Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Meeting Agenda Wednesday,August4,2021 VIA Telephone/ Zoom Video Conference (929) 205-6099 with access code 893-5918-6610
7:00 PM
During this tele-conference Planning Commission meeting, public participation and comments will be handled as follows:
• Participants must call in by 6:55 pm and identify themselves with full name and address for the record. • The public will remain muted during the meeting when the Commission is conducting business. • The Chairman will ask for any public comment on agenda items. Audience members who wish to make comments must unmute, identify themselves with name and address, to ask questions and make comments. • Participants wishing to comment must state their name and address and must speak one at a time.
A. Call to Order/ Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting C. Review of Tracking Log/ Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes
1. June 2, 2021 F. Subdivision and Land Development Applications G. Conditional Uses and Variances H. Ordinance Amendments
1. LED Sign Ord. Amendment/ Electric Vehicle Charging & Media Station I. Old Business J. New Business K. Any Other Matter
1. Future Township Meetings to be held in person. L. Liaison Reports M. Correspondence N. Announcements
Bold Items indicate new information to review or discuss.
F:\Data\Shared Data\Agendas\Planning Commission\2021\PC AGENDA 08042021.doc
August 4, 2021 PC Meeting
u
II) >
II) 0 N
..J :::i u
C 0 .. " C.
Q. Application Name ..,. None
Bold = New Application or PC action required
Completed in 2021
14 Reservoir Rd./ Glossen ESKE Development LLC
Albert and Lynn Greto 1365 Enterprise Drive 198 Oneida Ln Pipeline HMS / Consultation Zone Ord.
Completed in 2020
1631 E. Strasburg Rd Solar Ordinance Amendment Synthes USA / 1303 Goshen Parkway
Boyle, 1137 N. Chester Rd.
KEY A-Approved AD -Adopted D - Denied
V V V V V ZO/SALDO
V zo
LD
V
;:;:-a:- ,:,l !!!. .,
Q. >, I-
Sk
s s Sk Sk DRAFT
Sk Sk
P/F Sk
East Goshen Township Planning Commission
Application Tracking Log
-'" u [D ., <C ., C ·s, ci. C e w
Q. :c "' C "' u .a C ll. -::, u .Q ,:, ., 0 .!!! - I- u <C .. 0 ii: C 0 0 - - - ., t: ., ., ., - .. - - - .. .. .. .. C - C C C II)
5/25/2021 5/25/2021 NA NA 5/27/2021 4/20/2021 4/20/2021 4/27/2021 NA 4/27/2021 4/26/2021 4/26/2021 NA NA 4/29/2021 4/1/2021 4/1/2021 NA NA 4/1/2021 1/26/2021 1/27/2021 NA NA 1/28/2021 NA NA NA NA NA
9/29/2020 9/29/2020 NA NA 10/2/2020 10/30/2020 NA NA NA NA 4/27/2020 5/6/2020 4/28/2020 4/30/2020 4/30/2020 7/29/2020 7/29/2020 NA NA 7/31/2020
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2021\PC Tracking Log for 08042021.xlsx
., ., - - .. .. C C C ., C 0 - 0 .a .. ., .a " - ,:, <C .. "' " ,:, C <C C - 0 I- .. C ..J "' ., ., ·;;; I- C z C E C ..J ., z II) ·c Q. E .. e >< u 0 ., 0 w a. [D :c C u
6/2/2021 7/6/2021 7/15/2021 7/23/2021 A 5/5/2021 5/11/2021 5/26/2021 6/18/2021 A 5/5/2021 6/1/2021 6/8/2021 6/25/2021 D 5/5/2021 5/18/2021 TBD 5/31/2021 A 2/3/2021 1/162021 2/25/2021 3/26/2021 A NA NA NA NA NA AD
10/7/2020 10/20/2020 10/27/2020 11/28/2020 A NA NA 12/1/2020 NA AD 1 9/15/2020 9/2/2020 NA 10/2/2020 A 9/2/2020 9/15/2020 8/26/2020 9/25/2020 A
7/28/2021
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29
30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
Draft EAST GOSHEN TOWNSHIP PLANNING COMMISSION MEETING
June 2, 2021
The East Goshen Township Planning Commission held their regular monthly meeting on Wednesday June 2, 2021. Because of the COVID-19 restrictions the meeting was held via teleconference using Zoom. Members present are highlighted: Chair - Ernest Harkness Vice Chair - John Stipe Dan Daley Edward Decker Michael Koza Mark Levy Michael Pagnanelli
Also present were: Mark Gordon, Zoning Officer Marty Shane, Township Supervisor Michele Truitt, Township Supervisor
COMMON ACRONYMS:
BOS - Board of Supervisors BC - Brandywine Conservancy CB - Conservancy Board CCPC - Chester Co Planning Commission
FORMAL MEETING - 7 p.m.
CPTF - Comprehensive Plan Task Force CVS - Community Visioning Session SWM - Storm Water Management
ZHB - Zoning Hearing Board
I. Ernest called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and a moment of silence to remember our first responders, military and healthcare providers. 2. Ernest asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response. 3. The tracking log was checked and no need for a workshop meeting. 4. The minutes of the May S, 2021 meeting were approved. S. Mark Gordon explained the procedure for public comments.
CONDITIONAL USES AND VARIANCES
I. Jeffery S. & Michelle A. Glosson/14 Reservoir Rd, Zoning Variance Request - Mr. Glosson was present and explained that he was here in 2017 with this proposal. He took the Planning Commission's recommendations to Yerkes to revise the plan. They are seeking relief from the required 40 foot flag pole width. They are on lot 2 and want to subdivide a Lot A. He reviewed some Chesco views of the property. Both neighbors also have flag lots so it will not impact the neighborhood. Ernest asked about the driveway. They will share a small pmtion of the driveway at the street. An easement will be required. Dan asked about utilities. Jeff explained that they have public sewer but well water. The poles
for the electric are at the rear of the prope1ty. Dan suggested indicating the easements for the utilities on the sketch plan.
Dan made a motion that the Planning Commission recommend that the Board of Supervisors suppott this dimensional variance application because the relief, if granted, will not alter the essential character of the neighborhood, or substantially impair the appropriate use or development of adjacent propetty or be
detrimental to the public welfare. John seconded the motion. The motion passed unanimously. OLD BUSINESS
PC 6-2-21 draft 1
1 I. Electric Vehicle Charing Stations -Mark mentioned that there is a stand alone noise ordinance and a 2 section in the township ordinance regarding noise. They should be put together in one stand alone 3 ordinance. Regarding signage at charging stations, he spoke with Westtown and East Bradford about 4 where they were installed in their townships. They didn't know they had signage. Mark is working with 5 the Township Solicitor and will have a draft for the July meeting. Mark also spoke with the sales 6 representative from Volta but he didn't give any information about a national size standard. Michele just 7 got an EV and has found that Volta seems to be the largest. Not all of them have advertising. 8 9 ANY OTHER MATTER 10 I. Ernest mentioned a noise ordinance and the pipeline. Mark commented that at their meeting last night 11 the BOS approved the pipeline repmt to go to a public meeting. 12 2. Mark reported on the ZHB hearings for CTDI and ESKE last week. 13 14 LIAISON REPORT 15 Board of Supervisors -Michele commented that the BOS will take a vote on June 15 regarding the Paoli 16 Pike Trail Section B which requires an archeological dig. If any historic items are found, they will have 17 to go to another level of the dig. Section A will be started soon. 18 19 ADJOURNMENT 20 There being no fmther business, John Stipe made a motion to adjourn the meeting. Dan Daley seconded 21 the motion. The meeting was adjourned at 7:40 pm. The next regular meeting will be held on 22 Wednesday, July 7, 2021 at 7:00 pm.
