Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION
Meeting Agenda
Tuesday, June 25, 2024
7:00 PM
- Call to Order / Pledge of Allegiance and Moment of Silence
- Chairman will ask if anyone is going to record the meeting.
- Review of Tracking Log / Determine need for Workshop Meeting
- Public Comment on Non-Agenda Items
- Approval of Minutes May 28, 2024
- Acknowledge Receipt of New Applications (Initial Submission)
- Subdivision and Land Development Applications 1365/1373 Enterprise Drive/CTDI Land Development (Presentation).
- Conditional Uses and Variances
- Zoning Hearing Board Variances
- Ordinance Amendments
- Old Business The Malvern Institute – Update – (No Action Required); Planning Commission Bylaw Review.
- New Business
- Liaison Reports
- Correspondence
- Announcements
- Next Meeting – July 23, 2024, at 7pm.
Bold Items indicate new information to review or discuss.
East Goshen Township Planning Commission
Application Tracking Log
June 25, 2024
July 6, 2022 PC Meeting
| Application Name | Application (CU,LD, ZO, SD, SE, CA) | Type (Sk, P, F) | Date Filed | Start Date | Date to Township Engineer | Date to CCPC | Date to Abutting Prop. / ABC's | Extension | PC MUST Act Date (70-Days) | BOS Must Act Date (90-Days) | Hearing Date | Drop Dead date | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Paoli Pike Trail ALT Route | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | |
| Bold = New Application or PC action required | |||||||||||||
| 14 Reservoir Raod | SD | P | 9/28/2022 | 9/28/2022 | '10-12-2022 | 10/19/2022 | 5-28-2023 8-28-2023 10-12-2023 2-17-2024 5-13-2024 |
2/28/2024 5/28/2024 8-28-2024 |
2/28/2024 5/28/2024 8-28-2024 |
2/28/2024 5/28/2024 8-28-2024 |
5-23-2023 Presention for SD | ||
| Millstone Meadows SD 1010 Hershey Mill Road |
SD | P | 5/16/2023 | 5/16/2023 | 5/5/2023 | 7/15/2023 10/12/2023 1/24/2024 4-11-2024 |
10/25/2023 1/25/2024 4/25/2024 7-25-2024 |
10/25/2023 1/25/2024 4/25/2024 7-25-2024 |
4/25/2024 1/25/2024 7-25-2024 |
The Township Engineer review letter was received on 6-8-2023. The CCPC review letter was received on 6-7-2023. The Township Park & Recreation Board decline to review application. The following reviews are still in process, Historical, Fire Marshal, Zoning Officer, Municipal Authority, Conservancy. |
|||
| Malvern Institute | LD | P | 6/28/2021 | 7/1/2021 | 6/30/2021 | 6/29/2021 | 8/13/2021 | \ | 2/2/2022 | 2/15/2022 | NA | 2/28/2022 | PC made rec to BOS for Prelim App on June 1 2022. ZHB Decission was 4 years for building permits for Barn Renovations Building 11,25,2024 |
| 1338 Morstein Road SD | SD | P | 2/5/2024 | 2/27/2024 | 4/11/2024 | 5/3/2024 8-3-2024 |
5/3/2024 8-3-2024 |
5/3/2024 8-3-2024 |
SD Application for a 16 lots subdivision split between West Whiteland and East Goshen with 3 lots located in EGT. Plan went to PC on 2-27-2024 for the initial submission with no action. | ||||
| Timbermill SD 301 Reservoir Road |
SD | P | 1/29/2024 | 2/27/2024 | 4/11/2024 | 5/3/2024 7-3-2024 |
5/27/2024 7-3-2024 |
5-27-2024 7-3-2024 |
SD Application for a 5 lots subdivision. One lot has existing historic farm house and accessory building and a sceond lot has existing historic barn, 3 new lots will be created. Plan went ot PC on 2-27-2024 for initial submission and presentation at applicants request. | ||||
| PROJECTS COMPLETED IN 2024 | |||||||||||||
| 1306 West Chester Pike | CU | NA | 3/15/2024 | 3/15/2024 | NA | NA | NA | NA | 4/30/2024 | 5/15/2024 | 4/16/2024 | 5/15/2024 | Conditional use for an automotive repair business. An automotive repair business is an existing use for this property. Board of Superviors approved the CU application on 4-16-2024. |
| 1344 Morstein Road Sketch Plan Review | SD | SK | 2/16/2024 | 2/27/2024 | NA | NA | NA | NA | NA | NA | NA | NA | Sketch Plan Review Application, Plan went to PC on 2-27-2024 as initial submission. Applicant will attend 3-26-2024 meet for discussion. Sketch Plan Review is closed and the Applicant is working on formal plans. |
F:\Data\Shared Data\ABC'S\Planning Commission\PC Tracking Log\2024\PC Tracking Log for 6.25.2024.xlsx
6/18/2024
DRAFT
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION MEETING
May 28, 2024
The East Goshen Township Planning Commission held their regular monthly meeting on Tuesday, May 28, 2024 at 7:00 pm in the Township Building.
Members present are highlighted:
Chair – Ernest Harkness
Vice Chair – John Stipe
Dan Daley
Michael Koza
Michael Paganelli
Fred Pioggia
Dan Truitt
Also present was:
Duane Brady, Zoning Officer
Kelly A. Krause, Asst. Zoning Officer
John Hertzog , BOS Liaison
Nathan Cline, Township Engineer
COMMON ACRONYMS:
| BOS – Board of Supervisors | CPTF – Comprehensive Plan Task Force |
|---|---|
| BC – Brandywine Conservancy | CVS – Community Visioning Session |
| CB – Conservancy Board | SWM – Storm Water Management |
| CCPC – Chester Co Planning Commission | ZHB – Zoning Hearing Board |
FORMAL MEETING – 7 p.m.
- Ernest called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and asked for a moment of silence to remember our first responders, police, military, and all who protect us.
- Ernest asked if anyone would be recording the meeting and if there were any public comments about non-agenda items. There was no response.
- The tracking log was checked and no need for a workshop meeting.
- The minutes of the March 26, 2024 meeting were approved as amended.
CHAIRMAN'S REPORT – None
SUBDIVISION AND LAND DEVELOPMENT APPLICATIONS
1. 301 Reservoir Road/ Timbermill – Subdivision – Michael Cowen represented the applicant. They are requesting to divide the property into 5 1-acre single family lots, including 2 existing lots with buildings that will be renovated. They will have public sewer and water. They received the review letter from Pennoni and will comply. Nate mentioned that he and Duane reviewed this second submission with some revisions. Distance from the pipeline is okay. Dan D. was at the site and noticed a bump in the road. He asked about sight distance. Nate explained that the driveway is in a flat area so he doesn't think this will be a problem. SWM was discussed. Michael C. commented that there will be an HOA which will be responsible for the SWM. The HOA can be operated by the residents or a 3rd party management company. Fred mentioned the width of the road. Michael C. commented that they will be doing a roll curb. Parking was discussed. Dan T. made a motion to recommend to the BOS approval of the preliminary plan with all resolved items before the final plan approval is recommended. John seconded
PC 5-28-24 draft1
the motion. The motion passed unanimously. This will go to the BOS for preliminary approval. They will be back to the PC in late summer for final approval.
CONDITIONAL USES AND VARIANCES
1. 1306 West Chester Pike – Automotive Repair Business. Approved by BOS. Closed.
ZONING HEARING BOARD VARIANCES
1. 1214 Upton Circle – Approved by ZHB. Closed
2. 1143 N. Chester Road – Fence Variance. Jim Schroeder, property owner was present. Jim has been a resident for 25 years. Originally, they put evergreens along their property as a noise barrier. However, as the trees grew, they lost branches, so they were removed and a new fence was installed. The road traffic has increased significantly. His request is for a 6-foot high fence instead of 4 foot. The fence has been installed and is in the proper distance from the property line. Fred feels 6 feet is better for privacy. His previous township changed their ordinance to allow 6 feet. Dan D. made a motion to recommend that the BOS vote in favor of the dimensional variance requested by the Schroeders to allow a 6-foot solid fence be placed within the required front yard. Dan T. seconded the motion. The motion passed unanimously.
ORDINANCE AMENDMENTS - None
OLD BUSINESS
1. The Malvern Institute – (No action required.)
2. By Laws – The By Laws were discussed with some revisions. Kelly will make the changes and have it ready for the next meeting.
NEW BUSINESS
LIAISON REPORTS –
ANY OTHER MATTER –
New member packet – This will be set up for review.
Meeting Agendas - The Commission members discussed receipt of the agenda by mail or email.
CORRESPONDENCE - None
ADJOURNMENT
There being no further business, Dan T. made a motion to adjourn the meeting. John seconded the motion. The meeting was adjourned at 8:10 pm.
The next meeting will be held on Tuesday June 25, 2024 at 7:00 p.m.
Respectfully submitted,
________________________________
Ruth Kiefer, Recording Secretary
PC 5-28-24 draft2
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: dbrady@eastgoshen.org
Date: 5-18-2024
To: Planning Commission
From: Duane J. Brady Sr., East Goshen Township Zoning Officer
Re: 1365/1373 Enterprise Drive/Communications Test Design, Inc & Parsons 1365, LLC Preliminary/Final LD Plan/Application Filing Letter
Dear Commissioners,
The Township Staff has received an LD application for 1365/1373 Enterprise Drive Owned by Communications Test Design, Inc & Parsons 1365, LLC. The proposal is to construct a new building, outdoor amenity space, parking and circulation improvements, stormwater management and site improvements. The building will serve as a reception area for existing CTDI visitors. The land development is in the Business Park District section 240-21 of the East Goshen Township Zoning Ordinance. The land development will be completed as a Declaration of Condominium by an agreement. The application has been reviewed for completeness and was accepted by Township Staff on May 7, 2024.
Background information:
- Lots 1365 and 1373 Enterprise Drive are approximately 12.5 acres.
- The property is in the BP Business Park District.
- The application notes a total of 5 lots and 30.60 acres to be part of the Condominium Agreement.
- The start date for the project is May 7, 2024. (Day 1).
- The must act date for the Planning Commission is July 17, 2024 (Day 70).
- The must act date for the Board of Supervisors is August 7, 2024 (Day 90).
Zoning Information:
- The property is in the BP Business Park District (240-21).
- The minimum lot area is 4 acres.
- Building setback line 400 feet.
- Street line 300 feet.
- The front yard is 100 feet, the side yard is 50 feet, and the rear yard is 50 feet.
- The minimum building height is 35 feet (3 stories).
- Total impervious cover is 50%.
- Total building cover is 30%.
- The property is outside the flood area.
- The property has a pipeline located on it and does require a pipeline awareness study.
Page 1 | 2
The Condominium Agreement has not been received as of the date of this letter and will be provided once it has been received and reviewed for completeness.
Respectfully,
[signature: Duane J Brady Sr]
Duane J. Brady Sr.
East Goshen Township
Zoning Officer (PA-CZO)
[Seal: East Goshen Township, Incorporated 1817, Chester County, Pennsylvania]
Page 2 | 2
[Aerial GIS map of East Goshen Township around Enterprise Drive, Boot Road, and Paoli Pike showing shaded stream/buffer zones, a distance measurement line labeled "677.28 ft", and a red dashed box marking the area of work at 1365 and 1373 Enterprise Drive. Street and feature labels: Irene DR, Grand Oak LA, Red Maple DR, Sycamore DR, Cherry LA, Linden LA, 677.28 ft, Enterprise DR, East Goshen Township, Continental DR, Generals WY, Nathaniel DR, Gates DR, Saratoga DR, Von Stuben DR, Boot RD, Paoli PK, Reservoir RD, Pine Rock RD, Hollyberry LA, Meadow DR.]
A pipeline is located alone Boot Road and is 677.28 feet from the property line of 1373 Enterprise Drive. The LD project will be constructed in the location of 1365 and 1373 Enterprise Drive property lines. See red box in plan that shows area of work.
Act 247 County Referral
Return to: Chester County Planning Commission
601 Westtown Road—Suite 270
P.O. Box 2747
West Chester, PA 19380-0990
To: Chester County Planning Commission
Subject: Request for review of a subdivision, land development proposal, ordinances, or comprehensive plans pursuant to the Pennsylvania Municipalities Planning Code, Act 247. This application must be completed by the applicant, and submitted by the municipality to the above address, along with one (1) complete set of plans and accompanying documents and the required fee for review (see reverse side)
TO BE COMPLETED BY THE MUNICIPALITY
From: (Municipality) East Goshen Township
Date: 5-1-2024
Official's Name: Duane J. Brady Sr.
Position: Zoning Officer
Official's signature: Duane J. Brady Sr.
Applications with ORIGINAL signatures must be submitted to CCPC.
TO BE COMPLETED BY THE APPLICANT
Development name (if applicable): One CTDI Place
Location: 1365 and 1373 Enterprise Drive
Owner's name: Communications Test Design Inc. (CTDI); 1365 Parsons, LLC
Phone #:
Owner's address: 1365/1373 Enterprise Drive, West Chester, PA 19380
Applicant's name: Communications Test Design Inc. (CTDI), 1365 Parsons, LLC
Phone #: 610-389-1459
Applicant's address: 1365/1373 Enterprise Drive, West Chester, PA, 19380
Architect/Engineer/Surveyor name: Chester Valley Engineers, Inc.
Phone #: 610-644-4623
TYPE OF REVIEW REQUESTED
(Check all appropriate boxes)
- ☐ Unofficial sketch plan (no fee)
- ☐ Subdivision plan
- ☑ Land development plan
- ☐ Planned residential development
- ☐ Zoning ordinance (no fee)
- ☐ Curative amendment (no fee)
- ☐ Subdivision ordinance (no fee)
- ☐ Comprehensive plan (no fee)
- ☐ Other
REVIEW FEE
(Fee schedule on other side)
- ☑ Attached $ 843.13
- ☐ Not applicable
TYPE OF PLAN
- ☐ Unofficial sketch
- ☑ Preliminary
- ☑ Final
TYPE OF SUBMISSION
- ☑ New proposal
- ☐ Revision to a prior proposal
- ☐ Phase of a prior proposal
- ☐ Amendment/revision to recorded plan is a new proposal
Tax parcel(s): # 53-4-161, 53-4-162,
# 53-4-163, 53-4-164
# 53-4-165
Total area (gross acres): 30.60 acres
PLAN INFORMATION
Length of new roads: N/A
Number of new parking spaces: 15
Ownership of roads: ☐ Public ☑ Private
Open space: ☐ Public ☐ Private
Acres: Acres:
HOA responsible for common facilities/areas: ☐ Yes ☑ No
HOA documents provided: ☐ Yes ☑ No
Traffic study included: ☐ Yes ☑ No ☐ Not conducted
*Information to be filled in for Commercial, Industrial or Institutional land use ONLY
*Total square footage of addition to existing building:
*Total square footage of new building(s): 6,146 sf
LAND USE
| LAND USE | # of lots/units |
|---|---|
| Agriculture | |
| Single family | |
| Townhouses | |
| Twin units | |
| Apartments | |
| Mobile homes | |
| *Commercial | 5 |
| *Industrial | |
| *Institutional | |
| Other |
ZONING DISTRICT OF PROPOSAL
Existing: BP
Proposed: BP
Variances/Special exception granted:
PROPOSED UTILITIES
(Check appropriate boxes)
| Utility Type | Water | Sewer |
|---|---|---|
| Public | ☑ | ☑ |
| On-site | ☐ | ☐ |
| Package | ☐ | ☐ |
No new sewage disposal or water supply proposed ☑
ADDITIONAL INFORMATION (This plan has been submitted to):
- ☐ County Health Department Date
- ☐ PennDOT Date
- ☐ DEP Date
- ☐ Other Date
THE TERM "LOTS"
The term "LOTS" includes conveyance, tracts or parcels of land for the purpose, whether immediate or future, of lease, transfer of ownership or building or development, as well as residue parcels, annexations, or the correction of lot lines.
Effective January 1, 2022
[Seal: TOWNSHIP OF EAST GOSHEN, CHESTER COUNTY, PENNSYLVANIA, INCORPORATED 1817][Stamp: RECEIVED MAY 01 2024]
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PA
SUBDIVISION AND / OR LAND DEVELOPMENT APPLICATION
Date Filed: ____________
Application for (Circle one): ( ) Subdivision (•) Land Development ( ) Subdivision & Land Development
A. Application is hereby made by the undersigned for approval of a Subdivision and or Land Development Plan, more particularly described below.
- Applicant's name: Communications Test Design, Inc. (CTDI), and Parsons 1365, LLC Address: 1365/1373 Enterprise Drive, West Chester, PA 19380 Phone: 610-389-1459 Fax: ____________ Email: tbooker@ctdi.com
- Name and address of present owner (if other than 1. above) Name: Same as Applicant - [handwritten: Tony] Address: ____________ Phone: ____________ Fax: ____________ Email: ____________
- Location of plan: 1365 and 1373 Enterprise Drive, West Chester, PA 19380
- Proposed name of plan: One CTDI Place
- County Tax Parcel No.: 53-4-161, 53-4-162, 53-4-163, 53-4-164, 53-4-165 Zoning District: BP
- Area of proposed plan (ac.): 30.60 acres Number of lots: 5
- Area of open space (ac.): NA
- Type of structures to be constructed: Accessory building, outdoor amenity spce, stormwater management and site improvements
- What provisions are to be made for water supply and sanitary sewer? Public sewer and water
- Linear feet of road to be constructed: NA
- Name of Engineer: Chester Valley Engineers, Inc. Phone Number: 610-644-4623 Fax: ____________ Email address: jmaziarz@chesterv.com
f:\data\shared data\code dept\application & forms\current forms and applications\subdivision and land dev application.doc
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA
SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
- Name of Land Planner: Bernardon Phone Number: 610-444-7868 Fax: ____________ Email address: zcross@bernardon.com
- I/We agree to reimburse the Township of East Goshen for such fees and expenses the Township may incur for the services of an Engineer(s) in investigations, tests, and review in relation to the Subdivision Plan.
- I/We agree to post financial security for the improvements depicted on the Subdivision and or land Development Plan pursuant to the Subdivision and Land Development Ordinance.
- I/We agree to reimburse the Township of East Goshen for all inspection fees at the actual cost to Township.
NOTICE
The Township requires an Occupancy Permit before any building can be occupied; no Occupancy Permit will be issued until final inspection and approved by the Zoning Officer and Building Inspector.
|
________________________________ Owner Signature |
[signature] Applicant Signature attorney in-fact |
|---|
Administrative Use
Fees received from applicant $ ____________ basic fee, plus $ ____________ per lot
For ____________ lots = $ ____________.
Application and plan received by: ________________________ Date: ________________________
(Signature)
Application accepted as complete on: ________________________
(Date)
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc2
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA
SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
SUBDIVISION AND/OR LAND DEVELOPMENT CHECKLIST
This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the State of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application Process and the Review Process. The application process must be completed in its entirety prior to the advancement into the Review Process.
* Review the formal Planning Commission review procedure on page five.
Application for (Circle all appropriate): ( ) Subdivision (•) Land Development
Applicant Information:
Name of Applicant: Communications Test Design Inc. (CTDI) and Parsons 1365, LLC
Address: 1365/1373 Enterprise Drive, West Chester, PA 19380
Telephone Number: 610-389-1459 Fax: ____________
Email Address: tbooker@ctdi.com
Property Address: 1365 and 1373 Enterprise Drive, West Chester, PA 19380
Property Information:
Owner's Name: Communications Test Design Inc. (CTDI) and Parsons 1365, LLC
Address: 1365/1373 Enterprise Drive, West Chester, PA 19380
Tax Parcel Number: 53-4-161, 53-4-162, 53-4-163, 53-4-164, 53-4-165 Zoning District: BP Acreage: 30.6
Description of proposed subdivision and or land Development:
The Applicant is proposing to construct a new building, outdoor amenity space, parking and circulation improvements, stormwater management and site improvements. The building will serve as a reception area for existing CTDI visitors. The proposed building will not increase visitors, traffic, or require the addition of parking spaces. For more information, see attached narrative.
