Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Meeting Agenda Wednesday, May 6, 2020 VIA Telephone/ Video Conference
7:00 PM
During this tele-conference Planning Commission meeting, public comment will be handled as follows:
• Participants are asked to call in by 6:55 pm. • Participants will be asked to identify themselves when being accepted into the meeting • The public will be muted during the meeting when the Commission is talking. • The Chairman will ask for public comment on agenda items and participants will be unmuted and given an opportunity to ask questions and make comments. • Participants wishing to comment must state their name and address and must speak one at a time. • Participants are asked to turn down the volume if they are livestreaming the meeting on YouTube.
A. Call to Order/ Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log/ Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes
1. March 4, 2020 F. Subdivision and Land Development Applications
1. Synthes USA / 1303 Goshen Parkway (Land Development) G. Conditional Uses and Variances H. Ordinance Amendments I. Old Business
1. Zoning Ordinance Review 2. Review Model ordinances for Pipelines J. New Business K. Any Other Matter L. Liaison Reports M. Correspondence N. Announcements
Bold Items indicate new information to review or discuss.
F:\Data\Shared Data\Agendas\Planning Commission\2020\PC AGENDA 05062020.doc
- Click here to read plans
- Click here to read Stormwater Report
May 6, 2020 PC Meeting
w cn >: C cn 0 N c ...I
u:-
C: 0 't, :;:; Cl) cu en u:: - - C. Cl) Cl) 0. .... Application Name 0. cu <( C
Synthes USA / 1303 Goshen Parkway LD P/F 4/27/2020
Bold = New Application or PC action required
Completed in 2019
Paoli Pike TND Overlay District Ord. zo N/A N/A ZEKS, 1302 Goshen Parkway cu Sk 8/27/2019 ESKE Development / Ducklings LO P/F 1/18/2019 PECO Gas Gate cu Sk 2/26/2019
CZ Woodworking / 1422 Ardleigh Cir. cu Sk 3/29/2019
1351 Paoli Pike / The Hankin Group zo SK 5/31/2019 1339 Enterprise Drive cu Sk 5/30/2019
East Goshen Township Planning Commission
Application Tracking Log
_IJ)
(.) .. co Cl) Cl) <( .5 -
C) ci. C: 0 w ..
C. 0..
.c:: C)
IJ) C: C: (.) :;:; - :: 0.. ::s (.) J:2 Cl) 0 C: - I- (.) <( 0 cu "iii C 0 0 0 - .... .... C: Cl) Cl) Cl) Cl) cu .... - .... .... - cu cu cu X en C C C w
5/6/2020 4/28/2020 4302020 4/30/2020 1
NIA NIA NIA NIA NIA 8/27/2019 NA NA 8/29/2019 2/6/2019 2/23/2019 2/23/2019 2/29/2019 2/26/2019 2/28/2019 NA 2/28/2019 1
3/29/2019 NA NA 4/22/2019 1 NA NA NA 5/31/2019 NA 5/30/2019 NA NA 6/11/2019
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2020\PC Tracking Log for 05062020.xlsx
Cl) - Cl) cu - C cu C C: Cl) C: 0 - 0 :;:; Cl) cu (,) 't, :;:; - (,) <( cu 't, IJ) <( C - I- cu C: I- ...I C) Cl) Cl) z C ...I C: E z en ·;:: C. E 0 cu 0 (.) Cl) .. 0 0.. co :::c C (.) extension
not 7/15/2020 8/4/2020 NA 8/4/2020 included in these dates
NIA NIA 12/17/2019 NA Continued 10/2/2019 10/29/2019 10/15/2019 10/25/2019 APPVD. 4/3/2019 4/9/2019 NA 5/6/2018 APPVD. 4/3/2019 6/5/2019 5/14/2019 6/25/2019 APPVD.
APPVD. W 6/5/2019 6/18/2019 6/18/2019 6/27/2019 Conds. NA NA NA NA DENIED 7/10/2019 7/16/2019 7/16/2019 7/29/2019 APPVD.
5/1/2020
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
DRAFT EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING
March 4, 2020
The East Goshen Township Planning Commission held a regular meeting on Wednesday, March 4, 2020 at 7:00 p.m. at the East Goshen Township building. Members present are highlighted: Chair - Ernest Harkness Vice Chair - John Stipe Dan Daley Edward Decker Michael Koza Mark Levy Michael Pagnanelli Also present were: Mark Gordon, Zoning Officer Martin Shane, Township Supervisor Mike Lynch, Township Supervisor Christina Morley & Gerald Sexton & Judy DiFonzo-Pipeline Task Force Members Dan Truitt, Resident
COMMON ACRONYMS:
BOS - Board of Supervisors BC - Brandywine Conservancy CB - Conservancy Board CCPC - Chester Co Planning Commission
A. FORMAL MEETING - 7 p.m.
CPTF - Comprehensive Plan Task Force CVS - Community Visioning Session SWM - Storm Water Management
ZHB -Zoning Hearing Board
1. Ernie called the meeting to order at 7 :00 pm. He led the Pledge of Allegiance and a moment of silence to remember our first responders and military. 2. Ernie asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response. 3. Ernie checked the log. 4. The minutes of the February 8, 2020 meeting were approved.