23
24 25 Respectfully submitted, 26 27 28 29 30 Ruth Kiefer, Recording Secretary
PC 6-2-21 draft 2
MEMO to The EGT Planning Commission/ LED Sign Ord Amendment
Memorandum
East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 Fax: 610-692-8950 E-mail: mgordon@eastgoshen.org
Date: 7/27/2021 To: Planning Commission From: Mark Gordon, Township Zoning Officer 0 Re: LED Sign Ord. Amendment
Planning Commission Members,
You may recall that we discussed a possible amendment to the Township Zoning Ordinance to address a new sign type being installed in shopping centers. The vendor, Volta, has approached the Giant supermarket on Boot Rd (Village Square Shopping Center) and would like to install two of these charging stations with integrated "Media Stations" within the parking lot.
The Giant on West Chester Pike (Westtown Township) recently installed these charging stations In the parking lot too, I have included pictures, but you can go see for yourself.
I have drafted an ordinance for your review and discussion.
F:\Data\Shared Data\Admin Dept\Township Code\LED signs 2021\Memo to PC 07272021.doc
\ . ✓,. , '. .·,·,. ' /. \ ' ' . ' ·\ '\ \ ,,
Level 2 Media Station
Volta Charging is driving the transition to
clean electric transportation by transforming properties with electric vehicle charging.
No longer will people drive to fuel, but fuel where they drive.
Volta's turn-key electric vehicle charging
Ila
55"digital screens is tailored to each location's needs and desired customer experience to increase traffic and customer engagement. Our fully integrated EV chargers include high-impact digital media screens that provide properties with branding and messaging as well as additional revenue opportunities.
84.25"H
Charger Specs
• Output power: 10 kW max (AC)
• Safety certification: UL 2202
Power Requirements
• Input voltage: 208 - 240 VAC
• Output voltage: 208 - 240 VAC
• Circuit size: 60A/2P, 208/240 breaker
• Network connectivity: Cell connection or LAN access
Display Screen Specs
• Size: 55" outdoor LED back light system x2
• Picture: Full HD 1080p resolution
• Power requirements: 20A/1P, 120V breaker
• File type: JPEG or PNG
Example Level 2 Media Foundation Plans
Bolt Down
411 • 1 /
3"MIN
voltacharging.com
--0 Charg;ng
Station
• 4 --0 Concrete · Base
Installation Requirements
• Foundation req: 36"L x 36"W x 36"D
J1772 connector
15' cable with cable management
• Conduit diameter: 1.5" min per station approx*
*Separate conduit for communication maybe required
Concrete Footing
--0 Concreto f-"------' ••--i · Base ·--- ---
Conctele Dase dimenslOns re ,1pprorlma1e
770-00002-A
East Goshen Township Draft Zoning Ordinance Amendment Electric Vehicle Charging Station LED Signs
§240-6 Definitions: LED SIGN A type of animated sign which uses light-emitting diodes, liquid crystal displays, or similar technologies to change the message of the sign.
[Added 9-4-2012 by Ord. No. 129-F-2012]
§240-22 Signs W. LED signs. LED signs may be used on the following types of signs subject to the regulations in this§ 240-22W: i) an off-premises sign along West Chester Pike between Westtown Way and the Township's border with West Goshen Township; ii) an off-premises sign along Route 202; Wiii) on a wall sign or freestanding sign in the C-1 District-:-; and iv) LED signs which are integrated with electric vehicle charging stations and located on a parcel with an approved Shopping Center use.
[Added 9-4-2012 by Ord. No. 129-F-2012] {!}_The message displayed on the digital off-premises sign shall be static and
nonanimated and shall remain fixed for a minimum of 10 seconds; {l}_The sign shall not display any message that moves, appears to move, scrolls, or
changes in intensity during the fixed display period; filThe transition time between changes in the sign face or message shall be less than one second; Ml The sign must be equipped with brightness controls which shall be used to reduce the intensity of the light based on outside light levels; and fil The digital LED display shall not have lighting that would compete with or distract
from traffic signal lighting. (6) LED signs associated with electric vehicle charging stations shall conform to all the standards within §240-22W and have a maximum sign area of 10 square feet and have a maximum height of 7 feet tall.
F:\Data\Shared Data\Admin Dept\Township Code\LED signs 2021\LED Sign amendment 07272021.docx
(SPARE)
)' l.fOlstfin
I
.,
\\, / ' ,,
j I l
t
.,.».if CJ...
\ \.
'
I
VOLTA
GIANT# 6505 HERSHEY'S MILLS VILLAGE
/ ;·
1375 BOOT ROAD WEST CHESTER, PA 19380
WASHINGTON, DC MARKET
APPLICABLE CODES AND AGENCIES:
lnlemalional Accreditation Service, lnc.-The lnternaltonal Accreditallon Service, Inc., 5360 Workman Mill Road, Whttller, California 90601.
International Building Code-An International Building Code Issued by the ICC. Chapter 11 and Appendix E of the ''International Bulldlng Code 2016" Issued by the ICC. The term Jncludes all errala Issued by the ICC.
International Energy Conservallon Code-An lnternallonal Energy Conservallon Code Issued by the ICC. The term Includes all errala Issued by the ICC.
International Existing Bulldfng Code-An lnlernaUonal Existing Building Code for Bulldings and Facllilles issued by the ICC. The accesslblUty provisions In the "lnterna\lonal Exfslfng Building Code for Buildings 2018" Issued by thO ICC. The term Includes all errata
issued by the ICC,
International Fire Codo-An lnternallonal Ffre Code Issued by the ICC. The term Includes all errata Issued by the ICC.
All codes are to be used with applicable slate and local changes.
CODE BLOCK
t i-A3Si) . l
I I
·, I . /. .,., .., "\
\ '. '?!
,, .f ' 1' • I ,I
•,
VOLTA PROPOSES TO INSTALL:
(2) ELECTRIC VEHICLE CHARGING STATIONS AND ALL RELATED ELECTRICAL AND CIVIL ACTIVITIES. PAINTING AND MARKING OF EV CHARGING PARKING SPACES AND INSTALLATION OF NECESSARY PARKING SIGNS.
DISCLAIMER
TI-iESE DMW1NGS WERE PRODUCEO WITHOUT THE BENEFIT OF A CURRENT LAND SURVEY. ALL PROPERTY UHES. EASEMENTS, ANO SETBACKS SHALL BE VER IA ED PRIOR TO START OF CONSTRUCTION. VOLTA DOES NOT GUARANTEE THE ACCURACY OF SAID PROPERTY LINES, EASEMENTS, ROADS AND SETBACKS.