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc3
BEFORE THE BOARD OF SUPERVISORS OF EAST GOSHEN TOWNSHIP
IN RE: Application of Communications Test Design, Inc. & Parsons 1365, LLC
For the Properties at: 1365/1373 Enterprise Drive, West Chester
NARRATIVE IN SUPPORT OF APPLICATION
I. Introduction.
Parsons 1365, LLC is the owner of the property known as 1365 Enterprise Drive in the Goshen Corporate Park (UPI No.’s 53-4-162, 53-4-163, 53-4-164, 53-4-165, and 53-4-1741) (“1365 Properties”). Communications Test Design, Inc. (“CTDI”) is the owner of the property located at 1373 Enterprise Drive in the Goshen Corporate Park (UPI No. 53-4-161) (“1373 Property”). The properties are located in East Goshen Township’s Business Park Zoning District (the “BP District”). The properties’ primary uses are business office, testing for research or product development, and warehousing and distribution.
II. Proposed Project.
Parsons 1365, LLC and CTDI (together, “Applicants”) seek to construct a new building, outdoor amenity space, parking and circulation improvements, stormwater management, and site improvements (“Project”). The building will be a reception area for CTDI visitors, to serve the properties’ existing approved uses. The proposed building will be located between UPI Nos. 53-4-162 and 53-4-161. The new private entrance drive will be named “One CTDI Place”, and will be used as the new address for the CTDI campus.
1 According to a conditional use approval from 1986, UPI Nos. 53-4-162, 53-4-163, 53-4-164 are “deemed merged into one lot for all purposes.”
1
5631200v3
092100.76667
Except where otherwise noted, the Project will comply with all parking and bulk & area criteria in accordance with the approved plans for these properties.
III. Proposed Condominium.
The owners of the 1373 Property and 1365 Properties have agreed to enter into a Declaration of Condominium pursuant to the Pennsylvania Uniform Condominium Act, 68 Pa.C.S. §3101 et seq. According to the Condominium Plan, see attached as Exhibit “A”, the proposed building will be a limited common element, as that term is defined in the Declaration.
IV. Zoning Analysis.
ZONING VERIFICATION/CONDITIONAL USE CONTINUATION
The Applicants have previously been advised by the then Township Zoning Officer that the existing uses on the 1365 Properties have been approved by the Township and that there are no existing zoning violations. See 01/22/2021 zoning verification letter from Mark A. Gordon, attached hereto as Exhibit “B.” The Zoning Officer further explained that the conditional use approval granted by the Township in 1986 for the 1365 Properties permitted the following multiple principal uses by conditional use: business office; testing for research or product development; television transmitter; and warehouse and distribution. See 02/24/2021 Conditional Use Continuation Letter from Mark A. Gordon, attached hereto as Exhibit “C”. The 02/24/2021 letter also acknowledged CTDI’s existing operation at the 1373 Property and that the 1373 Property is also permitted to continue, with the notation that the television transmitter was not being continued.
2
5631200v3
092100.76667
Accordingly, the existing uses at the properties: business office; testing for research or product development; and warehouse and distribution are permitted. The proposed Project, a reception area for CTDI visitors is a permitted accessory use to those uses. The East Goshen Township Zoning Ordinance defines “accessory use” as, “[a] use subordinate to the principal use of land or a building on a lot and customarily incidental thereto.” East Goshen Code §240-6(B).
The proposed building will not generate more traffic or require additional parking, as the proposed accessory building will serve existing visitors to the properties.
PARKING
The Project will result in the loss of 57 parking spaces. Currently, there are 827 parking spaces provided for the 1365 Properties and 403 parking spaces associated with the 1373 Property. As shown on the Condominium Plan, the required parking for the 1365 Properties is 369 and the total parking required for the 1373 Property is 231. Accordingly, there is sufficient parking provided even with the loss of 57 parking spaces due to this Project.
IMPERVIOUS COVERAGE
The 1365 Properties and 1373 Property are both legally conforming with respect to impervious coverage. The existing impervious coverage for the 1373 Property is 57.21% and the proposed increase would bring it to 59.56%. The 1373 Property previously was permitted to increase the impervious coverage on the property via conditional use decision dated September 11, 2000. The Board approved the increase pursuant to Zoning Ordinance §240-21.C(23), which allows for impervious coverage to increase to 60% in the BP District in order to provide parking. The existing impervious
3
5631200v3
092100.76667
coverage for the 1365 Properties is 48.66% and the proposed impervious coverage following the Project would be 51.40%.
Together, the total impervious coverage permitted for the properties is 53.4% (or 717,675 sq. ft.). The Project would bring the total impervious coverage to 54.2% (or 728,848 sq. ft.). The total impervious coverage would exceed the permitted impervious coverage by (0.85%) or 11,461 sq. ft.
To address the excess impervious coverage for the properties, Applicants intend to remove unnecessary parking spaces at a location to be determined. The removal of these spaces will bring the impervious coverage into compliance with §240-21(G) of the Zoning Ordinance. The plans will be revised accordingly.
V. Conclusion.
The proposed Project is permitted as an accessory use to the existing uses at the 1365 Properties and 1373 Property. The building will serve as a reception area for CTDI visitors. The Project will comply with the area & bulk and parking requirements for the properties.
Respectfully submitted,
[signature: Brian L. Nagle]
Brian L. Nagle, Esquire
Attorney I.D. #86924
17 West Miner Street
P.O. Box 660
West Chester, PA 19381-0660
(610) 436-0100
Attorneys for Applicants
Date: May 1, 2024
4
5631200v2
092100.76667
EXHIBIT A
Condo Plans
CONDOMINIUM PLAN - PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE (SHEET 4 OF 17)
Engineering plan drawing showing the north portion of the Condominium Plan for One CTDI Place (Unit 1, Brick Office Building at 1373 Enterprise Drive, U.P.I. #53-4-161, and U.P.I. #53-4-174 along Enterprise Drive), with surrounding parcels, bearings and distances, easements, flood plain boundaries, general notes, parking summary, location map, and legends.
PLAN LABELS, BEARINGS, AND ADJOINING PROPERTIES
- UNIT 1, BRICK OFFICE BUILDING, U.P.I. # 53-4-161, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-161, 1373 ENTERPRISE DRIVE
- U.P.I. # 53-4-174, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-174
- ENTERPRISE DRIVE
- 30' WIDE BUFFER STRIP (PLAN 3553)
- 20' WIDE UTILITY EASEMENT FOR WATER
- 25' WIDE DRAINAGE EASEMENT
- 25' WIDE SANITARY SEWER EASEMENT
- ZONE A FLOOD PLAIN, TRIBUTARY OF EAST BRANCH CHESTER CREEK
- MATCHLINE (SHEET 4) / MATCHLINE (SHEET 5)
- N 21°39'13" W 445.78', S 58°53'45" W 129.10', S 68°20'47" W 1062.01', N 68°20'47" E 150.44', S 21°39'13" E 508.41', S 21°39'13" E 401.57', S 68°20'47" W 445.57', S 68°20'47" W 326.90', S 68°20'47" W 348.94', S 68°20'47" W 219.91', S 68°20'47" W 601.51'
- R=325.00' A=222.00' C=217.70' S 46°52'41" E; R=375.00' A=130.65' C=129.99' S 37°19'12" E; R=25.00' A=35.69' C=32.73' N 54°07'15" E; R=325.00' A=294.30' C=284.35' S 03°17'52" W
- N/L 1381 PARSONS, D.B. 6426 PG. 855, UPI #53-4-159
- N/L EDWARD F & LISA M BERRY, D.B. 6602 PG. 671, UPI #53-4E-41
- N/L MICHAEL J & KRISTIN MIRAGLIA, D.B. 5748 PG. 710, UPI #53-4E-40
- N/L RITA & CHRISTOPHER P MARINO, D.B. 11153 PG. 1248, UPI #53-4E-39
- N/L PAUL F & LOIS A VANDERSLICE, D.B. 739 PG. 966, UPI #53-4E-38
- N/L JOHN W & EILEEN C MCCAFFERY, D.B. 3947 PG. 344, UPI #53-4E-37
- N/L JANET E PYEWELL, D.B. 58 PG. 353, UPI #53-4E-36
- N/L JOHN WEBSTER & LAUREN K BECKER, D.B. 10727 PG. 256, UPI #53-4E-35
- N/L CHRISTOPHER R & ERIN E SMYTH, D.B. 9566 PG. 2294, UPI #53-3M-28
- N/L DAVID & DEBRA BASARUB, D.B. 6708 PG. 192, UPI #53-3M-27
- N/L CALABRO & REMETTA BLANCHE TRUST, D.B. 1146 PG. 206, UPI #53-4-175
- N/L LOUIS SIANA, JOHN EARLEY, JOHN, DAVID & SUSAN KIM TRUST, D.B. 1159 PG. 257, UPI #53-4-172
- N/L LOUIS SIANA, JOHN EARLEY, JOHN, DAVID & SUSAN KIM TRUST, D.B. 1159 PG. 262, UPI #53-4-173
GENERAL NOTES
- 1. PROPERTY ADDRESS: 1365 AND 1373 ENTERPRISE DRIVE, WEST CHESTER, PA 19380
- 2. APPLICANT: COMMUNICATIONS TEST DESIGN, INC. (CTDI), 1373 ENTERPRISE DRIVE, WEST CHESTER, PA 19380
- 3. OWNER: (PARCEL #53-4-161) - COMMUNICATIONS TEST DESIGN, INC. (CTDI); (PARCELS #53-4-162, 163, 164, 165) - PARSONS 1365, LLC.
- 4. BOUNDARY INFORMATION SHOWN FROM EXISTING PLANS AND DEEDS OF RECORD.
- 5. GROSS TRACT AREAS: U.P.I. # 53-4-161 - 10.606 ACRES; U.P.I. # 53-4-162 - 1.834 ACRES; U.P.I. # 53-4-163 - 8.933 ACRES; U.P.I. # 53-4-164 - 4.000 ACRES; U.P.I. # 53-4-165 - 5.300 ACRES
- 6. THE TOPOGRAPHY AND IMPROVEMENTS SHOWN WAS PHOTOGRAMMETRICALLY COMPILED BY AERO-METRIC FROM PHOTOGRAPHY TAKEN DECEMBER 24, 2010 SUPPLEMENTED AND CONTROLLED BY FIELD SURVEYS PERFORMED JANUARY 4, 5, & 10, 2011 AND JULY 14, 2023 BY CHESTER VALLEY ENGINEERS, INC.
- 7. ELEVATION DATUM - REFERENCE MARK #235 - PENNDOT DISK AT SOUTHWEST CONCRETE ABUTMENT OF PAOLI PIKE BRIDGE OVER EAST BRANCH OF CHESTER CREEK, ELEVATION = 399.204 NGVD 1929. BENCHMARK TAKEN FROM FLOOD INSURANCE RATE MAP 42029C0352 D DATED NOVEMBER 20, 1996 BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY.
- 6. BY GRAPHIC PLOTTING ONLY, PARCELS #53-4-163, #54-4-164 & #54-4-165 LIE WITHIN AREAS IDENTIFIED AS "ZONE A, ZONE AE & ZONE X" ON FLOOD INSURANCE RATE MAPS 42029C0210G & 42029C0215G DATED SEPTEMBER 29, 2017 FOR CHESTER COUNTY, PENNSYLVANIA BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY.
- 7. SOILS INFORMATION TAKEN FROM USDA NRCS WEB SOIL SURVEY MAP.
- 8. WETLANDS LOCATIONS SHOWN ON PARCELS #53-4-163 & #53-4-165 FROM PHYSICAL FIELD SURVEY BY CHESTER VALLEY ENGINEERS, INC. OF POINTS MARKED BY DEL VAL SOIL & ENVIRONMENTAL CONSULTANTS, INC., DOYLESTOWN, PA.
- 9. THE LOCATION OF EXISTING EASEMENTS WAS TAKEN FROM EXISTING PLANS. THE EASEMENTS WERE NOT DESCRIBED WITH BEARINGS AND DISTANCES, THE EASEMENT LOCATIONS ARE TO BE CONSIDERED APPROXIMATE.
- 10. SCHEDULE B - PART 2 OF TITLE COMMITMENT NO.PA123-2478 KM, NOT DATED, ISSUED BY FIDELITY NATIONAL TITLE INSURANCE COMPANY, INCLUDES THE FOLLOWING EXCEPTIONS:
- 9. RIGHT OF WAY GRANTED TO PHILADELPHIA ELECTRIC COMPANY AS IN MISCELLANEOUS DEED BOOK 203 PAGE 215. (LIMITED BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 10. RIGHT OF WAY GRANTED TO PHILADELPHIA ELECTRIC COMPANY AS IN MISCELLANEOUS DEED BOOK 248 PAGE 296. (LIMITED BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 11. RIGHT OF WAY GRANTED TO PHILADELPHIA ELECTRIC COMPANY AS IN MISCELLANEOUS DEED BOOK 563 PAGE 230. (LIMITED BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 12. INSTRUMENT ESTABLISHING PROTECTIVE COVENANTS FOR GOSHEN CORPORATE PARK RECORDED IN MISCELLANEOUS DEED BOOK 541 PAGE 68, (EXPIRED JANUARY 1, 2010) FIRST AMENDMENT THERETO AS IN RECORD BOOK 4489 PAGE 1731. (EXPIRED BY EXPIRATION CLAUSE IN 541/68) (AS TO TRACTS I AND II)
- 13. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 586 PAGE 426. (BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 14. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 1045 PAGE 82. (NOT PLOTTABLE FROM SCHEMATIC DIAGRAM SUPPLIED) (AS TO TRACT II)
- 15. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 2612 PAGE 16. (BLANKET EASEMENT - NOT PLOTTABLE) (AS TO TRACT I)
- 16. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 3272 PAGE 258. (DOCUMENT NOT PROVIDED - NOT PLOTTABLE) (AS TO TRACT I)
- 17. CONDITIONS AS SHOWN ON PLAN #3553 AS FOLLOWS: (A) TEMPORARY CUL-DE-SAC EASEMENT (LOT 7) (DOES NOT AFFECT PREMISES); (B) REQUIREMENT OF BUILDING SETBACK LINES. (PLOTTED) (C) 30 FEET WIDE BUFFER PLANTING STRIP THROUGH REAR OF LOT. (PLOTTED) (AS TO TRACTS I AND II)
- 18. CONDITIONS AS SHOWN ON PLAN #4193 AS FOLLOWS: (A) REQUIREMENT OF BUILDING SETBACK LINES. (PLOTTED) (B) 20 FEET WIDE UTILITY EASEMENT FOR WATER EXTENDS THROUGH REAR OF LOTS 18 AND 19. (PLOTTED) (C) 30 FEET WIDE BUFFER PLANTING STRIP THROUGH REAR OF LOTS 18 AND 19. (PLOTTED) (AS TO TRACT II)
- 19. CONDITIONS AS SHOWN ON CHESTER COUNTY PLAN #3553. (30 FEET WIDE BUFFER STRIP PLOTTED) (AS TO TRACT I)
- 20. CONDITIONS AS SHOWN ON CHESTER COUNTY PLAN #11951. (ADDITIONAL 3.236 ACRES CONVEYANCE AREA INCLUDED IN U.P.I. 53-4-163) (AS TO TRACT I)
- 21. CONDITIONS AS SHOWN ON CHESTER COUNTY PLAN #12114. (IMPROVEMENTS FOR PARKING LOT EXPANSION FOR Q.V.C. AS SHOWN ON PLAN) (AS TO TRACT I)
PARKING SUMMARY
REQUIRED PARKING: (PARCELS 53-4-162, 53-4-163, 53-4-164, 53-4-165, 53-4-174) 1365 ENTERPRISE DRIVE PROPERTIES
1365 ENTERPRISE DRIVE PROPERTIES IS 248,000 SF OF GROSS FLOOR AREA OF THE BUILDING. APPROXIMATELY 54,000 SF OF THIS BUILDING IS DEVOTED TO OFFICE USE. APPROXIMATELY 140,000 SF OF THIS BUILDING IS DESIGNATED FOR WAREHOUSE, UK, AND OTHER NON-WAREHOUSE USES.
OFFICE USE: REQUIRES 4 SPACES PER 1,000 SF OF GROSS FLOOR AREA OR 1 SPACE PER EMPLOYEE ON THE LARGEST SHIFT, WHICHEVER IS GREATER.
4 X (54,000/1,000) = 216 SPACES
WAREHOUSE/DISTRIBUTION: 1 SPACE PER 1,000 SF GROSS FLOOR AREA OR 1 SPACE PER EACH EMPLOYEE ON THE LARGEST SHIFT, WHICHEVER IS GREATER.
1 X (140,000/1,000) = 140 SPACES
VISITORS: 4 SPACES PER PRINCIPAL BUILDING = 4 SPACES
ACCESSIBLE (ADA) SPACES: 9 SPACES
TOTAL REQUIRED SPACES = 369 SPACES
TOTAL PROVIDED SPACES = 827 SPACES
REQUIRED PARKING: (PARCEL 53-4-161), 1373 ENTERPRISE DRIVE PROPERTY
1373 ENTERPRISE DRIVE PROPERTY IS APPROXIMATELY 91,000 SF OF GROSS FLOOR AREA OF THE BUILDING.
OFFICE USE: REQUIRES 4 SPACES PER 1,000 SF OF GROSS FLOOR AREA OR 1 SPACE PER EMPLOYEE ON THE LARGEST SHIFT, WHICHEVER IS GREATER.
4 X (45,950/1,000) = 184 SPACES
WAREHOUSE/OTHER: 1 SPACE PER 1,000 SF GROSS FLOOR AREA OR 1 SPACE PER EACH EMPLOYEE ON THE LARGEST SHIFT, WHICHEVER IS GREATER.
1 X (45,950/1,000) = 46 SPACES
VISITORS: 4 SPACES PER PRINCIPAL BUILDING = 4 SPACES
ACCESSIBLE (ADA) SPACES: 7 SPACES
TOTAL REQUIRED SPACES = 231 SPACES
TOTAL PROVIDED SPACES = 403 SPACES
LOCATION MAP AND LEGENDS
LOCATION MAP: SCALE 1"=2000' (GOSHEN SITE)
EXISTING FEATURES
- EXISTING PROPERTY BOUNDARY
- EXISTING ADJOINING PROP. LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING EASEMENT
- EXISTING SETBACK BOUNDARY
- EXISTING BUILDING
- EXISTING CURB
- EXISTING EDGE OF PAVEMENT
- EXISTING FENCE
- EXISTING LIGHT POLE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING CONIFEROUS TREE
- EXISTING DECIDUOUS TREE
- EXISTING TREE & SHRUB LINE
CONDOMINIUM LEGEND
- UNIT
- LIMITED COMMON ELEMENT
- LIMITED COMMON ELEMENT TO UNIT 1
- LIMITED COMMON ELEMENT TO UNIT 2
- COMMON ELEMENT
NOTE: LANDSCAPE AREAS AS COMMON ELEMENT OR LIMITED COMMON ELEMENT TO BE DETERMINED.
STANDARD PLAN NOTES AND TITLE BLOCK
COPYRIGHT: CHESTER VALLEY ENGINEERS, INC., CIVIL ENGINEERS & SURVEYORS, EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND ALL OTHER PROPERTY RIGHTS IN THESE PLANS. ALL DRAWINGS, SPECIFICATIONS AND COPIES THEREOF ARE AND SHALL REMAIN THE PROPERTY OF CHESTER VALLEY ENGINEERS, INC. THEY ARE TO BE USED ONLY IN RESPECT TO THIS PROJECT AND ARE NOT TO BE USED ON ANY OTHER PROJECT, NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF CHESTER VALLEY ENGINEERS, INC. IN THE EVENT THAT CHANGES OR ALTERATIONS TO THESE PLANS ARE MADE BY ANYONE OTHER THAN CHESTER VALLEY ENGINEERS, INC., THEN CHESTER VALLEY ENGINEERS, INC. SHALL HAVE NO LIABILITY FOR ANY CLAIM, LOSS OR EXPENSE ARISING THEREFROM OR RESULTING THEREFROM.
NOTE TO USER OF THESE PLANS: WARNING: THE INFORMATION CONTAINED ON THIS PLAN MAY NOT BE CONSISTENT WITH CONDITIONS IN THE FIELD. ANY PERSON OR ORGANIZATION USING OR RELYING ON THESE PLANS MUST CONTACT CHESTER VALLEY ENGINEERS, INC. PRIOR TO ANY USE OF THESE PLANS FOR BIDDING OR CONSTRUCTION OR INSTALLATION OF IMPROVEMENTS SHOULD OCCUR UNTIL ALL DISCREPANCIES HAVE BEEN VERIFIED WITH CHESTER VALLEY ENGINEERS, INC. CHESTER VALLEY ENGINEERS, INC., ITS OFFICERS, EMPLOYEES AND REPRESENTATIVES SHALL NOT BE LIABLE FOR DAMAGES OF ANY KIND RESULTING FROM THE USER'S FAILURE TO OBTAIN CURRENT VERIFICATION AND VALIDATION OF THE INFORMATION CONTAINED IN THIS FILE.