B. OLD BUSINESS
1. Zoning Ordinance Review - Incubator Ordinance - Ernie commented that this will be discussed next month. He received some comments and will share them next month. Dan mentioned that June 2011 was the last time the Commission reviewed the business plan.
C. NEW BUSINESS
1. Review Model Ordinances for Pipelines - Christina Morley mentioned that sample documents arn on the CATO and CCPC websites. The blank spaces can be filled in as each municipality wants. It is recommended language, but you can tailor it to your municipality's needs. Ernie mentioned that he read that ACT 13 sec 33/34 were too restrictive on local municipalities.
Christina explained that the cmTent Draft is dated Dec. 2014. Pipeline safety is a shared responsibility by local, state and the pipeline. This is designed to create safety zones to separate development from pipelines. One section is regulating pipelines and the other is regulating development. Dan Daley commented that the zoning section is putting regulations on the pipeline. As long as the Township Solicitor okays it he has no problem with it. This regulates pipeline above ground facilities. Mark Gordon commented that the municipality can regulate any structure.
PC 3-4-20 draft 1
1 Dan Daley doesn't feel that the Land Development is for East Goshen because we are all developed. We 2 have multiple pipelines coming through East Goshen. Dan provided a map for everyone that shows the 3 pipelines and the area on the sides of each line are about 1,000 feet. It restricts homeowners from putting 4 additions, sheds on their property near a pipeline. All setbacks are currently in the Zoning Ordinance. 5 Christina commented that the intent is not to restrict homeowners. It is to prevent future construction 6 such as another Wellington near the pipeline that is difficult for people to exit or a childcare opening in a 7 home near a pipeline. 8 Dan Daley recommended a review be made of the parcels still available for development to see how they 9 would be impacted by this restriction. 10 Gerald mentioned that prope1ties and structures can be repurposed, so you have to be careful of what they 11 want to use it for. 12 Mike Koza feels there is nothing left to develop near a pipeline. He feels this is very restrictive. 13 Ernie mentioned that the concept of a "consultation zone" should be looked at. 14 Mark Gordon commented that the Ducklings is a new high on-site population zone. 15 Ernie is concerned about the length of setbacks. An above ground valve is high risk compared to a pipe 16 below ground. He reviewed the risk assessments. 17 Christina recommended that the Commission contact Eric Freedman to come to a meeting to discuss this. 18 In all of her research what was remarkable was that many cities who want to do these setbacks couldn't 19 because they didn't have the necessary data and couldn't afford it. However, East Goshen has been one 20 of the area townships that had risk assessments done so we have the data. The assessments were done by 21 Quest and you can use canary software to review it. 22 Dan Daley explained what the canary software can do. No one has done an assessment with specific
23 locations. 24 Ernie pointed out some things covered in the Quest repmt. 25 Christina commented that the probability of something happening along the pipeline is 1 in 7 years. 26 Gerald spoke about the acceptable risk. The Planning Commission should send their ideas to the Pipeline 27 Task Force so they can get answers for them. He feels we definitely need setbacks in consultation zones. 28 Mike Lynch mentioned that John Gaadt was the consultant that helped with East Bradford's ordinances. 29 East Bradford adopted a Land Development ordinance 5 years ago. They have 2 or 3 pipelines. They do 30 have a lot of open space. 31 Marty mentioned that he has been on both County boards and isn't aware of this. All pipelines have to be 32 included. The township staff will have to dete1mine what properties would be affected. This could 33 diminish residential property value and owners could sue because of the restriction that wasn't on their 34 property when they purchased it. This is referred to as a "taking". He spoke about corporate parks and 35 their value to the community. The risk assessments are all different. Is it worth doing? Has everything
36
from a safety perspective been done for the safety of the residents. 37 Christina commented that if this was enacted 40-50 years ago, developments wouldn't be on the 38 easements because there would have been setback and buffers. But development was done without this. 39 She feels this has to be part of the onward ordinance. It is where we live, shop, and go to school. 40 She is asking that this be done so we can have a safe community. 41 Dan Trnitt commented that public safety is a first priority. He would encourage the Commission to think 42 about what happens after an explosion. Evacuation. It is unwise to keep packing people in a high risk 43 area. He spoke about his neighborhood and how they would have to get out. He suggested that this be 44 crafted so there is no increase in density but someone can add to their house. 45 Mark Gordon mentioned that they should identify any developmental tracts and options for evacuation 46 have to be part of the plan. He gave some examples. 4 7 Gerald commented that the values for setbacks have to be based on what is going through the pipeline.
48
Mark Gordon pointed out that existing lines can be repurposed. 49 Gerald suggested using the worse case. 50 Christina mentioned maintenance of the pipeline which they are finding the pipeline companies are not 51 doing. 52 Judy commented that all pipelines eventually leak. She spoke about the different materials and how they 53 impact the soil and air when there is a leak.