PROJECT DESCRIPTION '
APPLICANT: VOLTA 155 DE HARO STREET SAN FRANCISCO, CA 94103 CONTACT: SUNG PAEK PHONE#: 571-309-0212 EMAIL: SUNG.PAEK@VOLTACHARGING.COM
PROJECT MANAGER: VOLTA 155 DE HARO STREET SAN FRANCISCO CA 94103 CONTACT: SUNG PAEK PHONE#: 571-309-0212 EMAIL: SUNG.PAEK@VOLTACHARGING.COM
ENGINEERING:
DURAK EVRIM ERCAN, P.E. PO BOX32 CEOAR GROVE, NJ 07009 PHONE#: 201-920-2899 EMAIL: EVRIM@AMPERENGINEERING.COM
PROJECT TEAM
SHEET DESCRIPTION l------+------------------------1 COVER T-1.0 T-2.0 NOTES AND LEGENDS
C-1.0 OVERALL SITE PLAN C-3.0 FOUNDATION DETAILS C-3.1 DETAILS
C-4.0 STRIPING DETAILS
E-1.0 CONDUIT PLAN
E-1,1 ELECTRICAL ONE-LINE I RISER
SHEET INDEX
CALL AT LEAST TWO WORKING
DAYS BEFORE YOU DIG
VOLTA
155 DE HARO STREET SAN FRANCISCO, CA 94103
EV CHARGING INSTALLERS
OF AMERICA, LLC
188 Breakneck Rd. Suite 204 Highland lakes, NJ 07422
Phone: 855-373-9566
A 07/02120 CD50 MM
REV DATE DESCRIPTION BY
[
ISSUE DATE
06/02/2020
ISSUED FOR
REVIEW
rTISA'IIOl.AnotlOfl.AWfORN-<1PERSOU, UUl..ESS n£'I' AA£ ACltKJ UtEE"' llEOIREC'U0tl
OF A UCENSEO PROfESSIO«AL AACHITECT AJOOREUG,.1cER, TOAJ.T£RTHISOCX:Olo!EHT.
ELECTRIC VEHICLE CHARGING STATIONS
GIANT#6505
EVCIA JOB# 1028
1030-PA-EV-Giant-6505-072320.dw
SHEET TITLE
COVER
]
GENERAL NOTES:
1. THIS DOCUMENT DOES NOT CONTAIN ALL SPECIFICATIONS AND DETAILS NECESSARY FOR CONSTRUCTION. REFER TO INSTALLATION GUIDES AND OTHER DOCUMENTS PROVIDED DY VOLTA FOR ADDITIONAL INFORMATION.
2. ALL EXISTING CONDITIONS SHOWN ARE APPROXIMATE. EXISTING UTILITY LOCATIONS AND CROSSINGS ARE TO BE LOCATED IN THE FIELD. CONTRACTOR IS TO CONTACT 811 PRIOR TO BEGINNING ANY EXCAVATION WORK.
3. ALL PAVEMENT, LANDSCAPING, UTILITIES, AND OWNER PROPERTY THAT IS DAMAGED OR AFFECTED BY CONSTRUCTION SHALL BE RETURNED TO EXISTING CONDITIONS AT THE CONTRACTOR'S EXPENSE.
4. PROPOSED PAVEMENT STRIPING SHALL LINE UP WITH EXISTING STRIPING WHEREVER POSSIBLE. ADDITIONAL PAVEMENT STRIPE IS NOT NECESSARILY PARALLEL TO THE CONSTRUCTED CHARGING ISLAND.
5. CONTRACTOR IS TO SUBMIT SKETCH OF ESTIMATED EXTENTS OF PROPOSED PAVEMENT WORK TO VOLTA PRIOR TO BEGINNING PAVEMENT WORK.
6. PROPOSED TRANSFORMER AND SWITCHGEAR CABINET LOCATIONS ARE APPROXIMATE. CONTRACTOR CAN FIELD LOCATE AS NECESSARY WITH APPROVAL FROM VOLTA.
7. THE ACCESSIBILITY REVIEW WAS UNDERTAKEN TO IDENTIFY DESIGN FEATURES OF THE PROJECT THAT MAY BE CONSIDERED BY GOVERNMENTAL AGENCIES OR DEPARTMENTS, OR NON-GOVERNMENTAL GROUPS TO BE NON-COMPLIANT WITH THE AMERICANS WITH DISABILITIES ACT OF 1990, REVISED 2010 ADA REGULATIONS AND STANDARDS. THE AMERICAN WITH DISABILITIES ACT OF 1990 IS A FEDERAL CIVIL RIGHTS LAW. THERE IS NO FEDERAL REVIEW PROCESS TO ENSURE FULL COMPLIANCE WITH THE GUIDELINES, EXCEPT THROUGH THE FEDERAL COURT SYSTEM. THE DEPICTIONS, NOTES, AND RECOMMENDATIONS EXPRESSED ON THIS PLAN ARE BASED ON PROFESSIONAL JUDGEMENT GAINED FROM PAST EXPERIENCE
WITH ACCESSIBILITY LAWS, CODES, AND STANDARDS AND THE WORKING INVOLVEMENT TO DEVELOP ACCESSIBILITY STANDARDS THAT WILL MEET OR EXCEED THE APPLICABLE FEDERAL GUIDELINES. ACCORDINGLY, NO CLAIMS OR WARRANTIES, EXPRESSED OR IMPLIED, ARE MADE THAT IN PREPARING THIS PLAN AND PROPOSING RECOMMENDATIONS, THAT ALL POSSIBLE BARRIERS TO ALL PEOPLE HAVE BEEN IDENTIFIED.
B. CONTRACTOR SHALL ACHIEVE A MINIMUM OF 1'/o BUT NO MORE THAN 2% SLOPE IN ANY DIRECTION WITHIN ADJACENT ACCESSIBLE SPACE AND BLEND ASPHALT OVERLAY TO EXISTING GRADES AS REQUIRED. CONTRACTOR SHALL PROVIDE A SKETCH TO VOLTA OF PROPOSED LIMITS OF ASPHALT OVERLAY TO ACHIEVE THIS REQUIREMENT PRIOR TO BEGINNING PAVEMENT WORK.
9. ACCESSIBLE EV STALLS WERE DESIGNED BASED ON EXISTING CONDITIONS AND WITHOUT BENEFIT OF SURVEY DATA. ALL ADA AND LOCAL REQUIREMENTS INCLUDING, BUT NOT LIMITED TO SCOPE AND SPACING SHALL BE CONFIRMED BY THE CONTRACTOR AND MET AT THE TIME OF CONSTRUCTION.
10. CONTRACTOR TO NOTIFY THE ENGINEER OF ANY DISCREPANCIES IN ACCESSIBILITY PRIOR TO CONSTRUCTION.
11. ANY NOTES ON DRAWING PAGES CONTAINED HEREIN SHALL BE CONSIDERED PART OF THESE NOTES.
12. CONTRACTOR RESPONSIBILITIES INCLUDE CHARGING STATION MOUNTING, OVERHEAD CONDUIT INSTALLATION, AND WIRING.
13. CONTRACTOR TO PAINT PROPOSED EV PARKING SPACES PER JURISDICTIONAL REQUIREMENTS.
14. CONTRACTOR TO FIELD SCANIXRAY EXISTING CONCRETE SLAB TO ENSURE REINFORCEMENT IS NOT DAMAGED DURING EQUIPMENT OR CONDUIT ANCHORING, ENSURE 1" GAP MIN. BETWEEN REBAR AND ANCHORAGE.