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20232523344. CHESTER VALLEY ENGINEERS, INC. DOES NOT GUARANTEE THE ACCURACY OF THE LOCATION FOR EXISTING SUBSURFACE UTILITY STRUCTURES SHOWN ON THE PLANS, NOR DOES CHESTER VALLEY ENGINEERS, INC. GUARANTEE THAT ALL SUBSURFACE STRUCTURES ARE SHOWN. THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF WORK. EXCAVATIONS, TRENCHING AND SHORING: ALL EXCAVATIONS, TRENCHING, AND SHORING OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING UNITED STATES DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PUBLICATIONS OR THE LATEST REVISIONS THERETO: (1) "CONSTRUCTION INDUSTRY STANDARDS AND INTERPRETATIONS (OSHA 2207) SUBPART P, PART 1926.650 - EXCAVATIONS, TRENCHING AND SHORING". (2) "EXCAVATIONS AND TRENCHING OPERATIONS" (OSHA 2226) DATED 1985 (REVISED).
SEE SHEET 1 FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PENNSYLVANIA ONE CALL SYSTEM, INC.: CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776, POCS SERIAL NUMBER: 20232523344
Scale in Feet: 0, 20, 40, 60, 120, 180, 240 (1" = 60')
Professional Engineer Seal: JEREMY R. MAZURZ, PE-044382-E, COMMONWEALTH OF PENNSYLVANIA
CONDOMINIUM PLAN - PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers, Inc., 835 Paoli Pike, Suite 200, Malvern, PA 19355, 610-644-4623, www.chesterv.com
PROJECT NO. 22024 | SCALE: 1"=60' | DATE: 4/29/2024 | DRAWN BY: RRB | CHECKED BY: JRM | SHEET 4 OF 17
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
Condominium Plan - Preliminary Land Development Plan, One CTDI Place
East Goshen Township, Chester County, Pennsylvania. Project No. 22024. Chester Valley Engineers, Inc. Scale 1 inch = 60 feet. Sheet 5 of 17.
Plan drawing showing Unit 2, a brick office building, and parking areas along Enterprise Drive, with a matchline (Sheet 4) at the top, flood plain and wetlands areas at the bottom, and a location map labeled Site.
Plan labels
- Unit 2
- Enterprise Drive
- Existing QVC parking
- Easement for stormwater detention basin
- Zone AE flood plain
- Zone X flood plain
- Wetlands
- Location map, scale 1 inch = 2000 feet
Legend
Existing features
- Existing property boundary
- Existing adjoining property line
- Existing right-of-way line
- Existing easement
- Existing setback boundary
- Existing building
- Existing curb
- Existing edge of pavement
- Existing fence
- Existing light pole
- Existing sign
- Existing utility pole
- Existing coniferous tree
- Existing deciduous tree
- Existing tree and shrub line
Condominium legend
- Unit
- Limited common element
- Limited common element to Unit 1
- Limited common element to Unit 2
- Common element
Note: Landscape areas as common element or limited common element to be determined.
Uniform parcel identifiers: 53-4-161, 53-4-162, 53-4-163, 53-4-164. Small print notes and parcel owner labels are illegible.
EXHIBIT B
01/22/2021 Zoning Verification Letter
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
January 22, 2021
Partner Engineering and Science, Inc.
ATTN: Ms. Colleen Degano
1141 West Sheridan Ave.
Oklahoma City, OK 73106
Re: Zoning Verification Letter (VIA EMAIL ONLY)
1365 Enterprise Dr. West Chester, PA 19380
TPNs': 53-4-162, 53-4-163, 53-4-164, 53-4-165, 53-4-174, 53-3-1.8
Dear Ms. Degado:
The Township has received a request for Zoning Verification of the above referenced properties. I have provided the information requested is below:
- Subject Property Zoning District and Overlay Districts: All the Tax Parcels (TPN's) referenced above are located within the BP - Business Park, Zoning District. There are no zoning overlay districts for the BP district at this time.
- Open Zoning Violations: There are no open zoning violations for the parcels referenced above.
- If the property is a Planned Development, please include development approvals resolutions , and ordinances; All development on the parcels listed above has been approved. The development plans are attached and the zoning ordinance regulating the BP District can be found here: https://ecode360.com/7253699
- Information on Area regulations: https://ecode360.com/7253699
- Any known variances, special exceptions, or conditions: These documents are enclosed.
- Required off street parking requirements: The existing use has adequate parking that meets or exceeds the Township parking requirements; the parking ordinance is referenced here: https://ecode360.com/7255200
- Site / Zone development Requirements: The Township SALDO is referenced here: https://ecode360.com/7251174
- Legal Non-Conforming issues and regulations on rebuilding after damage and destruction: The Nonconforming Uses ordinance is referenced here: https://ecode360.com/7255619
- A copy of the approved site plan: Plans enclosed
This verification is based on a file search and not a physical property inspection. Township Re-Occupancy inspections are required to take place prior to the sale of the property. The application is located here: https://eastgoshen.org/wp-content/uploads/2020/01/Change-of-Use-and-or-Occupancy-Multi-Use-App_1-8-20_Fillable.pdf
F:\Data\Shared Data\Property Management\53-4\53-4-163 (1365 Enterprise Dr.)\2021 Zoning Verification\Zoning Verification Letter 01222021.doc
Please contact me if you have any question or need additional information regarding this matter.
Sincerely,
[signature: Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer
Enclosures (VIA EMAIL ONLY)
F:\Data\Shared Data\Property Management\53-4\53-4-163 (1365 Enterprise Dr.)\2021 Zoning Verification\Zoning Verification Letter 01222021.doc
EXHIBIT C
02/24/2021 Conditional Use Continuation Letter
610-692-7171
www.eastgoshen.org
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
CHESTER COUNTY
1580 PAOLI PIKE, WEST CHESTER, PA 19380-6199
February 24, 2021
Brian L. Nagle, Esquire
MacElree Harvey, Ltd.
17 W. Miner Street
P.O. Box 660
West Chester, PA 198-381-0660
RE: Continuation of Conditional Use
1365 Enterprise Drive, West Chester, PA 19380
TPN's: 53-4-162, 53-4-163, 53-4-164, 53-4-165, 53-4-174 (the "Properties") [53-3-1.8 is subject to a ground lease which is for parking only that is being assigned to CTDI]
Dear Mr. Nagle,
I have reviewed your inquiry regarding Communication Test Design Incorporated's (CTDI) acquisition and future use of the referenced Properties. The Properties currently have conditional use approval that was obtained during QVC's ownership via the letter decision dated September 24, 1986, which permitted the following multiple principal uses by conditional use:
- Business Office; and
- Testing for research or product development; and
- Television transmitter; and
- Warehouse and distribution.
I am aware of CTDI's existing operation at other properties within the Goshen Corporate Park. It is my understanding that, after acquisition, the Properties will be used by CTDI for the following uses:
- Business Office; and
- Testing for research or product development; and
- Warehouse and distribution.
It is also my understanding that your client will not continue the Television transmitter use and that the existing satellite dishes will be removed in due course. I have determined that CTDI may utilize the Properties for its business as a continuation of the previously approved conditional uses and that a new conditional use approval shall not be required by East Goshen Township for CTDI's use and occupancy of the Properties and the buildings and other improvements located thereon. Please note that CTDI will still need to obtain applicable electrical, plumbing, and similar applicable permits for any interior fit-out work that it plans to complete within the existing building. As I noted in my January 22, 2021 letter to Partner
F:\Data\Shared Data\Property Management\53-4\53-4-163 (1365 Enterprise Dr.)\2021 Zoning Verification\CTDI - QVC Continuance of CU Letter 02242021.DOCX
Engineering and Science, Inc., Township Re-Occupancy inspections are required to take place prior to sale of the property.
I have also provided you with a copy of the Radio Frequency analysis performed by Metropolitan Communications Inc. for the QVC Founders Park Building in accordance with §119 of the Township Code. The report identifies areas of the building that do not meet the minimum requirements of the code. Frequency enhancements are required and must be installed within the facility on or before June 30, 2022.
Sincerely,
[signature: Mark A. Gordon]
Mark A. Gordon
Township Zoning Officer
Enclosure
F:\Data\Shared Data\Property Management\53-4\53-4-163 (1365 Enterprise Dr.)\2021 Zoning Verification\CTDI - QVC Continuance of CU Letter 02242021.DOCX
POST – CONSTRUCTION
STORMWATER MANAGEMENT REPORT
for
COMMUNICATIONS TEST DESIGN, INC.
ONE CTDI PLACE
East Goshen Township
Chester County, Pennsylvania
CVE Project No. 22024-0000
prepared for
CTDI
prepared by
Chester Valley Engineers, Inc.
112 Moores Road,
Suite 200
Malvern, PA 19355
Dated: April 29, 2024
Last Revised:
[Logo: Chester Valley Engineers CVE]
[Engineer Seal: Commonwealth of Pennsylvania, Jeremy R. Maziarz, Registered Professional Engineer, License PE-50557-E, signed Jeremy R Maziarz]
Jeremy R. Maziarz, P.E.
Professional Engineer
Pennsylvania License No. PE-50557-E
Table of Contents
Chapter 1 Narrative and Project Information
- Scope of Report ................................................................................................................. 2
- Site Location and Existing Conditions ................................................................................ 2
- Proposed Conditions ......................................................................................................... 2
- Soil Types and Geology ..................................................................................................... 3
- Post Construction Stormwater Management Design Criteria ............................................ 3
- Post Construction Stormwater Management BMP's ........................................................... 6
- Loading Ratio Summary .................................................................................................... 6
- Conclusion ......................................................................................................................... 7
Chapter 2 Pre-Development and Post-Development Hydrology
- Rate Control Summary ...................................................................................................... 9
- HydroCad Routing Diagram ............................................................................................. 11
- HydroCad Analysis ........................................................................................................... 12
- HydroCad Stage Storage ................................................................................................. 117
- HydroCad Stage Discharge .............................................................................................. 119
Chapter 3 Post-Construction Stormwater Management & Water Quality Design
- Worksheet #4 Volume Calculation (Net 2-Year) ............................................................. 122
- BMP Drawdown Worksheet ............................................................................................ 125
Chapter 4 Storm Drainage Calculations
- Storm Inlet Inflow Calculations ....................................................................................... 128
- Storm Pipe Design Calculations ...................................................................................... 130
Chapter 5 References
- DBA Infiltration Testing Report ....................................................................................... 133
- NOAA Atlas 14, Volume 2, Version 3 Precipitation Data ................................................ 158
- Soils Report (NRCS Web Soil Survey) .............................................................................. 162
Appendix A - Drainage Area Maps ................................................................................. 192
Stormwater Management Report
Communications Test Design, Inc.
One CTDI Place
CHAPTER 1
Narrative and Project Information
1
[Logo: Chester Valley Engineers, Inc. CVE]
Stormwater Management Report
Communications Test Design, Inc.
One CTDI Place
CVE Project No. 22024
April 29, 2024
SCOPE OF REPORT
The applicant, Communications Test Design, Inc. (CTDI), proposes to construct a building, parking lot, and several walkway/patio improvements. In order to do so, the applicant plans on demolishing existing parking lots and other impervious surfaces. The subject property exists in East Goshen Township, Chester County, Pennsylvania.
SITE LOCATION AND EXISTING CONDITIONS
The project site is located at 1365/1373 Enterprise Drive in East Goshen Township, Chester County, Pennsylvania. The site is located within a Business Park and is bordered by commercial, industrial and residential uses.
The stormwater runoff associated with the project site drains to the East Branch of Chester Creek. PA Code Chapter 93 designates East Branch of Chester Creek as Trout Stocking Fishes, Migratory Fishes (TSF-MF). The receiving watercourse is listed as having the following impairments: Siltation, Habitat Modifications, Urban Runoff / Storm Sewers. No TMDLs have been established or approved.
This project is considered "redevelopment". For modeling purposes, existing (pre-development) non-forested pervious areas must be considered meadow in good condition or its equivalent. For areas that are impervious surfaces, pre-development calculations assume 20% of the existing impervious surface area to be disturbed as "meadow" ground cover. Unaffected areas located outside of the Area of Disturbance have been modeled with actual land cover conditions.
There is currently an existing stormwater detention basin beneath the parking lot at 1373 Enterprise Drive. Since there is an orifice at the bottom of this system, it is assumed that this basin does not provide recharge benefits. For modeling purposes, actual cover conditions were routed through the basin, to determine peak rate requirements. Per the routing calculations, the basin inflow exceeds the basin storage beyond the 5-year storm event. Therefore, the peak rate requirements consist of the existing basin outflow (through the 5-year storm event) and the existing basin inflow (in events exceeding the 5-year storm event). Refer to the peak rate summary tabulation for additional information.
PROPOSED CONDITIONS
The applicant, Communications Test Design, Inc. (CTDI), proposes to construct a building, parking lot, and several walkway/patio improvements. In order to do so, the applicant plans on demolishing existing parking lots and other impervious surfaces.
Subsurface conveyance systems and sheet flow directed towards the Post-Construction Stormwater Management (PCSM) Best Management Practices (BMPs) will control the post-construction surface runoff by managing volumes and rates as required by Township and PADEP regulations. Uncontrolled runoff from the site will mimic existing drainage patterns by flowing overland to the receiving watercourses.
2
[Logo: Chester Valley Engineers, Inc. CVE]
Stormwater Management Report
Communications Test Design, Inc.
One CTDI Place
CVE Project No. 22024
April 29, 2024
SOIL TYPES AND GEOLOGY
Original soil types on the project area identified in the NRCS Web Soil Survey and the following soil types can be found within the overall project area:
| Soil Type | Description (& Hydrologic Soil Group Classification) |
|---|---|
| UugB | Urban Land – Udorthents, 0% to 8% slopes (HSG C) |
| UugD | Urban Land – Udorthents, 8% to 25% slopes (HSG C) |
A copy of the custom soils report and map for the project area is included in this report and depicts the above-mentioned soil categories within the project's disturbance area. There are no known geologic formations or soil conditions that may have the potential to cause pollution.
POST CONSTRUCTION STORMWATER MANAGEMENT DESIGN CRITERIA
The Post Construction Stormwater Management Plan described herein has been designed according to the following publications and criteria:
- East Goshen Township Stormwater Management Ordinance;
- County-Wide Act 167 Stormwater Management Plan for Chester County, PA, approved by PADEP July 13, 2013;
- "Urban Hydrology for Small Watersheds" (Technical Release No. 55), published by the United States Department of Agriculture, Soil Conservation Service, dated June 1986;
- "PA Stormwater Best Management Practices Manual", prepared by the Department of Environmental Protection, dated December 2006;
Two (2) distinct stormwater management study areas exist within the project area:
- Study Area #1: Overland & pipe conveyance flow to an inlet located Northeast of the proposed driveway entrance. This inlet conveys stormwater Northeast, to a patch of wetlands that drain to the East Branch of Chester Creek. Currently, an existing detention facility is located beneath the existing parking lot, which provides peak rate benefits. This facility is to be removed, and replaced with an infiltration system. Stormwater calculations were performed with respect to the existing inlet, which ensure that post-development peak rates and volumes do not exceed pre-development conditions.
- Study Area #2: Overland & pipe conveyance flow to the southern conveyance systems. From here, stormwater is conveyed Southeast, to a patch of wetlands that drain to the East Branch of Chester Creek. In this study area, two sub-areas were considered. The first is an on-site inlet. The second is an off-site inlet, on Enterprise Drive. These inlets are not connected, but discharge to the same point of interest. Therefore, the basin outflow was compared to the on-site inlet. The bypass calculations were compared to the off-site inlet. These studies were performed to ensure that the post-development peak rates and volumes do not exceed pre-development conditions.
3
[Logo: Chester Valley Engineers, Inc. CVE]
Stormwater Management Report
Communications Test Design, Inc.
One CTDI Place
CVE Project No. 22024
April 29, 2024
The Stormwater Management Plan has been designed to meet the following guidelines, directly extracted from the East Goshen Township Stormwater Management Ordinance:
§ 195-19 WATER QUALITY AND RUNOFF VOLUME REQUIREMENTS
To control post-construction stormwater impacts from regulated activities and meet state water quality requirements, BMPs shall be provided in the site design that replicate pre-development stormwater infiltration and runoff conditions, such that post-construction stormwater discharges do not degrade the physical, chemical, or biological characteristics of the receiving waters. The applicant shall comply with the following water quality and runoff volume requirements for all regulated activities, including all new development and redevelopment activities:
A. The post-construction total runoff volume shall not exceed the pre-development total runoff volume for all storms equal to or less than the two-year, twenty-four-hour duration precipitation (design storm). The water quality and runoff volume to be managed shall consist of any runoff volume generated by the proposed regulated activity over and above the pre-development total runoff volume and shall be captured and permanently retained or infiltrated on the site. Permanent retention options may include, but are not limited to, reuse, evaporation, transpiration, and infiltration.
The required infiltration volume is achieved via infiltration beds. Refer to Chapters 2 & 3.
§ 195-20 INFILTRATION REQUIREMENTS
Providing for infiltration consistent with the natural hydrologic regime is required to compensate for the reduction in the recharge that occurs when the ground surface is disturbed or impervious surface is created or expanded. The applicant shall achieve the following infiltration requirements:
A. Wherever possible, infiltration should be designed to accommodate the entire water quality and runoff volume required in § 195-19.
B. For regulated activities involving new development, the volume of a minimum of one inch of runoff from all proposed impervious surfaces shall be infiltrated.
C. For regulated activities involving redevelopment, whichever is less of the following volume options shall be infiltrated:
1) The volume of a minimum of one inch of runoff from all proposed impervious surfaces; or
2) The total water quality and runoff volume required in § 195-19 of this chapter.
The required infiltration volume is achieved via infiltration beds. Refer to Chapters 2 & 3.
4
[Logo: Chester Valley Engineers, Inc. CVE]
Stormwater Management Report
Communications Test Design, Inc.
One CTDI Place
CVE Project No. 22024
April 29, 2024
§ 195-21 STREAM CHANNEL PROTECTION REQUIREMENTS
For regulated activities involving new development with one or more acres of earth disturbance, the applicant shall comply with the following stream channel protection requirements to minimize stream channel erosion and associated water quality impacts to the receiving waters:
A. The peak flow rate of the postconstruction two-year, twenty-four-hour design storm shall be reduced to the predevelopment peak flow rate of the one-year, twenty-four-hour-duration precipitation, using the SCS Type II distribution.
Peak flow reductions have been achieved via infiltration beds. Refer to Chapter 2 for calculations. Since Stream Channel requirements specifically apply to activities involving new development, they do not apply to undisturbed areas, or those areas draining to the existing detention bed.
§ 195-22 STORMWATER PEAK RATE CONTROL REQUIREMENTS
The applicant shall comply with the following peak flow rate control requirements for all regulated activities, including those that involve new development and redevelopment that are not located in the Chester Creek watershed:
I. Chester Creek watershed redevelopment. Regulated activities for redevelopment projects located within the Chester Creek watershed shall meet peak discharge requirements based on the adjusted runoff control number (RCN) or "C" values illustrated in Appendix H.
Since the referenced table (195-22.3) provides runoff coefficients, and not peak rate control criteria, it is assumed that redevelopment conditions within the Chester Creek watershed are similar to those outside of the Chester Creek watershed. Per Table 195-22.1, redeveloped regulated activities cannot exceed pre-development conditions. See below table that summarizes the considered reductions.
| Post-Developed Design Storm | Pre-Developed Design Storm | |
|---|---|---|
| 2-year | Reduce to | 1-year (per § 195-21) |
| 5-year | 5-year | |
| 10-year | 10-year | |
| 25-year | 25-year | |
| 50-year | 50-year | |
| 100-year | 100-year |
Peak flow reductions have been achieved via PCSM BMPs. Refer to Chapter 2.
In addition to meeting the above requirements of the East Goshen Township Stormwater Management Ordinance, the Stormwater Management Plan has been designed to incorporate the following features:
- Utilize a "treatment train" approach with redundant Best Management Practices (BMP's) adequately sized to provide pretreatment of the Water Quality Storm prior to surface or subsurface infiltration or detention.