PC 3-4-20 draft 2
1 Dan Truitt asked what Board would be responsible for evacuation plans. 2 Mark Gordon responded the Board of Supervisors. 3 Ernie closed the discussion asking that Mark Gordon have the solicitor look at this and check the 4 prope1ties that could be impacted. 5 6 7 C. LIASION REPORTS 8 None 9 10 D. ANYOTHERMATTER 11 None 12 13 14 E. ADJOURNMENT 15 There being no further business, Dan Daley made a motion to adjourn the meeting. Ed Decker 16 seconded the motion. The meeting was adjourned at 8:40 pm. The next regular meeting will be held on 17 Wednesday, April 1, 2020 at 7:00 p.m. 18 19 20 Respectfully submittedÀ--------------------- 21 Ruth Kiefer, Recording Secretary
PC 3-4-20 draft 3
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 4/30/2020 To: Planning Commission ,,. / / From: Mark Gordon, Township Zoning Officer 41'1..{p Re: Synthes USA/ JABIL/ Land Development Application
Dear Commissioners,
The Township has received a Land Development Application from Synthes USA for their facility at 1303 Goshen Parkway. Synthes received Conditional Use Approval in 2017, to add an addition to the existing facility as well as associated parking lot and pedestrian walkway modifications.
Due to COVID Contingency operations, the Township requested a 60 day extension for the Land Development review period for this plan, the applicant provided it. I do not anticipate needing all the extra time, however we wanted to cover our bases should the conditions of the Emergency Declaration change.
The applicant now seeks Land Development approval for the proposed improvements.
Staff Recommendation:
At this time the Township has not received review comments from the Township Engineer or the County Planning Commission. The meeting this evening is primarily to provide the PC with an overview of the plan and answer any general questions. The Township Engineer, the Conservancy Board, and the Chester County Planning Commission all need to review the plan and forward comments.
This is the first presentation to the Planning Commission for this application. It is premature to forward a recommendation to the Board at this time.
F:\Data\Shared Data\Property Management\53-3\53-3-1.12 (1303 Goshen Parkway)\LD 2020\Memo to PC 04302020.doc
610-692-7171
www.eastgoshen.org BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
October 18, 2017
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
Mr. Kyle Turner Synthes USA Inc. 1302 Wrights Lane East West Chester, PA. 19380
Re: Synthes USA CU Application
Impervious Coverage Increase 1303 Goshen Parkway TPN 53-3-1.12
Dear Kyle:
At the public hearing on October 17, 2017 the Board of Supervisors approved the conditional use application of Synthes USA to increase the impervious cover on their property at 1303 Goshen Parkway to 60% with the following conditions.
1. All outstanding comments from the Township Engineer are addressed on the Land Development plan. 2. The applicant return to the Conservancy Board during the Land Development review process to present their landscape plan. 3. The applicant adjusts the proposed plantings on the plan in order to meet the requirements of the Airport Zoning for landscape plantings within the airport approach zone of the property. 4. The applicant considers implementing a variety of best practice methods to deal with storm water runoff from the increased impervious coverage. 5. The applicant shall screen the outdoor storage facility as required by §240- 24E.(2)., of the East Goshen Township Zoning Ordinance, with a fence that will conceal it from adjacent properties. 6. The applicant shall follow all applicable Federal, State and Local laws and ordinances.
Please give me a call at 610-692-7171 or e-mail me at rsmith@eastgoshen.org if you have any questions or need additional information.
Sincerely,
f c'/c- : {), Louis F. Smith, Jr. Township Manager
cc: Brenden P. Burke, Esquire
F:\Dala\Shared Data\Property Managernent\53-3\53-3-1.12 (1303 Goshen Parkway)\CU App 20171BOS Decision 101817.doc
610-692-7171
www.eastgoshen.org BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
April 30, 2020
Dear Property Owner:
The purpose of this letter is to inform you that Synthes USA has submitted a Land Development application for their facility at 1303 Goshen Parkway, West Chester, PA 19380. Synthes is proposing to add additional walkways, parking and an addition to their building. The applicant was granted Conditional Use approval for these proposed improvements to the property in 2017, and is now applying for Land Development approval.
The applicant proposes to add a+/- 1,200 square foot addition to the existing manufacturing facility, future equipment pads, future parking spaces, and future sidewalks on the property.
Pursuant to Township policy, property owners within 1000 feet of the subject property are notified of Land Development applications. The meeting dates for this matter are listed below and subject to change without further written notice:
May 6, 2020 - Planning Commission {7:00 PM) May 13, 2020 - Conservancy Board {7:00 PM) June 3, 2020 - Planning Commission {7:00 PM) June 16, 2020 - Board of Supervisors {7:00 PM)
During Covid-19 Contingency Operations, all public meetings are being held via Video/ Telephone Conferencing. Members of the public can participate in the May meeting via telephone only. To access the May 6th Planning Commission meeting using your telephone, call {929) 205-6099, use access code 893 5918 6610. The Planning Commission meeting will be live streamed via YouTube with a 20 second delay and will be available for rebroadcast. Future call in numbers for meetings will be provided on the Township Website prior to the meeting dates.
