light Industrial zoning district.

RECOMMENDATION: The County Planning Commission recommends that the issues raised in this letter should be addressed, particularly the access and circulation issues and natural features protection issues discussed below, and all Township issues should be resolved before action is taken on this land development plan.

Email: ccplanning@chesco.org • website: www.chescoplanning.org

Page: 2 Re: Preliminary/Final Land Development - Ducklings Early Leaming Center # East Goshen Township - LD-01-19-15745

COUNTY POLICY:

LANDSCAPES:

I. The project site is located within the Suburban Center Landscape and Natural Landscape designations of Landscapes3, the 2018 County Comprehensive Plan. The vision for the Suburban Center Landscape is regional economic, population and transportation centers with varying land uses, accommodating substantial future growth of medium to high intensity. Repurposing obsolete structures and sites and encouraging sustainable development will be critical as suburban centers grow, and transpo1tation infrastructure and amenities will need to expand to create an integrated multimodal network. As an overlay of all other landscapes, the county's Natural Landscapes consist of a network of streams, wetlands, floodplains, and forests that are protected by regulations or should be subject to limited disturbance. Conservation practices should protect and restore these natural resources. While the proposed facility is an appropriate use in a Suburban Center Landscape, careful consideration of the proposed development activity is required due to the environmental constraints of the project site, which are discussed in comments #9 through # 12.

Parcel Info: Pan:e~a) : 53°$.1.2C

(Main)Addresa: 1302 Wison Or. Municiplity: East Goshen l"I'.

WATERSHEDS:

Image Info: Qa(e Taken: 2014

source: ccPC. 2011

c::JPercel

Olher Parcell

Hole: Tb• CCPC mallet •very elctt '° tfl.S.ur• tlis map I• frn of •mm tNt don 1101 vuranlH "•mapotllt futurn b be 1p1f 1lly0fteinoordy

acc1ua~.

2. Watersheds, the water resources component of Landscapes3, indicates the proposed development is located within the east branch subbasin of the Chester Creek watershed. Watersheds' highest priority land use objectives within this watershed are: reduce stormwater runoff, restore water quality of "impaired" streams, and protect vegetated riparian corridors. Watersheds can be accessed at www.chesco.org/water.

Page: Re: #

3 Preliminary/Final Land Development - Ducklings Early Learning Center East Goshen Township-LD-01-19-15745

'f

11<#8./7' I A ..;ww~

"""' "

CH"51.91' ' N1J"IJ'1'U£ /:

"' I /

I /

' /

ZONF A

/ I / ' ! I ' I

REGULATORY

fLOO!JWAY

i L -- ""~,,.,,,.,~,.,.' I

•~""""'""""~"I

' \

Site Plan Detail, Sheet 1: Preliminary/Final Land Development - Ducklings Early Learning Center

PRIMARY ISSUES:

Access and Circulation:

3, While the site plan depicts a stream crossing for the proposed driveway entrance, the details of which are provided on Sheet 8, we note that this stream crossing is located approximately 110 feet east of an existing stream crossing on the adjoining parcel to the west (UPI# 53-3-l.2D). We suggest that the applicant and Township investigate the feasibility of utilizing the main driveway entrance on the

Page: Re: #

4 Preliminaty/Final Land Development - Ducklings Early Learning Center East Goshen Township-LD-01-19-15745

adjoining parcel to the west as the primary entrance for both parcels, instead of constructing a second stream crossing.

4. The site plan indicates that an emergency access connection will be provided to the adjoining parcel to the west. However, the site plan indicates that the emergency access connection extends to an existing parking area, and it does not depict any modifications to the existing parking arrangement (any cars utilizing these parking spaces would block this emergency access connection). This should be clarified by the applicant. We also suggest that the applicant and Township investigate the feasibility of an emergency access connection with the adjoining parcel to the south.

5. The Township's emergency service providers should be requested to review the plan to ensure that emergency vehicles will be able to safely navigate the proposed development when completed. We note that a vehicle turning plan is provided on Sheet 12.

6. The Zoning Information table on Sheet I indicates that the applicant is proposing 21 more parking spaces than required by the Township Zoning Ordinance (this figure does not include the 35 spaces identified on the adjoining parcel to the west as a "day care events" overflow parking area). We suggest that the applicant and the Township evaluate the actual anticipated parking demand for this facility, and determine whether the number of proposed parking spaces will be necessaty. If fewer spaces are required, we suggest that the extra spaces could be landscaped and held in reserve instead of being paved. The reserve spaces could be installed in the future if it becomes evident that they are actually needed. Reserving parking spaces in this manner can help to reduce initial construction costs, limit the creation of impervious surfaces, and increase opportunities for landscaping.

Design Issues:

7. The site plan depicts the location of a sidewalk connection extending to the overflow parking area on the adjoining parcel to the west. However, this sidewalk extends to an existing parking area, and the site plan does not depict any modifications to the existing parking configuration in order to facilitate pedestrian access between these parcels. This should be clarified by the applicant.

8. The Township should verify that the design of the proposed outdoor lighting plan (Sheet 13) conforms to Township ordinance requirements. The illumination should be directed inward from the periphery of the site and be oriented to reduce glare and visual impact on the adjoining roadways and land uses.

Natural Features Protection:

9. The plan depicts the location of both the Federal Emergency Management Agency (FEMA) floodplain elevation and the "calculated" floodplain elevation. The Township engineer should review the applicant's calculated floodplain boundary findings.