5
[Logo: Chester Valley Engineers, Inc. CVE]
Stormwater Management Report
Communications Test Design, Inc.
One CTDI Place
CVE Project No. 22024
April 29, 2024
- Routings were performed through the stormwater management basin using HydroCAD . The program closely follows the S.C.S. TR-55 calculation procedure for calculating and routing hydrographs. The 24-hour design rainfalls were taken from the NOAA Atlas 14, Volume 2, Version 3, and are as follows: Storm Frequency (Year) 24 – Hour Rainfall (Inches) 1-year 2.70 2-year 3.25 5-year 4.08 10-year 4.77 25-year 5.77 50-year 6.61 100-year 7.51
- Provide an onsite storm sewer drainage system that safely conveys the 100-year storm under normal flow conditions to the proposed Stormwater Management systems without surcharging inlets.
- Provide temporary and permanent measures for proper soil erosion and sediment control according to the County Conservation District Soil Erosion and Sediment Control Standards and Township codes.
POST CONSTRUCTION STORMWATER MANAGEMENT BMP'S
Subsurface Infiltration Beds (SWM #100/#200)
The systems are comprised of AASHTO #57 stone and perforated HDPE pipe. Surface runoff drains overland into inlets and then conveyed to these underground systems. The infiltration BMPs are designed to treat and mitigate surface runoff from the contributing watershed. The outlet structures are designed to ensure infiltration is attained, providing peak rate and volume reductions.
LOADING RATIO SUMMARY
Loading ratios for runoff from impervious surface areas are summarized below:
- SWM #100 – 6.6:1
- SWM #200 – 6.4:1
Loading ratios for runoff from tributary drainage areas are summarized below:
- SWM #100 – 10.1:1
- SWM #200 – 13.1:1
The footprints of the proposed subsurface infiltration BMPs have been maximized. There are several design constraints (proximity to buildings, proximity to walls, minimum cover requirements) that control these footprints.
6
[Logo: Chester Valley Engineers, Inc. CVE]
Stormwater Management Report
Communications Test Design, Inc.
One CTDI Place
CVE Project No. 22024
April 29, 2024
Reference "A Risk-Based Approach for Sizing Stormwater Infiltration BMPs," prepared by Domenic Rocco, P.E., CPESC, CPSWQ, Chief, Stormwater Section, Watershed Management Program, PADEP – Southeast Region, dated July 27, 2009:
- "One of the lessons learned while developing this document is that the Maximum Impervious Loading Ratio is a much more important consideration than Maximum Total Loading Ratio for designing infiltration BMPs. Therefore, this document no longer includes a maximum adjusted TDA:IA , as this value may not factor significantly in the design process."
- The maximum allowable impervious drainage area loading ratio (in non-karst watersheds) was reported as 10:1 in this document. "This number was selected as a conservative estimate for those designers following a loading ratio approach to infiltration BMP design. Greater loading ratios can be justified, within reason, when proper soil and geologic investigations are conducted. See other recommendations in this document and Appendices A and B."
CONCLUSIONS
Rate Control:
Overall project site, post development flow rates for all storm events have been designed not to exceed the allowable release rates of all pre-development storms to ensure that no receiving watersheds incur any adverse conditions.
Volume Control:
All stormwater management systems have been designed to provide no net increase in the total 2-year/24-hour post-development volume.
Storm Sewer Design:
The storm drain system has been designed to safely convey the 100-year storm under normal flow conditions to proposed stormwater management systems.
Summary:
The above listed engineering measures will reduce and mitigate the impacts of the proposed development in accordance with the standards set forth by the Township and Pennsylvania Department of Environmental Protection. The Stormwater Management Plan will protect stream morphology, maintain groundwater recharge, prevent downstream increases in flooding and bank erosion, and replicate the hydrology on-site before development.
7
HARDSCAPE / LANDSCAPE PLAN
Colored landscape site plan for the addition to 1373 at One CTDI Place, showing paver plazas, lawn panels, planting beds, trees, and water features along Enterprise Drive.
- 1 HARDSCAPE / LANDSCAPE PLAN, SCALE: 1" = 20'
- ENTERPRISE DRIVE
- Grid references: numbers 1 to 12 across, letters A to M down
Title block
BERNARDON, A Core States Group Company. Architecture, Interior Design, Landscape Architecture. 10 North High Street, Suite 310, West Chester, Pennsylvania 19380, t. 610 444 2900, www.bernardon.com
Project: Addition to 1373 at ONE CTDI PLACE, 1373 Enterprise Drive, West Chester, PA 19380
Owner: CTDI, 1373 Enterprise Drive, West Chester, Pennsylvania 19380
Revision/Issue: A 1/1/24 Schematic Design
Drawn: CDK. Reviewed: CDK. Contact: Tim Kiser. Project Number: 2335.01-23
Sheet Title: HARDSCAPE / LANDSCAPE PLAN
Sheet Number:
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
PLANTING PLAN
Addition to 1373 at ONE CTDI PLACE, 1373 Enterprise Drive, West Chester, PA 19380. Landscape plan drawing, scale 1" = 20'. Owner: CTDI. Bernardon. Revision A 1/1/24 Schematic Design.
PLANT SCHEDULE
| KEY | QTY | BOTANICAL NAME | COMMON NAME | CONTAINER |
|---|---|---|---|---|
| AME | 23 | Amelanchier laevis 'Spring Flurry' | Spring Flurry Serviceberry | B&B |
| COR | 5 | Cornus florida 'Cherokee Princess' | Cherokee Princess Dogwood | B&B |
| GLE | 17 | Gleditsia triacanthos inermis 'Skyline' | Skyline Honey Locust | B&B |
| OXY | 3 | Oxydendrum arboreum | Sourwood Tree | B&B |
| TIL | 16 | Tilia cordata 'June Bride' | June Bride Littleleaf Linden | B&B |
| THU | 41 | Thuja plicata 'Green Splendor' | Green Splendor Western Red Cedar | B&B |
| ILE | 32 | Ilex glabra 'Shamrock' | Shamrock Inkberry Holly | B&B |
| VIB | 13 | Viburnum x 'Chesapeake' | Chesapeake Viburnum | B&B |
| CAL | 48 | Calamagrostis x acutiflora 'Karl Foerster' | Karl Foerster Feather Reed Grass | Pot |
| PAN | 49 | Panicum virgatum 'Cheyenne Sky' | Cheyenne Sky Switch Grass | Pot |
The schedule groups plants as deciduous trees, evergreen trees, shrubs, and perennials and grasses. Sizes and remarks are too small to read reliably. Street label: ENTERPRISE (Drive).
POST-DEVELOPMENT DRAINAGE AREA PLAN - ONE CTDI PLACE (SHEET 2 OF 2)
Engineering plan drawing showing post-development stormwater drainage areas, infiltration beds (SWM #100 and SWM #200), roof drains, trench drains, and bypass drainage areas for the proposed building addition between 1373 and 1365 Enterprise Drive.
PLAN LABELS AND DRAINAGE AREAS
- POST-DEVELOPMENT DRAINAGE AREA TO SWM #100 (STUDY AREA #1)
- POST-DEVELOPMENT DRAINAGE AREA TO SWM #200 (STUDY AREA #2A)
- POST-DEVELOPMENT BYPASS DRAINAGE AREA (STUDY AREA #1)
- POST-DEVELOPMENT BYPASS DRAINAGE AREA (STUDY AREA #2B)
- SWM #100 (BMP #1A) INFILTRATION BED
- SWM #200 (BMP #2A) INFILTRATION BED
- ROOF DRAINS, 8" HDPEP @ 1.00% MIN., 8" HDPEP @ 2.00% MIN., 15" REDUCER WYE (8"), STONE TRENCH WITH 6" PERF. HDPEP (TYP.)
- REPLACE TYPE-M TOP WITH TOP SLAB & MH RIM, REPLACE STRUCTURE WITH 4X4 INLET BOX & MH RIM
- EXTERIOR SITE CANOPY BETWEEN PROPOSED ADDITION AND THE 1365 BUILDING
- Trench drains and inlets: TD101, TD103, TD107, TD108, TD109, TD110, TD111, TD113, TD114, TD203, TD208, TD209, TD210, TD211, TD213, TD214, TD215, TD216, EW103, EW104, EW203, EW204, EW205, EW208
- INLET T.G. 391.91 INV. 388.61 INV. 388.71; INLET T.G. 392.98 INV. 389.93 OUT; INLET GRATE: 399.91 INV.IN: 395.93 INV.OUT: 395.73
- ENTERPRISE DRIVE
- R=325.00' A=222.00' C=217.70' S 46°52'41" E; R=375.00' A=204.30' C=201.79' N 31°51'32" W; CHB=S 21°14'00" W A=90.83' C=90.53' Δ=16°00'45"; R=25.00' A=35.69' C=32.73' N 54°07'15" E; R=375.00' A=61.83' C=61.76' S 89°41'37" E; R=325.00' A=294.30' C=284.35' S 03°17'52" W; R=25.00' A=35.69' C=32.73' S 44°06'32" E; R=325.00' A=156.89' C=155.37' N 81°11'07" E
- U.P.I. # 53-4-161, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-161, BRICK OFFICE BUILDING 1373 ENTERPRISE DRIVE
- U.P.I. # 53-4-162, N/L PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-162, BRICK OFFICE BUILDING 1365 ENTERPRISE DRIVE
- U.P.I. # 53-4-163, N/L PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-163
- U.P.I. # 53-4-174, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-174
- N/L CHRISTOPHER R & ERIN E SMYTH, D.B. 9566 PG. 2294, UPI #53-3M-28
- N/L DAVID & DEBRA BASARUB, D.B. 6708 PG. 192, UPI #53-3M-27
- N/L RAYMOND L & MYRNA J. LEBRE, D.B. 10392 PG. 1097, UPI #53-3M-26
- N/L CATHERINE A. BECK, D.B. 9226 PG. 41, UPI #53-3M-25
SOILS LIST
| SYMBOL | DESCRIPTION | DEPTH TO SEASONALLY HIGH WATER TABLE | DEPTH TO BEDROCK | FREQUENCY OF FLOODING | FREQUENCY OF PONDING | HYDROLOGIC SOIL GROUP | HYDRIC SOIL RATING |
|---|---|---|---|---|---|---|---|
| UrmB | URBAN LAND-UDORTHENTS COMPLEX, 0 TO 8% SLOPES | 60" | 39"-79" | NONE | NONE | C | NO |
| UugB | URBAN LAND-GLENVILLE COMPLEX, 0 TO 8% SLOPES | 18" | 39"-79" | NONE | NONE | C | NO |
| UugD | URBAN LAND-GLENVILLE COMPLEX, 8 TO 25% SLOPES | 18" | 39"-79" | NONE | NONE | C | NO |
LOCATION MAP AND LEGENDS
LOCATION MAP: SCALE 1"=2000' (GOSHEN SITE)
EXISTING FEATURES
- EXISTING PROPERTY BOUNDARY
- EXISTING ADJOINING PROP. LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING EASEMENT
- EXISTING SETBACK BOUNDARY
- EXISTING BUILDING
- EXISTING 1' CONTOURS (404)
- EXISTING 5' CONTOURS (405)
- EXISTING SPOT ELEVATION (x 406.00)
- EXISTING SOIL TYPE (GdB)
- EXISTING CURB
- EXISTING EDGE OF PAVEMENT
- EXISTING FENCE
- EXISTING STORM INLET AND PIPE
- EXISTING MANHOLE AND PIPE
- EXISTING U/G FIRE LINE
- EXISTING U/G WATER LINE
- EXISTING U/G ELECTRIC LINE
- EXISTING U/G TELEPHONE LINE
- EXISTING U/G GAS LINE
- EXISTING OVERHEAD WIRES
- EXISTING LIGHT POLE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING CONIFEROUS TREE
- EXISTING DECIDUOUS TREE
- EXISTING TREE & SHRUB LINE
PROPOSED FEATURES
- PROPOSED BUILDING
- PROPOSED HEAVY DUTY PAVEMENT
- PROPOSED CONCRETE PAD/SIDEWALK
- PROPOSED PAVERS
- PROPOSED RETAINING WALL
- PROPOSED CONCRETE CURB
- NUMBER OF PROPOSED PARKING SPACES (9)
- PROPOSED SIGN
- PROPOSED 1' CONTOURS (404)
- PROPOSED 5' CONTOURS (405)
- PROPOSED SPOT ELEVATION (x 406.00)
- PROPOSED STORMWATER MANAGEMENT FACILITY
- PROPOSED STORM PIPE AND INLET
- PROPOSED STORM PIPE AND MANHOLE
- PROPOSED STORM PIPE AND CLEANOUT
- PROPOSED PIPE FLOW ARROW
DRAINAGE FEATURES
- POST-DEVELOPMENT DRAINAGE AREA
- POST-DEVELOPMENT DRAINAGE AREA TO PCSM BMPS
- POST-DEVELOPMENT INLET DRAINAGE AREA
- POST-DEVELOPMENT Tc PATH
STANDARD PLAN NOTES AND TITLE BLOCK
COPYRIGHT: CHESTER VALLEY ENGINEERS, INC., CIVIL ENGINEERS & SURVEYORS, EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND ALL OTHER PROPERTY RIGHTS IN THESE PLANS. ALL DRAWINGS, SPECIFICATIONS AND COPIES THEREOF ARE AND SHALL REMAIN THE PROPERTY OF CHESTER VALLEY ENGINEERS, INC. THEY ARE TO BE USED ONLY IN RESPECT TO THIS PROJECT AND ARE NOT TO BE USED ON ANY OTHER PROJECT, NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF CHESTER VALLEY ENGINEERS, INC. IN THE EVENT THAT CHANGES OR ALTERATIONS TO THESE PLANS ARE MADE BY ANYONE OTHER THAN CHESTER VALLEY ENGINEERS, INC., THEN CHESTER VALLEY ENGINEERS, INC. SHALL HAVE NO LIABILITY FOR ANY CLAIM, LOSS OR EXPENSE ARISING THEREFROM OR RESULTING THEREFROM.
NOTE TO USER OF THESE PLANS: WARNING: THE INFORMATION CONTAINED ON THIS PLAN MAY NOT BE CONSISTENT WITH CONDITIONS IN THE FIELD. ANY PERSON OR ORGANIZATION USING OR RELYING ON THESE PLANS MUST CONTACT CHESTER VALLEY ENGINEERS, INC. PRIOR TO ANY USE OF THESE PLANS FOR BIDDING OR CONSTRUCTION OR INSTALLATION OF IMPROVEMENTS SHOULD OCCUR UNTIL ALL DISCREPANCIES HAVE BEEN VERIFIED WITH CHESTER VALLEY ENGINEERS, INC. CHESTER VALLEY ENGINEERS, INC., ITS OFFICERS, EMPLOYEES AND REPRESENTATIVES SHALL NOT BE LIABLE FOR DAMAGES OF ANY KIND RESULTING FROM THE USER'S FAILURE TO OBTAIN CURRENT VERIFICATION AND VALIDATION OF THE INFORMATION CONTAINED IN THIS FILE.
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20232523344. CHESTER VALLEY ENGINEERS, INC. DOES NOT GUARANTEE THE ACCURACY OF THE LOCATION FOR EXISTING SUBSURFACE UTILITY STRUCTURES SHOWN ON THE PLANS, NOR DOES CHESTER VALLEY ENGINEERS, INC. GUARANTEE THAT ALL SUBSURFACE STRUCTURES ARE SHOWN. THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF WORK. EXCAVATIONS, TRENCHING AND SHORING: ALL EXCAVATIONS, TRENCHING, AND SHORING OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING UNITED STATES DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PUBLICATIONS OR THE LATEST REVISIONS THERETO: (1) "CONSTRUCTION INDUSTRY STANDARDS AND INTERPRETATIONS (OSHA 2207) SUBPART P, PART 1926.650 - EXCAVATIONS, TRENCHING AND SHORING". (2) "EXCAVATIONS AND TRENCHING OPERATIONS" (OSHA 2226) DATED 1985 (REVISED).
SEE SHEET 1 FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PENNSYLVANIA ONE CALL SYSTEM, INC.: CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776, POCS SERIAL NUMBER: 20232523344
Scale in Feet: 0, 10, 20, 30, 60, 90, 120 (1" = 30')
POST-DEVELOPMENT DRAINAGE AREA PLAN - PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers, Inc., 835 Paoli Pike, Suite 200, Malvern, PA 19355, 610-644-4623, www.chesterv.com
PROJECT NO. 22024 | SCALE: 1"=30' | DATE: 4/29/2024 | DRAWN BY: RRB | CHECKED BY: JRM | SHEET 2 OF 2
PRE-DEVELOPMENT DRAINAGE AREA PLAN - ONE CTDI PLACE (SHEET 1 OF 2)
Engineering plan drawing showing pre-development stormwater drainage areas and time of concentration (Tc) paths for Study Areas #1, #2A, and #2B around 1373 and 1365 Enterprise Drive.
PLAN LABELS AND DRAINAGE AREAS
- PRE-DEVELOPMENT DRAINAGE AREA TO EXISTING UNDERGROUND DETENTION BED (STUDY AREA #1)
- PRE-DEVELOPMENT DRAINAGE AREA TO ENTERPRISE DRIVE INLETS (STUDY AREA #1)
- PRE-DEVELOPMENT DRAINAGE AREA TO ON-SITE INLETS (STUDY AREA #2A)
- PRE-DEVELOPMENT DRAINAGE AREA TO ENTERPRISE DRIVE INLETS (STUDY AREA #2B)
- ENTERPRISE DRIVE
- R=325.00' A=222.00' C=217.70' S 46°52'41" E; R=375.00' A=204.30' C=201.79' N 31°51'32" W; CHB=S 21°14'00" W A=90.83' C=90.53' Δ=16°00'45"; R=25.00' A=35.69' C=32.73' N 54°07'15" E; R=375.00' A=61.83' C=61.76' S 89°41'37" E; R=325.00' A=294.30' C=284.35' S 03°17'52" W; R=25.00' A=35.69' C=32.73' S 44°06'32" E; R=325.00' A=156.89' C=155.37' N 81°11'07" E
- U.P.I. # 53-4-161, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-161, BRICK OFFICE BUILDING 1373 ENTERPRISE DRIVE
- U.P.I. # 53-4-162, N/L PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-162, BRICK OFFICE BUILDING 1365 ENTERPRISE DRIVE
- U.P.I. # 53-4-163, N/L PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-163
- U.P.I. # 53-4-174, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-174
- N/L CHRISTOPHER R & ERIN E SMYTH, D.B. 9566 PG. 2294, UPI #53-3M-28
- N/L DAVID & DEBRA BASARUB, D.B. 6708 PG. 192, UPI #53-3M-27
- N/L RAYMOND L & MYRNA J. LEBRE, D.B. 10392 PG. 1097, UPI #53-3M-26
- N/L CATHERINE A. BECK, D.B. 9226 PG. 41, UPI #53-3M-25
SOILS LIST
| SYMBOL | DESCRIPTION | DEPTH TO SEASONALLY HIGH WATER TABLE | DEPTH TO BEDROCK | FREQUENCY OF FLOODING | FREQUENCY OF PONDING | HYDROLOGIC SOIL GROUP | HYDRIC SOIL RATING |
|---|---|---|---|---|---|---|---|
| UrmB | URBAN LAND-UDORTHENTS COMPLEX, 0 TO 8% SLOPES | 60" | 39"-79" | NONE | NONE | C | NO |
| UugB | URBAN LAND-GLENVILLE COMPLEX, 0 TO 8% SLOPES | 18" | 39"-79" | NONE | NONE | C | NO |
| UugD | URBAN LAND-GLENVILLE COMPLEX, 8 TO 25% SLOPES | 18" | 39"-79" | NONE | NONE | C | NO |
LOCATION MAP AND LEGENDS
LOCATION MAP: SCALE 1"=2000' (GOSHEN SITE)
EXISTING FEATURES
- EXISTING PROPERTY BOUNDARY
- EXISTING ADJOINING PROP. LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING EASEMENT
- EXISTING SETBACK BOUNDARY
- EXISTING BUILDING
- EXISTING 1' CONTOURS (404)
- EXISTING 5' CONTOURS (405)
- EXISTING SPOT ELEVATION (x 406.00)
- EXISTING SOIL TYPE (GdB)
- EXISTING CURB
- EXISTING EDGE OF PAVEMENT
- EXISTING FENCE
- EXISTING STORM INLET AND PIPE
- EXISTING MANHOLE AND PIPE
- EXISTING U/G FIRE LINE
- EXISTING U/G WATER LINE
- EXISTING U/G ELECTRIC LINE
- EXISTING U/G TELEPHONE LINE
- EXISTING U/G GAS LINE
- EXISTING OVERHEAD WIRES
- EXISTING LIGHT POLE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING CONIFEROUS TREE
- EXISTING DECIDUOUS TREE
- EXISTING TREE & SHRUB LINE
DRAINAGE FEATURES
- PRE-DEVELOPMENT DRAINAGE AREA
- PRE-DEVELOPMENT Tc PATH
STANDARD PLAN NOTES AND TITLE BLOCK
COPYRIGHT: CHESTER VALLEY ENGINEERS, INC., CIVIL ENGINEERS & SURVEYORS, EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND ALL OTHER PROPERTY RIGHTS IN THESE PLANS. ALL DRAWINGS, SPECIFICATIONS AND COPIES THEREOF ARE AND SHALL REMAIN THE PROPERTY OF CHESTER VALLEY ENGINEERS, INC. THEY ARE TO BE USED ONLY IN RESPECT TO THIS PROJECT AND ARE NOT TO BE USED ON ANY OTHER PROJECT, NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF CHESTER VALLEY ENGINEERS, INC. IN THE EVENT THAT CHANGES OR ALTERATIONS TO THESE PLANS ARE MADE BY ANYONE OTHER THAN CHESTER VALLEY ENGINEERS, INC., THEN CHESTER VALLEY ENGINEERS, INC. SHALL HAVE NO LIABILITY FOR ANY CLAIM, LOSS OR EXPENSE ARISING THEREFROM OR RESULTING THEREFROM.