15. EXACT STATION PLACEMENT AND ROTATION ANGLE MAY VARY SLIGHTLY UPON INSTALLATION DEPENDING ON SITE CONDITIONS.
ELECTRICAL NOTES:
1. ALL ELECTRICAL WORK AND RELATED ACTIVITIES PERFORMED ON-SITE SHALL BE DONE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE (NEC) STANDARDS BEING ENFORCED BY ALL APPLICABLE JURISDICTIONAL REQUIREMENTS AT THE TIME OF CONSTRUCTION.
2. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY ENGINEER AT THE TIME OF THE PRE-CONSTRUCTION MEETING TO ENSURE ACCURACY OF INSTALLATIONS.
3. CONDUIT PATHS ARE REPRESENTATIVE ONLY. EXACT CONDUIT PLACEMENT TO BE DETERMINED ON SITE BASED ON FIELD CONDITIONS.
4. ANY NOTES ON ELECTRICAL DRAWINGS CONTAINED HEREIN SHALL BE CONSIDERED PART OF THESE NOTES.
5. THE USE OF UNDERGROUND HOPE SHALL BE IN ACCORDANCE WITH NEC SPECIFICATIONS AND BE UL APPROVED. MINIMUM STANDARD DIMENSION RATIO TO BE SOR 11.
6. EMT OR RIGID CONDUIT SHALL BE USED OVERHEAD AND ABOVE GROUND.
GRADING NOTES:
1. ADDITIONAL EROSION CONTROL DEVICES TO BE USED AS REQUIRED BY LOCAL INSPECTOR.
2.
DISTURBED AREAS LEFT IDLE FOR FIVE DAYS, AND NOT TO FINAL GRADE, WILL BE ESTABLISHED TO TEMPORARY VEGETATION. MULCH, TEMPORARY VEGETATION OR PERMANENT
VEGETATION SHALL BE COMPLETED ON ALL EXPOSED AREAS WITHIN 14 DAYS AFTER DISTURBANCE. ALL AREAS TO FINAL GRADE WILL BE ESTABLISHED TO PERMANENT VEGETATION UPON COMPLETION.
3. WHEN HAND PLANTING, MULCH (HAY OR STRAW) SHOULD BE UNIFORMLY SPREAD OVER SEEDED AREA WITHIN 24 HOURS OF SEEDING. IF UNABLE TO ACCOMPLISH, MULCH SHALL BE USED LEGENDS AS A TEMPORARY COVER. CONCENTRATED FLOW AREAS AND ALL SLOPES STEEPER THAN 2.5:1 AND WITH A HEIGHT OF TEN FEET OR GREATER (DOES NOT APPLY TO RETAINING WALLS), ·, w AND CUTS AND FILLS WITHIN BUFFERS, SHALL BE STABILIZED WITH THE APPROPRIATE EROSION CONTROL MATTING OR BLANKETS. e 4. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES, PRIOR TO, AND CONCURRENT u WITH, LAND-DISTURBING ACTIVITIES. k
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION . 5 w CONTROL AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. e 6. SEED ALL DISTURBED AREAS UNLESS OTHERWISE NOTED AS PART OF THIS CONTRACT.
7. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK AND AGREES TO BE RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MAY RESULT FROM CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY UNDERGROUND UTILITIES TD REMAIN. THE CONTRACTOR IS TO NOTIFY THE ENGINEER k IMMEDIATELY OF ANY DISCREPANCIES AND/OR CONFLICTS WITH EXISTING OR PROPOSED UTILITIES PRIOR TO PROCEEDING. n EROSION CONTROL NOTES:
1. STOCKPILED TOPSOIL OR FILL MATERIAL IS TO BE TREATED SO THE SEDIMENT RUN-OFF WILL NOT CONTAMINATE SURROUNDING AREAS OR ENTER NEARBY STREAMS. STOCKPILE LOCATIONS SHALL BE COORDINATED WITH THE ENGINEER PRIOR TO GRADING ACTIVITIES. EROSION & SEDIMENT CONTROL PRACTICE SHALL BE INSTALLED PRIOR TO STOCKPILE
<( OPERATIONS.
2. CONSTRUCT SILT BARRIERS BEFORE BEGINNING GRADING OPERATIONS. 3. MULCH AND SEED ALL DISTURBED AREAS AS SOON AS POSSIBLE AFTER FINAL GRADING IS COMPLETED (WITHING 15 DAYS OF ACHIEVED FINAL GRADES) UNLESS OTHERWISE INDICATED. CONTACTOR SHALL TAKE WHATEVER MEANS NECESSARY TO ESTABLISH PERMANENT SOIL STABILIZATION. STEEP SLOPES (GRATER THAN 3:1) SHALL BE STABILIZED WITHIN 7 DAYS OF FINAL GRADING.
4. PROVIDE TEMPORARY CONSTRUCTION ACCESS(ES) AT THE POINT(S) WHERE CONSTRUCTION EXIT THE CONSTRUCTION AREA, MAINTAIN PUBLIC ROADWAYS FREE OF TRACKED MUD AND
DIRT. 5. DO NOT DISTURB VEGETATION OR REMOVE TREES EXCEPT WHEN NECESSARY FOR GRADING PURPOSES. I ADDITIONAL NOTES:
ij I THE FOLLOWING PAGES CONTAIN ADDITIONAL NOTES. I
0
NOTES 1 I l I DIG ALERT
SYMBOLS DESCRIPTIONS - VOLTA CHARGING STATION (CORD TOWARD VEHICLE)
fill WALL MOUNTED JUNCTION BOX
IN-GROUND JUNCTION/PULL BOX (PLAN VIEW) ------- UNDERGROUND CONDUCTORS AND CONDUIT ----- INTERIOR OVERHEAD CONDUCTORS AND CONDUIT
!E-123 I ELECTRICAL PANEL D' NON-FUSED DISCONNECT X PARKING LOT LIGHT POLES $ LANDSCAPING UP-LIGHT © LANDSCAPING ELECTRICAL DEVICE ® WATER VALVE • FIRE HYDRANT
@) • BOLLARDS, ANCHORED / IN-GROUND CONCRETE SET o---e CONDUIT TURNS (UP/DN) ® MANHOLE, SEWER OR OTHER 1@1 MANHOLE, STORM DRAIN m SPECIAL ATTENTION NEEDED ' ADA PARKING STALL
cf SIGN
.J.. GROUND
SIWAlEGEHOI IM.Y HOT IEUSEOOH TH£SIORAWl,GS, SQl,',el.J:(;EHOIIUSED .. AYNOT#HM0/1nal.JST.
*
CALL before you dig. oowwhat's below.
DIG ALERT CALL AT LEAST TWO WORKING
DAYS BEFORE YOU DIG I
CONTRACTOR SHALL VERIFY ALL PLANS & EXISTING LOCATIONS, CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY THE
ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE ·ROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME I
I
I
; I I I I
.
I
VOLTA
155 DE HARO STREET SAN FRANCISCO, CA 94103
6-
di"glno
s.tdlle<5.
- 0, Atnf'flC.