We note that the County Planning Commission does not support development in the floodplain, and the Federal Emergency Management Agency and Pennsylvania Department of Environmental Protection regulate filling or development in the floodplain. Development within a floodplain can increase the magnitude and frequency of normally minor floods, and present health and safety problems. The applicant should contact both of these agencies to determine if the proposed development activity will require a permit. The Township should request documentation of these contacts or permit(s) before approving the plan.

Page: 5 Re: Preliminary/Final Land Development - Ducklings Early Learning Center # East Goshen Township-LD-01-19-15745

10. The site contains areas of hydric (wet) soils (CpA Cokesbury and GIB Glenville) which have limitations to development. These limitations include drainage problems due to low permeability, low runoff rates and sub-surface saturation. When construction takes place on these soils, it interferes with the natural drainage of the land. On-site alterations to existing drainage patterns should be carefully inspected by the Township Engineer to insure that off-site drainage conditions are not negatively affected.

11. The site plan depicts the location of a 50 foot riparian buffer on both sides of the stream, and we note that the proposed driveway will traverse these buffer areas. The Township should confirm that the site plan complies with the riparian buffer requirements in the Township Code.

12. The site contains wetlands. Placement of fill in wetlands is regulated by the U.S. Army Corps of Engineers in accordance with Section 404 of the Clean Water Act (1977). The Pennsylvania Department of Environmental Protection regulates all activities that affect bodies of water, including wetlands, under Chapter 105 Rules and Regulations for the Bureau of Dams and Waterway Management. The applicant should contact both of these agencies to determine if future development activity will require a permit. The Township should request documentation of these contacts or permit(s) before approving the plan.

ADMINISTRATIVE ISSUES:

13. The Zoning Information table on Sheet 1 indicates that conditional use approval is required for this project. The final plan should accurately note the date and any conditions set as part of the conditional use approval, and the Township should verify that all applicable conditions of approval have been incorporated into the final plan.

14. The site plan depicts the location of easement areas for parking spaces, landscaping, and an overflow parking area on the adjoining parcel to the west (UPI# 53-3-1.2D). The details of these easements should be incorporated into the deeds of both lots.

15. The site plan depicts the location of two retaining walls, and site plan notes indicate that the design of these retaining walls will be provided "by others." We suggest that the design of these retaining walls be submitted for the review of the Township engineer, as part of this land development plan.

16. The Township should receive written confirmation that the applicant meets all licensing and registration requirements regulated by the PA Department of Public Welfare - Office of Children, Youth and Families, and any other applicable state regulations pertaining to child day care facilities.

17. We suggest that the applicant, in consultation with the business park owner, coordinate its proposed hours of operations with the other businesses in the business park, in order to mitigate any potential vehicular conflicts amongst the various business park uses.

18. Land disturbance and land development activities that occur within Chester County must comply with the County-wide Act 167 Stormwater Management Plan for Chester County, PA (July 2013) and the associated Act 167 stormwater management ordinance standards adopted by each municipality.

Page: 6 Re: Preliminary/Final Land Development - Ducklings Early Learning Center # East Goshen Township-LD-Ol-19-15745

19. The applicant should contact the Pennsylvania Department of Environmental Protection (DEP) to detennine whether a stream encroachment pennit is necessary for the proposed driveway crossing in accordance with Section 205.293 of its rules and regulations and provide the municipality with documentation of this contact and the requirements of DEP before action on this plan is taken.

20. The applicant should contact the office of the Chester County Conservation District (CCCD) for information and clarification on erosion control measures. The provisions of the Commonwealth Erosion Control Regulations may apply to the project and may require an Earth Disturbance Permit or a National Pollutant Discharge Elimination System permit for discharge of stormwater from construction activities.

2l. A minimum of four (4) copies of the plan should be presented at the Chester County Plarming Commission for endorsement to permit recording of the final plan in accord with the procedures of Act 247, the Pennsylvania Municipalities Plarming Code, and to meet the requirements of the Recorder of Deeds and the Assessment Office.

This report does not review the plan for compliance to all aspects of your ordinance, as this is more appropriately done by agents of East Goshen Township. However, we appreciate the opportunity to review and comment on this plan. The staff of the Chester County Plarming Commission is available to you to discuss this and other matters in more detail.

cc: Eske Development LLC D.L. Howell & Associates, Inc. S Winig Associates L.P. Chester County Conservation District

Sincerely,

Paul Farkas Senior Review Planner

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610·692·7171 Fax: 610-692-8950 E-mail: mmiller@eastgoshen.org

Date: 2/21/2019 To: Mark Gordon, Zoning Officer Planning Commission From: Mark Miller, Public Works Director, Asst. Fire Marshal

Carmen Battavio, Fire Marshal Re: Fire Marshal Review Land Development Application/ Ducklings Early Learning Center

Mark Carmen and I looked over the LD plans for above property and we have the following fire safety comments for consideration.

1. The Emergency access from the neighboring property needs to be a minimum of 26' wide. The parking spots should be removed so they won't hinder emergency vehicle access. Also, a radius on the curbing should be added to provide better access for emergency vehicles. 2. Two points of rooftop access for the ladder truck should be provided. We suggest extending the emergency access drive to the front of the building to provide a second access point for a ladder truck. 3. We would recommend that the driveway from Wilson Dr. be widened to 30'. We suggest widening the front parking lot to 42' between the parking stalls just like the rear parking lot. 4. The Goshen Fire Company has A Pearce 100' rear mount tower truck. The cu I- de-sac and truck turning template should be revised accordingly. 5. Fire Hydrant and stand pipe locations are not shown. We recommend that a Fire Hydrant be planned along Wilson Drive. A second hydrant should be planned with the Building FDC along the driveway near the NW corner of the building. The Fire Marshall needs to approve these locations. 6. The largest Goshen Fire Company fire truck is rated at 80,000 lbs. GVWR. Please note the weight rating for the culvert on the plans.