NOTE TO USER OF THESE PLANS: WARNING: THE INFORMATION CONTAINED ON THIS PLAN MAY NOT BE CONSISTENT WITH CONDITIONS IN THE FIELD. ANY PERSON OR ORGANIZATION USING OR RELYING ON THESE PLANS MUST CONTACT CHESTER VALLEY ENGINEERS, INC. PRIOR TO ANY USE OF THESE PLANS FOR BIDDING OR CONSTRUCTION OR INSTALLATION OF IMPROVEMENTS SHOULD OCCUR UNTIL ALL DISCREPANCIES HAVE BEEN VERIFIED WITH CHESTER VALLEY ENGINEERS, INC. CHESTER VALLEY ENGINEERS, INC., ITS OFFICERS, EMPLOYEES AND REPRESENTATIVES SHALL NOT BE LIABLE FOR DAMAGES OF ANY KIND RESULTING FROM THE USER'S FAILURE TO OBTAIN CURRENT VERIFICATION AND VALIDATION OF THE INFORMATION CONTAINED IN THIS FILE.
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20232523344. CHESTER VALLEY ENGINEERS, INC. DOES NOT GUARANTEE THE ACCURACY OF THE LOCATION FOR EXISTING SUBSURFACE UTILITY STRUCTURES SHOWN ON THE PLANS, NOR DOES CHESTER VALLEY ENGINEERS, INC. GUARANTEE THAT ALL SUBSURFACE STRUCTURES ARE SHOWN. THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF WORK. EXCAVATIONS, TRENCHING AND SHORING: ALL EXCAVATIONS, TRENCHING, AND SHORING OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING UNITED STATES DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PUBLICATIONS OR THE LATEST REVISIONS THERETO: (1) "CONSTRUCTION INDUSTRY STANDARDS AND INTERPRETATIONS (OSHA 2207) SUBPART P, PART 1926.650 - EXCAVATIONS, TRENCHING AND SHORING". (2) "EXCAVATIONS AND TRENCHING OPERATIONS" (OSHA 2226) DATED 1985 (REVISED).
SEE SHEET 1 FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PENNSYLVANIA ONE CALL SYSTEM, INC.: CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776, POCS SERIAL NUMBER: 20232523344
Scale in Feet: 0, 10, 20, 30, 60, 90, 120 (1" = 30')
PRE-DEVELOPMENT DRAINAGE AREA PLAN - PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers, Inc., 835 Paoli Pike, Suite 200, Malvern, PA 19355, 610-644-4623, www.chesterv.com
PROJECT NO. 22024 | SCALE: 1"=30' | DATE: 4/29/2024 | DRAWN BY: RRB | CHECKED BY: JRM | SHEET 1 OF 2
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
PRELIMINARY LAND DEVELOPMENT PLANS
ONE CTDI PLACE
FOR
COMMUNICATIONS TEST DESIGN, INC. (CTDI)
Cover sheet with site plan map showing the project area, adjoining property owners and parcel numbers, sheet index and utility list.
SHEET INDEX
| SHEET NO. | TITLE |
|---|---|
| 1 | COVER SHEET |
| 2 | EXISTING CONDITIONS PLAN |
| 3 | DEMOLITION PLAN |
| 4, 5 | CONDOMINIUM PLAN |
| 6 | SITE PLAN |
| 7, 8 | GRADING & UTILITIES PLANS |
| 9 | CONSTRUCTION DETAILS |
| 10 | PROFILES |
| 11 | EROSION & SEDIMENTATION CONTROL PLAN |
| 12 | EROSION & SEDIMENTATION CONTROL NOTES |
| 13 | EROSION & SEDIMENTATION CONTROL DETAILS |
| 14 | POST-CONSTRUCTION STORMWATER MANAGEMENT PLAN |
| 15 | POST-CONSTRUCTION STORMWATER MANAGEMENT NOTES & DETAILS |
| 16 | POST-CONSTRUCTION STORMWATER MANAGEMENT DETAILS |
| 17 | VEHICLE TRACKING PLAN |
EAST GOSHEN TOWNSHIP UTILITY LIST
| COMPANY | ADDRESS |
|---|---|
| AT&T | 1100 3RD AVE, ALTOONA, PA 16602 |
| COMCAST | 190 SHOEMAKER RD, POTTSTOWN, PA 19464 |
| EAST GOSHEN TOWNSHIP | 1580 PAOLI PIKE, WEST CHESTER, PA 19380 |
| AQUA PENNSYLVANIA | 762 LANCASTER AVE, BRYN MAWR, PA 19010 |
| COMCAST | 1004 CORNERSTONE BLVD, DOWNINGTOWN, PA 19335 |
| PECO ENERGY C/O USIC | 650 S HENDERSON RD, SUITE B, KING OF PRUSSIA, PA 19406 |
| LUMEN FORMERLY LEVEL 3 | 1025 ELDORADO BLVD, BROOMFIELD, CO 80021 |
| ENERGY TRANSFER | 1300 MAIN ST, HOUSTON, TX 77002 |
| TRANSCONTINENTAL GAS/WILLIAMS GAS | 99 FARBER RD, PRINCETON, NJ 08540 |
| VERIZON BUSINESS FORMERLY MCI | 7000 WESTON PKWY, CARY, NC 27513 |
Contact names, emails and phone numbers in the utility list are too small to transcribe reliably.
TITLE BLOCK
Chester Valley Engineers, Inc., 112 Moores Road, Suite 200, Malvern, PA 19355, 610-644-4623, www.chesterv.com
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PRELIMINARY LAND DEVELOPMENT, ONE CTDI PLACE, ISSUED: APRIL 29, 2024, REVISED:, CVE PROJECT #: 22024, SHEET 1 OF 17
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
EXISTING CONDITIONS PLAN - ONE CTDI PLACE (SHEET 2 OF 17)
Engineering plan drawing showing existing topography, buildings, utilities, easements, spot elevations, and vegetation between 1373 and 1365 Enterprise Drive.
PLAN LABELS
- U.P.I. # 53-4-161, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-161, BRICK OFFICE BUILDING 1373 ENTERPRISE DRIVE
- APPROXIMATE LOCATION OF EXISTING UNDERGROUND DETENTION BED PER "FINAL LAND DEVELOPMENT PLAN FOR COMMUNICATIONS TEST DESIGN, INC. 1373 ENTERPRISE DRIVE", PREPARED BY KELLY ENGINEERS, DATED 08/06/1996, LAST REVISED 12/06/1996. THE LOCATION OF THIS FACILITY WAS NOT FIELD VERIFIED.
- U.P.I. # 53-4-162, N/L PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-162, BRICK OFFICE BUILDING 1365 ENTERPRISE DRIVE
- U.P.I. # 53-4-163, N/L PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-163
- U.P.I. # 53-4-174, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-174
- ENTERPRISE DRIVE
- 20' WIDE UTILITY EASEMENT FOR WATER
- 30' WIDE BUFFER STRIP
- INLET T.G. 391.91 INV. 388.61 INV. 388.71; INLET T.G. 392.98 INV. 389.93 OUT; INLET GRATE: 399.91 INV.IN: 395.93 INV.OUT: 395.73
- R=325.00' A=222.00' C=217.70' S 46°52'41" E; R=375.00' A=204.30' C=201.79' N 31°51'32" W; CHB=S 21°14'00" W A=90.83' C=90.53' Δ=16°00'45"; R=25.00' A=35.69' C=32.73' N 54°07'15" E; R=375.00' A=61.83' C=61.76' S 89°41'37" E; R=325.00' A=294.30' C=284.35' S 03°17'52" W; R=25.00' A=35.69' C=32.73' S 44°06'32" E; R=325.00' A=156.89' C=155.37' N 81°11'07" E
- N/L CHRISTOPHER R & ERIN E SMYTH, D.B. 9566 PG. 2294, UPI #53-3M-28
- N/L DAVID & DEBRA BASARUB, D.B. 6708 PG. 192, UPI #53-3M-27
- N/L RAYMOND L & MYRNA J. LEBRE, D.B. 10392 PG. 1097, UPI #53-3M-26
- N/L CATHERINE A. BECK, D.B. 9226 PG. 41, UPI #53-3M-25
GENERAL NOTES
- 1. BEING CHESTER COUNTY UNIFORM PARCEL IDENTIFIERS: 53-4-161, 162, 163, 164, & 165.
- 2. BOUNDARY INFORMATION SHOWN FROM EXISTING PLANS AND DEEDS OF RECORD.
- 3. GROSS TRACT AREAS: U.P.I. # 53-4-161 - 10.606 ACRES; U.P.I. # 53-4-162 - 1.834 ACRES; U.P.I. # 53-4-163 - 8.933 ACRES; U.P.I. # 53-4-164 - 4.000 ACRES; U.P.I. # 53-4-165 - 5.300 ACRES
- 4. THE TOPOGRAPHY AND IMPROVEMENTS SHOWN WAS PHOTOGRAMMETRICALLY COMPILED BY AERO-METRIC FROM PHOTOGRAPHY TAKEN DECEMBER 24, 2010 SUPPLEMENTED AND CONTROLLED BY FIELD SURVEYS PERFORMED JANUARY 4, 5, & 10, 2011 AND JULY 14, 2023 BY CHESTER VALLEY ENGINEERS, INC.
- 5. ELEVATION DATUM - REFERENCE MARK #235 - PENNDOT DISK AT SOUTHWEST CONCRETE ABUTMENT OF PAOLI PIKE BRIDGE OVER EAST BRANCH OF CHESTER CREEK, ELEVATION = 399.204 NGVD 1929. BENCHMARK TAKEN FROM FLOOD INSURANCE RATE MAP 42029C0352 D DATED NOVEMBER 20, 1996 BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY.
- 6. BY GRAPHIC PLOTTING ONLY, PARCELS #53-4-163, #54-4-164 & #54-4-165 LIE WITHIN AREAS IDENTIFIED AS "ZONE A, ZONE AE & ZONE X" ON FLOOD INSURANCE RATE MAPS 42029C0210G & 42029C0215G DATED SEPTEMBER 29, 2017 FOR CHESTER COUNTY, PENNSYLVANIA BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY.
- 7. SOILS INFORMATION TAKEN FROM USDA NRCS WEB SOIL SURVEY MAP.
- 8. WETLANDS LOCATIONS SHOWN ON PARCELS #53-4-163 & #53-4-165 FROM PHYSICAL FIELD SURVEY BY CHESTER VALLEY ENGINEERS, INC. OF POINTS MARKED BY DEL VAL SOIL & ENVIRONMENTAL CONSULTANTS, INC., DOYLESTOWN, PA.
- 9. THE LOCATION OF EXISTING EASEMENTS WAS TAKEN FROM EXISTING PLANS. THE EASEMENTS WERE NOT DESCRIBED WITH BEARINGS AND DISTANCES, THE EASEMENT LOCATIONS ARE TO BE CONSIDERED APPROXIMATE.
- 10. SCHEDULE B - PART 2 OF TITLE COMMITMENT NO.PA123-2478 KM, NOT DATED, ISSUED BY FIDELITY NATIONAL TITLE INSURANCE COMPANY, INCLUDES THE FOLLOWING EXCEPTIONS:
- 9. RIGHT OF WAY GRANTED TO PHILADELPHIA ELECTRIC COMPANY AS IN MISCELLANEOUS DEED BOOK 203 PAGE 215. (LIMITED BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 10. RIGHT OF WAY GRANTED TO PHILADELPHIA ELECTRIC COMPANY AS IN MISCELLANEOUS DEED BOOK 248 PAGE 296. (LIMITED BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 11. RIGHT OF WAY GRANTED TO PHILADELPHIA ELECTRIC COMPANY AS IN MISCELLANEOUS DEED BOOK 563 PAGE 230. (LIMITED BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 12. INSTRUMENT ESTABLISHING PROTECTIVE COVENANTS FOR GOSHEN CORPORATE PARK RECORDED IN MISCELLANEOUS DEED BOOK 541 PAGE 68, (EXPIRED JANUARY 1, 2010) FIRST AMENDMENT THERETO AS IN RECORD BOOK 4489 PAGE 1731. (EXPIRED BY EXPIRATION CLAUSE IN 541/68) (AS TO TRACTS I AND II)
- 13. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 586 PAGE 426. (BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 14. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 1045 PAGE 82. (NOT PLOTTABLE FROM SCHEMATIC DIAGRAM SUPPLIED) (AS TO TRACT II)
- 15. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 2612 PAGE 16. (BLANKET EASEMENT - NOT PLOTTABLE) (AS TO TRACT I)
- 16. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 3272 PAGE 258. (DOCUMENT NOT PROVIDED - NOT PLOTTABLE) (AS TO TRACT I)
- 17. CONDITIONS AS SHOWN ON PLAN #3553 AS FOLLOWS: (A) TEMPORARY CUL-DE-SAC EASEMENT (LOT 7) (DOES NOT AFFECT PREMISES); (B) REQUIREMENT OF BUILDING SETBACK LINES. (PLOTTED) (C) 30 FEET WIDE BUFFER PLANTING STRIP THROUGH REAR OF LOT. (PLOTTED) (AS TO TRACTS I AND II)
- 18. CONDITIONS AS SHOWN ON PLAN #4193 AS FOLLOWS: (A) REQUIREMENT OF BUILDING SETBACK LINES. (PLOTTED) (B) 20 FEET WIDE UTILITY EASEMENT FOR WATER EXTENDS THROUGH REAR OF LOTS 18 AND 19. (PLOTTED) (C) 30 FEET WIDE BUFFER PLANTING STRIP THROUGH REAR OF LOTS 18 AND 19. (PLOTTED) (AS TO TRACT II)
- 19. CONDITIONS AS SHOWN ON CHESTER COUNTY PLAN #3553. (30 FEET WIDE BUFFER STRIP PLOTTED) (AS TO TRACT I)
- 20. CONDITIONS AS SHOWN ON CHESTER COUNTY PLAN #11951. (ADDITIONAL 3.236 ACRES CONVEYANCE AREA INCLUDED IN U.P.I. 53-4-163) (AS TO TRACT I)
- 21. CONDITIONS AS SHOWN ON CHESTER COUNTY PLAN #12114. (IMPROVEMENTS FOR PARKING LOT EXPANSION FOR Q.V.C. AS SHOWN ON PLAN) (AS TO TRACT I)
LOCATION MAP AND LEGEND
LOCATION MAP: SCALE 1"=2000' (GOSHEN SITE)
EXISTING FEATURES
- EXISTING PROPERTY BOUNDARY
- EXISTING ADJOINING PROP. LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING EASEMENT
- EXISTING SETBACK BOUNDARY
- EXISTING BUILDING
- EXISTING 1' CONTOURS (404)
- EXISTING 5' CONTOURS (405)
- EXISTING SPOT ELEVATION (x 406.00)
- EXISTING SOIL TYPE (GdB)
- EXISTING CURB
- EXISTING EDGE OF PAVEMENT
- EXISTING FENCE
- EXISTING STORM INLET AND PIPE
- EXISTING MANHOLE AND PIPE
- EXISTING U/G FIRE LINE
- EXISTING U/G WATER LINE
- EXISTING U/G ELECTRIC LINE
- EXISTING U/G TELEPHONE LINE
- EXISTING U/G GAS LINE
- EXISTING OVERHEAD WIRES
- EXISTING LIGHT POLE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING CONIFEROUS TREE
- EXISTING DECIDUOUS TREE
- EXISTING TREE & SHRUB LINE
SOILS LIST
| SYMBOL | DESCRIPTION | DEPTH TO SEASONALLY HIGH WATER TABLE | DEPTH TO BEDROCK | FREQUENCY OF FLOODING | FREQUENCY OF PONDING | HYDROLOGIC SOIL GROUP | HYDRIC SOIL RATING |
|---|---|---|---|---|---|---|---|
| UrmB | URBAN LAND-UDORTHENTS COMPLEX, 0 TO 8% SLOPES | 60" | 39"-79" | NONE | NONE | C | NO |
| UugB | URBAN LAND-GLENVILLE COMPLEX, 0 TO 8% SLOPES | 18" | 39"-79" | NONE | NONE | C | NO |
| UugD | URBAN LAND-GLENVILLE COMPLEX, 8 TO 25% SLOPES | 18" | 39"-79" | NONE | NONE | C | NO |
STANDARD PLAN NOTES AND TITLE BLOCK
COPYRIGHT: CHESTER VALLEY ENGINEERS, INC., CIVIL ENGINEERS & SURVEYORS, EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND ALL OTHER PROPERTY RIGHTS IN THESE PLANS. ALL DRAWINGS, SPECIFICATIONS AND COPIES THEREOF ARE AND SHALL REMAIN THE PROPERTY OF CHESTER VALLEY ENGINEERS, INC. THEY ARE TO BE USED ONLY IN RESPECT TO THIS PROJECT AND ARE NOT TO BE USED ON ANY OTHER PROJECT, NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF CHESTER VALLEY ENGINEERS, INC. IN THE EVENT THAT CHANGES OR ALTERATIONS TO THESE PLANS ARE MADE BY ANYONE OTHER THAN CHESTER VALLEY ENGINEERS, INC., THEN CHESTER VALLEY ENGINEERS, INC. SHALL HAVE NO LIABILITY FOR ANY CLAIM, LOSS OR EXPENSE ARISING THEREFROM OR RESULTING THEREFROM.
NOTE TO USER OF THESE PLANS: WARNING: THE INFORMATION CONTAINED ON THIS PLAN MAY NOT BE CONSISTENT WITH CONDITIONS IN THE FIELD. ANY PERSON OR ORGANIZATION USING OR RELYING ON THESE PLANS MUST CONTACT CHESTER VALLEY ENGINEERS, INC. PRIOR TO ANY USE OF THESE PLANS FOR BIDDING OR CONSTRUCTION OR INSTALLATION OF IMPROVEMENTS SHOULD OCCUR UNTIL ALL DISCREPANCIES HAVE BEEN VERIFIED WITH CHESTER VALLEY ENGINEERS, INC. CHESTER VALLEY ENGINEERS, INC., ITS OFFICERS, EMPLOYEES AND REPRESENTATIVES SHALL NOT BE LIABLE FOR DAMAGES OF ANY KIND RESULTING FROM THE USER'S FAILURE TO OBTAIN CURRENT VERIFICATION AND VALIDATION OF THE INFORMATION CONTAINED IN THIS FILE.
