Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Meeting Agenda Wednesday, July 1, 2020 VIA Telephone/ Video Conference
7:00 PM
During this tele-conference Planning Commission meeting, public comment will be handled as follows:
• Participants are asked to call in by 6:55 pm. • Participants will be asked to identify themselves when being accepted into the meeting • The public will be muted during the meeting when the Commission is talking. • The Chairman will ask for public comment on agenda items and participants will be unmuted and given an opportunity to ask questions and make comments. • Participants wishing to comment must state their name and address and must speak one at a time. • Participants are asked to turn down the volume if they are livestreaming the meeting on YouTube.
A. Call to Order/ Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log/ Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes
1. June 17, 2020 F. Subdivision and Land Development Applications
1. Synthes USA/ 1303 Goshen Parkway (Land Development) G. Conditional Uses and Variances H. Ordinance Amendments I. Old Business
1. Zoning Ordinance Review 2. Review Model ordinances for Pipelines J. New Business K. Any Other Matter L. Liaison Reports M. Correspondence N. Announcements
Bold Items indicate new information to review or discuss.
F:\Data\Shared Data\Agendas\Planning Commission\2020\PC AGENDA 07012020.doc
July 1, 2020 PC Meeting
0 "' > ci "' 0 N ci ...I ::::> iL
0.:- C: 0 "O :.::; 8 Cl> ca 9 - LL Q. Cl> Cl> C. ... Application Name ; ?': ca C
Synthes USA / 1303 Goshen Parkway LO P/F 4/27/2020
Bold = New Application or PC action required
Completed in 2019
Paoli Pike TND Overlay District Ord. zo N/A NIA ZEKS, 1302 Goshen Parkwav cu Sk 8/27/2019 ESKE Development / Ducklings LD P/F 1/18/2019 PECO Gas Gate cu Sk 2/26/2019
CZ Woodworking / 1422 Ardleigh Cir. cu Sk 3/29/2019
1351 Paoli Pike / The Hankin Group zo SK 5/31/2019 1339 Enterorise Drive cu Sk 5/30/2019
East Goshen Township Planning Commission
Application Tracking Log
1/) 0 ... Ill Cl> Cl> <C C: -
C) ci. C: e w
C. .r:. C) C: 1/) C: 0 :.::; ... == 0.. :I 0 .c Cl> 0 C: ... I- 0 <C .2 ca C 0 0 0 1/) ... ... ... C: : Cl> Cl> Cl> Cl> ca ... ... ... ... ... ca ca ca >< "' C C C w
5/6/2020 4/28/2020 4302020 4/30/2020 1
N/A N/A N/A N/A N/A 8/27/2019 NA NA 8/29/2019 2/6/2019 2/23/2019 2/23/2019 2/29/2019 2/26/2019 2/28/2019 NA 2/28/2019 1
3/29/2019 NA NA 4/22/2019 1 NA NA NA 5/31/2019 NA 5/30/2019 NA NA 6/11/2019
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2020\PC Tracking Log for 07012020.xlsx
Cl> ... Cl> ca ... C ca C C: 0 Cl> C: ... 0 :.::; Cl> ca (,) "O :.::; ... (,) <C ca "O Jg <C C I- ca C: I- ...I C) Cl> Cl> ...I z C: C E z "' ·;:: C. E 0 ca 0 0 Cl> ... 0 0.. Ill :::c C 0 extension
not 7/15/2020 8/4/2020 NA 8/4/2020 included in these dates
N/A N/A 12/17/2019 NA Continued 10/2/2019 10/29/2019 10/15/2019 10/25/2019 APPVD. 4/3/2019 4/9/2019 NA 5/6/2018 APPVD. 4/3/2019 6/5/2019 5/14/2019 6/25/2019 APPVD. APPVD. W 6/5/2019 6/18/2019 6/18/2019 6/27/2019 Conds. NA NA NA NA DENIED 7/10/2019 7/16/2019 7/16/2019 7/29/2019 APPVD.
6/26/2020
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
DRAFT EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING
June 17, 2020
The East Goshen Township Planning Commission's regular meeting, scheduled for Wednesday, June 3, 2020 was cancelled due to inclement weather conditions, and rescheduled to Wednesday June 17, 2020. Because of the COVID-19 restrictions the meeting was held via teleconference. Members present are highlighted: Chair - Ernest Harkness Vice Chair - John Stipe Dan Daley Edward Decker Michael Koza Mark Levy Michael Pagnanelli Also present were: Mark Gordon, Zoning Officer Martin Shane, Township Supervisor Kristin Camp, Esq., Township Solicitor Gabrielle Long, Township Intern Susan D' Amore, Township Staff Mike Lynch, Township Supervisor Michele Truitt, Township Supervisor
COMMON ACRONYMS:
BOS - Board of Supervisors BC - Brandywine Conservancy CB - Conservancy Board CCPC - Chester Co Planning Commission
A. FORMAL MEETING - 7 p.m.
CPTF - Comprehensive Plan Task Force CVS- Community Visioning Session SWM - Storm Water Management
ZHB - Zoning Hearing Board
I. Ernie called the meeting to order at 7 :00 pm. He led the Pledge of Allegiance and a moment of silence to remember our first responders who keep us safe. 2. Ernie asked if anyone would be recording the meeting and ifthere were any public comments about non-agenda items. There was no response. 3. Ernie checked the log. Synthes is scheduled for July 15, 2020. Mark mentioned that he received the revised plan today. 4. The minutes of the May 6, 2020 meeting were approved.
B. SUBDIVISION AND LAND DEVELOPMENT APPLICATIONS
I. Synthes USA, 1303 Goshen Parkway (Land Development). Mark G. reviewed what documents have been received.
C. OLD BUSINESS
I. Review Model Ordinances for Pipelines - Kristin explained that under common law in Pennsylvania the Public Utilities Commission regulates public utilities. She explained that process for getting permits. She mentioned that a public utility company doesn't have to comply with local municipal ordinances. Since East Goshen is mostly developed, she is concerned that these proposed ordinances will have dire consequences. She commented that the setbacks are large 750 ft to 1,000 ft. The Commission needs to understand how the ordinance will impact residents. Comments:
PC 6-17-20 draft 1
1 John asked if the setbacks are from the pipe or easement. Mark replied from the edge of the easement and 2 the size of easements vary with the pipelines. 3 John asked what other Municipalities have these ordinances. Ernie replied Willistown and East Bradford. 4 Mike P asked if there are any examples in East Goshen now. Mark G. replied that PECO on the Texas 5 Eastern pipeline is an example. East Goshen used their current ordinance to regulate that. He explained 6 the process he went through for that project. Mark also mentioned that Adelphia has a compressor station 7 on the property next to the Township Building. Kristin pointed out that Adelphia is not a Public Utility 8 but is regulated under Federal laws, which is a different layer. There are other considerations that impact 9 where they can go. 10 Ernie mentioned consultation zones. He thinks that is when we ask for documentation, but they don't 11 have to respond. Kristin gave examples. 12 13 Mark G. and Gabrielle presented pipeline analysis maps, which show the existing pipelines and 14 approximate 50 ft. easements. Mark reviewed where county consultation zones are located and their 15 sizes, Then he selected all parcels that would be in a 300 ft. setback. There were 1,587 parcels including 16 the business park. Ernie commented that we can't write an ordinance to specify patticular parcels, right? 17 Kristin replied no and buildings already in the easement would be non-conforming. There was discussion 18 about expansion of existing buildings both business and residential. 19 John spoke about storm water depressions on certain parcels. 20 Dan asked to review the map. Mark G. showed the impact of 300 ft. setbacks on one undeveloped parcel. 21 22 Ernie thanked Kristin and Gabrielle for all they did on this project. He mentioned that several risk 23 assessments were done and he wants to get additional information from the Pipeline Authority. Then he 24 feels the PC should send a letter to the BOS explaining what has been done and asking if they want them 25 to continue. He will develop something to review at the next meeting. 26 27 28 D. NEW BUSINESS 29 None 30 31 E. LIASION REPORTS 32 Board of Supervisors - Marty mentioned that the Township staff is working on possible formats for 33 future meetings. 34 35 F. ANY OTHER MATTER 36 John asked if any restaurants have requested outdoor dining. Mark G. replied that there is nothing at this 37 time. 38 39 40 G .. ADJOURNMENT 41 There being no further business, Ed made a motion to adjourn the meeting. John seconded the 42 motion. The meeting was adjourned at 7:50 pm. The next regular meeting will be held on Wednesday,
43 July 1, 2020 at 7:00 p.m. 44 45 46 Respectfully submittedâ-------------------- 4 7 Ruth Kiefer, Recording Secretary
PC 6-17-20 draft 2
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 6/25/2020 To: Planning Commission . I I' From: Mark Gordon, Township Zoning Officer ,;tv\ k, Re: Synthes USA/ JABIL/ Land Development Application
Dear Commissioners,
As you know, the Township has received a Land Development Application from Synthes USA for their facility at 1303 Goshen Parkway. Synthes received Conditional
Use Approval in 2017, to add an addition to the existing facility as well as associated parking lot and pedestrian walkway modifications.
The Land Development application proposes a 1,921 square foot addition to the existing manufacturing facility along with the required storm water management and landscape enhancements.