EV CHARGING INSTALLERS
OF AMERICA, LLC
188 Breakneck Rd. Suite 204 Highland Lakes, NJ 07422
Phone: 855-373-9566
A 07/02120 CD50 MM
REV DATE DESCRIPTION BY
I
ISSUE DATE 06/02/2020 ( )
ISSUED FOR REVIEW
rr IS A VIOlAllON Of LAWfORNff PERSOU, U'USS THEY AAl!ACTl'«J UUOEA nee REC:llOtl
Of: Al.lC
EHSfDPROfUSQIALAACKJ"ECT NOORDGIIIE:fl!. T0M.lERTI-UDOCOMEIIT.
ELECTRIC VEHICLE CHARGING STATIONS
GIANT#6505
EVCIA JOB # 1028
h 030-PA-EV-Giant-6505-072320.dwt
SHEET TITLE
NOTES AND LEGENDS
(
SHEET NUMBER ) T-2.0
r:rrl
i;n
•w-whar, below.
; <
CALLbefo<eyoudfg.
DIG ALERT CALLATI.EASTlWOWORKJNG
DAYS BEFORE YOU DIG
OVERALL SITE PLAN
REMOTE HOLSTER
DISCLAIMER
THESE DRAWINGS WERE PRODUCEOVVITHOUT f'He DENEFIT OF A CURRENT LANO SURVEY.ALL PROPERTY LINES EASEMENTS AND SETBACKS SHAll BE VERIFIED PRIOR TO srART OF CONSTRUCTION. VOL TA DOES HOT GUARANTEE THE ACCUMCY OF SAID PROPERTY LINES, EASEMENTS, ROADS ANO SETBACKS. VOLTA
155 DE HARO STREET SAN FRANCISCO, CA 94103
EV CHARGING INSTALLERS
OF AMERICA, LLC
A
188 Breakneck Rd. Suite 204 Highland Lakes, NJ 07422
Phone: 855-373-9566
07/02/20 CD50 MM
REV DATE DESCRIPTION BY
ISSUE DATE 06/02/2020
ISSUED FOR REVIEW
IT IS A. YIOI..A.TIOU OFLAWF"OR Nti PERSOl'l,. LIIUSS THEY ME t.CTING UUOER THE OlRECTIOU
Of A UCEIISEOPROf'ESSIOtW.AAC1illl;CT NIOORENOtlEIEA, TOM..T'ERTlOSO<XULIEtIT.
ELECTRIC VEHICLE CHARGING STATIONS
GIANT#6505
EVCIA JOB# 1028
030-PA-EV-Gianl-6505-072320.dw
SHEET TITLE
OVERALL SITE PLAN
16' - 0' 7.6' [J]
16' SCALE: 1'" o 16"--0"" (24x3') 1 [
I (OR) 112" ""1&'--0" (11xH)
SHEET NUMBER
C-1.0
•'
19'-1"(REF)
2'--0"(MIN)
f:ml?•wwh,t', below.
- Q
CALLb,ro11youdlg.
DIG ALERT CALLATLEASTlWOWORKING
DAYS BEFORE YOU DIG
2'--0"(MIN) 4'--0"(MAX)
I ' I I ; I I
"
BOLLARD
CHARGING STATION BASEPLATE
SIGN r @--lfaif--,:t----:=Eil:iaW.----+-- sI
-----tz,;,-J
2
I \ Ff EV CHARGING
VOLTA
155 DE HARO STREET SAN FRANCISCO, CA 94103
["
hdrQlnQ ;._v fr1:,tdl_fer5,
. o,,c.
EV CHARGING INSTALLERS
OF AMERICA, LLC
A
188 Breakneck Rd. Suite 204 Highland Lakes, NJ 07 422
Phone: 855-373-9566
07/02/20 CDSO
REV DATE DESCRIPTION
ISSUE DATE 06/02/2020
ISSUED FOR REVIEW
fflSAVICt.A.1'0NOfl1..AWf'."OftNNPm.SOH,. l.t,US.S nEY AAE ACllt-«JUl'UR nECXRECnetl
OF A UC81SEO f'ROFESSIOl'W. AACHTECT N.OOREIKiM:ER. TOM.TOITHISOOCUVOII".
ELECTRIC VEHICLE CHARGING STATIONS
GIANT#6505
MM BY
EVCIA JOB# 1028
1030-PA-EV-Gianl-6505-072320.dw
SHEET TITLE
FOUNDATION DETAILS
11--F_O_U_N_ D _A_ T _IO_N ___ 0_1_D_E_ T_ A __ IL-P-LA_N ________ --r-s-:-;.-89--.--1-+-:--F-O_U_N _D_A_T _ IO_N ___ 02_ D_E_ T_A_IL_P_ LA_N_.;-. _________ ;s-:-;.-8E-_-2--1[<- -s
-
HE
_
=
;>
;
0
ER _ __,]
1
CONSTRUCTION NOTES:
1. CONTRACTOR RESPONSIBILITIES INCLUDE CHARGING STATION MOUNTING, OVERHEAD CONDUIT INSTALLATION, AND WIRING. 2. CONTRACTOR TO PAINT PROPOSED EV PARKING SPACES PER JURISDICTIONAL REQUIREMENTS. 3. CONTRACTOR TO FIELD SCAN/XRAY EXISTING CONCRETE SLAB TO ENSURE REINFORCEMENT IS NOT DAMAGED DURING EQUIPMENT OR CONDUIT ANCHORING, ENSURE 1" GAP MIN. BETWEEN REBAR AND ANCHORAGE. 4. EXACT STATION PLACEMENT AND ROTATION ANGLE MAY VARY SLIGHTLY UPON INSTALLATION DEPENDING ON SITE CONDITIONS.
5. JUNCTION BOX LOCATIONS AND SIZES TO BE DETERMINED BY INSTALLER AND SHALL MEET NEC REQUIREMENTS. 6. EXACT LOCATION OF BOLLARD PLACEMENT TO BE DETERMINED IN FIELD TO MEET LOCAL JURISDICTION REQUIREMENTS AND TO PROVIDE THE BEST PROTECTION OF ELECTRICAL COMPONENTS FROM DAMAGE. 7. BOLLARD LOCATIONS NOT TO OBSTRUCT STATION MONITORS,
NOTES
86.25" 0 VOLT.I\
38"
•
Ã32.5"Ä 1--12.75"-j
FRONT SIDE
CHARGER SPECIFICATIONS
SIZE: 83.5"H X 32'W X 1 O"D POWER: 208V & 120V 40/5 A 60Hz. PLUG: SAE 1772 COMPLIANT CONNECTOR LISTINGS: ETL LISTED TO UL E472596
NOTES:
1. THE GRIP RANGE FOR
THE CHARGE CABLE BEGINS AT 32" ABOVE PARKING SURFACE.
2. CORD SIDE TOWARD
VEHICLE
I 32.5"---
PLAN
ANCHOR NOTES
CONTRACTOR TO VERIFY POST INSTALLATION OR CAST IN PLACE ANCHOR AS LISTED BELOW BASED ON FIELD MEASURMENTS AND JURISDICTIONAL REQUIREMENTS.