The Land Development Plan and Application will be available for review on the Township Website beginning Friday, May 1, 2020 no later than 5 PM. Use the following link; https://eastgoshen.org/boards/planning-commission/ and click on the May 6th meeting agenda to access the plans and application materials.
Please give me a call if you have any questions or need additional information.
Mark A. Gordon Township Zoning Officer
CC: All Authorities, Boards and Commissions
F:\Data\Shared Data\Property Management\53-3\53-3-1.12 (1303 Goshen Parkway)\LD 2020\1000 foot letter LD 042992020.doc
Civil Engineering Structural Engineering Fall Protection Services
Corporate Headquarters: 1750 Walton Road | Blue Bell, PA 19422 | 215 646 5595 New Jersey Office: 1415 Marlton Pike East, Suite 312 | Cherry Hill, NJ 08034 | 732 868 8636
www.megr.com
April 23, 2020
East Goshen Township Mr. Mark A. Gordon, CFM Director of Code Enforcement / Zoning Officer 1580 Paoli Pike West Chester, PA 19380 (610) 692-7171 mgordon@eastgoshen.org
RE: 1303 Goshen Parkway – Preliminary / Final Land Development JABIL Plant Expansion APN 53-003-001.1200 – SYNTHES USA HQ, INC. (Record Owner) MEG Reference No. 19360
Mr. Gordon:
With respect to the above-referenced parcel, we are submitting the following items in support of the land development application for the 1,900 square foot (±) building addition at 1303 Goshen Parkway:
x Eleven (11) copies of Preliminary / Final Land Development Plans; x Three (3) copies of a Stormwater Narrative; x One (1) East Goshen Township Subdivision and/or Land Development Application; x One (1) List of Requested Waivers from Chapter 205; x One (1) Act 247 County Referral; x One (1) Application Review Period Extension Form; x One (1) Township Application fee ($450 payable to East Goshen Township); x One (1) Township Escrow fee ($2,000 payable to East Goshen Township); x One (1) County Application fee ($540 payable to Chester County Planning Commission);
Please process the enclosed for review. Should you have any questions or require any additional information, please do not hesitate to reach out to me directly. Thank you for your time in this matter.
Best Regards, Mainstay Engineering Group, Inc.
David F. Citro, P.E. Civil Engineering Department Manager
CC: Mr. Todd McVoy (JABIL) Mr. John Neilson (Johnsrud/Bergmann) Mr. Brendan Burke, Esq.
Civil Engineering
Structural Engineering
Fall Protection
Corporate Headquarters: 1750 Walton Road ~ Blue Bell, PA 19422 ~ tel 215 646 5595 New Jersey Office: 1415 Marlton Pike East Suite 312 ~ Cherry Hill NJ 08034 ~ tel 732 868 8636
www.megr.com
1303 GOSHEN PARKWAY – JABIL PLANT EXPANSION LAND DEVELOPMENT SYNTHES USA HQ INC. WAIVERS REQUESTED FROM CHAPTER 205 (SUBDIVISION & LAND DEVELOPMENT ORDINANCE)
SECTION 205-40: A WAIVER IS REQUESTED FROM THE PROVISION TO PROVIDE A WATER STUDY. NO NEW WATER SERVICES ARE PROPOSED.
SECTION 205-39: A WAIVER IS REQUESTED FROM THE PROVISION TO PROVIDE A TRAFFIC IMPACT STUDY. THERE WILL BE NO INCREASE / DECREASE IN THE NUMBER OR LOCATION OF SITE DRIVEWAYS.
SECTION 205-37C.(7): A WAVER IS REQUESTED FROM THE PROVISION TO PROVIDE A MINIMUM INSIDE DIAMETER OF 15 INCHES. PIPES ARE SIZED APPROPRIATELY ACCORDING TO FLOW WITH A MINIMUM OF 6 INCHES.
PRELIMINARY/FINAL LAND DEVELOPMENT PLAN JABIL PLANT EXPANSION - 1303 GOSHEN PARKWAY
60
MAINSTAY ENGINERING / DAVID F. CITRO, P.E. ON BEHALF OF THE APPLICANT
23 APRIL 2020
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PA
SUBDIVISION AND / OR LAND DEVELOPMENT APPLICATION
f:\data\shared data\code dept\application & forms\current forms and applications\subdivision and land dev application.doc
Date Filed: _______________ Application for (Circle one):
Subdivision Land Development Subdivision & Land Development A. Application is hereby made by the undersigned for approval of a Subdivision and or Land
Development Plan, more particularly described below.