TOWNSHIP AND CONSULTANT REVIEWS: Zoning:
• The applicant needs to demonstrate how they will completely screen the proposed rooftop mechanical units IAW §240-19F(2). This can be provided during the building permit process however a permit will not be issued until the ordinance is met. • The Zoning Table indicates that the new addition will be the same height as the existing building however the applicant has presented information showing the new addition to be taller than the existing building. The applicant needs to clarify the building height for the commission.
Conservancy Board: The CB reviewed this application at their meeting May 13· 2020. The CB recommendations have been incorporated in the latest revised plans.
Pennoni: The Township engineer has reviewed the latest revision of the plans and has issued a review letter dated June 25 , 2020. Only minor comments remain and they are housekeeping and administrative in nature and will be addressed with staff prior to the presentation to the Board of Supervisors.
F:\Data\Shared Data\Property Management\53-3\53-3-1.12 {1303 Goshen Parkway)\LD 2020\Memo to PC 06262020.doc
Chester County Planning Commission: The CCPC has forwarded their review comments. The CCPC comments are all administrative in nature.
Fire Service Review: The Twp. Code Department has conducted a Fire Service review of the plans.
• Comment #3: The Fire Code Requires that buildings protected with fire suppression systems maintain at least two accessible areas to the roof for fire department vehicles. In this case the front of the building is one access point, and the rear of the building is the second access point. The western side of the building does not meet the access requirement because of the distance the building sits from the access drive. The loading dock area along the western side of the building cannot be considered because there could be large vehicles parked in the loading area at the time of an emergency. Since the rear of the building must be used as one of the required access points to the roof, the access drive must not be a "Dead-End access road".
Please review the fire code section and appendix noted in the review letter and provide turning templates for a ladder truck so the PC can discuss this at their meeting on July 1. • Is there interior access to the roof from the main building? • The addition needs to have ladder access to the main roof.
WAIVER REQUESTS: The applicant has requested four waivers from the SALDO: §205-28: Preliminary plan. The applicant is proposing a Preliminary/ Final Plan submission, this waiver request is customary and justified. §205-37C.(7): Pipe Sizes: the waiver request if for pipe sizes within the private storm water system. This waiver request is acceptable to the Twp. Engineer and justified. §205-39: Traffic Impact Study: This project does not warrant a Traffic Study do to the
limited scope and size of the proposed addition. This waiver request is acceptable and justified. §205-40: Water Study: This project does not warrant a Water Study do to the limited
scope and size of the proposed addition. This waiver request is acceptable and justified.
Staff Recommendation:
At this time, the only significant issue to resolve is the fire apparatus access to the rear of the building. This may entail some reconfiguration to the parking lot and that will need to be reviewed by the Township Engineer. At this time Staff does not support forwarding a recommendation to the Board of supervisor until this issue is resolved.
F:\Data\Shared Data\Property Management\53-3\S3-3-1.12 (1303 Goshen Parkway)\LD 2020\Memo to PC 06262020.doc
EAST GOSHEN
CONSERVANCY
May 14, 2020
East Goshen Township Planning Commission 1580 Paoli Pike West Chester, Pa. 19380
Re: Synthes USA LO Application
Mr. Chairman, J move that we recommend the Planning Commission approve the Synthes USA Land Development application with the following conditions:
1. The applicant agrees to add five (5) additional evergreen trees on the north side of the northern parking area. 2. The applicant agrees to amend the plans specifying tree species that are identified in the Township Tree Species list; Resolution 2015-20.
Sincerely,
d°'-- Mark A. Gordon Zoning Officer
F:\Data\Shared Data\Property Management\53-3\53-3-1.12 (1303 Goshen Parkway)\LD 2020\CB Rec to PC 1 5 °ar11i1D2Dj1°5\ O L I P I K E , W E S T C H E S T E R , P A • 1 9 3 8 0
EGOST 00131
Mark Gordon, Zoning Officer East Goshen Township 1580 Paoli Pike West Chester, PA 19380
June 25, 2020
RE: Jabil Finishing Plant Expansion, 1303 Goshen Parkway
Preliminary/Final Land Development Plan - 2nd Submission
Dear Mark:
One South Church Street
Second Floor West Chester, PA 19382
T: 610-429-8907
F: 610-429-8918
www.pennoni.com
As requested, we have reviewed the following information, prepared by Mainstay Engineering Group, Inc. in connection with the referenced project:
• "Finishing Plant Expansion Plans" (seventeen sheets), last revised June 12, 2020.
• "Jabil Finishing Plant Expansion - Land Development Stormwater Narrative" dated April 23, 2020, revised June 12, 2020; and
• Response letter dated June 12, 2020 and waiver request letter.
The applicant, Synthes USA HQ, Inc., proposes to construct a ±1,926 square foot addition with sidewalk and new utilities at an existing manufacturing facility on UPI #53-003-001.1200 (±8.6 acres) at 1303 Goshen Parkway (T-646). The property is located approximately 460 feet west of the intersection of Airport Road and Goshen Parkway, within the 1-1 Light Industrial District. The lot is currently served by public water and public sanitary sewer.
In 2017, the applicant received Conditional Use approval to increase the total impervious coverage to 60%. The proposed expansion was included on the Conditional Use Plan associated with that approval.
The applicant has requested the following four (4) waivers:
1. From §205-28 -requiring a sperate preliminary plan submission; 2. From §205-40 - requiring a water study; 3. From §205-39 - requiring a traffic impact study; and 4. From §205-37.((7) - requiring a minimum inside pipe diameter of 15 inches.
The following comments from our May 21, 2020 review letter remain outstanding (new comments in bold/italics):
ZONING
1. All new structures shall incorporate a complete visual screen for all rooftop structures. (§240-19.F(2))
Pending. The applicant has indicated this requirement will be reflected on the architectural drawings.
EGOST00131 Mark Gordon. Zoning Officer
June 25, 2020 Page 2 Jabil Finishing Plant Expansion - 1303 Goshen Parkway
2. It is unclear why the required building coverage area in the Zoning Summary table is blacked out. Please indicate the required 30% in the table. (§240-19.G)
Resolved. The Zoning Summary table has been updated.
3. The rear yard shall be measured from the property line to the proposed addition and the Zoning Summary table updated. (§240-19.G)
Resolved. The Zoning Summary table has been updated.
4. A detail for the proposed lighting shall be provided to confirm the light is completely shielded and/or covered by an appropriate translucent cover. (§240-27.C(l)(b))
Outstanding. It appears the applicant has provided a detail for the lighting adjacent to the walkway however no detail has been provided for the parking lot light.
SUBDIVISION AND LAND DEVELOPMENT
5. The applicant is proposing preliminary/final plan approval, therefore a waiver from §205.1 should additionally be requested.
Resolved. The applicant has requested a waiver. 6. Regarding preliminary and final plan requirements (§205-30 and §205-33), the following should be provided:
a. The name of all abutting or adjacent property owners in the vicinity of the project including those across Goshen Parkway. (§205-30.6(5)) Resolved. Property owners have been added to the plans. b. Location and elevation of the benchmark to which contour elevations refer. (§205-30.6(8)) Resolved. Benchmark information has been added to the plans. c. Such private deed restrictions and/or a statement of any restrictions previously imposed in accordance with §205-33.((2). If no such deed restrictions exist or will be imposed, it is
recommended a note stating the same be indicated on the plan. Resolved. The applicant has added notes to Sheet C0.12.
STORMWATER MANAGEMENT
7. Regarding the Erosion and Sediment Control Plans, please provide the following, including details, if applicable:
a. Indicate construction fence around the proposed infiltration area.
Resolved. The construction fence has been added to the plans.
b. Provide a means to prevent sediment from being deposited on public roads, such as a rock construction entrance and/or wash station.
Resolved. The applicant has proposed a wash station.
c. Indicate a concrete washout area.
EGOST00131 Mark Gordon, Zoning Officer
June 25, 2020 Page 3 Jabil Finishing Plant Expansion - 1303 Goshen Parkway
Resolved. A concrete washout area is now indicated on the plans.
d. Indicate a soil stockpile area.
Resolved. A soil stockpile area is now indicated on the plans.
e. It is unclear how the outlet modifications will be completed without possible additional earth disturbance. Please revise the limit of disturbance accordingly.
Resolved. Work in this area is limited to modifications to the outlet structure; no earth
disturbance will be required.
8. Wherever possible, infiltration should be designed to accommodate the entire water quality and runoff volume required in §195-19. (§195-20.A)
Resolved. The applicant provided calculations which demonstrate the requirement is met.
9. The applicant should clearly identify the predeveloped and post-developed areas and specifically BMP drainage area in the report.
Resolved. The applicant has identified the drainage areas on the drainage area plan.
10. Please provide the location of the test pit used for the design of the proposed infiltration facility on the plan. (§195-20.1)
Resolved. The applicant has indicated the test pit location.
11. The applicant should provide Worksheet 4 calculations for the area tributary to the proposed infiltration BMP to demonstrate compliance with §195-19 and §195-20.
Resolved. The applicant has indicated the BMP tributary area on the drainage area plans and has provided calculations demonstrating compliance with §195-19 and §195-20.
12. The proposed BMP does not appear to be included in the HydroCAD model. Please provide routing calculations for the proposed infiltration BMP. (§195-19 and §195-20)
Resolved. The applicant has provided calculations for the proposed infiltration bed.