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20232523344. CHESTER VALLEY ENGINEERS, INC. DOES NOT GUARANTEE THE ACCURACY OF THE LOCATION FOR EXISTING SUBSURFACE UTILITY STRUCTURES SHOWN ON THE PLANS, NOR DOES CHESTER VALLEY ENGINEERS, INC. GUARANTEE THAT ALL SUBSURFACE STRUCTURES ARE SHOWN. THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF WORK. EXCAVATIONS, TRENCHING AND SHORING: ALL EXCAVATIONS, TRENCHING, AND SHORING OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING UNITED STATES DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PUBLICATIONS OR THE LATEST REVISIONS THERETO: (1) "CONSTRUCTION INDUSTRY STANDARDS AND INTERPRETATIONS (OSHA 2207) SUBPART P, PART 1926.650 - EXCAVATIONS, TRENCHING AND SHORING". (2) "EXCAVATIONS AND TRENCHING OPERATIONS" (OSHA 2226) DATED 1985 (REVISED).
SEE SHEET 1 FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PENNSYLVANIA ONE CALL SYSTEM, INC.: CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776, POCS SERIAL NUMBER: 20232523344
Scale in Feet: 0, 10, 20, 30, 60, 90, 120 (1" = 30')
Professional Engineer Seal: JEREMY R. MAZURZ, PE-044382-E, COMMONWEALTH OF PENNSYLVANIA
EXISTING CONDITIONS PLAN - PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers, Inc., 835 Paoli Pike, Suite 200, Malvern, PA 19355, 610-644-4623, www.chesterv.com
PROJECT NO. 22024 | SCALE: 1"=30' | DATE: 4/29/2024 | DRAWN BY: RRB | CHECKED BY: JRM | SHEET 2 OF 17
DEMOLITION PLAN - ONE CTDI PLACE (SHEET 3 OF 17)
Engineering plan drawing showing demolition limits, features to be removed, pavement sawcut lines, and utility service relocations between 1373 and 1365 Enterprise Drive.
PLAN LABELS
- CONTRACTOR TO CONFIRM LIMITS OF DEMOLITION PER LANDSCAPE ARCHITECT'S LANDSCAPE DESIGN PLANS/DETAILS
- 1 FT SAWCUT OF EXISTING PAVEMENT FOR CURB REPLACEMENT
- TELECOMMUNICATION SERVICE RELOCATION DUE TO 4+ FEET OF CUT
- WATER SERVICE RELOCATION DUE TO 5+ FEET OF CUT
- CONTRACTOR TO VERIFY WITH LANDSCAPE ARCHITECT IF EXISTING TREES ARE TO REMAIN
- CONTRACTOR TO REMOVE ALL PARKING LOT SIGNAGE
- PATIO, TRENCH DRAINS, AND FENCE TO BE REMOVED
- REPLACE TYPE-M TOP WITH TOP SLAB & MH RIM
- U.P.I. # 53-4-161, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-161, BRICK OFFICE BUILDING 1373 ENTERPRISE DRIVE
- APPROXIMATE LOCATION OF EXISTING UNDERGROUND DETENTION BED PER "FINAL LAND DEVELOPMENT PLAN FOR COMMUNICATIONS TEST DESIGN, INC. 1373 ENTERPRISE DRIVE", PREPARED BY KELLY ENGINEERS, DATED 08/06/1996, LAST REVISED 12/06/1996. THE LOCATION OF THIS FACILITY WAS NOT FIELD VERIFIED.
- U.P.I. # 53-4-162, N/L PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-162, BRICK OFFICE BUILDING 1365 ENTERPRISE DRIVE
- U.P.I. # 53-4-163, N/L PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-163
- U.P.I. # 53-4-174, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-174
- ENTERPRISE DRIVE
- N/L CHRISTOPHER R & ERIN E SMYTH, D.B. 9566 PG. 2294, UPI #53-3M-28
- N/L DAVID & DEBRA BASARUB, D.B. 6708 PG. 192, UPI #53-3M-27
- N/L RAYMOND L & MYRNA J. LEBRE, D.B. 10392 PG. 1097, UPI #53-3M-26
- N/L CATHERINE A. BECK, D.B. 9226 PG. 41, UPI #53-3M-25
DEMOLITION NOTES
- 1. CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING THE LOCATION AND ELEVATION OF ALL EXISTING UTILITIES WITHIN THE WORK AREA BEFORE THE START OF CONSTRUCTION. IF A CONFLICT EXISTS, CONTRACTOR IS TO NOTIFY THE ENGINEER IMMEDIATELY.
- 2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL/DEMOLITION OF ALL ANCILLARY FEATURES ASSOCIATED WITH OR ON THE PROPERTY SCHEDULED TO BE REMOVED OR DEMOLISHED, INCLUDING, BUT NOT LIMITED TO, POSTS, VEGETATION, PADS, STEPS, SIGNS, UTILITY POLES, LIGHT AND LAMP POSTS, MAILBOXES, MECHANICAL, ELECTRICAL AND HVAC EQUIPMENT, WALLS, ROOF DRAIN PIPING, ETC.
- 3. IF REQUIRED, CONTRACTOR IS RESPONSIBLE FOR GRADE ADJUSTMENT OF ALL SURFACE UTILITIES, INCLUDING BUT NOT LIMITED TO VALVES, LIDS, GRATES, RIMS, CAPS, STORM AND SANITARY STRUCTURES WITHIN THE LIMITS OF WORK. GRADE ADJUSTMENTS SHALL BE MADE PRIOR TO THE INSTALLATION OF PAVEMENT WEARING COURSE OR PLACEMENT OF TOPSOIL IN UNPAVED AREAS.
- 4. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE APPROPRIATE UTILITY OWNERS TO DISCONNECT AND CAP ALL EXISTING UTILITY SERVICES SCHEDULED FOR DEMOLITION IN ACCORDANCE WITH THE UTILITY COMPANIES REQUIREMENTS: A. WATER LINE: CAP EXISTING WATER SERVICE BEYOND THE LIMITS OF THE PROPOSED DEMOLITION AND REMOVE SERVICE LINE. SITE CONTRACTOR TO COORDINATE WITH THE OWNER AND AQUA PA FOR EXACT LOCATION OF CAPPING AND REMOVAL OF EXISTING WATERLINE, IF REQUIRED.; B. PECO ENERGY CO.: CAP EXISTING ELECTRIC SERVICE BEYOND THE LIMITS OF PROPOSED DEMOLITION AND REMOVE SERVICE LINE. SITE CONTRACTOR TO COORDINATE WITH THE OWNER AND PECO FOR REMOVAL OF ELECTRIC SERVICE.; C. TELECOMMUNICATIONS SERVICES: CAP EXISTING TELECOMMUNICATIONS SERVICES (PHONE, CABLE, ETC.) BEYOND THE LIMITS OF PROPOSED DEMOLITION AND REMOVE SERVICE LINES. SITE CONTRACTOR TO COORDINATE WITH THE OWNER AND UTILITY COMPANIES FOR REMOVAL OF TELECOMMUNICATION SERVICES.; D. NOTE: ALL EXISTING UTILITIES THAT SERVICE THE EXISTING BUILDING ON SITE AND ARE DESIGNATED TO THE EXISTING BUILDING FOOTPRINT ARE TO BE RE-ROUTED BEYOND THE PROPOSED BUILDING PRIOR TO DEMOLITION. IF REQUIRED, TEMPORARY UTILITY SERVICES SHALL BE PROVIDED TO ENSURE THAT ALL UTILITY SERVICES ARE NOT INTERRUPTED.
- 5. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ALL EXISTING FEATURES WHICH ARE DAMAGED DURING DEMOLITION AT NO COST TO TWP. AND OWNER.
- 6. REMOVAL OF EXISTING PAVED SURFACES INCLUDES THE REMOVAL OF CRUSHED STONE BASE MATERIALS.
- 7. REMOVAL OF EXISTING STRUCTURES INCLUDES THE REMOVAL OF ALL FOOTINGS, FOUNDATION WALLS AND OTHER STRUCTURAL SUPPORT ELEMENTS.
- 8. REMOVAL OF ALL FENCES, POSTS AND OTHER SIMILAR FEATURES INCLUDES THE REMOVAL OF CONCRETE FOOTINGS AND BASES.
- 9. ALL EXISTING SHRUBS LOCATED AROUND THE PERIMETER OF THE BUILDING SHALL BE REMOVED. CONTRACTOR IS RESPONSIBLE FOR ALL TREE REMOVAL WITHIN THE PROPOSED LIMITS OF WORK, PER THE OWNER'S DISCRETION.
- 10. DEMOLITION OF TREES AND OTHER VEGETATION INCLUDES REMOVAL OF ALL STUMPS AND ROOT BALLS IN AREAS WITHIN FINISHED GRADE.
- 11. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL ELECTRICAL, MECHANICAL, AND HVAC EQUIPMENT AS REQUIRED FOR DE-ENERGIZING, ELECTRICAL, AND PLUMBING PLANS.
- 12. WHERE PROPOSED CURB AND SIDEWALK ARE TO MATCH EXISTING, THE CONTRACTOR IS TO PROVIDE A CLEAN TRANSITION AND REMOVE/REPLACE ANY EXISTING CURB AND/OR SIDEWALK THAT IS DAMAGED, PER THE OWNER'S DISCRETION.
- 13. BITUMINOUS PAVING SHALL BE SAWCUT PRIOR TO APPLICATION OF THE NEW PAVING, INCLUDING PATCHING IN AREAS OF CURB REPLACEMENT, IF REQUIRED.
- 14. CONTRACTOR IS TO VERIFY WITH OWNER AND LANDSCAPE ARCHITECT WHICH EXISTING TREES ARE TO BE REMOVED OR REQUIRE SELECTIVE PRUNING DUE TO THE CLOSE PROXIMITY TO THE PROPOSED CONSTRUCTION.
- 15. CONTRACTOR IS TO VERIFY WITH OWNER IF EXISTING LIGHT POLES/FIXTURES TO BE REMOVED ARE TO BE SALVAGED OR RE-INSTALLED. CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF ALL LIGHTS, BASES, WIRING AND CONDUITS FOR ALL LIGHTS TO BE REMOVED.
- 16. CONTRACTOR SHALL PROVIDE SAFE PEDESTRIAN ACCESS TO BUILDING ENTRANCES DURING SITE CONSTRUCTION PER OWNER'S BUILDING ACCESS REQUIREMENTS.
- 17. CONTRACTOR TO VERIFY IF EXISTING PARKING LOT AND DRIVEWAY SIGNAGE TO BE REMOVED ARE TO BE RE-INSTALLED OR REPLACED WITH NEW SIGNAGE (STOP SIGNS, ADA PARKING SIGNS, DIRECTIONAL SIGNS, ETC.).
UTILITY LEGEND/NOTES AND LEGENDS
- E: CONTRACTOR TO VERIFY EXISTING ELECTRICAL SERVICE LIMITS TO REMAIN.
- T: CONTRACTOR TO VERIFY EXISTING TELECOMMUNICATION SERVICE LIMITS TO REMAIN.
- 1: EXISTING ELECTRIC LINE SERVICES, LIGHT STANDARDS, ETC. TO BE REMOVED (CONTRACTOR TO VERIFY REMOVAL LIMITS).
- 2: EXISTING TELECOMMUNICATION SERVICES TO BE REMOVED (CONTRACTOR TO VERIFY REMOVAL LIMITS).
- EXISTING WATER SERVICE LINE TO BE REMOVED
- EXISTING ELECTRIC SERVICE LINE TO BE REMOVED
- EXISTING TELECOMMUNICATION SERVICE LINE TO BE REMOVED
EXISTING FEATURES
- EXISTING PROPERTY BOUNDARY
- EXISTING ADJOINING PROP. LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING EASEMENT
- EXISTING SETBACK BOUNDARY
- EXISTING BUILDING
- EXISTING 1' CONTOURS (404)
- EXISTING 5' CONTOURS (405)
- EXISTING SPOT ELEVATION (x 406.00)
- EXISTING SOIL TYPE (GdB)
- EXISTING CURB
- EXISTING EDGE OF PAVEMENT
- EXISTING FENCE
- EXISTING STORM INLET AND PIPE
- EXISTING MANHOLE AND PIPE
- EXISTING U/G FIRE LINE
- EXISTING U/G WATER LINE
- EXISTING U/G ELECTRIC LINE
- EXISTING U/G TELEPHONE LINE
- EXISTING U/G GAS LINE
- EXISTING OVERHEAD WIRES
- EXISTING LIGHT POLE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING CONIFEROUS TREE
- EXISTING DECIDUOUS TREE
- EXISTING TREE & SHRUB LINE
DEMOLITION FEATURES
- (T.B.R.) TO BE REMOVED
- EXISTING FEATURE TO BE REMOVED
- EXISTING PAVEMENT / CONCRETE / STRUCTURE TO BE REMOVED
SOILS LIST
| SYMBOL | DESCRIPTION | DEPTH TO SEASONALLY HIGH WATER TABLE | DEPTH TO BEDROCK | FREQUENCY OF FLOODING | FREQUENCY OF PONDING | HYDROLOGIC SOIL GROUP | HYDRIC SOIL RATING |
|---|---|---|---|---|---|---|---|
| UrmB | URBAN LAND-UDORTHENTS COMPLEX, 0 TO 8% SLOPES | 60" | 39"-79" | NONE | NONE | C | NO |
| UugB | URBAN LAND-GLENVILLE COMPLEX, 0 TO 8% SLOPES | 18" | 39"-79" | NONE | NONE | C | NO |
| UugD | URBAN LAND-GLENVILLE COMPLEX, 8 TO 25% SLOPES | 18" | 39"-79" | NONE | NONE | C | NO |
STANDARD PLAN NOTES AND TITLE BLOCK
COPYRIGHT: CHESTER VALLEY ENGINEERS, INC., CIVIL ENGINEERS & SURVEYORS, EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND ALL OTHER PROPERTY RIGHTS IN THESE PLANS. ALL DRAWINGS, SPECIFICATIONS AND COPIES THEREOF ARE AND SHALL REMAIN THE PROPERTY OF CHESTER VALLEY ENGINEERS, INC. THEY ARE TO BE USED ONLY IN RESPECT TO THIS PROJECT AND ARE NOT TO BE USED ON ANY OTHER PROJECT, NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF CHESTER VALLEY ENGINEERS, INC. IN THE EVENT THAT CHANGES OR ALTERATIONS TO THESE PLANS ARE MADE BY ANYONE OTHER THAN CHESTER VALLEY ENGINEERS, INC., THEN CHESTER VALLEY ENGINEERS, INC. SHALL HAVE NO LIABILITY FOR ANY CLAIM, LOSS OR EXPENSE ARISING THEREFROM OR RESULTING THEREFROM.
NOTE TO USER OF THESE PLANS: WARNING: THE INFORMATION CONTAINED ON THIS PLAN MAY NOT BE CONSISTENT WITH CONDITIONS IN THE FIELD. ANY PERSON OR ORGANIZATION USING OR RELYING ON THESE PLANS MUST CONTACT CHESTER VALLEY ENGINEERS, INC. PRIOR TO ANY USE OF THESE PLANS FOR BIDDING OR CONSTRUCTION OR INSTALLATION OF IMPROVEMENTS SHOULD OCCUR UNTIL ALL DISCREPANCIES HAVE BEEN VERIFIED WITH CHESTER VALLEY ENGINEERS, INC. CHESTER VALLEY ENGINEERS, INC., ITS OFFICERS, EMPLOYEES AND REPRESENTATIVES SHALL NOT BE LIABLE FOR DAMAGES OF ANY KIND RESULTING FROM THE USER'S FAILURE TO OBTAIN CURRENT VERIFICATION AND VALIDATION OF THE INFORMATION CONTAINED IN THIS FILE.
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20232523344. CHESTER VALLEY ENGINEERS, INC. DOES NOT GUARANTEE THE ACCURACY OF THE LOCATION FOR EXISTING SUBSURFACE UTILITY STRUCTURES SHOWN ON THE PLANS, NOR DOES CHESTER VALLEY ENGINEERS, INC. GUARANTEE THAT ALL SUBSURFACE STRUCTURES ARE SHOWN. THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF WORK. EXCAVATIONS, TRENCHING AND SHORING: ALL EXCAVATIONS, TRENCHING, AND SHORING OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING UNITED STATES DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PUBLICATIONS OR THE LATEST REVISIONS THERETO: (1) "CONSTRUCTION INDUSTRY STANDARDS AND INTERPRETATIONS (OSHA 2207) SUBPART P, PART 1926.650 - EXCAVATIONS, TRENCHING AND SHORING". (2) "EXCAVATIONS AND TRENCHING OPERATIONS" (OSHA 2226) DATED 1985 (REVISED).
SEE SHEET 1 FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PENNSYLVANIA ONE CALL SYSTEM, INC.: CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776, POCS SERIAL NUMBER: 20232523344
Scale in Feet: 0, 10, 20, 30, 60, 90, 120 (1" = 30')
Professional Engineer Seal: JEREMY R. MAZURZ, PE-044382-E, COMMONWEALTH OF PENNSYLVANIA
DEMOLITION PLAN - PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers, Inc., 835 Paoli Pike, Suite 200, Malvern, PA 19355, 610-644-4623, www.chesterv.com
PROJECT NO. 22024 | SCALE: 1"=30' | DATE: 4/29/2024 | DRAWN BY: RRB | CHECKED BY: JRM | SHEET 3 OF 17
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
CONDOMINIUM PLAN - PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE (SHEET 4 OF 17)
Engineering plan drawing showing the north portion of the Condominium Plan for One CTDI Place (Unit 1, Brick Office Building at 1373 Enterprise Drive, U.P.I. #53-4-161, and U.P.I. #53-4-174 along Enterprise Drive), with surrounding parcels, bearings and distances, easements, flood plain boundaries, general notes, parking summary, location map, and legends.
PLAN LABELS, BEARINGS, AND ADJOINING PROPERTIES
- UNIT 1, BRICK OFFICE BUILDING, U.P.I. # 53-4-161, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-161, 1373 ENTERPRISE DRIVE
- U.P.I. # 53-4-174, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-174
- ENTERPRISE DRIVE
- 30' WIDE BUFFER STRIP (PLAN 3553)
- 20' WIDE UTILITY EASEMENT FOR WATER
- 25' WIDE DRAINAGE EASEMENT
- 25' WIDE SANITARY SEWER EASEMENT
- ZONE A FLOOD PLAIN, TRIBUTARY OF EAST BRANCH CHESTER CREEK
- MATCHLINE (SHEET 4) / MATCHLINE (SHEET 5)
- N 21°39'13" W 445.78', S 58°53'45" W 129.10', S 68°20'47" W 1062.01', N 68°20'47" E 150.44', S 21°39'13" E 508.41', S 21°39'13" E 401.57', S 68°20'47" W 445.57', S 68°20'47" W 326.90', S 68°20'47" W 348.94', S 68°20'47" W 219.91', S 68°20'47" W 601.51'
- R=325.00' A=222.00' C=217.70' S 46°52'41" E; R=375.00' A=130.65' C=129.99' S 37°19'12" E; R=25.00' A=35.69' C=32.73' N 54°07'15" E; R=325.00' A=294.30' C=284.35' S 03°17'52" W
- N/L 1381 PARSONS, D.B. 6426 PG. 855, UPI #53-4-159
- N/L EDWARD F & LISA M BERRY, D.B. 6602 PG. 671, UPI #53-4E-41
- N/L MICHAEL J & KRISTIN MIRAGLIA, D.B. 5748 PG. 710, UPI #53-4E-40
- N/L RITA & CHRISTOPHER P MARINO, D.B. 11153 PG. 1248, UPI #53-4E-39
- N/L PAUL F & LOIS A VANDERSLICE, D.B. 739 PG. 966, UPI #53-4E-38
- N/L JOHN W & EILEEN C MCCAFFERY, D.B. 3947 PG. 344, UPI #53-4E-37
- N/L JANET E PYEWELL, D.B. 58 PG. 353, UPI #53-4E-36
- N/L JOHN WEBSTER & LAUREN K BECKER, D.B. 10727 PG. 256, UPI #53-4E-35
- N/L CHRISTOPHER R & ERIN E SMYTH, D.B. 9566 PG. 2294, UPI #53-3M-28
- N/L DAVID & DEBRA BASARUB, D.B. 6708 PG. 192, UPI #53-3M-27
- N/L CALABRO & REMETTA BLANCHE TRUST, D.B. 1146 PG. 206, UPI #53-4-175
- N/L LOUIS SIANA, JOHN EARLEY, JOHN, DAVID & SUSAN KIM TRUST, D.B. 1159 PG. 257, UPI #53-4-172
- N/L LOUIS SIANA, JOHN EARLEY, JOHN, DAVID & SUSAN KIM TRUST, D.B. 1159 PG. 262, UPI #53-4-173
GENERAL NOTES
- 1. PROPERTY ADDRESS: 1365 AND 1373 ENTERPRISE DRIVE, WEST CHESTER, PA 19380
- 2. APPLICANT: COMMUNICATIONS TEST DESIGN, INC. (CTDI), 1373 ENTERPRISE DRIVE, WEST CHESTER, PA 19380
- 3. OWNER: (PARCEL #53-4-161) - COMMUNICATIONS TEST DESIGN, INC. (CTDI); (PARCELS #53-4-162, 163, 164, 165) - PARSONS 1365, LLC.