F:\Data\Shared Data\Property Management\53-3\53-3-1.2C (1302 Wilson Dr.)\LD 2019 - Ducklings Early Learning Center\FM Memo to PC Re. 02142019.doc

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org

Date: 3/1/2019 To:

From: Re:

Planning Commission /A J / Mark Gordon, Township Zoning Officer l'VV\J.f Conditional Use Application I PECO Energy CO.

Planning Commission Members,

The Township has received a Conditional Use Application and plans for the un addressed Hershey's Mill property at the north corner of the intersection of N. Chester

Rd. and Wineberry Ln., West Chester PA 19380. Conditional Use approval for a Public Utility Facility was granted for this property in 1997, to PECO Energy Co.

PECO Energy is seeking to modify the Conditional Use approval from 1997 by adding a 10' x 16' building to the site. PECO proposes to upgrade the existing communications equipment for the facility and house it inside this new building.

The property is situated in the R-1, (Low Density Suburban Residential) Zoning District of East Goshen Township. Public Utility Facilities are permitted in the R-1 Zoning District as a Conditional Use.

STAFF RECOMMENDATION

Staff has reviewed the application and plans and has identified a few items to be addressed:

1. How is the storm water for the new building going to be managed? 2. Will the building be placed on a concrete foundation? 3. Will the equipment in and mounted to the building make any noise? 4. Will the facility be served by utilities; Electricity, Gas, Phone or Fiber? 5. Will the facility have exterior lighting? 6. Will the facility be serviced by technicians regularly? How often?

At this time no action is needed by the Planning Commission on this application.

F:\Data\Shared Data\Property Management\ 53-2\53-2-25.3 (Hershey's Mill Spray Irrigation Field)\PECO GAS GATE\CU Application Feb. 2019\Memo to PC Re. CU App 03012019.doc

61 0-692-7171

www.eastgoshen.o rg BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY 1580 PAOLI PIKE, WEST C HESTER, PA 19380-6199

March 1, 2019

Dear Property Owner:

The purpose of this letter is to inform you that East Goshen Township has received a Conditional Use application for the un addressed Hershey's Mill property at the north corner of the intersection of N. Chester Rd. and Wineberry Ln., West Chester

PA 19380. Conditional Use approval for a Public Utility Facility was granted for this property in 1997, to PECO Energy Co.

PECO Energy is seeking to modify the Conditional Use approval from 1997 by adding a 10' x 16' building to the site. PECO proposes to upgrade the existing communications equipment for the facility and house it inside this new building.

The property is situated in the R-1, (Low Density Suburban Residential) Zoning District of East Goshen Township. Public Utility Facilities are permitted in the R-1 Zoning District as a Conditiona.1 Use.

Pursuant to Township policy, property owners within 1000 feet of the subject property are notified when Conditional use applications are received. The meeting dates for this matter are listed below and subject to change without further written notice:

March 6, 2019 - Planning Commission (7:00 PM) March 13, 2019- Conservancy Board (7:00 PM) April 3, 2019 - Planning Commission (7:00 PM) April 23, 2019 - Board of Supervisors (7:00 PM - Conditional Use Hearing)

These meetings will be held at the Township Administration Building and will be open to the public. The Application is available for review at the Township building during normal business hours. If any person who wishes to attend the hearing has a disability and/or requires an auxiliary aid, service or other accommodation to observe or participate in the proceedings, he or she should contact East Goshen Township at 610- 692-7171 to discuss how those needs may be accommodated.

Sincerely,

Mark A. Gordon Township Zoning Officer

F:\Data\Shared Data\Property Management\53-2\53-2-25.3 (Hershey's Mill Spray Irrigation Field)\PECO GAS GATE\CU Application Feb. 2019\1 000 foot letter .doc

I

'AREA CODE 610

692~71'71

August 21, 1997

BOARD OF SUPERVISORS

EAST GOSHEN TOWNSHIP

CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199

Louis J. Colagreco, Esquire Riley, Riper, Hollin & Colagreco P.O. Box 568 Paoli, PA 19301

Re: PECO Energy Gate Station Conditional Use Hearing Tax Parcels #53-2-25

Dear Lou:

At the Conditional Use Hearing for the PECO Energy Gate Station which was be held on August

19, 1997 the Board of Supervisors approved the application with the following conditions:

1. That the use and construction be in strict conformance with the testimony and exhibits that have been entered at this hearing.

2. That it be in conformance with the ordinances of East Goshen Township.

3. That if after a reasonable period of time, the local residents state that the screening is insufficient, that PECO will agree to readdress this issue.

I would appreciate it if you would advise me in writing as to whether or not the conditions are acceptable.

If you have any questions give me a call.

Sincerely yours,

VL~~

Louis F. Smith, Jr. Township Manager

cc; Ron Nagle, Esquire

\RICK\LE'ITERSI PECO.WPD

IL

1

2 MR. McDONOUGH: Mr. Chairman, I would

3 move that we approve the application with

4 conditions that the use and construction be in

5 strict conformance with the testimony, exhibits

6 that have been entered at this hearing and the

7 governing ordinances of East Goshen Township.