13. The closest infiltration test to the proposed BMP appears to be more than 75 feet away from the proposed location. The applicant should provide a test pit and infiltration test at the proposed infiltration elevation in the area of the proposed BMP. (§195-20J(l)
Resolved. The applicant has provided infiltration testing adjacent to the proposed infiltration bed.
14. Please provide calculations to ensure the system will dewater in 72 hours. (§195-20-J(3))
Resolved. The applicant has provided calculations which demonstrate that the infiltration bed and basin dewater within 72 hours.
15. The plans shall note that during site construction, all infiltration practice components shall be protected from compaction due to heavy equipment operation or storage of fill or construction
EGOST00131 Mark Gordon, Zoning Officer
June 25, 2020 Page 4 Jabil Finishing Plant Expansion - 1303 Goshen Parkway
material. Infiltration areas shall also be protected from sedimentation. Areas that are accidentally compacted or graded shall be remediated to restore soil composition and porosity. (§195-20-M)
Resolved. The applicant has provided notes on Sheet Cl. 01 regarding equipment operation within the stormwater BMP areas.
16. Where roof drains are designed to discharge to infiltration practices, they shall have appropriate measures to prevent clogging by unwanted debris (for example, silt, leaves and vegetation). Such measures shall include but are not limited to leaf traps, gutter guards and cleanouts. (§195-20-0)
Resolved. The applicant has indicated leaf separators on the plans and details.
17. All infiltration practices shall have appropriate positive overflow controls. Please provide a detail and routing calculations for the proposed BMP.
Resolved. The applicant has provided an overflow for the infiltration bed.
18. Please provide complete delineation of the flow paths used for calculating the time of concentration (Tc) for the predevelopment and postconstruction conditions. (§195-27.8(14))
Resolved. The applicant provided Tc flow paths on the drainage area plans.
19. Please provide a statement, signed by the applicant, acknowledging that any revision to the approved SWM site plan shall be submitted to and approved by the municipality and that a revised erosion and sediment control plan shall be submitted to, and approved by East Goshen Township for a determination of adequacy prior to construction of the revised features on the PCSM Plan. (§195- 27.A(3))
Resolved. The applicant has provided the statement on Sheet C6.03.
20. Please provide the required signature block signed and sealed by the qualified licensed professional responsible for the preparation of the SWM site plan. (§195-27.A(4))
Resolved. The applicant provided the signature block on Sheet C6.03.
21. A detail for the proposed infiltration BMP shall be provided. (§195-27.8(13))
Resolved. The applicant has provided a detail on Sheet C3.21.
22. The PCSM Plan includes notes regarding a Notice of Termination. Since an NPDES permit is not required the notes should be removed.
Resolved. The applicant removed the note.
23. The applicant is reminded that a Stormwater Management Operation and Maintenance Agreement shall be completed. (§195-36) This document is available on the Township website. Please sign two copies and return to the Township for authorization by the Board of Supervisors. The Township will then return to the applicant for recording with the plan, at the County. A copy of the time stamped document and proof of recording should then be returned to the Township.
The applicant has acknowledged this requirement.
EGOST00131 Mark Gordon, Zoning Officer
June 25, 2020 Page 5 Jabil Finishing Plant Expansion - 1303 Goshen Parkway
24. It appears the proposed outlet structure modification may be on the adjacent property, which is noted as under different ownership; please confirm authorization has been provided from the property owner.
The applicant has stated that they will secure the permissions prior to final plan approval.
25. The applicant should provide an easement granting the Township ingress and egress to the stormwater BM P's. Note: a blanket easement is acceptable; see below. (§195-27.B(18)(c))
Resolved. The applicant has offered a blanket easement on a note on Sheet C6.01.
26. Per §195-39, the Township requests that the following be added to the plans regarding stormwater management easement:
"A blanket stormwater management easement is provided over and across the property in favor of East Goshen Township to allow the Township and its agent and designees access to the proposed storm water management facilities. The Township is granted the right, but not the duty, to access and conduct periodic inspections and to undertake other actions that may be necessary to enforce the requirements of the Township's Storm water Management Ordinance or of any applicable O&M plan or O&M agreement.
11
Resolved. The applicant added the note to Sheet C6.01.
GENERAL
27. We recommend the Conditional Use approval be noted on the plans and referenced below the Zoning Summary table (Sheet C0.12) regarding the impervious coverage.
Resolved. The Conditional Use approval as been added to the plans below the Zoning Summary table.
28. The plans should indicate any additional signage proposed.
The applicant has indicated there is no additional signage proposed as part of this land development.
Should you have any further questions or comments, please contact the undersigned.
Sincerely,
PENNONI
Nathan M. Cline, PE Township Engineer
cc: Rick Smith, Township Manager (via e-mail) Mark Miller, Director of Public Works (via e-mail)
Marian D. Moskowitz Josh Maxwell Michelle Kichline
Brian N. O'Leary, AICP
Executive Director
Louis F. Smith, Jr., Manager East Goshen Township 1580 Paoli Pike West Chester, PA 19380
May 27, 2020
Re: Preliminary/Final Land Development - 1303 Goshen Parkway # East Goshen Township - LD-05-20-16336
Dear Mr. Smith:
A Preliminary/Final Land Development Plan entitled "1303 Goshen Parkway", prepared by Mainstay Engineering Group, and dated March 31, 2020, and last revised on April 23, 2020, was received by this office on April 28, 2020. This plan is reviewed by the Chester County Planning Commission in accord with the provisions of Section 502 of the Pennsylvania Municipalities Planning Code. We offer the following comments on the proposed land development for your consideration.
PROJECT SUMMARY:
Location: Site Acreage: Lots/Units: Non-Res. Square Footage: Proposed Land Use: New Parking Spaces: Municipal Land Use Plan Designation: UPI#:
PROPOSAL:
the north side of Goshen Parkway, east of Airpo1t Road 8.63 1 Lot 1,921 Addition to Existing Building (Jabil Brandywine Plant) 0 Business Park Industrial 53-3-1.12
The applicant proposes the construction of a 1,921 square foot building addition. No new sewage disposal or water supply is proposed as part of this plan submission. The project site is located in the I-1 Light Industrial zoning district.
RECOMMENDATION: The County Planning Commission recommends that the administrative issues raised in this letter should be addressed, and all Township issues should be resolved before action is taken on this land development plan.
email: ccplanning@chesco.org • website: www.chescoplanning.org
Page: 2 Re: #
Preliminary/Final Land Development - 1303 Goshen Parkway East Goshen Township - LD-05-20-16336
... c:::200
111i,.,c='o., o ___ .,.ao
i;:
0==== 1.2• 00 ----• 1.s"
Parcel Info: Parecl(t): 53-3·1.12
(Main)Address: 1303 Goshoo Pw. MuniclpaHty: Eut GoNlen Twp.
COUNTY POLICY:
LANDSCAPES:
lmego lnro: Dale Taken: 2017
Source: CCPC, 2020
Map Fearuru:
c:JP.areel
Other Parcels
N +
•iote:The CCPC mil.es nery tlfort to t111u,e t11, map is frM' or errors bwtdoH not QllM,utec t.• ,na,p orltl r,aturts t:o 1>• 11>i1Lalf)' «temportiitr ae:uraÉ.
1. The project site is located within the Suburban Center Landscape and Natural Landscape designations of Landscapes3, the 2018 County Comprehensive Plan. The vision for the Suburban Center Landscape is regional economic, population and transp01tation centers with varying land uses, accommodating substantial future growth of medium to high intensity. As an overlay of all other landscapes, the county's Natural Landscapes consist of a network of streams, wetlands, floodplains, and forests that are protected by regulations or should be subject to limited disturbance. Conservation practices should protect and restore these natural resources. The proposed land development is consistent with the objectives of the Suburban Center Landscape.
WATERSHEDS:
2. Watersheds, the water resources component of Landscapes3, indicates the proposed development is located within the Chester Creek watershed. Watersheds' highest priority land use objectives within this watershed are: reduce stormwater runoff, restore water quality of"impaired" streams, and protect vegetated riparian corridors. Watersheds can be accessed at www.chesco.org/water.
Page: Re: #
3 Preliminary/Final Land Development - 1303 Goshen Parkway East Goshen Township - LD-05-20-16336
Site Plan Detail, Sheet C0.12: Preliminary/Final Land Development -1303 Goshen Parkway
•
,-'
Page: 4 Re: Preliminary/Final Land Development - 1303 Goshen Parkway # East Goshen Township - LD-05-20-16336
ADMINISTRATIVE ISSUES:
3. While not identified on Sheet CO.I I (Conditional Use Plan), the October 17, 2017 Township Board of Supervisors meeting minutes indicate that conditional use approval was granted to increase the impervious coverage on the property to sixty percent (60%), with six conditions ofapproval (we note that the Zoning Summary table Sheet C0.12-Land Development Plan indicates that the maximum impervious coverage is proposed to increase from 55 percent to approximately 56 percent). Prior to granting final plan approval, the Township should verify that all applicable conditions of approval are incorporated into the final plan, the details of which should be identified on the plan.
4. Land disturbance and land development activities that occur within Chester County must comply with the County-wide Act 167 Stormwater Management Plan for Chester County, PA (July 2013) and the associated Act 167 stormwater management ordinance standards adopted by each municipality.
5. The applicant is requesting three waivers from Article VIII-Supplementary Studies and Plans of the Township Subdivision and Land Development Ordinance. Waiver requests should only be granted following the determination that the proposed project either meets the purpose of these requirements or does not create the impacts that these provisions are intended to manage.