- 4. BOUNDARY INFORMATION SHOWN FROM EXISTING PLANS AND DEEDS OF RECORD.
- 5. GROSS TRACT AREAS: U.P.I. # 53-4-161 - 10.606 ACRES; U.P.I. # 53-4-162 - 1.834 ACRES; U.P.I. # 53-4-163 - 8.933 ACRES; U.P.I. # 53-4-164 - 4.000 ACRES; U.P.I. # 53-4-165 - 5.300 ACRES
- 6. THE TOPOGRAPHY AND IMPROVEMENTS SHOWN WAS PHOTOGRAMMETRICALLY COMPILED BY AERO-METRIC FROM PHOTOGRAPHY TAKEN DECEMBER 24, 2010 SUPPLEMENTED AND CONTROLLED BY FIELD SURVEYS PERFORMED JANUARY 4, 5, & 10, 2011 AND JULY 14, 2023 BY CHESTER VALLEY ENGINEERS, INC.
- 7. ELEVATION DATUM - REFERENCE MARK #235 - PENNDOT DISK AT SOUTHWEST CONCRETE ABUTMENT OF PAOLI PIKE BRIDGE OVER EAST BRANCH OF CHESTER CREEK, ELEVATION = 399.204 NGVD 1929. BENCHMARK TAKEN FROM FLOOD INSURANCE RATE MAP 42029C0352 D DATED NOVEMBER 20, 1996 BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY.
- 6. BY GRAPHIC PLOTTING ONLY, PARCELS #53-4-163, #54-4-164 & #54-4-165 LIE WITHIN AREAS IDENTIFIED AS "ZONE A, ZONE AE & ZONE X" ON FLOOD INSURANCE RATE MAPS 42029C0210G & 42029C0215G DATED SEPTEMBER 29, 2017 FOR CHESTER COUNTY, PENNSYLVANIA BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY.
- 7. SOILS INFORMATION TAKEN FROM USDA NRCS WEB SOIL SURVEY MAP.
- 8. WETLANDS LOCATIONS SHOWN ON PARCELS #53-4-163 & #53-4-165 FROM PHYSICAL FIELD SURVEY BY CHESTER VALLEY ENGINEERS, INC. OF POINTS MARKED BY DEL VAL SOIL & ENVIRONMENTAL CONSULTANTS, INC., DOYLESTOWN, PA.
- 9. THE LOCATION OF EXISTING EASEMENTS WAS TAKEN FROM EXISTING PLANS. THE EASEMENTS WERE NOT DESCRIBED WITH BEARINGS AND DISTANCES, THE EASEMENT LOCATIONS ARE TO BE CONSIDERED APPROXIMATE.
- 10. SCHEDULE B - PART 2 OF TITLE COMMITMENT NO.PA123-2478 KM, NOT DATED, ISSUED BY FIDELITY NATIONAL TITLE INSURANCE COMPANY, INCLUDES THE FOLLOWING EXCEPTIONS:
- 9. RIGHT OF WAY GRANTED TO PHILADELPHIA ELECTRIC COMPANY AS IN MISCELLANEOUS DEED BOOK 203 PAGE 215. (LIMITED BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 10. RIGHT OF WAY GRANTED TO PHILADELPHIA ELECTRIC COMPANY AS IN MISCELLANEOUS DEED BOOK 248 PAGE 296. (LIMITED BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 11. RIGHT OF WAY GRANTED TO PHILADELPHIA ELECTRIC COMPANY AS IN MISCELLANEOUS DEED BOOK 563 PAGE 230. (LIMITED BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 12. INSTRUMENT ESTABLISHING PROTECTIVE COVENANTS FOR GOSHEN CORPORATE PARK RECORDED IN MISCELLANEOUS DEED BOOK 541 PAGE 68, (EXPIRED JANUARY 1, 2010) FIRST AMENDMENT THERETO AS IN RECORD BOOK 4489 PAGE 1731. (EXPIRED BY EXPIRATION CLAUSE IN 541/68) (AS TO TRACTS I AND II)
- 13. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 586 PAGE 426. (BLANKET RIGHT OF WAY - NOT PLOTTABLE) (AS TO TRACTS I AND II)
- 14. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 1045 PAGE 82. (NOT PLOTTABLE FROM SCHEMATIC DIAGRAM SUPPLIED) (AS TO TRACT II)
- 15. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 2612 PAGE 16. (BLANKET EASEMENT - NOT PLOTTABLE) (AS TO TRACT I)
- 16. RIGHT OF WAY GRANTED TO THE BELL TELEPHONE COMPANY AS IN MISCELLANEOUS DEED BOOK 3272 PAGE 258. (DOCUMENT NOT PROVIDED - NOT PLOTTABLE) (AS TO TRACT I)
- 17. CONDITIONS AS SHOWN ON PLAN #3553 AS FOLLOWS: (A) TEMPORARY CUL-DE-SAC EASEMENT (LOT 7) (DOES NOT AFFECT PREMISES); (B) REQUIREMENT OF BUILDING SETBACK LINES. (PLOTTED) (C) 30 FEET WIDE BUFFER PLANTING STRIP THROUGH REAR OF LOT. (PLOTTED) (AS TO TRACTS I AND II)
- 18. CONDITIONS AS SHOWN ON PLAN #4193 AS FOLLOWS: (A) REQUIREMENT OF BUILDING SETBACK LINES. (PLOTTED) (B) 20 FEET WIDE UTILITY EASEMENT FOR WATER EXTENDS THROUGH REAR OF LOTS 18 AND 19. (PLOTTED) (C) 30 FEET WIDE BUFFER PLANTING STRIP THROUGH REAR OF LOTS 18 AND 19. (PLOTTED) (AS TO TRACT II)
- 19. CONDITIONS AS SHOWN ON CHESTER COUNTY PLAN #3553. (30 FEET WIDE BUFFER STRIP PLOTTED) (AS TO TRACT I)
- 20. CONDITIONS AS SHOWN ON CHESTER COUNTY PLAN #11951. (ADDITIONAL 3.236 ACRES CONVEYANCE AREA INCLUDED IN U.P.I. 53-4-163) (AS TO TRACT I)
- 21. CONDITIONS AS SHOWN ON CHESTER COUNTY PLAN #12114. (IMPROVEMENTS FOR PARKING LOT EXPANSION FOR Q.V.C. AS SHOWN ON PLAN) (AS TO TRACT I)
PARKING SUMMARY
REQUIRED PARKING: (PARCELS 53-4-162, 53-4-163, 53-4-164, 53-4-165, 53-4-174) 1365 ENTERPRISE DRIVE PROPERTIES
1365 ENTERPRISE DRIVE PROPERTIES IS 248,000 SF OF GROSS FLOOR AREA OF THE BUILDING. APPROXIMATELY 54,000 SF OF THIS BUILDING IS DEVOTED TO OFFICE USE. APPROXIMATELY 140,000 SF OF THIS BUILDING IS DESIGNATED FOR WAREHOUSE, UK, AND OTHER NON-WAREHOUSE USES.
OFFICE USE: REQUIRES 4 SPACES PER 1,000 SF OF GROSS FLOOR AREA OR 1 SPACE PER EMPLOYEE ON THE LARGEST SHIFT, WHICHEVER IS GREATER.
4 X (54,000/1,000) = 216 SPACES
WAREHOUSE/DISTRIBUTION: 1 SPACE PER 1,000 SF GROSS FLOOR AREA OR 1 SPACE PER EACH EMPLOYEE ON THE LARGEST SHIFT, WHICHEVER IS GREATER.
1 X (140,000/1,000) = 140 SPACES
VISITORS: 4 SPACES PER PRINCIPAL BUILDING = 4 SPACES
ACCESSIBLE (ADA) SPACES: 9 SPACES
TOTAL REQUIRED SPACES = 369 SPACES
TOTAL PROVIDED SPACES = 827 SPACES
REQUIRED PARKING: (PARCEL 53-4-161), 1373 ENTERPRISE DRIVE PROPERTY
1373 ENTERPRISE DRIVE PROPERTY IS APPROXIMATELY 91,000 SF OF GROSS FLOOR AREA OF THE BUILDING.
OFFICE USE: REQUIRES 4 SPACES PER 1,000 SF OF GROSS FLOOR AREA OR 1 SPACE PER EMPLOYEE ON THE LARGEST SHIFT, WHICHEVER IS GREATER.
4 X (38,220/1,000) = 153 SPACES
WAREHOUSE/OTHER: 1 SPACE PER 1,000 SF GROSS FLOOR AREA OR 1 SPACE PER EACH EMPLOYEE ON THE LARGEST SHIFT, WHICHEVER IS GREATER.
1 X (52,780/1,000) = 53 SPACES
VISITORS: 4 SPACES PER PRINCIPAL BUILDING = 4 SPACES
ACCESSIBLE (ADA) SPACES: 7 SPACES
TOTAL REQUIRED SPACES = 217 SPACES
TOTAL PROVIDED SPACES = 403 SPACES
LOCATION MAP AND LEGENDS
LOCATION MAP: SCALE 1"=2000' (GOSHEN SITE)
EXISTING FEATURES
- EXISTING PROPERTY BOUNDARY
- EXISTING ADJOINING PROP. LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING EASEMENT
- EXISTING SETBACK BOUNDARY
- EXISTING BUILDING
- EXISTING CURB
- EXISTING EDGE OF PAVEMENT
- EXISTING FENCE
- EXISTING LIGHT POLE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING CONIFEROUS TREE
- EXISTING DECIDUOUS TREE
- EXISTING TREE & SHRUB LINE
CONDOMINIUM LEGEND
- UNIT
- LIMITED COMMON ELEMENT
- LIMITED COMMON ELEMENT TO UNIT 1
- LIMITED COMMON ELEMENT TO UNIT 2
- COMMON ELEMENT
NOTE: LANDSCAPE AREAS AS COMMON ELEMENT OR LIMITED COMMON ELEMENT TO BE DETERMINED.
STANDARD PLAN NOTES AND TITLE BLOCK
COPYRIGHT: CHESTER VALLEY ENGINEERS, INC., CIVIL ENGINEERS & SURVEYORS, EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND ALL OTHER PROPERTY RIGHTS IN THESE PLANS. ALL DRAWINGS, SPECIFICATIONS AND COPIES THEREOF ARE AND SHALL REMAIN THE PROPERTY OF CHESTER VALLEY ENGINEERS, INC. THEY ARE TO BE USED ONLY IN RESPECT TO THIS PROJECT AND ARE NOT TO BE USED ON ANY OTHER PROJECT, NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF CHESTER VALLEY ENGINEERS, INC. IN THE EVENT THAT CHANGES OR ALTERATIONS TO THESE PLANS ARE MADE BY ANYONE OTHER THAN CHESTER VALLEY ENGINEERS, INC., THEN CHESTER VALLEY ENGINEERS, INC. SHALL HAVE NO LIABILITY FOR ANY CLAIM, LOSS OR EXPENSE ARISING THEREFROM OR RESULTING THEREFROM.
NOTE TO USER OF THESE PLANS: WARNING: THE INFORMATION CONTAINED ON THIS PLAN MAY NOT BE CONSISTENT WITH CONDITIONS IN THE FIELD. ANY PERSON OR ORGANIZATION USING OR RELYING ON THESE PLANS MUST CONTACT CHESTER VALLEY ENGINEERS, INC. PRIOR TO ANY USE OF THESE PLANS FOR BIDDING OR CONSTRUCTION OR INSTALLATION OF IMPROVEMENTS SHOULD OCCUR UNTIL ALL DISCREPANCIES HAVE BEEN VERIFIED WITH CHESTER VALLEY ENGINEERS, INC. CHESTER VALLEY ENGINEERS, INC., ITS OFFICERS, EMPLOYEES AND REPRESENTATIVES SHALL NOT BE LIABLE FOR DAMAGES OF ANY KIND RESULTING FROM THE USER'S FAILURE TO OBTAIN CURRENT VERIFICATION AND VALIDATION OF THE INFORMATION CONTAINED IN THIS FILE.
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20232523344. CHESTER VALLEY ENGINEERS, INC. DOES NOT GUARANTEE THE ACCURACY OF THE LOCATION FOR EXISTING SUBSURFACE UTILITY STRUCTURES SHOWN ON THE PLANS, NOR DOES CHESTER VALLEY ENGINEERS, INC. GUARANTEE THAT ALL SUBSURFACE STRUCTURES ARE SHOWN. THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF WORK. EXCAVATIONS, TRENCHING AND SHORING: ALL EXCAVATIONS, TRENCHING, AND SHORING OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING UNITED STATES DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PUBLICATIONS OR THE LATEST REVISIONS THERETO: (1) "CONSTRUCTION INDUSTRY STANDARDS AND INTERPRETATIONS (OSHA 2207) SUBPART P, PART 1926.650 - EXCAVATIONS, TRENCHING AND SHORING". (2) "EXCAVATIONS AND TRENCHING OPERATIONS" (OSHA 2226) DATED 1985 (REVISED).
SEE SHEET 1 FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PENNSYLVANIA ONE CALL SYSTEM, INC.: CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776, POCS SERIAL NUMBER: 20232523344
Scale in Feet: 0, 20, 40, 60, 120, 180, 240 (1" = 60')
Professional Engineer Seal: JEREMY R. MAZURZ, PE-044382-E, COMMONWEALTH OF PENNSYLVANIA
CONDOMINIUM PLAN - PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers, Inc., 835 Paoli Pike, Suite 200, Malvern, PA 19355, 610-644-4623, www.chesterv.com
PROJECT NO. 22024 | SCALE: 1"=60' | DATE: 4/29/2024 | DRAWN BY: RRB | CHECKED BY: JRM | SHEET 4 OF 17
CONDOMINIUM PLAN - PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE (SHEET 5 OF 17)
Engineering plan drawing showing the south portion of the Condominium Plan for One CTDI Place (Unit 2, Brick Office Building at 1365 Enterprise Drive, U.P.I. #53-4-162, #53-4-163, #53-4-164, #53-4-165, and #53-4-174 along Enterprise Drive), with surrounding parcels, bearings and distances, flood plains, wetlands, easements, location map, and legends.
PLAN LABELS, BEARINGS, AND ADJOINING PROPERTIES
- UNIT 2, BRICK OFFICE BUILDING, U.P.I. # 53-4-163, PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-163, 1365 ENTERPRISE DRIVE
- BRICK OFFICE BUILDING, U.P.I. # 53-4-161, COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-161, 1373 ENTERPRISE DRIVE
- U.P.I. # 53-4-162, PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-162
- U.P.I. # 53-4-164, PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-164
- U.P.I. # 53-4-165, PARSONS 1365, LLC, D.B. 10507 PG. 1528, UPI #53-4-165
- U.P.I. # 53-4-174, COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-174
- ENTERPRISE DRIVE
- EXISTING QVC PARKING (LEASE AREA = 4.00 ACRES) PER PLAN OF PROPERTY OF QVC NETWORK, INC. BY EDWARD B. WALSH & ASSOCIATES, INC.
- EASEMENT FOR STORMWATER DETENTION BASIN
- 20' WIDE SANITARY SEWER EASEMENT
- 30' WIDE BUFFER STRIP (PLAN 3553)
- 20' WIDE UTILITY EASEMENT FOR WATER
- SHADED ZONE X FLOOD PLAIN, ZONE AE FLOOD PLAIN, ZONE X FLOOD PLAIN, WETLANDS - A, WATERS - A
- MATCHLINE (SHEET 4) / MATCHLINE (SHEET 5)
- N 68°20'47" E 150.44', N 68°20'47" E 414.82', N 68°20'47" E 260.05', N 68°20'47" E 295.06', N 68°20'47" E 358.87', S 21°39'13" E 508.41', S 21°39'13" E 365.58', S 21°39'13" E 556.86', 596.00', 545.00', S 22°38'58" E 895.06', 670.06', N 68°08'22" E 310.85', N 68°08'22" E 570.63', N 68°08'22" E 282.58', N 21°51'38" W 290.00', S 67°19'51" W 435.00', S 22°38'58" E 238.94', S 22°38'58" E 157.82', S 03°16'29" W 274.15', S 85°26'28" E 485.46', N 22°52'10" W 476.33'
- R=25.00' A=35.69' C=32.73' N 54°07'15" E; R=325.00' A=294.30' C=284.35' S 03°17'52" W; R=375.00' A=61.83' C=61.76' S 89°41'37" E; R=25.00' A=35.69' C=32.73' S 44°06'32" E; R=325.00' A=156.89' C=155.37' N 81°11'07" E; R=535.00' A=311.58' C=307.20' S 39°19'57" E
- N/L CHRISTOPHER R & ERIN E SMYTH, D.B. 9566 PG. 2294, UPI #53-3M-28
- N/L DAVID & DEBRA BASARUB, D.B. 6708 PG. 192, UPI #53-3M-27
- N/L RAYMOND L & MYRNA J LEBRE, D.B. 10392 PG. 1097, UPI #53-3M-26
- N/L CATHERINE A. BECK, D.B. 9226 PG. 41, UPI #53-3M-25
- N/L HEATHER JORDAN, D.B. 9298 PG. 1869, UPI #53-3M-24
- N/L STEVEN & ELIZABETH FERNANDO, D.B. 9523 PG. 1214, UPI #53-3M-23
- N/L RICHARD & JANINE GENGLER, D.B. 1793 PG. 595, UPI #53-3M-22
- N/L RICHARD & JANINE GENGLER, D.B. 1793 PG. 595, UPI #53-3M-21
- N/L WILLIAM HICKS, D.B. 591 PG. 18, UPI #53-4-158
- N/L WILLIAM HICKS, D.B. 591 PG. 18, UPI #53-4-108
- N/L RUSSELL & ELIZABETH HICKS, D.B. 039 PG. 342, UPI #53-4-166
- N/L LOUIS SIANA, JOHN EARLEY, JOHN, DAVID & SUSAN KIM TRUST, D.B. 1159 PG. 262, UPI #53-4-173
LOCATION MAP AND LEGENDS
LOCATION MAP: SCALE 1"=2000' (GOSHEN SITE)
EXISTING FEATURES
- EXISTING PROPERTY BOUNDARY
- EXISTING ADJOINING PROP. LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING EASEMENT
- EXISTING SETBACK BOUNDARY
- EXISTING BUILDING
- EXISTING CURB
- EXISTING EDGE OF PAVEMENT
- EXISTING FENCE
- EXISTING LIGHT POLE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING CONIFEROUS TREE
- EXISTING DECIDUOUS TREE
- EXISTING TREE & SHRUB LINE
CONDOMINIUM LEGEND
- UNIT
- LIMITED COMMON ELEMENT
- LIMITED COMMON ELEMENT TO UNIT 1
- LIMITED COMMON ELEMENT TO UNIT 2
- COMMON ELEMENT
NOTE: LANDSCAPE AREAS AS COMMON ELEMENT OR LIMITED COMMON ELEMENT TO BE DETERMINED.
STANDARD PLAN NOTES AND TITLE BLOCK
COPYRIGHT: CHESTER VALLEY ENGINEERS, INC., CIVIL ENGINEERS & SURVEYORS, EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND ALL OTHER PROPERTY RIGHTS IN THESE PLANS. ALL DRAWINGS, SPECIFICATIONS AND COPIES THEREOF ARE AND SHALL REMAIN THE PROPERTY OF CHESTER VALLEY ENGINEERS, INC. THEY ARE TO BE USED ONLY IN RESPECT TO THIS PROJECT AND ARE NOT TO BE USED ON ANY OTHER PROJECT, NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT PRIOR WRITTEN CONSENT OF CHESTER VALLEY ENGINEERS, INC. IN THE EVENT THAT CHANGES OR ALTERATIONS TO THESE PLANS ARE MADE BY ANYONE OTHER THAN CHESTER VALLEY ENGINEERS, INC., THEN CHESTER VALLEY ENGINEERS, INC. SHALL HAVE NO LIABILITY FOR ANY CLAIM, LOSS OR EXPENSE ARISING THEREFROM OR RESULTING THEREFROM.