1. Applicant’s name: _________________________________________________________ Address: ___________________________________________ Phone: ______________ Fax: _______________________ Email: ______________________________________
2. Name and address of present owner (if other than 1. above) Name: _________________________________________________________________ Address: __________________________________________ Phone: _______________
Fax: _______________________ Email: ______________________________________ 3. Location of plan: _______________________________________________
4. Proposed name of plan: _________________________________________ 5. County Tax Parcel No.: ______________________ Zoning District: _________________ 6. Area of proposed plan (ac.): __________________ Number of lots: ______________ 7. Area of open space (ac.): __________________________________________________
8. Type of structures to be constructed: _________________________________________
9. What provisions are to be made for water supply and sanitary sewer? _______________ _______________________________________________________________________ 10. Linear feet of road to be constructed: ________________
11. Name of Engineer: ______________________________________________________ Phone Number: ____________________ Fax: _____________________
Email address: _______________________________________________
04/20/2020
SYNTHES USA HQ, INC. 1302 WRIGHTS LANE EAST
Todd McVoy <Christopher_McVoy@jabil.com>
1303 GOSHEN PARKWAY
1303 GOSHEN PARKWAY LAND DEVELOPMENT
53-003-0001.1200 I-1 8.60 1
0
Manufacturing Facility Expansion
Use of existing fire,
0
Mainstay Engineering Group, Inc. (David F. Citro, P.E.)
215-646-5595 x115 215-857-0540 dcitro@megr.com
water, domestic water, and sanitary discharge facilities. No new facilities required.
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA
SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
- Name of Land Planner: N/A Phone Number: ____________ Fax: ____________ Email address: ________________________
- I/We agree to reimburse the Township of East Goshen for such fees and expenses the Township may incur for the services of an Engineer(s) in investigations, tests, and review in relation to the Subdivision Plan.
- I/We agree to post financial security for the improvements depicted on the Subdivision and or land Development Plan pursuant to the Subdivision and Land Development Ordinance.
- I/We agree to reimburse the Township of East Goshen for all inspection fees at the actual cost to Township.
NOTICE
The Township requires an Occupancy Permit before any building can be occupied; no Occupancy Permit will be issued until final inspection and approved by the Zoning Officer and Building Inspector.
[Signature]
Owner Signature
[Signature]
Applicant Signature
Administrative Use
Fees received from applicant $ ____________ basic fee, plus $ ____________ per lot
For ____________ lots = $ ____________.
Application and plan received by: ________________________ Date: ________________________
(Signature)
Application accepted as complete on: ________________________
(Date)
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc
2
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc 3
SUBDIVISION AND/OR LAND DEVELOPMENT CHECKLIST This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the State of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application Process and the Review Process. The application process must be completed in its entirety prior to the advancement into the Review Process. * Review the formal Planning Commission review procedure on page five. Application for (Circle all appropriate): Subdivision Land Development Applicant Information: Name of Applicant: ______________________________________________________ Address: ______________________________________________________________ Telephone Number: ________________________ Fax: _________________________ Email Address: _________________________________________________________ Property Address: _______________________________________________________ Property Information: Owner’s Name: _________________________________________________________ Address: ______________________________________________________________ Tax Parcel Number: __________________ Zoning District: ________ Acreage: ______ Description of proposed subdivision and or land Development: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________
SYNTHES USA HQ, INC.
1302 WRIGHTS LANE EAST
1-610-622-7784
todd_mcvoy@jabil.com
1303 GOSHEN PKWY, WEST CHESTER, PA 19380
SYNTHES USA HQ, INC.
1302 WRIGHTS LANE EAST
53-003-0001.1200 I-1 8.60
New 1,902 SF building addition, with access sidewalk and stairs. Utility relocation and new
construction involving storm, sanitary sewer, electric, lighting and fiber optic. Modifications to
existing surface detention basin to attenuate increase flow.
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc 4
Application Process Checklist (Administrative use only): Item Date Complete
1. Completed Township Application Form: ……………………… ______ 2. Township application and review fees paid:…………………. ______ 3. County Act 247 Form complete: ………………………………. ______ 4. Appropriate County Fees included: …………………………… ______ 5. 11 Copies of sealed Sub / LD plans: ………………………….. ______ 6. 11 copies of other required plans: a. Landscape: (sealed).…………………………….………..______ b. Conservancy: (sealed)…………………………………. ______ c. Stormwater Management: (sealed)…………………… ______ 7. Three copies of the stormwater report and calculations: …… ______ 8. Copies of supplementary studies, if required: a. Traffic Impact Study:……………………………………. ______ b. Water Study: ………………………………………………______ Application accepted on __________ by _____________________________ Official Signature _________________________ Title __________________ Review Process Checklist (Administrative use only) Item Date Complete 1. Date of first formal Planning Commission Meeting following complete submission of application, (Day 1):………………… ______ Date Abutting property letter sent: …………………………… ______ 2. Date presented to Planning Commission: ……………………. ______ 3. Date submitted to CCPC: ………………………………………. ______ 4. Date submitted to Township Engineer: ……………………… ______ 5. Date by which the PC must act, (Day 70): ……………………. ______ 6. Date by which Board of Supervisors must act, (Day 90): …… ______ 7. Date sent to CB: …………………………………………………. ______ 8. Date sent To MA: ………………………………………………... ______ 9. Date sent to HC: …………………………………………………. ______ 10. Date sent to PRB: ……………………………………………….. ______ 11. Date sent to TAB: ……………………………………………….. ______
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc 5
East Goshen Township Planning Commission Procedure for processing Subdivision, Land Development, Conditional Use,
Variance, and Special Exception Applications
August 19, 2002 1st Revision: September 22, 2003 2nd Revision: March 2, 2006 1. In order for any application to be considered by the Planning Commission it must be submitted to the Township with all required documentation as per the Township Code and with all applicable fees paid. The Township will use a checklist to verify all required documentation has been submitted. Until the application is complete the application will not be considered “filed” by the Township staff. The Planning Commission will acknowledge receipt of the application at their next regularly scheduled meeting.