6. A minimum of four (4) copies of the plan should be presented at the Chester County Planning Commission for endorsement to permit recording of the final plan in accord with the procedures of Act 247, the Pennsylvania Municipalities Planning Code, and to meet the requirements of the
Recorder of Deeds and the Assessment Office.
This report does not review the plan for compliance to all aspects of your ordinance, as this is more appropriately done by agents of East Goshen Township. However, we appreciate the opportunity to review
and comment on this plan. The staff of the Chester County Planning Commission is available to you to discuss this and other matters in more detail.
cc: Synthes USA HQ, Inc. Johnson & Johnson Mainstay Engineering Group
Sincerely,
Paul Farkas Senior Review Planner
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY 1580 PAOLI PIKE, WEST CHESTER. PA 19380-6199 610-692-7171
Date: June 24, 2020
Address: Jabil 1303 Goshen Parkway, West Chester Pa. 19380
RE: Land development Application/ Fire Service site plan review for proposed ~1900 s.f. addition.
The following questions or concerns arose as a result ofmy plan review for the above referenced project. To expedite the permit approval, please submit the additional information so that this project can proceed:
1. Fire Depattment Connection (FDC) is located behind a generator on the west wall, is unmarked, and is fashioned as a single 2 ½-inch connection. The FDC needs to be moved to an accessible location (to be determined by the Fire Chief). It also needs to be properly marked (identified) with signage and has to be fashioned as a 5 inch Storz connection on a 30-degree swivel.
2. There is an entrance door on the southwest corner of the building (near the loading docks and near a roll up door). That door (by signage) warns of combustible liquids inside. It needs to be determined what liquids are being stored and if the storage is proper and protected. It must also be determined if they are being stored in the exit way or exit discharge.
3. The turning radius at the end of the parking lot on the north side of the building (in the area where the addition is going) is questionable for the responding fire apparatus. It does not appear sufficient for fire apparatus to turn (and even if it sufficient) the fire apparatus would turn into a dead-end access roadway with no way ohurning around. Applicant must demonstrate reconfiguration of that area and satisfy the requirements in Section 503.2.5 of the 2015 International Fire Code, entitled Dead Ends (below) and Appendix 0.
"Dead-end fire apparatus access roads in excess of150 feet (45 720 mm) in length shall be provided with an approved area for turning around fire apparatus."
4. The trees in the traffic island in the north side of the building need to be pruned so that fire apparatus can maneuver without obstruction.
If you have any questions, please feel free to call me via e-mail or by calling one of the numbers provided below.
Respectfully Yours,
,-,,? Vincent J. Di Martini Building Inspector/ Fire Inspector East Goshen Township Office: 610-692-7171
F:\Data\Shared Data\Property Management\53-3\53-3-1.12 (1303 Goshen Parkway)\LD 2020\1303 Goshen Parkway FS site review 06252020.doc
/,M- . t _/,,, a1ns ay ENGINEERING GROUP, lIC,
June 12, 2020
East Goshen Township Mr. Mark A. Gordon, CFM Director of Code Enforcement/ Zoning Officer 1580 Paoli Pike West Chester, PA 19380
RE: 1303 Goshen Parkway - Preliminary I Final Land Development Jabil Finishing Plant Expansion
1303 Goshen Parkway, West Chester, PA 19380 Mainstay Project Number: 19360 Pennoni / EGT Reference: EGOST00131
Mr, Gordon:
Civil Engineering Structural Engineering Fall Protection Services
We have received the Township Engineer's technical review letter, prepared by Mr. Nathan M. Cline, P,E., and dated May 21, 2020 for the above-referenced project, and we offer the following responses:
ZONING
1. All new structures shall incorporate a complete visual screen for all rooftop structures. (§240-
19,F(2))
Architectural drawings will reflect compliance with this section.
2, It is unclear why the required building coverage area in the Zoning Summary table is blacked out. Please indicate the required 30% in the table. (§240-19.G)
The Zoning Summary table has been revised to indicate the building coverage area as 30%.
3. The rear yard shall be measured from the property line to the proposed addition and the Zoning Summary table updated. (§240-19.G)
A dimension indicating the proposed rear yard has been added to the plans. The Zoning Summary table (Sheet C0.12) has been updated as well.
4, A detail for the proposed lighting shall be provided to confirm the light is completely shielded and/or covered by an appropriate translucent cover. (§240-27. C(7)(b))
A detail has been provided on the Lighting and Landscaping Plan (Sheet CS.01 ).
SUBDIVISION AND LAND DEVELOPMENT
5. The applicant is proposing preliminary/final plan approval, therefore a waiver from §205.28 should additionally be requested.
Corporate Headquarters: 1750 Walton Road I Blue Bell, PA 19422 I 215 646 5595 New Jersey Office: 1415 Mar/ton Pike East, Suite 312 I Cherry Hill, NJ 08034 I 732 868 8636
www.megr.com
1303 Goshen Parkway- Preliminary/Final Land Development Mainstay Project Number 19360 /iM June 12, 2020
A waiver is requested from Section 205-28, from the requirement to submit a
preliminary plan. The applicant proposes the submission of preliminary/final.
6. Regarding preliminary and final plan requirements (§205-30 and §205-33), the following should be provided:
a. The name of all abutting or adjacent property owners in the vicinity of the project including those across Goshen Parkway. (§205-30.8(5))
This information has been added to the plan set.
b. Location and elevation of the benchmark to which contour elevations refer, (§205-30.8(8))
This information has been added to the Land Development Plan (Sheet C0.12).
c. Such private deed restrictions and/or a statement of any restrictions previously imposed in accordance with §205-33. C(2). If no such deed restrictions exist or will be imposed, it is recommended a note stating the same be indicated on the plan,
This information has been added to the Land Development Plan (Sheet CO, 12).
STORMWATER MANAGEMENT
7. Regarding the Erosion and Sediment Control Plans, please provide the following, including details, if applicable:
a. Indicate construction fence around the proposed infiltration area.
Construction fencing has been added around the infiltration basin area on the Conservation Plan (Sheet C1 .11) and a detail has been added on the Conservation Details (Sheet C7.11 ).
b. Provide a means to prevent sediment from being deposited on public roads, such as a rock construction entrance and/or wash station.
A mobile wash station has been added to the Conservation Plan (Sheet C1 .11 ).
c. Indicate a concrete washout area.
A concrete washout has been added on the Conservation Plan (Sheet C1 .11) and a detail has been added on the Conservation Details (Sheet C7, 11 ).
d. Indicate soil stockpile area.
A soil stockpile has been added on the Conservation Plan (Sheet C1 .11) referring to the detail located on the Conservation Details (Sheet C7.11 ). N
· Corporate Headquarters: 1750 Walton Road I Blue Bell, PA 19422 I 215 646 5595 New Jersey Office: 1415 Marlton Pike East, Suite 312 I Cherry Hill, NJ 08034 I 732 868 8636
www.megr.com
(!J b-0 (IJ CL
1303 Goshen Parkway - Preliminary/Fina! Land Development Mainstay Project Number 19360 /iM June 12, 2020
e. It is unclear how the outlet modifications will be completed without possible additional earth disturbance. Please revise the limit of disturbance accordingly.
The outlet modifications are described on the Site Utilities Plan (Sheet (3.21), being a
new galvanized steel plate with 16" orifice to be grouted to the existing headwall and the replacement of the inlet grate with a galvanized steel plate with 18" orifice.
Both modifications are orifice plates to be attached on the face of the structure and on top plane of the structure. No earth disturbance is described or necessary for installation.
8. Wherever possible, infiltration should be designed to accommodate the entire water quality and runoff volume required in §195-19. (§195-20.A)
Calculations have been updated to demonstrate compliance with this section.
9, The applicant should clearly identify the predeveloped and post-developed areas and specifically BMP drainage area in the report.
The Pre-Development and Post-Development Watershed Plans delineate these areas.
10. Please provide the location of the test pit used for the design of the proposed infiltration facility on the plan. (§195-20.I)
Test pit location has been located on the Post-Development Drainage Plan (Sheet (6.01 ). Refer to infiltration report in the Stormwater Narrative appendix.
11. The applicant should provide Worksheet 4 calculations for the area tributary to the proposed infiltration BMP to demonstrate compliance with §195-19 and §195-20.
Worksheet 4 is now a legacy document, and not available readily from PADEP, With that understood, the design of the infiltration BMP has been modified, and inclusion of additional worksheets is not necessary.
12. The proposed BMP does not appear to be included in the HydroCAD model. Please provide routing colculations for the proposed infiltration BMP. (§195-19 and §195-20)
The proposed infiltration bed has been added to the HydroCAD model.
13. The closest infiltration test to the proposed BMP appears to be more than 75 feet away from the proposed location. The applicant should provide a test pit and infiltration test at the proposed infiltration elevation in the area of the proposed BMP. (§195-20}(1)
Test pit location has been located on the Post-Development Drainage Plan (Sheet C6.01 ). Refer to infiltration report in the Stormwater Narrative appendix,
Corporate Headquarter·s: 1750 Walton Road I Blue Bell, PA 19422 I 215 646 5595 New Jersey Office: 1415 Marlton Pike East, Suite 312 I Cherry Hill, NJ 08034 I 732 868 8636
www.megr.com
(Y)
QJ b.O ro Q_
I '
1303 Goshen Parkway - Prellmlnary/Flna! Land Development Mainstay Project Number 19360 June 12, 2020
14, Please provide calculations to ensure the system will dewater in 72 hours. (§195-20-}(3))
Basin A hydrograph table has been added to the HydroCad Appendix in the Stormwater Narrative to demonstrate compliance with this requirement.