CAST IN PLACE ANCHOR:
(6) 1/2" DIAMETER STAINLESS STEEL GR. SS304 CAST-IN-PLACE ANCHORS WITH MINIMUM EFFECTIVE EMBEDMENT OF 3 1/4" OR ENGINEERING APPROVED EQUAL POST INSTALLATION MECHANICAL ANCHOR:
(6) 1/2" DIAMETER HIL Tl KWIK BOLT TZ-SS304 ANCHOR ROD WITH MINIMUM EFFECTIVE EMBEDMENT OF 3 1/4" OR ENGINEERING APPROVED EQUAL.
BOLLARD(S), IF USED
2" SQUARE GALV. STEEL SHIM PLATES AS REQUIRED TO LEVEL 0 EVCS
EVCS ANCHORS (SEE ABOVE)
#5@12"OC TOP&BOTTOM BOTH DIRECTIONS
FOUND ATION SECTION
INCOMING 1" SPARE FEEDER CONDUIT CUT BELOW STATION
J-BOX AND CAP OR TAPE WITH MULE
TAPE INSTALLED.
OUTGOING 1"
SPARE CONDUIT,AS
REQD.
INCOMING FEEDER
CONDUIT
C)
CHARGING STATION BASE PLAN
(TYP)
CONCRETE FILL
STATION PAD
SCALE
N.T.S. 2
CHARGING STATION
CONCRETE FOUNDATION
CORD END
CHARGING STATION BASE PLATE
CONDUIT STUB-UP
3.8 I I 7.5--J l--1.5--J-j l-.a8 _75
LOCATION NOTE
LOCATIONS SHOWN IN RELATION TO THE CHARGING STATION BASE PLATE TO ACCOMMODATE THE LOCATION OF THE STATION INTERNAL JUNCTION BOX Ii'"EEJ +
.....1.__::c.2.0;.::,9.!-,Å----Æ-L::_-_..:... ____ =..l---.f:.Ç!1.1,8-4
1.38 23
.
5
-------l 17 -È,..._---26.25
CONDUIT OR MC CABLE TO ELECTRIC SUPPLY
BUILD ING EN TRY DETAIL
LB OR PULL-BOX TO FIELD CONDITIONS (NOT BE MOUNTED ON EXTERIOR WALL)
MOUNT TO WALL TO CODE
EXTERIOR WALL OF BUILDING
1-1/2" POWER CONDUIT
QUAZITE UNDERGROUND ENCLOSURE (OPTIONAL)
CAP 1" SPARE CONDUIT WITH PULLING TAPE INSTALLED
1-1/2" CONDUIT
CONCRETE SLAB OR WALKWAY (REPLACE ENTIRE SLAB IF cun
SCALE
N.T.S. 3
TIER 22 STREET RATED BOX (BOTTOMLESS)
MIN 6" GRAVEL BASE
MIN 10" CONCRETE RING
EXISTING ASPHALT
' J(i)\t.:;\-· ·)\*.J-l-t+t •.:.=:
i :_.:· ·::;_ 1rr-:.::(,/ii!t?1;r.-t;{tt;.
-f U,:fl/}12:i1
1
1 1 l!ffj}J,1
1 1 1 fiff --./I,.. --. -1 / /:::J, ..
VOLTA
155 DE HARO STREET SAN FRANCISCO, CA 94103
e L'1eirQlnQ -.v .. li-is.tcllers.
Cl"Af'r\9otle:d
EV CHARGING INSTALLERS
OF AMERICA, LLC
A
188 Breakneck Rd. Suite 204 Highland Lakes, NJ 07422
Phone: 855-373-9566
07/02/20 CD50 MM
REV DATE DESCRIPTION BY
(
ISSUE DATE 06/02/2020
ISSUED FOR REVIEW
ffNAVKV,T,oNOFLAl'IFORNNPEASOU. 1.-'.USSTliE'l'AAEACTltOl.t'IO£RTHEM£C1lOtl OF A U:OISEO PROFESSIOtW. AA.OiITECT NOOREP,(;ltEER. TOALlER 00900C1JllEUT,
ELECTRIC VEHICLE CHARGING STATIONS
GIANT#6505
EVCIA JOB# 1028
1030-PA-EV-Giant-6505-072320.dw
SHEET TITLE
DE;TAILS 1
)
PROPOSED CHARGING STATION ANCHOR
CHARGING STATION BASE PLATE
L--V-O_L_T_A _E _V_C_S _D_E_TA-IL ______ ____:._.,...S_C _AL-E-r--4--+-B-A_ S_E_P_L_A _T_E_D_E_ T_ A_IL -------S -CA_ L_E
....--5--+-Q-U_A_Z_IT_E_B_ O_X_D _E_T_A_IL-------r--S -CA_L_EH-6-I f _____
8
_
HE
_;É_;Ê_;
B
-
ER
_Ë) N.T.S. N.T.S. N.T.S.
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
Striping Details
Sheet C-4.0 of an electric vehicle charging station plan set containing five Volta reference pages (striping best practices with mock-up images of black EV charging parking stalls with a Volta logo, car icon and stall number; a photo of a Volta charging station in a parking lot; and a station overview) and a striping notes box. Much of the small page text is too small to read.
Striping Notes
- Striping guidelines are to be used for stencil or thermoplastic layout locations.
- Deviations from striping guidelines to be approved by Volta.
- The note under "Absolutely Do Not" break EV charging only into three lines" deviation has been approved by Volta due to limited space in most parking stalls.
- Parking stall conditions to be evaluated prior to logo application. Repair of damaged surfaces to be coordinated with Volta.
Volta pages
- Page 1: Striping Best Practices - Products; Surface Prep; Branded Striping; Volta logo; Lines & Stencils; numbered steps for shape, Volta logo, numbers, letters and car. Mock-up to scale 9'x18' stall.
- Page 2: Striping Best Practices - Absolutely Do Not; Accessories (wheel blocks, access aisle, curbs). Mock-up to scale 9'x18' stall, and 12'x18' stall with 5' access aisle.
- Page 3: Striping Best Practices - Diagonal Stalls. Mock-up to scale 9'x18' stall at 45° angle.
- Page 4: Volta Parking Space Details; Station Inspection + Evaluation Info (CSA Group).
- Page 5: Volta - Station Overview, Volta Station Benefits, Charging Unit Information, Power Requirements, Installation Requirements.
Title block
| Field | Entry |
|---|---|
| Company | Volta, 155 De Haro Street, San Francisco, CA 94103 |
| Installer | EV Charging Installers of America, LLC, 188 Breakneck Rd. Suite 204, Highland Lakes, NJ 07422, Phone 855-373-9566 |
| Revision | A, 07/02/20, CD50, MM |
| Issue date | 06/02/2020 |
| Issued for | Review |
| Project | Electric Vehicle Charging Stations, Giant # 6505 |
| EVCIA job # | 1028 |
| File | 1030-PA-EV-Giant-6505-072320.dwg |
| Sheet title | Details |
| Sheet number | C-4.0 |
Notice: It is a violation of law for any person, unless they are acting under the direction of a licensed professional, architect and/or engineer, to alter this document. Sheet label: Striping Details.
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
Conduit Plan
Site plan (sheet E-1.0) of a Giant store parking lot showing a dashed red underground conduit run from an electrical panel on the store wall to electric vehicle charging stations along the parking spaces.