2. All materials to be considered at the next regular meeting of the Planning Commission must be submitted with at least eleven (11) copies to the Township Staff by not later than close of business the previous Tuesday. Any materials submitted after that time will be held for the following meeting and not provided to the Commission at the upcoming meeting.
3. The application review cycle for Subdivision and Land Development Applications shall begin with the next regular meeting of the Commission after the complete application is filed. The application review cycle for Conditional Use, Variance, and Special Exception Applications shall begin the day a complete application is filed with the Township.
4. Applicants should not distribute material to the Commission during a meeting unless it is directly related to the initial presentation of the application. All materials for the Planning Commission, including any material to be used at a meeting, must be delivered to the Township Staff not later than close of business the previous Tuesday.
5. The burden of supplying necessary materials to the Planning Commission in a timely manner is on the applicant. Late delivery of material may require an extension on the part of the applicant or a recommendation for denial of the application by the Planning Commission.
6. Formal application presentations to the Planning Commission will only be made at the regular meeting after the complete application is submitted and accepted by the Township staff.
7. The application will remain on the Planning Commission’s agenda until such time as the Commission has made its recommendation to the Board of Supervisors and or Zoning Hearing Board.
8. Applicants are encouraged to attend each Planning Commission meeting in order to answer questions or address issues concerning their application.
9. Applications will be voted on only during the regular Planning Commission meetings.
10. The Chairman, in his sole discretion, may waive or modify any of this procedure.
Return to: Chester County Planning Commission
601 Westtown Road– Suite 270 P.O. Box 2747 West Chester, PA 19380-0990
Act 247 County Referral
To: Chester County Planning Commission Subject: Request for review of a subdivision, land development
proposal, ordinances, or comprehensive plans pursuant to the Pennsylvania Municipalities Planning Code, Act 247. This application must be completed by the applicant, and
submitted by the municipality to the above address, along with one (1) complete set of plans and accompanying doc- uments and the required fee for review (see reverse side)
TO BE COMPLETED BY THE MUNICIPALITY
From: (Municipality) _ __________________________________ Date: _ ______________________________________________ Official’s Name: _______________________________________ Position: _____________________________________________ Official’s signature: _____________________________________
Applications with ORIGINAL signatures must be submitted to CCPC.
TO BE COMPLETED BY THE APPLICANT
Development name (if applicable): _________________________________________ Location: _ ____________________________ Owner’s name: _ _______________________________________________________ Phone #: _____________________________ Owner’s address: _ ____________________________________________________________________________________________ Applicant’s name: _______________________________________________________ Phone #: _____________________________ Applicant’s address: ____________________________________________________________________________________________ Architect/Engineer/Surveyor name: _ _______________________________________ Phone #: _____________________________
TYPE OF REVIEW REQUESTED (Check all appropriate boxes) £ Unofficial sketch plan (no fee) £ Subdivision plan £ Land development plan £ Planned residential development £ Zoning ordinance (no fee) £ Curative amendment (no fee) £ Subdivision ordinance (no fee) £ Comprehensive plan (no fee) £ Other_____________________________
REVIEW FEE (Fee schedule on other side) £ Attached $ _______________ £ Not applicable
TYPE OF SUBMISSION £ New proposal £ Revision to a prior proposal £ Phase of a prior proposal £ Amendment/revision to recorded plan is
a new proposal TYPE OF PLAN £ Unofficial sketch £ Preliminary £ Final
Tax parcel(s): # ________________________
# ________________________ # ________________________
Total area (gross acres): _ ________________
PLAN INFORMATION
Length of new roads: _ ____________________ Number of new parking spaces: _____________ Ownership of roads: £ Public £ Private Open space: £ Public £ Private Acres:_____________ Acres:_____________
HOA responsible for common facilities/areas: £ Yes £ No
HOA documents provided: £ Yes £ No
Traffic study included: £ Yes £ No £ Not conducted
LAND USE # of lots/units ZONING DISTRICT
OF PROPOSAL
Existing: ___________ Proposed: _________ Variances/ Special exception granted: ___________
PROPOSED UTILITIES
(Check appropriate
boxes)
Water Sewer Public £ £ On-site £ £ Package £ £ No new sewage disposal or water supply proposed £
Agriculture
Single family
Townhouses
Twin units
Apartments
Mobile homes
*Commercial
*Industrial
*Institutional
Other
ADDITIONAL INFORMATION (This plan has been submitted to): £ County Health Department Date _ ________________________ £ PennDOT Date _ ________________________ £ DEP Date _ ________________________ £ Other_ _________________Date _ ________________________ *Information to be filled in for Commercial, Industrial or Institutional land use ONLY
*Total square footage of addition to existing building: ______________________ *Total square footage of new building(s): _______________________
THE TERM “LOTS”
The term “LOTS” includes conveyance, tracts or parcels of land for the purpose, wheth-
er immediate or future, of lease, transfer of ownership or building or development, as well as residue parcels, annexations, or the correction of lot lines.