15, The plans shall note that during site construction, all infiltration practice components shall be protected from compaction due to heavy equipment operation or storage of fill or construction material, Infiltration areas shall also be protected from sedimentation. Areas that are accidentally compacted or graded shall be remediated to restore soil composition and porosity. (§195-20-M)
The following notes has been added to the Excavation and Backfill notes located on the Existing Features and Demolition Plans (Sheet C1 .01 ):
9, COMPACTION OF SOILS WITHIN STORMWATER BMP AREAS IS NOT ACCEPTABLE, EQUIPMENT OPERATING WITHIN STORMWATER BMP AREAS SHOULD BE EQUIPPED FOR LOW-PRESSURE OPERATIONS (MAX PRESSURE 7 PSI), 10, DURING SITE CONSTRUCTION, ALL INFILTRATION BMP COMPONENTS SHALL
BE PROTECTED FROM COMPACTION DUE TO HEAVY EQUIPMENT OPERATION OR STORAGE OF FILL OR CONSTRUCTION MATERIAL. INFILTRATION AREAS SHALL ALSO BE PROTECTED FROM SEDIMENTATION, AREAS THAT ARE ACCIDENTALLY COMPACTED OR GRADED SHALL BE REMEDIATED TO RESTORE SOIL COMPOSITION AND POROSITY,"
16, Where roof drains are designed to discharge to infiltration practices, they shall have appropriate measures to prevent clogging by unwanted debris (for example, silt, leaves and vegetation), Such measures shall include but are not limited to leaf traps, gutter guards and cleanouts, (§195-20-0)
A downspout boot detail (11 /C?,01) specifying a cleanout has been added to the Civil
Details Sheet (Sheet C?,01 ), Cleanouts are indicated along the trunk line for the roof drain system,
17, All infiltration practices shall have appropriate positive overflow controls, Please provide a detail and routing colculations for the proposed BMP.
A detail of the infiltration facility is provided on C3,21. An overflow pipe with top-third
perforations is located near the top of the infiltration facility, Any overflow from the infiltration basin will enter the detention basin,
18. Please provide complete delineation of the flow paths used for calculating the time of concentration (Tc) for the predevelopment and postconstruction conditions. (§195-27.8(14))
The complete delineation of flow paths for the time of concentration (Tc) has been added to the Pre-Development Drainage Plan (Sheet C6.01) and the Post-Development Drainage Plan (Sheet C6,02). s;:j"
Corporate Headquarters: 1750 Walton Road I Blue Bell, PA 19422 I 215 646 5595 New Jersey Office: 1415 Marlton Pike East, Suite 312 I Cherry Hill, NJ 08034 I 732 868 8636
www.megr.com
QJ t>O f1l Q_
s
< \
'
1303 Goshen Parkway - Preliminary/Fina! Land Development Mainstay Project Number 19360 June 12, 2020
19. Please provide a statement, signed by the applicant, acknowledging that any revision to the approved SWM site plan shall be submitted to and approved by the municipality and that a revised erosion and sediment control plan shall be submitted to, and approved by East Goshen
Township for a determinatian of adequacy prior to construction of the revised features on the PCSM Plan. (§195-27.A(3))
The following statement with signature line has been added to the Stormwater Management Plan (Sheet C6.03):
"THE PERMITTEE ACKNOWLEDGES THAT ANY REVISION TO THE APPROVED
STORMWATER MANAGEMENT PLAN SHALL BE SUBMITTED TO AND APPROVED BY THE MUNICIPALITY AND THAT A REVISED EROSION AND SEDIMENT CONTROL PLAN
SHALL BE SUBMITTED TO, AND APPROVED BY EAST GOSHEN TOWNSHIP FOR A DETERMINATION OF ADEQUACY PRIOR TO CONSTRUCTION OF THE REVISED FEATURES ON THE STORMWATER MANAGEMENT PLAN"
20. Please provide the required signature block signed and sealed by the qualified licensed professional responsible for the preparation of the SWM site plan. (§195-27.A(4))
The required signature block has been signed and sealed by the engineer of record.
21. A detail for the proposed infiltration BMP shall be provided. (§195-27.8(13))
A detail has been added to C3.21.
22. The PCSM Plan includes notes regarding a Notice of Termination. Since an NP DES permit is not required the notes should be removed.
The Notice of Termination notes have been removed from the Stormwater Management Plan (Sheet C6.01 ).
23. The applicant is reminded that a Stormwater Management Operation and Maintenance Agreement shall be completed. (§195-36) This document is available on the Township website.
Please sign two copies and return to the Township for authorization by the Board of Supervisors. The Township will then return to the applicant for recording with the plan, at the County. A copy of the time stamped document and proof of recording should then be returned to the Township,
The applicant acknowledges this requirement and will provide prior as part of the final plan approval resolution.
24. It appears the proposed outlet structure modification may be on the adjacent property, which is noted as under different ownership; please confirm authorization has been provided from the property owner.
The owner shall secure any necessary easements as part of the Final Plan Approval
Resolution.
Corporate Headquarters: 1750 Walton Road ! Blue Bell, PA 19422 ! 215 646 5595 New Jersey Office: 1415 Marlton Pike East, Suite 312 I Cherry Hill, NJ 080341732 868 8636
www.megr.com
L.{)
(]J b.O (1J Q._
• I ,
1303 Goshen Parkway - Preliminary/Final Land Development Mainstay Project Number 19360 June 12, 2020
25. The applicant should provide an easement granting the Township ingress and egress to the stormwater BMP's. Note: a blanket easement is acceptable; see below. (§195-27.B(18)(c))
A blanket easement as noted below has been added to the Stormwater Management Plan (Sheet C6.01 ).
26. Per §195-39, the Township requests that the following be added to the plans regarding stormwater management easement: 'A blanket stormwater management easement is provided over and across the property in favor of East Goshen Township to allow the Township and its
agent and designees access to the proposed storm water management facilities. The Township is granted the right, but not the duty, to access and conduct periodic inspections and to undertake other actions that may be necessary to enforce the requirements of the Township's Stormwater Management Ordinance or of any applicable O&M plan or O&M agreement."
The aforementioned note has been added to the boxed note located in the upper left corner of the Stormwater Management Plan (Sheet C6.01 .)
GENERAL
27. We recommend the Conditional Use approval be noted on the plans and referenced below the Zoning Summary table (Sheet C0.12) regarding the impervious coverage.
The Conditional Use Approval as stated by East Goshen Township has been added adjacent to the Zoning Summary on C0.12.
28. The plans should indicate any additional signage proposed.
No additional sign age is proposed as part of this Land Development.
Please process the enclosed for review. If you have any questions, or should you require additional information, please do not hesitate to contact me at (215) 646-5595 x 115 or dcitro@megr.com.
/
avifF. Cü,-P:" . Civil[p.gmeering Department Manager
cc: Todd Mcvoy
Brendan Burke, Esq. John Neilson, RA
UABIL) (Law Offices ofBrendan P. Burke, LLC) Uohnsrud/Bergmann Architects)
Corporate Headquarters: 1750 Walton Road I Blue Bell, PA 19422 I 215 646 5595 New Jersey Office: 1415 Marlton Pike East, Suite 312 I Cherry Hill, NJ 08034 I 732 868 8636
www.megr.com
\.D
OJ b.O m 0...
Civil Engineering
Structural Engineering
Fall Protection
1303 GOSHEN PARl<WAY-JABIL PLANT EXPANSION LAND DEVELOPMENT SYNTHES USA HQ INC. WAIVERS REQUESTED FROM CHAPTER 205 (SUBDIVISION & LAND DEVELOPMENT ORDINANCE)
SECTION 205-40: A WAIVER IS REQUESTED FROM THE PROVISION TO PROVIDE A WATER STUDY. NO NEW WATER SERVICES ARE PROPOSED.
SECTION 205-39: A WAIVER IS REQUESTED FROM THE PROVISION TO PROVIDE A TRAFFIC
IMPACT STUDY. THERE WILL BE NO INCREASE/ DECREASE IN THE NUMBER OR LOCATION OF SITE DRIVEWAYS.
SECTION 205-37(.(7): A WAVER IS REQUESTED FROM THE PROVISION TO PROVIDE A MINIMUM INSIDE DIAMETER OF 15 INCHES. PIPES ARE SIZED APPROPRIATELY ACCORDING TO FLOW WITH
A MINIMUM OF 6 INCHES.
SECTION 205-28: A WAIVER IS REQUESTED FROM THE PROVISION TO SUBMIT A PRELIMINARY PLAN. THE APPLICANT PROPOSES THE SUBMISSION OF PRELIMINARY/ FINAL.