Callouts
- ELECTRIC PANEL "BP"
- CONDUIT TO BE ROUTED UNDERGROUND TO UG J-BOX AND UP EXTERIOR WALL AND PENETRATE INTO BAKERY ABOVE CEILING AT A LOCATION TO BE DETERMINED IN FIELD. 1" UG CONDUIT TERMINATED AND CAPPED. ENTIRE SECTION OF SLAB TO BE REPLACED. SEE DETAIL, LOWER LEFT.
- 1-1/2" CONDUIT, 4 - #2 AWG, 4 - #10 AWG, 1 - #8 Gnd
- 1-1/2" CONDUIT, 1" CONDUIT (Sp), 2 - #2 AWG, 2 - #10 AWG, 1 - #6 AWG Gnd
- 1-1/2" CONDUIT, 1" CONDUIT (Sp), 4 - #2 AWG, 4 - #10 AWG, 1 - #6 Gnd
- REMOVE AND REPLANT VEGETATION AS REQ'D.
- GIANT (store sign)
- DIG ALERT 811 Know what's below. CALL before you dig. CALL AT LEAST TWO WORKING DAYS BEFORE YOU DIG
- Scale: 1" = 10'-0" (24x36) or 1/2" = 10'-0" (11x17)
Title block
- VOLTA, 155 DE HARO STREET, SAN FRANCISCO, CA 94103
- EV CHARGING INSTALLERS OF AMERICA, LLC, 188 Breakneck Rd. Suite 204, Highland Lakes, NJ 07422, Phone: 855-373-9566
- Revision A, 07/02/20, CD50, MM
- ISSUE DATE 06/02/2020
- ISSUED FOR REVIEW
- ELECTRIC VEHICLE CHARGING STATIONS GIANT # 6505
- EVCIA JOB # 1028
- SHEET TITLE: CONDUIT PLAN
- SHEET NUMBER: E-1.0
Warning text about acting under a licensed professional is too small to read.
ELECTRICAL NOTES: ANEL CALCULA .'.:'.:_
"" == .. -..... --.. l j/1(:
,,,,. .. JN/U͓ ,/ .,.,_,_,
VD-1 ------ -·-
'VD-2 -- VOLTA
__ ...-=.;"' ... . -... , .... - -- - ---
1. ALL ELECTRICAL WORK AND RELATED ACTIVITIES PERFORMED ON.SITE SHALL BE DONE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE (NEC) STANDARDS BEING ENFORCED DY ALL APPLICABLE JURISDICTIONAL REQUIREMENTS AT THE TIME OF CONSTRUCTION.
2. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITH THE APPROPRIATE l/TILITY ENGINEER
AT TIME OF PRECONSTRUCTION MEETING TO ENSURE ACCURACY OF INSTALLATIONS. I
-~•m -
OH .... -
IIUC•-JiOm IUCUML.Uu,u, u• • -... // -- - ě --
155 DE HARO STREET SAN FRANCISCO, CA 94103
3. CONDUIT PATHS ARE REPRESENTATIVE ONLY. EXACT CONDUIT PLACEMENT TO BE DETERMINED ON SITE BASED ON FIELD CONDITIONS.
4. A NATIONALLY RECOGNIZED TESTING LABORATORY SHALL UST ALL EQUIPMENT IN COMPLIANCE WITH NEC ARTICLE 110.3
5. ALL EXTERIOR EQUIPMENT SHALL BE RAIN TIGHT AND APPROVED FOR USE IN WET CONDITIONS.
6. ALL CONDUCTORS TO BE THHN COPPER
7. ALL CONDUCTORS AND CABLES SHALL BE PROVIDED WITH STRAIN RELIEF UPON ENTRY INTO ENCLOSURES
6. EACH UNGROUNDED CONDUCTOR SHALL BE IDENTIFIED BY PHASE ANO SYSTEM PER NEC 210.5
9. ALL METALLIC COMPONENTS SHALL BE GROUNDED VIA ELECTRIC GROUNDING CONDUCTORS,
10. All UNDERGROUND CONDUIT TO BE HOPE SDR11 (OR BETTER), UL RATED, MINIMUM 24" DEEP.
11. WIRING FOR VOLTA CHARGING STATIONS TO BE INSTALLED PER MANUFACTURER'S DIRECTIONS ANO SPECIFICATIONS.
12. CHARGING UNITS ARE EQUIPPED WITH AN INTEGRATED CONTACTOR TO PREVENT BACK FEEDING OF POWER TO THE SOURCE,
u a.i UHIUDll ".,., 17 o,,...n,. Jt .. ••-a. 11 oa.,ar,,u.., -, u -"' " ,., O1-.f
' ' ' '' ' ' ' " '
» .." ". .. " ...
... .. ,a ·... .... ... -, .. ..... , ..
sa u, Ę . .,
... ... . .. u, . .. , ... &N .... ............ ..... .. ,n ,a ... . .,
... '" . ... . .... ...... ... . &N·... ·-
, .. , ..
OH H t.Ol M . .. ... .. •H ... ,u . .. &N
. . H ....,.
. H . .,
' ,.ooo-u,-nr-. ' - , •=
-✓ ----
UO .,,. U.o: :.>-<- JM J.U 1-' I • ffl UI ::.-͖ -:: :::."-:::'.: 6U J_.. U. I •
:' -· .,=..----./- ...... -·--.. -
,.,.,_,_JIIIXII_ l'Mo>..........._,OIIIDC .. Clf'"COOMIMI.. Ul-/'IDl't - -.<i&>u.-.'9ft11i:&:IIQINDOe͘ JlftOA•C-P w,..,.._o,..,,,..,..,un'-1.IS,_.,,,_.,-Q ,.,_.--·%-&---------·--'-
1'11')r,<rOtQI.Wf M( tlU""°tD<MOao.flWllll͚ i,uuo:.c,.-HIIO,._ ) .. CIUIMIISIW O.-.ttu,.tJIO͜ ltlCOIHA,-͝ DH'.c͞ -•"'·""-lllat'° .... '9Mt ICTAl͟ -lllffr\K'IJIICM.CCMm,ua.._ JJJIP\ffill,;I QaQ.ofOO,,.,,ro, """'"°"IO,t,QIJOU0...,.,,.,_111͡ ..,._ [Olff"'fflf--••..,,.n..r_u,.,. .. R- X ... Ĝ-·--z
''" ĝ ,..,_ ,,,u.
.: .: .. - .. .. .:..
u
il
-·-- --- - , ......... 2.38% 2AWG _... . .. ·-- .. _ ....... •--
"·-ę"" .. Ě ,-.z._,,_,.. - - ... ______ .., __ ..,_..,_,_..,.. ....... ·-·----- -·---·· ----... --..-........
CONDUIT FILL CALCULATOR
12
10
1/0
0.0000 o.60 o.imoo 0.Ol44 0.75 0.12400 0.0000 1 1.G400
0.0001 0.0000 I 1.50 t&UXI 0.0000 ..... 0.0000 0.0000 3..5 113+(1) 4.0 4.3J.40:J
--
2.97% 10AWG
=:-::::e:-- --
20llFW
--
oll,ough eur..t lcilaf To!al•Mh .fO"Fil >ne•q. ·---•Jnchu ofContUt 0.304 o.m . ...