1

8 MR. NAGLE: We'll allow you to move for

9 your exhibits.

10 MR. COLAGRECO: Yes, thank you.

11 (Applicant's exhibits A-1 and A-2

12 admitted into evidence.)

13 MRS. POWELL: I will second the motion.

14 MR. BATTAVIO: I would like to ask if you

15 would add an amendment to it, your motion, to

16 include the verbiage if there are complaints of the

17 fence that it be dealt with to the satisfaction or

18

19

in a satisfactory matter.

20 me.

21

22

23 if.

24

MR. McDONOUGH: Reword that again for

MR. BATTAVIO: If --

MR. McDONOUGH: I don't like the word

MR. BATTAVIO: Upon completion of the

25 gate station if there are complaints of

2

1

2 unsightliness from the chain link fence that PECO

3 will agree to address the concerns of the residents

4 and remove it or spruce it up. I don't care how

5 you say it.

6 MR. NAGLE: Augment the landscaping.

7 MR. COLAGRECO: Augment landscaping.

8 MR. BATTAVIO: There we go.

9 MR. McDONOUGH: I would move then that

10 the motion be amended that after a period of

11 MR. BATTAVIO: Completion.

12 MR. McDONOUGH: At the completion.

13 MR. BATTAVIO: Completion of the

14 construction.

15 MR. CHATLEY: You want the trees to

16 grow. You want give them a chance to mature a

17 little bit.

18 MR. BATTAVIO: We might as well wait five

19 years, let them be 15 foot tall, cover it.

20 MR .. McDONOUGH: We may lose some trees.

21 I was thinking time period. You may lose some

22 after three months.

23 MR. COLAGRECO: Can I suggest that there

24 is a pretty powerful governing force already in

25 effect, that's the Hershey's Mill Homeowner's

1

2 Association. It's their land. It's their lease.

3 It's their open space area, their area of their

4 place. They have insisted on fairly stringent

5 landscaping already for the project.

3

6 I will agree to a condition if the owner

7 of the property believes that additional

8 landscaping should be added to buffer the facility

9 from the residents of Hershey's Mill we will do

10 that.

11 MRS. POWELL: I don't think it's going

12 to be the residents of Hershey's .Mill that will be

13 having trouble. It's going to be more Wineberry or

14 352 residents I would think.

15 MR. McDONOUGH: I would amend if the

16 local residents after a reasonable period of time

17 state that the screening is insufficient, that PECO

18 will agree to readress this issue.

19 MR. COLAGRECO: PECO will a file

20 supplemental landscape plan with the Township,

21 augment the plan. We will be submitting landscape

22 with the land development plan. You will have a

23 shot of looking at it at that time.

24 MR. NAGLE: The gentlemen said the trees

25 would be about eight feet high. I took that to

1

2 mean at the time of planting. Was that your

3 assumption?

4 MR. COLAGRECO: I don't know. I will

5 have to wait and see the landscaping plans.

4

6 THE WITNESS: When you're doing it with

7 the ball and stuff probably ten, eleven feet.

8 Planted height will be about eight feet.

9

10

MR. COLAGRECO:

MR. McDONOUGH:

11 amend your second?

12

13 second.

14

15

16

17

18

19

20

21

22

23

24

25

questions?

closed.

MRS. POWELL:

THE CHAIRMAN:

All those in

MR. CHATLEY:

MR. BATTAVIO:

MR. McDONOUGH:

MRS. POWELL:

THE CHAIRMAN:

MR. McDONOUGH:

Okay.

Mary, do you want to

Yes, I do amend my

Any other comments or

favor of the motion?

Aye.

Aye.

Aye.

Aye.

Unanimous.

Move the hearing be

DIRECT 01/\L NUMBER: 215-575-7353

VIA OVERNIGHT DELIVERY

Mark A. Gordon, CFM

Dilworth Paxson LL ..

February 25, 2019

Director of Code Enforcement /Zoning Officer East Goshen Township

1580 Paoli Drive West Chester, PA 19380

Re: Conditional Use Application

Dear Mr. Gordon:

Neil Sklaroff nsklaroff@dilworthlaw.com

As you and I have discussed, we represent PECO Energy Company in its effort to redevelop a portion of a parcel at Hersey's Mills. We submit the enclosed Conditional Use Application and

related materials for the Township's review. A check to cover the fees will arrive under S(~paratc cover.

W~ h10k forward to presenting our Application to the Board of Supervisors. If you have any questions. piease contact me directly.

Thank you for your courtesies in this matter.

120789:19 1_1

1500 MarkctStrcct • .'i 11i11.: ~~00E • l'h1ladelpi1ia, !'1\ i'Jl:a.2 10 1 • tcl ::i l :i -.:~•j.7i'_tO'; 'Fnx. 215-575-7200 www.J ilworlhlaw.com • Ckr:)' Hill, NJ• i l arri ~ bu rg . PA' Prinrctt•n, N.l ~ \11il.l•ir;;'.t1.1;1, DE • New York, NY

Conditional Use Application and Checklist

East Goshen Township

To: Township Zoning Officer

Name of Applicant: PECO ENERGY CO. BY MALCOLM FRIDAY

Applicant Address: 2301 MARKET STREET, PHILADELPHIA, PA 19103

Telephone Number: 804 307-3703 Fax: _________ _

Email Address: MALCOLM.FRIDAY@EXELONCORP.COM

Property Address: SS CHANDLER ROAD ADJACENT TO 1588 WINEBERRY RD.