LOrporate Headquarters: 1750 Walton Road~ Blue Bell, PA 19422 ~ tel 215 646 5595 New Jersey Office: 1415 Marlton Pike East Suite 312 ~ Cherry HHl NJ 08034 ~ tel 732 868 8636
www.megr.com
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
DRAWING NUMBER
DATE ISSUE ISSUE DESCRIPTION
DRAWING TITLE
CIVIL INDEX SHEET C0.01
CONSERVATION PLAN C1.11
EXISTING FEATURES AND DEMOLITION PLAN C1.01
X
X X
X
X
X
X
X SITE GRADING PLAN C3.11
03-31-2020 ISSUE FOR OWNER REVIEW
C0.12 LAND DEVELOPMENT PLAN
C3.01 SITE IMPROVEMENTS PLAN
X
X
X
SITE UTILITIES PLAN (1 OF 2) C3.21
LANDSCAPE PLAN C5.01 PRE - DEVELOPMENT DRAINAGE PLAN C6.01
CIVIL DETAILS SHEET (1 OF 2) C7.01
CONSERVATION DETAILS SHEET C7.11
CIVIL INDEX SHEET
C0.01
A 03-31-2020 ISSUE FOR OWNER REVIEW
X SITE UTILITIES PLAN (2 OF 2) C3.22
CONDITIONAL USE PLAN * C0.11
X POST- DEVELOPMENT DRAINAGE PLAN C6.02
X CIVIL DETAILS SHEET (2 OF 2) C7.02
X
X X
X
X
X
X
X
04-23-2020 LAND DEVELOPMENT ISSUE
X
X
X
X
X
X
B 04-23-2020 LAND DEVELOPMENT ISSUE
STORM UTILITIES PROFILE C4.01 X
STORMWATER MANAGEMENT PLAN C6.03 X
* REFERENCE DOCUMENT
X
X X
X
X
X
X
X
05/01/2020 ISSUE FOR BID
X
X
X
X
X
X
X
X
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
X
X X
X
X
X
X
X
06/12/2020 LAND DEVELOPMENT ISSUE #2
X
X
X
X
X
X
X
X
DEPUY SYNTHES BRANDWINE PLANT
UPGRADE WESTER CHESTER CHESTER COUTNY, PA
SITE DATA
CONDITIONAL USE PLAN
C0.11
LOCATION MAP (1"=400')
THIS CONDITIONAL USE PLAN WAS APPROVED BY THE EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS ON OCTOBER 17, 2017. SEE DRAWING C0.12 FOR CONDITIONAL USE APPROVAL NOTES
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
LAND DEVELOPMENT PLAN
C0.12
BUILDING
PROPERTY LINE
RIGHT-OF-WAY
X X
UG STORM ST ST
EASEMENT LINE
SETBACK LINE
FLOODPLAIN LINE
CONC PAD
UG SWM
NORTH
SCALE: 1" = 40'-0"
A
C0.12
GENERAL NOTES: 1. SITE SERVICED BY PUBLIC SANITARY SEWER AND PUBLIC WATER SUPPLY. 2. SOIL DATA TAKEN FROM SOIL SURVEY OF CHESTER AND DELAWARE COUNTIES AND PER PLAN REFERENCED IN NOTE #1. 3. ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH EAST GOSHEN TOWNSHIP DESIGN SPECIFICATIONS.
CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATIONS OF ALL SUBSURFACE UTILITY LINES, STRUCTURES, ETC. BEFORE THE START OF WORK, BY CALLING THE PENNSYLVANIA ONE CALL SYSTEM AT 1-800-242-1776
UTILITIES TO BE NOTIFIED
AQUA PA (CLEAR - NO FACILITIES) AT & T (CLEAR - NO FACILITIES) COMCAST CABLE (DID NOT RESPOND) CROWN CASTLE (FACILITIES PRESENT) DEPUY SYNTHES (FACILITIES PRESENT) EAST GOSHEN TWP MUNICIPAL AUTH (FACILITIES PRESENT) LEVEL 3 COMMUNICATIONS (CLEAR - NO FACILITIES) PECO ENERGY (FACILITIES PRESENT) SUNOCO PIPELINE/ATLANTIC PIPELINE/CHEVRON (CLEAR - NO FACILITIES) TRANSCONTINENTAL GAS PIPELINE CORP. (CLEAR - NO FACILITIES) VERIZON PENNSYLVANIA (DID NOT RESPOND)
CERTIFICATE OF CONFORMANCE I HEREBY CERTIFY THAT TO THE BEST OF MY KNOWLEDGE, THESE PLANS ARE IN CONFORMITY WITH ENGINEERING, ZONING, BUILDING, SANITATION AND OTHER APPLICABLE TOWNSHIP ORDINANCES AND REGULATIONS.
__________________________________________________ DAVID F. CITRO, P.E.
COMMONWEALTH OF PENNSYLVANIA COUNTY OF CHESTER
ON THE __________DAY OF _______________A.D. 20 __ BEFORE ME, THE SUBSCRIBER, A NOTARY PUBLIC OF THE COMMONWEALTH OF PENNSYLVANIA, RESIDING IN _________________________, PERSONALLY APPEARED ________________ WHO ACKNOWLEDGES HIMSELF TO BE THE ______ ____________________ OF _______________ _____________________, A CORPORATION, AND THAT AS SUCH TO DO SO, HE EXECUTED THE FOREGOING PLAN BY SIGNING THE NAME OF THE SAID CORPORATION BY HIMSELF AS __________________ ________________ THAT THE SAID CORPORATION IS THE OWNER OF THE DESIGNATED LAND, THAT ALL NECESSARY APPROVAL OF THE PLAN HAS BEEN OBTAINED AND IS ENDORSED THEREON AND THAT THE SAID CORPORATION DESIRES THAT THE FOREGOING PLAN MAY BE DULY RECORDED.
_________________________________________ NOTARY PUBLIC
MY COMMISSION EXPIRES:______________________
REVIEWED BY THE PLANNING COMMISSION OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA., THIS ____________DAY OF ______________, 20__,
___________________ ____________________ CHAIRMAN MEMBER
___________________ ____________________ VICE-CHAIRMAN MEMBER
___________________ ____________________ MEMBER MEMBER
____________________ MEMBER
APPROVED BY THE BOARD OF SUPERVISIONS OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA., THIS ____________DAY OF_________________, 20__.
___________________ ____________________ CHAIRMAN SUPERVISOR
___________________ ____________________ VICE-CHAIRMAN SUPERVISOR
____________________ SUPERVISOR
REVIEWED BY THE CHESTER COUNTY PLANNING COMMISSION THIS__________ DAY OF ______________, 20__.
____________________ SECRETARY
APPROVED BY THE EAST GOSHEN TOWNSHIP ENGINEER;
___________________ ____________________ DATE
RECORDED IN THE OFFICE OF THE RECORDER OF DEEDS OF CHESTER COUNTY AT WEST CHESTER, PENNSYLVANIA IN PLAN BOOK ___________, PAGE ____________, ON THE _______________DAY OF ______________, 20__.
____________________ (DEPUTY) RECORDER OF DEEDS
OWNER/APPLICANT SYNTHES USA HQ INC 1302 WRIGHTS LANE EAST WEST CHESTER PA 19380-3417
CONC PAD
STRIPING
SURFACE SWM
SURFACE SWM
LOCATION MAP (1"=400')
03-31-2020 ISSUE FOR OWNER REVIEW A
NRCS SOILS BOUNDARY
B 04-23-2020 LAND DEVELOPMENT ISSUE
SYMBOL
SOILS SUMMARY - 100% OF AREA OF INTEREST
DEPTH TO WEATHERED ROCK (IN)
DEPTH TO WATER (IN)
HYDRIC SOIL
HYDROLOGIC SOIL GROUP SOIL NAME
SURFACE RUNOFF
CaB >6 NO D HIGH CALIFON LOAM, 3-8% SLOPES >20
CpA >0 YES C/D HIGH COKESBURY SILT LOAM, 0-3% SLOPES >20
GdC >80 NO B N/A GLADSTONE GRAVELLY LOAM, 8-15% SLOPES >65
NvB >80 NO C LOW NESHAMINY SILT LOAM, 3-8% SLOPES >60
NvC >80 NO C MED NESHAMINY SILT LOAM, 8-15% SLOPES >60
PER SECTION 204-35.D(2) OF THE EAST GOSHEN TOWNSHIP CODE, TRANSITIONAL ZONES. SLOPES SEVEN FEET OUTWARD FOR EACH FOOT UPWARD BEGINNING AT THE SIDES OF AND AT THE SAME ELEVATION AS THE PRIMARY SURFACE AND THE APPROACH SURFACE AND EXTENDING TO A HEIGHT OF 150 FEET ABOVE THE AIRPORT ELEVATION, EXCEPT THAT A BUILDING MAY BE CONSTRUCTED WITHIN THE TRANSITIONAL ZONE TO A MAXIMUM HEIGHT OF UP TO 50 FEET (SUBJECT TO THE HEIGHT LIMITATIONS IMPOSED BY OTHER PROVISIONS OF THIS CHAPTER WITH RESPECT TO THE PERMITTED HEIGHT OF BUILDINGS IN ANY ZONING DISTRICT, WHICH PROVISIONS SHALL APPLY) AS PROVIDED IN SUBSECTION D(5). IN ADDITION TO THE FOREGOING, THERE ARE ESTABLISHED HEIGHT LIMITS SLOPING SEVEN FEET OUTWARD FOR EACH FOOT UPWARD BEGINNING AT THE SIDE OF, AND AT THE SAME ELEVATION AS, THE APPROACH SURFACE AND EXTENDING TO WHERE THEY INTERSECT THE CONICAL SURFACE, WHICH IS 465 FEET ABOVE MEAN SEA LEVEL.