11.545 14,753
0.122 0."'-3 0.213 0.5N3 0.3t0 O.!M3
0.114 0.MIJ
◄.611 0.5H3 S.901 0..!063 I
5.11%
EV CHARGING INSTALLERS
OF AMERICA, LLC 188 Breakneck Rd. Suite 204 Highland Lakes, NJ 07422
Phone: 855-373-9566
·-- 1...U>Nl,on,,
210 310 0.0000 0.0000 NOTE: A 07/82/20 coso MM
i I
«: 0
il ģ
13. CONTRACTOR TO ENSURE THAT ALL FEEDERS, CONDUITS, CONDUCTORS, OCPO, TRANSFORMERS, ELECTRICAL PANELS AND OTHER ELECTRICAL EQUIPMENT IS SIZED TO COMPLY WITH WITH CURRENT NEC AND LOCAL AHJ CODES.
14. CONTRACTOR IS RESPONSIBLE TO VERIFY DESIGN, ENGINEERING ASSUMPTIONS AND EXISTING FIELD
CONDITIONS. REPORT ANY INSUFFICIENCIES TO ENGINEER OF RECORD PRIOR TO ANY WORK BEING PERFORMED.
ABBREVIATIONS:
A AC Al ART AUX BLDG CONC cu DC EGC (E) EMT EV El/SE GALV GND HOG I KVA KW M MAX MIN
AMPERE ALTERNATING CURRENT ALUMINUM ARTICLE AUXILIARY BUILDING STRUCTURE CONCRETE COPPER DIRECT CURRENT EQUIPMENT GROUNDING CONDUCTOR EXISTING ELECTRIC METALLIC TUBING ELECTRIC VEIIICLE ELECTRIC VEHICLE SUPPLY EQUIPMENT GALVANIZED GROUND HOT DIPPED GALVANIZED CURRENT KILOVOLT AMPERE KILOWATT METER MAXIMUM MINIMUM NEUTRAL NATIONAL ELECTRIC CODE NOT TO SCALE NEW ON CENTER PROPERTY LINE PHASE POLYVINYL CHLORIDE RIGID METALLIC CONDUIT
"' -
" " n ,·,ooOOClf"" "' " ,, "°''°°""" ". . , .
' ' ', ,.., , . , , , . , ,
,. -. -:: .. ,. " . ,..
.... . ..
u, .... ... .. ... .. ........
m u,
... ..
l(tDillCMLUftr
ğ . '" ·:s•-- = ):" ..... ·--· " ... - ....,....-0 .
fU O.A
....,.. ..
;=.,-.-:: • o< Ğ ,._, :-... , . . .. . .. ... .. ...........
.... .::.,.-.,: u, U,f .. Ġ _-:::;.-,,;:: ... .. u, ..,. -:; < ,.,. AM UJ !-:.--r_ UJ tU :,: .. r;"." -•...,....,:" 2.11 UI UI .uJ --ͣ . ::..---.:-·. JM 10 - UJ •ͥ -:-: S,U w =--- ;;;.,.-.c:;-. "' ..,..
ft 41:H .,.,,_,.., :.,..--r.: ... ... ..
.. .. . ..
u,u,
. .. ,n
............, ...
,. ,. ." » .. ,... .. ,. ,.,. - " .. .
u - Jl•-i.----RIIIMl.l,.,..,--IM.--
. .. . u -..,. .. u u .. Ģ ' ' --- -
ġ
J.Al,O. !Gllfͧͨͩ JOlll!lll,_OI .... _,..,..-. lͪ NMͫ l&littͬ ao,,o-n,111:ͭ •'1'--ͮ Jlr,Q,Nͯ O(U(OlllnlOt.■Wl,,ICll_JPoW_IWIWt.lGMli.D,.._Ͱ )JlllffltU,lͱ,0\Ullfl-}IUf#"6luot.lW.MOUͲ-,-,_.,uͳ
.,_,"""4Mrf"'°""'nc}u--.ii---..cuʹ•• ---
•J-.-..111 .... or...cu..1.t͵rs:itna-Ͷͷ-..,.._•--.io ·----- .,IUD'WM; 1),tn,fl!IIIIMMQl'PJlt\ffC-.ff0#""'1.-CUIO-""',OUO,.. .. .......,__,ͺ
cu,a.nO)fif .... ---wa>11C.L-• .... -•. -
r----------·---------·7
(E) 2SCW3Ph'4W PAtlELBP
200/120V ---+
VOLTA EVCS2
-4/0
300
0.0000 0.0000 0.0000 0.0000
1}AI dm.-Klonl _,. tom Wlll'dlCILflB sp«Uc:a&lanl. 2)Dimwllicn: .. bued'11'12017NEC. 3) IDll'H baud on t£C2017Tati,,4ͻe,lt.
I LOAD STUDY IN PROGRESS I
VOLTA EVCS 1
REV DATE DESCRIPTION
ISSUE DATE 06/02/2020
ISSUED FOR REVIEW
rT SSA VlOlATIOtlOflAWf'OR Nit PERSOU, l.H.ESSTHEYAAliN::TR,IQUUoeRTMEͼECTIOtl
C4' A UCE/.ISEO FROf'ESSIONAL ARCHITECT NIOOAEll®{E(R, TOM..l£.Ani\.SOCXUJ.!EUT.
ELECTRIC VEHICLE CHARGING STATIONS
GIANT# 6505
BY
] ]
N NEC NTS (NJ oc PL PH PVC RMC SCH ss TYP V w XFM
SCHEDULE STAINLESS STEEL TYPICAL
VOLT WATT TRANSFORMER
t
I BAKERY PANEL
;
Ĥ-:ĥĦ"CONDUIT
t
i ,
I I ħ I'\ i i
EVCIA JOB# 1028 ; ,-, \-.J/f...1-------)-----------'-h*,-.+.x--.-4----_-_-_-_-_-_-_-_-_-_-_-_-_-_-_ -_-_-_---=..:_c.. __ __.J
-==='J
'---J--
II __ ..__ ____________ ----lrr i--- -------I 1030-PA-EV-Glanl-6505-072320.dw! ! --- y---- --1-- L-------------------===:!J
SHEETTITLE
Ĩ 1-1/2" CONDUIT I - ĩ2" CONDUIT 7 --- ELECTRICAL ONE-LINE i Ī•-c
#
OtD. (SP) 1" COND. (SP) ., 2-#2 gu 4·#10 1 - # 6 GND 2 -# 10 ī 1 - II 6 GND
[
SHEET NUMBER
] ; E-1.1 1---E_L_E_ C_T_R_I_C _A_L_O_N ___ E _ _ LI_N_E ___ ___;_ _____________________________________________ -,--______ 1 ..._ ______ ....,
Memo
East Goshen Township
Date: July 28, 2021
To: Authorities, Boards and Commissions
From: Susan D’Amore
RE: Future ABC Meetings
Governor Wolf’s COVID-19 emergency disaster declaration officially ended back in June. The declaration ending caused the expiration of PA Act 15 of 2020 which means that fully virtual meetings are no longer allowed by law.
This memo is to inform you that as of September 1, 2021, all East Goshen Township ABC meetings must be held in person. I will be re-advertising in the Daily Local as needed.
Please let me know if you have any questions.
U:\SDAmore\Letters\ACT 15 of 2020 no longer in effect 072821 memo.docx