Tax Parcel Number: 13-07-00007-00 Zoning District: _R_-_1 __ .Acreage: __ _

Description of proposed use:

PECO LEASES A PORTION OF THE PROPERTY FROM HERSHEY'S MILL HOMEOWNERS ASSOCIATION. BY A 1997 CONDITIONAL USE APPROVAL, PECO DEVELOPED THE PROPERTY WITH EQUIPMENT TO SUPPORT TELECOMMUNICATIONS ACTIVITY. BY THIS APPLICATION, PECO SEEKS

REPLACE OUTDATED COPPER WIRING WITH FIBER OPTICS. IN ORDER TO DO SO, PECO NEEDS TO PLACE AND FIT OUT A PREFABRICATED BUILDING MEASURING 10 FEET IN WIDTH, 16 FEET IN LENGTH AND 12 FEET IN HEIGHT. THE PROJECT WILL ENHANCE SERVICES IN E. GOSHEN

Conditional Use is provided in Zoning Ordinance Section: 240-8(D)(2)(B)

Attest: --------------------

• Review the formal Planning Commission review procedure on page three.

F:\Oata\Shated Data\Webslte\Forms\Condltlonal Use App and Checklist rev 102406.doc • 1 •

Conditional Use Application and Checklist

Township Administration use onlv:

This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the state of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application process and the Review Process. The application process must be completed in its entirety prior to the applications advancement into the Review Process.

Application Checklist:

!!!!!!!. Date Complete 1. Completed Township Application Form: .................................. __ 2. All related materials submitted: ............................................. . 3. Township application and review fees paid: .............................. ==

Application accepted as complete on _____ by _______ _

Official Signature: ___________ Title: ______ _

Review Process Checklist

Item Date 1. Start date: ................................................................ . 2. Date of first formal Planning Commission Meeting following Submission of complete application: .................. .' ............. __ _ 3. Sent to Twp. Engineer: .................................................. __ _ 4. Date presented to Planning Commission: .......................... __ _ 5. Abutting Property Letter sent: ......................................... __ _ 6. Date sent to CB: .......................................................... __ _ 7. Date sent To MA: ........................................................ __ _ 8. Date sent to HC: .......................................................... __ _ 9. Date sent to PRB: ........................................................ __ _ 10. Date sent to TAB: ........................................................ __ _ 11. Date by which the PC must act: ..................................... __ _ 12. Date by which Board of Supervisors must act: ................... __ _ 13. Drop Dead Date; (Day 60): ....... .' .................................... __ _ 14.Conditional Use Hearing Date: ....................................... __ _ 15. Dates of hearing advertisement:......................... & __ _ 16. Property Posted: ......................................................... __ _

F:\Data\Shared Data\Website\Forms\Conditional Use App and Checklist rev 102406.doc • 2.

Conditional Use Application and Checklist

East Goshen Township Planning Commission Procedure for processing Subdivision, Land Development, Conditional Use,

Variance, and Special Exception Applications

August 19, 2002 2"d Revision: March 2, 2006

1. In order for any application to be considered by the Planning Commission it must be submitted to the Township with all required documentation as per the Township Code and with all applicable fees paid. The Township will use a checklist to verify all required documentation has been submitted. Until the application is complete the application will not be considered "filed" by the Township staff. The Planning Commission will acknowledge receipt of the application at their next regularly scheduled meeting.

2. All materials to be considered at the next regular meeting of the Planning Commission must be submitted with at least eleven (11) copies to the Township Staff by not later than close of business the previous Tuesday. Any materials submitted after that time will be held for the following meeting and not provided to the Commission at the upcoming meeting.

3. The application review cycle for Subdivision and Land Development Applications shall begin with the next regular meeting of the Commission after the complete application is filed. The application review cycle for Conditional Use, Variance, and Special Exception Applicalions shall begin the day a complete application is filed with the Township.

4. Applicants should not distribute material to the Commission during a meeting unless it is directly related to the initial presentation of the application. All materials for the Planning Commission, including any material to be used at a meeting, must be delivered to the Township Staff not later than close of business the previous Tuesday.

5. The burden of supplying necessary materials to the Planning Commission in a timely manner is on the applicant. Late delivery of material may require an extension on the part of the applicant or a recommendalion for denial of the application by the Planning Commission.

6. Formal application presentations to the Planning Commission will only be made at the regular meeting after the complete applicalion is submitted and accepted by the Township staff.

7. The application will remain on the Planning Commission's agenda until such time as the Commission has made its recommendation to the Board of Supervisors and or Zoning Hearing Board.

8. Applicants are encouraged to attend each Planning Commission meeting in order to answer questions or address issues concerning their application.

9. Applications will be voted on only during the regular Planning Commission meetings.

10. The Chairman, in his sole discretion, may waive or modify any of this procedure.

F:\Data\Shared Oata\Webslte\Forms\Condlllonal Use App and Checklist rev 102406.doc - 3 -

SUPPLEMENTAL DESCRIPTION OF PROPOSED USE

PECO Energy Company ("PECO") leases a portion of the Property from Hershey's Mill Homeowners Association. Foil owing a 1997 grant of conditional use approval, PECO developed the leased area for a Gas Gate station. PECO and the Hershey's Mill Homeowner's Association have agreed to an easement on this site to serve the purpose of the shelter installation. A Gas Gate station serves to add an odor to gas used for residential purposes as a safety measure before sending the gas through distribution pipelines to PECO's customers.