APPROXIMATE ELEVATION OF THE AIRPORT RUNWAY: EL = 465 DISTANCE FROM RUNWAY TO PROPERTY LINE: 547 LF MAXIMUM ALLOWABLE TREE HEIGHT @ PROPERTY LINE: EL = 543 DISTANCE FROM "HIGHEST TREE" TO RUNWAY (PROJECTED): 932 LF MAXIMUM ALLOWABLE TREE HEIGHT @ PLANTING LOCATION: EL = 598 MATURE HEIGHT OF PROPOSED TREES: EL = 486
WAIVERS REQUESTED FROM CHAPTER 205 (SUBDIVISION & LAND DEVELOPMENT ORDINANCE)
SECTION 205-28: A WAIVER IS REQUESTED FROM THE PROVISION TO PROVIDE THE SUBMISSION OF A PRELIMINARY PLAN. THE APPLICANT PROPOSES THE SUBMISSION OF A PRELIMINARY/FINAL LAND DEVELOPMENT APPLICATION.
SECTION 205-37C.(7): A WAVER IS REQUESTED FROM THE PROVISION TO PROVIDE A MINIMUM INSIDE DIAMETER OF 15 INCHES. PIPES ARE SIZED APPROPRIATELY ACCORDING TO FLOW WITH A MINIMUM OF 6 INCHES.
SECTION 205-39: A WAIVER IS REQUESTED FROM THE PROVISION TO PROVIDE A TRAFFIC IMPACT STUDY. THERE WILL BE NO INCREASE / DECREASE IN THE NUMBER OR LOCATION OF SITE DRIVEWAYS.
SECTION 205-40: A WAIVER IS REQUESTED FROM THE PROVISION TO PROVIDE A WATER STUDY. NO NEW WATER SERVICES ARE PROPOSED.
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
BENCHMARK NOTES:
1. SITE TOPOGRAPHIC BENCHMARK IS A STORM MANHOLE LID LOCATED IN THE NORTHEASTERN QUADRANT OF THE SUBJECT PARCEL NORTHERN PARKING LOT. 2. BENCHMARK ELEVATION = 433.10
DEED RESTRICTIONS:
1. NO DEED RESTRICTIONS IN ACCORDANCE WITH EAST GOSHEN TOWNSHIP CODE §205-33.C(2) EXIST ON THE SUBJECT PROPERTY. 2. NO DEED RESTRICTIONS IN ACCORDANCE WITH EAST GOSHEN TOWNSHIP CODE §205-33.C(2) ARE PROPOSED FOR THE SUBJECT PROPERTY.
CONDITIONAL USE ORDER:
AT THE PUBLIC HEARING ON OCTOBER 17, 2017, THE BOARD OF SUPERVISORS APPROVED THE CONDITIONAL USE APPLICATION OF SYNTHES USA TO INCREASE THE IMPERVIOUS COVER ON THEIR PROPERTY AT 1303 GOSHEN PARKWAY TO 60% WITH THE FOLLOWING CONDITIONS: 1. ALL OUTSTANDING COMMENTS FROM THE TOWNSHIP ENGINEER ARE ADDRESSED ON THE LAND DEVELOPMENT PLAN 2. THE APPLICANT RETURN TO THE CONSERVANCY BOARD DURING THE LAND DEVELOPMENT REVIEW PROCESS TO PRESENT THEIR LANDSCAPE PLAN. 3. THE APPLICANT ADJUSTS THE PROPOSED PLANTINGS ON THE PLAN IN ORDER TO MEET THE REQUIREMENTS OF THE AIRPORT ZONING FOR LANDSCAPE PLANTINGS WITHIN THE AIRPORT APPROACH ZONE OF THE PROPERTY. 4. THE APPLICANT CONSIDERS IMPLEMENTING A VARIETY OF BEST MANAGEMENT PRACTICE METHODS TO DEAL WITH STORM WATER RUNOFF FROM THE INCREASED IMPERVIOUS COVERAGE. 5. THE APPLICANT SHALL SCREEN THE OUTDOOR STORAGE FACILITY AS REQUIRED BY SECTION 240-24E.(2)., OF THE EAST GOSHEN TOWNSHIP ZONING ORDINANCE, WITH A FENCE THAT WILL CONCEAL IT FROM ADJACENT PROPERTIES. 6. THE APPLICANT SHALL FOLLOW ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES.
AIRPORT REGULATION NOTES: PER SECTION 240-3G.G.(1).(c) IN THE AREAS LYING WITHIN THE LIMITS OF THE TRANSITIONAL ZONES BEYOND THE PERIMETER OF THE HORIZONTAL ZONE, NO PERMIT SHALL BE REQUIRED FOR ANY TREE OR STRUCTURE LESS THAN 75 FEET OF VERTICAL HEIGHT ABOVE THE GROUND, EXCEPT WHEN SUCH TREE OR STRUCTURE, BECAUSE OF TERRAIN, LAND CONTOUR OR TOPOGRAPHIC FEATURES, WOULD EXTEND ABOVE THE HEIGHT LIMIT PRESCRIBED FOR SUCH TRANSITIONAL ZONES.
PER A TELEPHONE CALL WITH THE EAST GOSHEN TOWNSHIP ZONING OFFICER ON 10 JUNE 2020, IT IS CONFIRMED THIS APPLICATION CONFORMS TO SECTION 240-3G.G.(1).(c) AND NO PERMIT IS REQUIRED.
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
EXISTING FEATURES AND DEMOLITION PLAN
C1.01
03-31-2020 ISSUE FOR OWNER REVIEW A
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
CONSERVATION PLAN
C1.11
03-31-2020 ISSUE FOR OWNER REVIEW A
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
SITE IMPROVEMENTS PLAN
C3.01
A 03-31-2020 ISSUE FOR OWNER REVIEW
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
SITE GRADING PLAN
C3.11
ISSUE FOR OWNER REVIEW 03-31-2020 A
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
SITE UTILITIES PLAN (1 OF 2)
C3.21
ISSUE FOR OWNER REVIEW 03-31-2020 A
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
SITE UTILITIES PLAN (2 OF 2)
C3.22
ISSUE FOR OWNER REVIEW 03-31-2020 A
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-01-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
STORM UTILITIES PROFILE
C4.01
A 04-23-2020 LAND DEVELOPMENT ISSUE
C
B 05-01-2020 ISSUE FOR BID
C 06-12-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
LANDSCAPING PLAN
C5.01
A 03-31-2020 ISSUE FOR OWNER REVIEW
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
PRE-DEVELOPMENT DRAINAGE PLAN
C6.01
A 03-31-2020 ISSUE FOR OWNER REVIEW
DRAINAGE AREA AREA (SF) TIME OF CONCENTRATION
AREA A (TO BASIN A) 378,132 6.0 MINUTES
AREA B (TO BASIN B) 61,981 7.2 MINUTES
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
POST DEVELOPMENT DRAINAGE PLAN
C6.02
03-31-2020 ISSUE FOR OWNER REVIEW A
DRAINAGE AREA AREA (SF) TIME OF CONCENTRATION
AREA A1 (TO BASIN A) 371,651 6.0 MINUTES
AREA A2 (THRU I.B. TO BASIN A) 8,556 6.8 MINUTES
AREA B (TO BASIN B) 59,906 7.2 MINUTES
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
STORMWATER MANAGEMENT PLAN
C6.03
A 04-23-2020 LAND DEVELOPMENT ISSUE
C
B 05-01-2020 ISSUE FOR BID
C 06-12-2020 LAND DEVELOPMENT ISSUE #2
06-12-20
06-12-20
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
CIVIL DETAILS SHEET (1 OF 2)
C7.01
A 03-31-2020 ISSUE FOR OWNER REVIEW
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
CIVIL DETAILS SHEET (2 OF 2)
C7.02
A 03-31-2020 ISSUE FOR OWNER REVIEW
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
Drawing Title
Drawing No.
Project Title
Drawn By: JA Project No. Lead:
Key Plan
Checked By:
FINISHING PLANT EXPANSION
DFC AFH MEH 064-WC-02-006
© 2019 Johnsrud & Associates Architects, LLC
Rev. Rev. Date Description
1303 Goshen Parkway West Chester, PA 19380
D
Professional Seal
North
Project Area
MEG PROJECT NO. 19360
THESE DRAWINGS SHALL NOT BE UTILIZED FOR CONSTRUCTION UNLESS EXPLICITLY NOTED AS “CONSTRUCTION ISSUE”. THE INTENDED USE OF THESE DRAWINGS SHALL BE ONLY AS INDICATED IN THE ISSUANCE DESCRIPTION OF THE DRAWING TITLE BLOCK. MAINSTAY ENGINEERING GROUP, INC. SHALL ASSUME NO LIABILITY FOR DRAWINGS THAT ARE USED FOR ANY PURPOSE OTHER THAN INDICATED ON THESE DRAWINGS.