Effective June 1, 2018
1303 GOSHEN PARKWAY LAND DEVELOP 1303 GOSHEN PARKWAY SYNTHES USA HQ, INC. 1-610-622-7784 1302 WRIGHTS LANE EAST (Same as owner)
MAINSTAY ENGINEERING (DAVID CITRO) 215-646-5595 X115
I
540 I
I
53-003-0001.1200
I I
8.6
0 0
I I
I
I
I
I-1
YES
I 1 I
I
I
1920
CATEGORY I RESIDENTIAL SUBDIVISION OR LAND DEVELOPMENT These fees apply to residential projects for sale, condominium ownership, or rental; any type of buildings, either as a subdivision or single tract land development; or an agricultural subdivision (except for guidelines in Article I, Section 107, Subdivision, Pennsylvania Municipal Planning Code, Act 247, as amended). This category does not include institutional living facilities.
Number of lots and dwelling units Base fees Fees for each lot and/or unit*
1–2 lots/dwelling units $165.00 None 3 – 5 lots/dwelling units $165.00 Plus $28.00/lot/unit 6 –20 lots/dwelling units $220.00 Plus $25.00/lot/unit 21 –75 lots/dwelling units $400.00 Plus $22.00/lot/unit 76 lots/dwelling units and over $800.00 Plus $17.00/lot/unit
CATEGORY II NON-RESIDENTIAL SUBDIVISIONS These fees apply to applications for subdivision and conveyance of land for non-residential uses, not proposed for land development as defined in Section 107 of the Planning Code.
Number of lots or units Base fees Fees for each lot and/or unit*
1–2 lots/units $275.00 Plus $55.00/lot/unit 3 –10 lots/units $550.00 Plus $55.00/lot/unit 11 lots/units and over $800.00 Plus $50.00/lot/unit Financial subdivisions $275.00 Plus $55.00/lot/unit
CATEGORY III NON-RESIDENTIAL LAND DEVELOPMENT These fees apply to all projects or sections of mixed projects which are for non-residential use for sale, condominium, lease or rent in any type of building on a single tract of land.
Building square footage (gross) Base fees Fees for gross floor area
0 to 5,000 sq. ft. $450.00 Plus $45.00/1,000 sq. ft. of gross floor area 5,001 to 25,000 sq. ft. $550.00 Plus $40.00/1,000 sq. ft. of gross floor area 25,001 to 75,000 sq. ft. $900.00 Plus $40.00/1,000 sq. ft. of gross floor area 75,001 sq. ft. and over $1,350.00 Plus $28.00/1,000 sq. ft. of gross floor area
CATEGORY IV SECOND REVIEWS These fees apply to each review conducted after the first review (within a three (3) year period of the initial review) and only if requested by the municipality. • Flat fee of $165.00 for residential subdivisions/land developments • Flat fee of $220.00 for non-residential subdivisions/land developments • Maximum fee: $10,000
Effective June 1, 2018 FEE SCHEDULE
The following fees shall apply to each land subdivision or land development submitted to the Chester County Planning Commission for review in accordance with Article V, Section 502, Pennsylvania Municipalities Planning Code, Act 247, as amended.
If a plan for a non-residential use is to be subdivided and developed, the fee is the total of Category II plus Category III.
*NOTE: Fee applies to total number of lots/units after subdivision. Subdivisions include lot line revisions and lot consolidations.
CHECKS OR MONEY ORDERS SHOULD BE PAYABLE TO: County of Chester (cash will not be accepted) All fees are to be submitted to the Chester County Planning Commission (CCPC) through the appropriate township or borough at the time of application; and in accordance with the administrative guidelines established by CCPC. Upon written request from the
municipality, CCPC may waive the fees for plan reviews associated with municipally-owned subdivisions or land developments.
INFORMAL REVIEWS AND ADDITIONAL WORK: An informal review request to CCPC (such as meetings and discussions prior to the formal development application) shall be free of charge if said written request is from the municipality, or from an applicant with the knowledge and written consent of the municipality. In no case will informal review by CCPC replace the need for a formal review which would include the submission of the required fee listed above pursuant to the Municipalities Planning Code.