Inside these Gas Gate stations are copper wiring services (circuits) leased from Verizon. Equipment placed in the new shelter will help in the transition from leased services operated on the Verizon network to a PECO owned and operated network. The proposed project does not change the use.

The proposed use of the site will not result in disruption to any of the functions or the integrity of the Gas Gate station located inside of the existing fencing. The proposed shelter will be installed and placed outside of the existing fencing to the rear of the existing fencing. The shelter will house fiber optic communications equipment that is necessary to support this ongoing project. The shelter will measure 10 feet in width, 16 feet in length and 12 feet in height. The shelter is monitored remotely.

The fenced area will measure 20 feet by 14 feet. The finished fence height will be 7 feet and 5/8 inches. The fence will be a chain link fence with barbed wire for another 1 foot. The fence is necessary for the security of this unmanned shelter.

There will only be minor changes to the existing trees and shrubbery. A condition to the 1997 Conditional Use approval provided for PECO to reassess screening in the event that local residents stated that the screening was insufficient. PECO will agree to the same condition added to any grant of approval for this application.

120793676_2

ENGINEER'S RENDERING OF PROPOSED BUILDING

+ PECO EXELON FIBER OPTIC SYSTEM

~nglneerlng

1630 ROBIN CIRCLE FOREST HILL, MO. 21050

TEL 443-652-6458

FAX 410-838-1611 WVNl.ENENGINEERING.COM

EQUIPMENT SHELTER ELEVATION EXHIBIT

FOR HERSHEY'S MILL

Drown: SPM Design: KB Date: 02/25/19 Scale: NTS Job No: F813050.03

EXISTING SITE CONDITIONS

[Photograph: Grassy lawn area with white survey ground markings along a tree line.]

[Photograph: Two-lane roadway bordered by grass shoulder, chain-link fence, and trees.]

[Photograph: Chain-link security fence enclosing wooded area with ground survey lines.]

[Photograph: Utility equipment cabinet on concrete pad with yellow bollards and chain-link fence.]

[Photograph of outdoor terrain showing a white painted line on grass leading into thick dry brush, tangled brambles, and trees in the background.]

[Photograph of outdoor terrain showing a white painted line marked across grass and dirt, with evergreen branches in the lower foreground, dry brush and brambles in the midground, and trees with patches of snow in the background.]

[Photograph of wooded area showing trees and thick dry tangled brush in the foreground, with trees marked with paint, and patches of snow and ground cover in the background.]

EXISTING STRUCTURES AT OTHER SITES

[Photograph of a small utility shelter building with textured brown walls and flat roof, enclosed by a green privacy slat chain-link fence on a gravel lot with trees and field in the background. Timestamp in lower right: 08/22/2018 10:36]

[Photograph of a utility building enclosed by a tall blue-green privacy slat chain-link fence topped with barbed wire, situated next to a gravel access road. A person wearing a hard hat, dark jacket, and jeans stands by the fence gate. A communications tower is visible in the background against a blue sky.]

SAFETY NOTE:

PROJECT SUMMARY:

1. PROPERlY OWNER: HERSHEY'S MILL HOMEOWNERS ASSOCIATION

2. SITE ADORESS: UNADDRESSABLE PARCEL

3. CONSTRUCTION REPRESENTATIVE:

4. >J>PLICANT: PECO 2301 ~ARKET STREET PHILADEIPHIA. PA 19103

5. POINT OF CONTACT: MATT LUONGO 646-998-9218

6. ENGINEER:

7. JURISOICTION:

B. COUNTY:

9. PROPERlY 10:

10. CURRENT ZO,._,NG:

11. CURRENT USE OF PROPERlY:

EN Eh'GINEERING LLC STEPHEN KEITH NOLAN 1630 ROBIN CIRCLE fOREST HILL, MD 21050 (443) 652- 6101

EAST GOSHEN TOWNSHIP

CHESTER COUNTY

xx

C- 91 RECREATION (PRIVATE)

C- 91 RECREATION (PRIVATE)

A TAILBOARD CONFERENCE SHALL BE CONDUCTED BEFORE THE START OF EACH JOB. THE PRE- JOB TAILBOARD CONFERENCE SHALL COVER AT LEAST THE FOLLOWING SUBJECTS:

ENO •"WOOD FtNCE

MOOOW

LEGEND

I I (

'-.

ISSUED FOR CONSTRUCTION

PECO

c C . .____.k§)

·~

ELEVATION KEY

NOTE: -1. - ALL ITEMS MARKED FIELDWORK SHALL BE

INSTALLED, TESTED, REMOVED, AND PACKED IN BUILDING PRIOR TO SHIPMENT. 2. DRILL HOLE UNDER HVAC TO ALLOW FOR DRAINAGE.

ALDO ROOFING SYST£~

CONCRETE

SKIN ,,/

EPS FOAM ., • • /,.

INSULATION~ .<::1-'j -:.' '; •;,

1 1/2" THERMASHfATH --:_~~~

1/2" SHEETROCK -/[?e:;~Of 3/6" NUf>OL Y--' SEC!lQN

"' 111";:-==111==is=sr==1£L==1:::: rn=N==·o== 1 :::::ro:::::R::::;lll1 II HUMAN t!ABlfMION II

. .

0 -)._~ I 0 I ~ io

-....