DATE: 06-12-2020
DAVID F. CITRO REGISTERED PROFESSIONAL ENGINEER COMMONWEALTH OF PENNSYLVANIA PE075273
CONSERVATION DETAILS SHEET
C7.11
03-31-2020 ISSUE FOR OWNER REVIEW A
B 04-23-2020 LAND DEVELOPMENT ISSUE
C 05-01-2020 ISSUE FOR BID
D 06-12-2020 LAND DEVELOPMENT ISSUE #2
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692•7171 Fax: 610·692-8950 E-mail: mgordon@eastgoshen.org
Date: 6/25/2020 To: Planning Commission
·•"A .A / _ From: Mark Gordon, Zoning Officer /orv ' I"
Re: Review of Model Pipeline Ordinances
Dear Commissioners,
As you all know, as per request by the EGT Pipeline Taskforce and the Board of Supervisors, the PC has spent the last several months reviewing and discussing the two model pipeline ordinances (Zoning and SALDO) drafted in 2014 for the Chester County Association of Township Officials (CCATO). For the record, in 2014 the Township did review these two ordinances and in turn amended the Zoning Ordinance to include language specific to Public
Utility Buildings. This amendment is attached for your review.
The PC conducted the following review and analysis of the of the model pipeline Ordinances:
• December 6, 2019: Twp. staff forwarded the PC Members links to three pipeline risk assessments.
o Quest Consultants Inc. prepared for Del-Chesco United for Pipeline Safety and Clean Air Council Philadelphia PA, o G2 lntergrated Solutions Mariner East 2 Pipeline and Existing Adelphia Pipeline
Risk Assessments prepared for Delaware County, o JH Consulting, LLC prepared for Thornbury Township, in Delaware County. • Feb 2020: PC Met with members of the EGT Pipeline Taskforce to discuss their concerns and the Model Ordinances from CCATO • March 4, 2020: The PC discussed the Model ordinances and asked staff to assist with determining how many parcels would be impacted by the ordinances. The PC also asked staff to have the Township Solicitor review and comment on these ordinances. • April 1, 2020: No Meeting • May 6, 2020: The PC deferred discussion on this topic until the meeting in June • June 17, 2020: The PC Reviewed the Twp. Solicitor's review comments and asked her questions about the model ordinances. Staff also demonstrated a GIS tool they developed, which can be used to show the buffers graphically on a map and provide data on how many properties will be impacted by that buffer distance. • July 1, 2020: PC will discuss the ordinances and consider the next course of action.
F:\Data\Shared Data\Admin Dept\Township Code\Pipeline Zoning\Memo to PC re. Pipeline ords 06252020 ERJH comments.doc
DISCUSSION and STAFF RECOMMENDATION:
Pipelines in PA are primarily regulated by the PA Public Utility Commission (PUC) or the Federal Energy Regulatory Commission (FERC). The Township has very little if any regulatory authority with the exception of some Zoning for buildings and structures. The Township amended the zoning ordinance in 2015 to address "Public Utility Building" and "Public Utility Facility".
Pursuant to your review of the risk assessments, the proposed ordinances and the GIS analysis of how the requirements could affect existing Industrial, Commercial, and residential uses as well as future uses throughout the entire Township; it does not seem appropriate to adopt such broad regulations without more information and careful study.
Perhaps a more appropriate approach would be to identify uses that should have significant setbacks from pipelines and craft language that will protect those uses.
Staff recommends that the Commission forward a letter to the Board outlining the steps we took to review and analyze these ordinances, the potential impact the ordinances have on existing property, and ask them how they would like the Commission to proceed.
F:\Data\Shared Data\Admin Dept\Township Code\Pipeline Zoning\Memo to PC re. Pipeline ords 06252020 ERJH comments.doc
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PENNSYLVANIA
ORDINANCE NO. I 9 , ;to I .;- - <:..__
AN ORDINANCE OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA, AMENDING CHAPTER 240 OF THE EAST GOSHEN TOWNSHIP CODE , TITLED, "ZONING", TO AMEND THE DEFINITION FOR "ELECTRIC SUBSTATION", "PUBLIC UTILITY FACILITY", AND "PUBLIC UTILITY BUILDING" IN SECTION 240-6; TO ADD A DEFINITION FOR "PUBLIC UTILITY" AND "PUBLIC UTILITY CORPORATION" IN SECTION 240-6, TO AMEND THE USE REGULATIONS FOR THE R-1 DISTRICT TO DELETE PUBLIC UTILITY BUILDING; TO AMEND THE USE REGULATIONS FOR THE 1-1 AND 1-2 DISTRICTS TO ALLOW A PUBLIC UTILITY BUILDING BY CONDITIONAL USE; TO AMEND THE USE REGULATIONS FOR THE BP DISTRICT TO DELETE PUBLIC UTILITY INSTALLATION AND ADD PUBLIC UTLITY FACILITY; AND TO ADD CONDITIONAL USE STANDARDS FOR PUBLIC UTILTY FACILITIES AND PUBLIC UTILITY BUILDINGS IN SECTION 240- 31.C(3)(aa).
BE IT ENACTED AND ORDAINED by the Board of Supervisors of East Goshen Township that Chapter 240 of the East Goshen Township Code, titled, "Zoning", shall be amended as follows:
SECTION 1. The definition of "Electric Substation" in Section 240-6 shall be deleted and replaced with the following new definition:
"ELECTRIC SUBSTATION -An assemblage of equipment for transforming electric power from a higher to a lower voltage rather than for its generation or utilization."
SECTION 2. The definition of "Public Utility Building" in Section 240-6 shall be deleted and replaced with the following new definition:
"PUBLIC UTILITY BUILDING - A building constructed by a public utility or a public utility corporation."
SECTION 3. The definition of "Public Utility Facility" in Section 240-6 shall be deleted and replaced with the following new definition:
"PUBLIC UTILITY FACILITY • A facility, other than a building, owned and operated by a public utility or public utility corporation as defined in this Ordinance."
SECTION 4. Section 240-6 shall be amended to add the following definitions in alphabetical order:
"PUBLIC UTILITY - A public utility as that term is defined in the Public Utility Code, 66 Pa.CSA §101 et seq., as may be amended from time to time.
PUBLIC UTILITY CORPORATION - Any domestic or foreign corporation for profit that is subject to regulation as a public utility either by the Pennsylvania Public
Utility Commission or by an officer or agency of the United States."
SECTION 5. Section 240-8.D(2)(c) shall be deleted.
SECTION 6. Section 240-19.C(9) shall be amended as follows:
"(9) Public utility facility and public utility building."
SECTION 7. Section 240-20.0(23) shall be amended as follows:
"(23) Public utility facility and public utility building."
SECTION 8. Section 240-21.C(12) shall be amended as follows:
"(12) Public utility facility and public utility building."
SECTION 9. Section 240-31.C(3)(aa) shall be amended as follows:
"(aa) Public utility facility and/or public utility building.
[1] No obnoxious, toxic or corrosive fumes or gases shall be emitted as a result of the use.
[2] No use shall emit offensive odors which are perceptible at lot lines.
[3] No use shall discharge into the air dust or other particulate matter in a manner or quantity which does not conform to all applicable federal and state laws and implementing regulation.
[4] No use shall emit smoke from operations.
[5] No use shall produce any heat perceptible at or beyond the lot boundaries.
2
' '
[6] No use shall utilize lighting in a manner which does not conform with the lighting standards in this Chapter.
[7] No use shall permit physical vibrations perceptible at or beyond the lot boundaries.
[8] No use shall emit potentially harmful radiation.
[9] No use shall engage in the production or storage of any material designed for use as an explosive.
[1 OJ No use shall engage in the storage of waste materials on the lot for any period beyond 5 days. Such waste material storage shall be located behind the front building line of the primary building and no closer than 50 feet to any rear or side lot line and shall be completely screened from the view of any street or adjoining property.
[11] No use shall discharge any objectionable and/or potentially dangerous effluent from plant operations.
[12] No industrial lagoons for chemicals or other liquid waste shall be permitted.
[13] The portion of any such use not located within a building shall be enclosed or adequately screened in such a manner as to not be visible across property lines.
[14] All uses shall be conducted in compliance with applicable governmental regulations, including the noise and lighting regulations in this Chapter.
[15]
No retail activity shall be permitted.
[16] The owner of the Public Utility Facility and Public Utility Building shall provide the Township with an emergency liaison that may be reached 24 hours a day, 7 days a week in the event of an emergency.
[17] The owner of the Public Utility Facility and Public Utility Building shall prepare and file with the Township an emergency response plan which shall be followed in the event of an emergency at the facility.
[18] A Public Utility Facility and/or Public Utility Building shall be fully
screened in accordance with the criteria set forth in §240.27.C(3)."
3
I I
SECTION 10. Severability. If any sentence, clause, section, or part of this Ordinance is for any reason found to be unconstitutional, illegal or invalid, such unconstitutionality, illegality or invalidity shall not affect or impair any of the remaining provisions, sentences, clauses, sections, or parts hereof. It is hereby declared as the intent of the Board of Supervisors that this Ordinance would have been adopted had such unconstitutional, illegal or invalid sentence, clause, section or part thereof not been included herein.
SECTION 11. Repealer. All ordinances or parts of ordinances conflicting with any provision of this Ordinance are hereby repealed insofar as the same affects this Ordinance.
SECTION 12. Effective Date. This Ordinance shall become effective in five days from the date of adoption.
ENACTED AND ORDAINED this /1 day of {YWTlCJ.-f , 2015.
ATT
Louis F. Smith, Secretary
EAST GOSHEN TOWNSHIP BOARD OF SUPERVISORS
#ffa--.-
irman
Se
uttavio, rl:'1emfler v- Yd lt Charles W. Proctor, Ill, Esquire, Member t Janet L. Emanuel, Member
4