TIME LIMITATIONS: The review time period will begin from the date of receipt by CCPC of the application requesting a review by CCPC. CCPC has thirty (30) days
within which to review subdivision and land development applications and submit review comments. The review period may be extended if request- ed by the applicant or a time extension has been granted by the municipality with the concurrence of the applicant. When the time period has been stopped due to an incomplete application package, incorrect fee submittal or other reasons, the time period will continue from the day in which the application package is complete. CCPC has thirty (30) days within which to review ordinance amendments, and forty-five (45) days within which to review comprehensive plans, official maps, and complete ordinances.
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DRAWING NUMBER
DATE ISSUE ISSUE DESCRIPTION
DRAWING TITLE
CIVIL INDEX SHEET C0.01
CONSERVATION PLAN C1.11
EXISTING FEATURES AND DEMOLITION PLAN C1.01
X
X X
X
X
X
X
X SITE GRADING PLAN C3.11
03-31-2020 ISSUE FOR OWNER REVIEW
C0.12 LAND DEVELOPMENT PLAN
C3.01 SITE IMPROVEMENTS PLAN
X
X
X
SITE UTILITIES PLAN (1 OF 2) C3.21
LANDSCAPE PLAN C5.01 PRE - DEVELOPMENT DRAINAGE PLAN C6.01
CIVIL DETAILS SHEET (1 OF 2) C7.01
CONSERVATION DETAILS SHEET C7.11
CIVIL INDEX SHEET
C0.01
A 03-31-2020 ISSUE FOR OWNER REVIEW
X SITE UTILITIES PLAN (2 OF 2) C3.22
CONDITIONAL USE PLAN * C0.11
X POST- DEVELOPMENT DRAINAGE PLAN C6.02
X CIVIL DETAILS SHEET (2 OF 2) C7.02
X
X X
X
X
X
X
X
04-23-2020 LAND DEVELOPMENT ISSUE
X
X
X
X
X
X
B 04-23-2020 LAND DEVELOPMENT ISSUE
STORM UTILITIES PROFILE C4.01 X
STORMWATER MANAGEMENT PLAN C6.03 X
* REFERENCE DOCUMENT
DEPUY SYNTHES BRANDWINE PLANT
UPGRADE WESTER CHESTER CHESTER COUTNY, PA
SITE DATA
CONDITIONAL USE PLAN
C0.11
LOCATION MAP (1"=400')
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
LAND DEVELOPMENT PLAN
C0.12
LOCATION MAP (1"=400')
03-31-2020 ISSUE FOR OWNER REVIEW A
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
EXISTING FEATURES AND DEMOLITION PLAN
C1.01
03-31-2020 ISSUE FOR OWNER REVIEW A
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
CONSERVATION PLAN
C1.11
03-31-2020 ISSUE FOR OWNER REVIEW A
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
SITE IMPROVEMENTS PLAN
C3.01
A 03-31-2020 ISSUE FOR OWNER REVIEW
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
SITE GRADING PLAN
C3.11
ISSUE FOR OWNER REVIEW 03-31-2020 A
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
SITE UTILITIES PLAN (1 OF 2)
C3.21
ISSUE FOR OWNER REVIEW 03-31-2020 A
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
SITE UTILITIES PLAN (2 OF 2)
C3.22
ISSUE FOR OWNER REVIEW 03-31-2020 A
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
STORM UTILITIES PROFILE
C4.01
A 04-23-2020 LAND DEVELOPMENT ISSUE
A
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
LANDSCAPING PLAN
C5.01
A 03-31-2020 ISSUE FOR OWNER REVIEW
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
PRE-DEVELOPMENT DRAINAGE PLAN
C6.01
A 03-31-2020 ISSUE FOR OWNER REVIEW
DRAINAGE AREA AREA (SF) TIME OF CONCENTRATION
BASIN A 378,132 5 MINUTES
BASIN B 61,981 5 MINUTES
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
POST DEVELOPMENT DRAINAGE PLAN
C6.02
03-31-2020 ISSUE FOR OWNER REVIEW A
DRAINAGE AREA AREA (SF) TIME OF CONCENTRATION
BASIN A 38,046 5 MINUTES
BASIN B 60,067 5 MINUTES
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
STORMWATER MANAGEMENT PLAN
C6.03
A 04-23-2020 LAND DEVELOPMENT ISSUE
A
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
CIVIL DETAILS SHEET (1 OF 2)
C7.01
A 03-31-2020 ISSUE FOR OWNER REVIEW
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
CIVIL DETAILS SHEET (2 OF 2)
C7.02
A 03-31-2020 ISSUE FOR OWNER REVIEW
B 04-23-2020 LAND DEVELOPMENT ISSUE
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
B
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
CONSERVATION DETAILS SHEET
C7.11
03-31-2020 ISSUE FOR OWNER REVIEW A
B 04-23-2020 LAND DEVELOPMENT ISSUE