1 1 1 1/2" EPS toAM ' - ',, INSULATION ' , CONCRETE SKIN

" r.-.,: SEE BUILDING

---"----·------------- 16'-o" [192"] -------------------- -/ -

14· - 11! · [1791"] ---------------;f'"

- llll"I , ..... :11 I

<(~-- j

~ ::~ r COVERSHEET ~ i; FOR FINISH

l-'--1', -'.:::'.'::::==============:'.::! ~ j ;- 3/8' NUPOLY FLOOR PLAN

160.0 sq. ft JAN 2 3 2018 I 1/8" TILE / 1/2" SHEETROCK JYPICAL WALL .~ / 1 1/2" THERMASHEATH SECTION

,:~:~ -~' SECTION "A-A"

INSULATION lYPICAUl.Qlill sc>1.r: N.T,s. ~ (EQUIPMENT SIDE)

THESE Pt.ANS ARE THE 1300 DAVENPORT DRIVE MINDEN, LA. 71055 ~ ··t--1---~--t---I CONFIDENTIAL PROPflflY NIO h O) f'b b d r---1-- -1---------------- -+---1-- ,--,___ ~~il~W,~~8:s~t---- P- ·_ (a_ o_ a2_4_ -2_ s1_ 4_www __ . _,r_e_o_n_.ro_m __ --t ... ~

1---1--1--if-----------------1---1-__,1_,___ Jl:~n':tJUi~~~R~~~ PECO LEASED LINE OPTIMIZATION PROJECT c.J

1---1---1--+----------------1--r---1--1----1r:~~RES~~~ro~ 1-1-o~--o _,.., .. .,.....,.x-1.._,.6~--o~·..--,,,E'"""o-u""' 1p""'"M...,.,E=N=r,........,,s.,_,H=E'"' LT=E=R,...

1 F 1 s R E s o N o J--+-+---1--------- ------- --1---+--+---I FIBREOONO CORPORATION IS

l-R-t:-1-. +-BY-+-D-AT-£ -+--------R-EV-IS-10-N -------+A-P-P.+-D-AT-£ -+-B-OM-+-- DA-JE-t ~M

1c~~:iik..'t1=: w,<· I 1111r: I W:· PM I llo\1r: 09/19/17 8 I Pr D 11 Q 6 6

1--1-- +-- -1-----------------1--+ --1--+---1: i:>H:JiE~~~ FLOOR PLAN 1--1---~--1----------------- 1-----1---1-----1\WTH rnr UHDEASTNlDIHO TW.T ..... __ ...,.. ____ .,..,. _ _ ..,... ___ _.smr< JSltl'ET NO· 1---1--i---l-----------------1---i---1-- - N«Ol!l~N;.~~~ornOfamn~· DRllBY,· I I IN'P I I I 3'B"=l'-o• ,-: .... , ,. .., nm._._. "" ZO llllt: 09 19/17 B'l': ' ZO llo\TE: 09 19 17 ....:!.£.

Exterior Elevations "B" & "C"

Engineering drawing of a 10'-0" x 16'-0" equipment shelter showing Elevation "C" and Elevation "B" with dimensions and numbered callouts, plus an elevation key.

Elevation "C": width 16'-4" [196"]; height 11'-6" [138"] and 10'-5 1/2" [125 1/2"]; 3'-1 1/2" [37 1/2"]; 16 1/2"; 6 1/2"; 6"; 12"; callouts 1, 41, 32.

Elevation "B": width 10'-4" [124"]; 60"; 26 1/2" [REF] (twice); 16 1/2"; callouts 1, 2, 41, 36, 37, 38, 32, 17, 21, 28; labels: 3/4" FLEXIBLE NONMETALLIC CONDUIT; 1/2" FLEXIBLE NONMETALLIC CONDUIT; FIELD WORK.

NOTE: SEE FLOOR PLAN SHEET FOR NOTES.

ELEVATION KEY with points A, B, C, D.

Stamp: Commonwealth of Pennsylvania, Frank J. Raley, Professional Engineer, No. 78434, dated JAN 23 2018.

Title Block

1300 Davenport Drive, Minden, LA. 71055, ph. (800) 824-2614, www.fibrebond.com. PECO LEASED LINE OPTIMIZATION PROJECT, 10'-0" X 16'-0" EQUIPMENT SHELTER, EXTERIOR ELEVATIONS "B" & "C". FIBREBOND. Scale 3/8"=1'-0". Sheet no. 1-3. Dwg no. D11066, size B. Drawn by ZD, date 09/19/17; approved by ZD, date 09/19/17; checked by PM, date 09/19/17. Revision columns: Rev., By, Date, Revision, App, Date, BOM, Date (blank).

Mark Gordon

From: Sent: To: Cc: Subject: Attachments:

Hello Brad,

Tom Comitta <tom@comitta.com> Wednesday, February 27, 2019 1:12 PM

Brad Giresi Mark Gordon; Janet Emanuel; Erin Gross RE: Goshenville Parking Ratios Table 1 Parking Analysis & Calculations_ 1.10.19.pdf; Table 2 Parking Metrics_ 1.10.19.pdf

Attached are two tables that we prepared for an assignment in Kennett Square Borough. As you can see, we utilized the

metrics from the report titled : " ITE Parking Generation 4th Edition", and related the number of parking spaces per unit based on varying numbers of bedrooms.

We also checked several studies that utilized the ITE data, and noticed that the actual metrics used by various

Municipalities is different based on factors including mixed-use, walkability, bus service, train service, and overall policy. For example, in some of the studies that we researched, Municipalities simply used lower numbers to induce redevelopment. In West Chester Borough in 1995, we changed the Parking Metrics to zero (0). In other words, in order to promote the redevelopment of the TC - Town Center District, we changed the parking ratios from 1 parking space for every 250 square feet of gross leasable area of non-residential use to zero (0). We also changed the parking ratio from 2 parking spaces per dwelling unit to zero (O). Between 1995 and 2005, the number of restaurants in West Chester increased from 6 to 36. I realize that many of the employees from the restaurants parked in front of my house and walked several blocks to work, but on balance everyone felt the outcome was win-win. In order for a reduced parking

ratio strategy to work in Goshenville, we would need to evaluate the shared parking regulations. For example, would it be OK for people who might be at a restaurant in Goshen Village to park in the EGT Municipal Building parking lot on certain days at certain times? Perhaps, if we are inclined to reduce the parking ratios, we will need to adjust the

regulations for shared parking.

The original version of the ITE publication of 2010 was reprinted in 2018. When Tim returns from his travels, perhaps he can also send you additional information that would be useful for our EGT Goshenville initiative.

Tom

Thomas J. Comitta, AICP, CNU-A, RLA

President

THOMAS COMIITA ASSOCIATES, INC.

Town Planners & Landscape Architects

18 W. Chestnut Street West Chester, PA 19380 p. 610-696-3896 ext. 4 I f. 610-430-3804 cell: 484-678-9245 www.comitta.com tom@comitta.com

Important Notice: This electronic mail, including any attachments, may contain information that is privileged, confidential and/or otherwise protected from disclosure to anyone other than its intended recipients. Any dissemination or use of this electronic mail or its contents by persons other than the intended recipients is strictly prohibited. If you have received this message In error, please notify us immediately by reply e-mail so that we may correct our internal records. Please then delete the original

message and any attachments from your system. Thank you.

1

From: Brad Giresi [mailto:brad.giresi.egt@gmail.com] Sent: Tuesday, February 19, 2019 4:49 PM To: Tom Comitta <tom@comitta.com> Cc: Mark Gordon <mgordon@eastgoshen.org>; Janet Emanuel <jemanuel@eastgoshen.org> Subject: Goshenville Parking Ratios

Tom,

I was able to pull together some parking ratios from ITE, but I don't have the ULI publication we discussed. Could you please bring that appropriate data for the parking ratios/references to our Workshop Meeting tomorrow.

Unfortunately, Tim Haahs has been out of the country travelling quite a bit, so didn't have much luck coordinating with him.

Thanks much, Brad

2

THOMAS COMITTA ASSOCIATES, INC,

Town Planners cf{. Landscape Architects

State Street Lofts Kennett Square Borough - Chester County. PA

Table 1. PARKING ANALYSIS & CALCULATIONS

December 10, 2018; Updated: January 10, 2019

1. Hypothetical Number of Parking Spaces, based on Borough Context

1.1. 225 parking spaces (1.2 parking spaces average per dwelling unit, in walkable Kennett Square Borough, for area with bus service) 1.2. TCA has utilized the 1.2 average number of parking spaces per apartment unit in other Borough Ordinances

2. Number of Parking Spaces Based on ITE Parking Generation 41" Edition, 2018

2.1. 12 - Studio Units x 1.13 parking spaces per unit = 13.6 2.2. 115-1 BR Units x 1.3 parking spaces per unit = 149.5 2.3. 32 - 1 BR + Den Units x 1.3 parking spaces per unit = 41.6 2.4. 24 - 2 BR Units x 1.6 parking spaces per unit = 38.4 2.5. 4 - 3 BR Units x 2.0 parking spaces per unit = ~ 2.6. Total Number of Required Parking Spaces = 251.1 2.7. Total Number of Required Parking Space/Unit = 1.34

3. Proposed Actual Numbers of Parking Spaces based on Plan

3.1. 185 parking spaces beneath units 3.2. 38 surface parking spaces 3.3. 30 on-street parking spaces 3.4. 253 total parking spaces 3.5. 1.35 parking spaces/unit (for 187 dwelling units)

4. Conclusion

4.1. With 253 total parking spaces, and 1.35 parking spaces per unit, there would be enough parking for 187 units, based on the above Parking Analysis and Calculations.

4.2. Given the 253 total parking spaces, the parking provisions in C-2R District regulations can be 1.35 spaces per unit.

www.comitta.com

18 West Chestnut Street· West Chester, PA 19382 ·PHONE: 610-696-3896 ·FAX: 610·430-J804

W)/TCA/

THOMAS (OM ITT A ASSOCIATES, INC. Town Planners~ Landscape Architects

State Street Lofts Kennett Square Borough - Chester County. PA

Table 2. OTHER PARKING METRICS

January 9, 2019; Updated: January 10, 2019

Number of Parking Spaces Based on ITE Parking Generation 4th Edition 2018

Apartment Number of Parking SpacesA Number of Parking SpacesA Unit Type Per Unit in a Suburban Setting Per Unit in an Urban Setting

Studio 1.13 1.038

1 BR+ Den 1.3 1.148

1 BR 1.3 1.148

2 BR 1.6 1.23

3 BR 2.0 1.94

Notes:

A. The Number of Parking Space Per Unit is based on peak demand hours between 12

midnight and 5AM.

B. In certain urban settings, such as Doylestown Borough, and Media Borough (both of

whom have Train Service) the Number of Parking Spaces for Studio and 1 BR Apartment Units actually equals 0.9 spaces per unit.

C. Refer to Table 1., Parking Analysis & Calculations for additional details.

i8 West Chestnut Street· West Chester, PA i9382 ·PHONE: 610-696-3896 ·FAX: 610-430-3804

www.comitta.com