NOTE TO USER OF THESE PLANS: WARNING: THE INFORMATION CONTAINED ON THIS PLAN MAY NOT BE CONSISTENT WITH CONDITIONS IN THE FIELD. ANY PERSON OR ORGANIZATION USING OR RELYING ON THESE PLANS MUST CONTACT CHESTER VALLEY ENGINEERS, INC. PRIOR TO ANY USE OF THESE PLANS FOR BIDDING OR CONSTRUCTION OR INSTALLATION OF IMPROVEMENTS SHOULD OCCUR UNTIL ALL DISCREPANCIES HAVE BEEN VERIFIED WITH CHESTER VALLEY ENGINEERS, INC. CHESTER VALLEY ENGINEERS, INC., ITS OFFICERS, EMPLOYEES AND REPRESENTATIVES SHALL NOT BE LIABLE FOR DAMAGES OF ANY KIND RESULTING FROM THE USER'S FAILURE TO OBTAIN CURRENT VERIFICATION AND VALIDATION OF THE INFORMATION CONTAINED IN THIS FILE.
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20232523344. CHESTER VALLEY ENGINEERS, INC. DOES NOT GUARANTEE THE ACCURACY OF THE LOCATION FOR EXISTING SUBSURFACE UTILITY STRUCTURES SHOWN ON THE PLANS, NOR DOES CHESTER VALLEY ENGINEERS, INC. GUARANTEE THAT ALL SUBSURFACE STRUCTURES ARE SHOWN. THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF WORK. EXCAVATIONS, TRENCHING AND SHORING: ALL EXCAVATIONS, TRENCHING, AND SHORING OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING UNITED STATES DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PUBLICATIONS OR THE LATEST REVISIONS THERETO: (1) "CONSTRUCTION INDUSTRY STANDARDS AND INTERPRETATIONS (OSHA 2207) SUBPART P, PART 1926.650 - EXCAVATIONS, TRENCHING AND SHORING". (2) "EXCAVATIONS AND TRENCHING OPERATIONS" (OSHA 2226) DATED 1985 (REVISED).
SEE SHEET 1 FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER.
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PENNSYLVANIA ONE CALL SYSTEM, INC.: CALL 3 WORKING DAYS BEFORE YOU DIG 1-800-242-1776, POCS SERIAL NUMBER: 20232523344
Scale in Feet: 0, 20, 40, 60, 120, 180, 240 (1" = 60')
Professional Engineer Seal: JEREMY R. MAZURZ, PE-044382-E, COMMONWEALTH OF PENNSYLVANIA
CONDOMINIUM PLAN - PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
Chester Valley Engineers, Inc., 835 Paoli Pike, Suite 200, Malvern, PA 19355, 610-644-4623, www.chesterv.com
PROJECT NO. 22024 | SCALE: 1"=60' | DATE: 4/29/2024 | DRAWN BY: RRB | CHECKED BY: JRM | SHEET 5 OF 17
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
Site Plan - Preliminary Land Development Plan, One CTDI Place
East Goshen Township, Chester County, Pennsylvania. Project No. 22024. Scale 1 inch = 30 feet. Sheet 6 of 17.
Site plan showing a proposed building addition between two existing brick office buildings (1373 and 1365 Enterprise Drive), with planting beds, synthetic lawn putting green, outdoor dining/employee lunch area, and stormwater facilities along Enterprise Drive.
Plan labels
- Proposed building addition (FFE 407.33)
- Exterior site canopy between proposed addition and the 1365 building
- SWM #100 (BMP #1A) infiltration bed
- SWM #200 (BMP #2A) infiltration bed
- Synthetic lawn putting green
- Synthetic lawn
- Planting bed
- Outdoor dining / employee lunch area
- Enterprise Drive
- Brick office building 1373 Enterprise Drive
- Brick office building 1365 Enterprise Drive
- U.P.I. #53-4-161, #53-4-162, #53-4-163, #53-4-174
Zoning compliance tables
Two tables, one for Parcel 53-4-161 and one for Parcels 53-4-162, 53-4-163, 53-4-164, 53-4-165, BP - Business Park District, listing required, existing and proposed values for lot area, lot width, maximum land coverage, maximum building height and minimum yard setbacks. Figures are too small to transcribe reliably.
Other content
General notes (numbered list), location map, legend of existing and proposed features, and standard engineer notes are present but too small to transcribe reliably.
GRADING & UTILITY PLAN
Preliminary Land Development Plan for One CTDI Place, East Goshen Township, Chester County, Pennsylvania. Sheet 7 of 17, scale 1" = 30'. Engineering plan showing grading, storm piping, infiltration beds, and the proposed building addition along Enterprise Drive, with location map, legend, and soils list.
Plan labels
- PROPOSED BUILDING ADDITION (FFE: 407.33)
- ADDITION ABOVE
- EXTERIOR SITE CANOPY BETWEEN PROPOSED ADDITION AND THE 1365 BUILDING
- FOUNTAIN
- SWM #100 (BMP #1) INFILTRATION BED; SWM #200 (BMP #2) INFILTRATION BED
- 8" HDPEP @ 1.00% MIN.; 15" REDUCER WYE (8"); STONE TRENCH WITH 6" PERF. HDPEP (TYP.)
- REPLACE TYPE-M TOP WITH TOP SLAB & MH RIM; REPLACE STRUCTURE WITH 4x4 INLET BOX & MH RIM
- ENTERPRISE DRIVE
- U.P.I. #53-4-161, #53-4-162, #53-4-163, #53-4-174
- N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058; BRICK OFFICE BUILDING 1373 ENTERPRISE DRIVE
- PARSONS 1365, LLC D.B. 10507 PG. 1528; BRICK OFFICE BUILDING 1365 ENTERPRISE DRIVE
- Adjoining owners: Christopher R. and Erin E. Smyth; David and Debra Basarub; Raymond L. and Myrna J. Lebre; Catherine A. Beck
- LOCATION MAP, SCALE 1" = 2000', SITE in East Goshen
- LEGEND: Existing Features and Proposed Features
- NOTES: 1. Contractor to refer to landscape architect's plans and details for all pavement/paver/hardscape units, types and patterns.
- SOILS LIST
Title block
PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA. Chester Valley Engineers, Inc. Project No. 22024. Scale 1" = 30'. Date 4/29/2024. SHEET 7 OF 17.
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
GRADING & UTILITY PLAN
PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, East Goshen Township, Chester County, Pennsylvania. Chester Valley Engineers, Inc. Project 22024. Scale 1" = 20'. Date 4/29/2024. Sheet 8 of 17.
Plan Labels
- ENTERPRISE DRIVE
- PROPOSED BUILDING ADDITION (FFE: 407.33)
- BRICK OFFICE BUILDING 1373 ENTERPRISE DRIVE
- BRICK OFFICE BUILDING 1365 ENTERPRISE DRIVE
- N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-161
- N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-174
- N/L PARSONS 1365, LLC D.B. 10507 PG. 1528 UPI #53-4-162
- N/L PARSONS 1365, LLC D.B. 10507 PG. 1528 UPI #53-4-163
- SWM #100 INFILTRATION BED
- SWM #200 INFILTRATION BED
- FOUNTAIN
- Doorsill elevations, trench drains (TD labels), pipe callouts
LOCATION MAP
Scale 1" = 2000'. Shows East Goshen with the site marked.
LEGEND
Existing features: property boundary, adjoining property line, right-of-way line, easement, setback boundary, building, 1' and 5' contours, spot elevation, soil type, curb, edge of pavement, fence, storm inlet and pipe, manhole and pipe, underground fire, water, electric, telephone and gas lines, overhead wires, light pole, sign, utility pole, coniferous and deciduous trees, tree and shrub line.
Proposed features: building, heavy duty pavement, concrete pad/sidewalk, pavers, retaining wall, concrete curb, number of proposed parking spaces, sign, 1' and 5' contours, spot elevation, stormwater management facility, storm pipe and inlet, manhole, cleanout, pipe flow arrow.
NOTES: 1. CONTRACTOR TO REFER TO LANDSCAPE ARCHITECT'S PLANS AND DETAILS FOR ALL PAVEMENT/PAVER/HARDSCAPE LIMITS, TYPES AND PATTERNS.
Uniform parcel identifiers: 53-4-161, 53-4-162, 53-4-163, 53-4-164. Pennsylvania One Call: 1-800-242-1776. A soils list and standard notes in very small print are not transcribed.
CONSTRUCTION DETAILS
Engineering construction details sheet for One CTDI Place containing bollard, concrete curb, depressed curb, sidewalk, bituminous pavement section, paving notch, detectable warning surface (DWS) curb cut, stop sign, handicap parking sign, and parking stall striping details.
BOLLARD DETAIL
N.T.S.
Diagram of a pipe bollard embedded in concrete foundation:
- NEOPRENE CAP
- 6" DIA. STEEL (SCH. 40) PIPE BOLLARD FILLED WITH CONCRETE
- Height above ground: 3'-6"
- MOUND TO SHED RAIN
- Foundation depth: 3'-0", 6" below pipe, 20" (MIN.) Ø
- PA DOT CLASS 'A' CEMENT CONCRETE
NOTE: BOLLARD TO BE PAINTED WITH EXTERIOR PAINT, COLOR PER OWNER.
CONCRETE CURB DETAIL
N.T.S.
Diagrams of Detail A Contraction Joint, Typical Cross Section, and Isometric Curb View:
- DETAIL A CONTRACTION JOINT: 50 (2") DEEP, 5 (3/16") WIDE
- TYPICAL CROSS SECTION: Top width 200 (8"), 175 (7") + 25 (1") batter, 6 (1/4") RADIUS, 20 (3/4") RADIUS, 6" reveal, 450 (18") total height, 300 (12") base depth, CLASS A CONCRETE
- Isometric view: CONTRACTION JOINT SPACING 6.0 m (20'-0") MAX TO 1.2 m (4'-0") MIN SEE NOTE 2; CONTRACTION JOINT, SEE DETAIL A
NOTES:
- PROVIDE MATERIALS AND CONSTRUCTION MEETING THE REQUIREMENTS OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PUBLICATION 408, SECTION 630 FOR PLAIN CONCRETE CURB AND DEPRESSED CURB.
- SPACE CONTRACTION JOINTS IN UNIFORM LENGTHS OF SECTIONS.
- PLACE 3/4" PREMOLDED EXPANSION JOINT FILLER MATERIAL AT STRUCTURES, AND AT THE END OF THE WORK DAY. CUT MATERIAL TO CONFORM TO AREA ADJACENT TO CURB OR TO CONFORM TO CROSS-SECTIONAL AREA OF CURB.
- ALL CURBS SHOULD BE CONSTRUCTED OF CLASS A CEMENT CONCRETE W/ A 3,300 PSI 28-DAY STRENGTH, AND SHALL BE CONSTRUCTED IN 10-FOOT LENGTHS.
- A PREMOLDED BITUMINOUS IMPREGNATED 1/2 INCH EXPANSION JOINT SHALL BE PLACED BETWEEN SECTIONS OF CURBING AT INTERVALS OF NOT MORE THAN 30-FEET.
- DEPRESSED CURB AT DRIVEWAYS SHALL BE BETWEEN ONE AND 1/2 INCHES ABOVE THE FINISHED STREET GRADE. PIPES, GRATES, WOOD PLANKS OR OTHER MATERIALS SHALL NOT BE PLACED IN THE GUTTER TO FORM A DRIVEWAY RAMP.
- WHEN CURBING MUST BE CUT FOR DEPRESSED CURB INSTALLATION, THE LENGTH OF THE REMAINING SECTION SHALL BE NO LESS THAN FOUR FEET BETWEEN EXPANSION JOINTS AND THE CUT SHALL BE MADE IN A NEAT MANNER WITH A POWER SAW EQUIPPED WITH A PROPER MASONRY CUTTING BLADE.
- ANY DEPRESSED CURB SECTIONS THAT ARE UNUSED WHEN A DEVELOPMENT OR PHASE OF A DEVELOPMENT IS COMPLETED, SHALL BE COMPLETELY REMOVED AND REPLACED WITH FULL SECTION UPRIGHT CURBING TO LINE AND GRADE OF ADJACENT CURBING. FORMING AND POURING VERTICAL CURBING ON TOP OF AN EXISTING CURB DEPRESSION WILL NOT BE PERMITTED.
- ALL CURBING SHALL BE 6" REVEAL UNLESS NOTED OTHERWISE.
- EXPOSED CURB FACES SHALL HAVE A BRUSHED FINISH.
- BASE UNDER CONCRETE CURB SHALL BE MINIMUM 4" OF 2A MODIFIED AGGREGATE.
- CONCRETE CURBS SHALL BE SEALED W/ AC-20 OR OTHER TOWNSHIP APPROVED SEALER. THE SEAL MATERIALS SHALL EXTEND OUT A MINIMUM OF 12" FROM FACE OF CURB AND A MINIMUM 2" UP FACE. THE PAVEMENT AND FACE SHALL BE PROPERLY CLEANED PRIOR TO SEALING TO PROVIDE FOR MAXIMUM ADHERENCE OF THE SEALING MATERIAL.
PARKING LOT/DRIVEWAY STANDARD STRAIGHT CONCRETE CURB DETAIL
N.T.S.
Cross-section diagram showing: 1/4" Rad., SEAL JOINT WITH AC-20, 2", PROPOSED CURB WHERE NOTED ON PLAN.
DEPRESSED CURBS FOR CURB RAMPS
N.T.S.
Cross-section diagram showing: (8") width, (1") batter, (1/4") RADIUS, FLARED SLOPE SURFACE (SEE NOTE 2), SLOPE TO MATCH RAMP OR LANDING SLOPE, ROADWAY SURFACE, CURB FLUSH WITH ROADWAY SURFACE SEE NOTE 1, (6"), (18"), (12"), CLASS A CONCRETE.
NOTES:
- CONSTRUCT DEPRESSED CURB FOR CURB RAMPS FLUSH TO ADJACENT ROADWAY GRADE EDGE OF ROAD ELEVATIONS AT THE FLOW LINE TO ENSURE POSITIVE DRAINAGE AND PREVENT PONDING. FOR LEVEL TURNING SPACES BEHIND DEPRESSED CURB, ADJUST SLOPES TO PROVIDE POSITIVE DRAINAGE. AT THE JOINT BETWEEN DEPRESSED CURB AND ROADWAYS, REMOVE EXCESS JOINT SEALER AND COVER THE SEALED AREA WITH A LIGHT APPLICATION OF DRY SAND.
- CURB TAPER MAY BE FIELD ADJUSTED TO MEET EXISTING CURB REVEAL HEIGHT OF EXISTING GRANITE CURB.
SIDEWALK DETAIL & CONCRETE SIDEWALK DETAIL
N.T.S.
Isometric and cross-section diagrams of concrete sidewalk:
- 30' section with 5' intervals, 5" CLASS 'A' CONCRETE, 4" AASHTO NO. 57 COARSE AGGREGATE, 1/2" DEEP SCORE, FORM OUTSIDE EDGES AND JOINTS WITH A 1/4" RADIUS-EDGING TOOL, 1/2" FULL DEPTH EXPANSION JOINT.
- Cross section: AS NOTED ON PLAN, 2% SLOPE (MAX.), RESTORED LAWN (TYP.), 5" PA DOT CLASS A CEMENT CONCRETE (3750 PSI 28-DAY SEE NOTE 3), 4" AASHTO NO. 57 COARSE AGGREGATE.
NOTE:
- SIDEWALK SHALL BE PROVIDED WITH A LIGHT BROOM FINISH.
- CONSTRUCT SIDEWALK IN ACCORDANCE WITH PENNDOT PUBLICATION 408.
NOTES:
- PLACE 1/4" THICK PREMOLDED EXPANSION JOINT FILLER WHERE SIDEWALK ABUTS CURBS.
- CONSTRUCT SIDEWALK IN 30' LENGTHS, EXCEPT FOR CLOSURES. SEPARATE SLABS W/ A TRANSVERSE 1/4" THICK PREMOLDED EXPANSION JOINT FILLER. DIVIDE SLABS BETWEEN EXPANSION JOINTS W/ TRANSVERSE SCORES AT 5' SPACING.
- PADOT CLASS "AA" CEMENT CONCRETE (3750 PSI) SHALL BE USED FOR ALL SIDEWALKS CONSTRUCTED WITHIN THE RIGHT-OF-WAY OF TOWNSHIP STREETS.
- LAWN RESTORATION TO CONSIST OF 6" (MIN.) TOPSOIL AND PERMANENT SEED MIXTURE AND MULCH.
- CONCRETE CURING COMPOUND TO BE APPLIED IN ACCORDANCE WITH PENNDOT PUB. 408, SECTION 711.
REQUIRED BITUMINOUS PAVEMENT SECTION
N.T.S.
Layered diagram showing: WEARING COURSE, BINDER COURSE, BASE COURSE, SUBBASE, COMPACTED SUBGRADE.
| DEPTH | LOCATION: BITUMINOUS PAVEMENT HEAVY DUTY PAVEMENT (ENTERPRISE DRIVE) |
|---|---|
| WEARING: | 1-1/2" |
| BINDER: | NONE |
| BASE (AS NOTED): | 5" BCBC |
| SUBBASE: PA DOT 2A COARSE AGGREGATE | 8" |
NOTE: FOR PAVEMENT WHERE UNCURBED, EXTEND SUBBASE AND/OR BASE COURSE EIGHT INCHES BEYOND EACH REQUIRED EDGE OF THE BINDER AND SURFACE COURSES.
BITUMINOUS PAVEMENT SPECIFICATIONS, ALL SECTIONS, AS APPLICABLE
| Course | Specification |
|---|---|
| WEARING COURSE | SUPERPAVE ASPHALT MIXTURE DESIGN, HMA WEARING COURSE, PG 64-22, 10 TO <30 MILLION ESALS, 9.5 MM MIX, SLR-H |
| BINDER COURSE | SUPERPAVE ASPHALT MIXTURE DESIGN, HMA BINDER COURSE (LEVELING), PG 64-22, 10 TO <30 MILLION ESALS, 19.0 MM MIX |
| BITUMINOUS CONCRETE BASE COURSE | SUPERPAVE ASPHALT MIXTURE DESIGN, HMA BASE COURSE, PG 64-22, 10 TO <30 MILLION ESALS, 25.0 MM MIX |
NOTE:
- PAVEMENT SHOULD BE INSTALLED LATE IN CONSTRUCTION WHEN MOST HEAVY CONSTRUCTION TRAFFIC WILL NO LONGER BE ON-SITE. PRIOR TO PAVING, THE SITE SHOULD BE PROOFROLLED AGAIN, NEW SOFT AREAS TREATED IN ACCORDANCE WITH SOIL REMEDIATION NOTES, THE BASE LEVELED AND THICKENED AS REQUIRED, AND THE SITE PAVED AT THE END OF CONSTRUCTION.
- FOR PAVEMENT WHERE UNCURBED, EXTEND SUBBASE AND/OR BASE COURSE EIGHT INCHES BEYOND EACH REQUIRED EDGE OF THE BINDER AND SURFACE COURSES.
- FLEXIBLE (AGGREGATE) BASE SHOULD BE COMPACTED TO 100% OF THE MATERIAL'S MAXIMUM DRY DENSITY AS PER MODIFIED PROCTOR (ASTM D-1557).
- PAVEMENT MUST BE PLACED OVER WELL PREPARED SUBBASE COMPACTED TO AT LEAST 98% OF THE STANDARD PROCTOR (ASTM D-698) DENSITY IN THE UPPER 2' BELOW SUBGRADE AND TO AT LEAST 95% OF THE STANDARD PROCTOR (ASTM D-698) MAXIMUM DRY DENSITY ELSEWHERE.
- SEALING MATERIAL FOR FILLING PAVEMENT JOINTS SHALL MEET THE REQUIREMENTS OF ASTM D3405 OR D1190. ALTERNATIVELY, LOW MODULUS MATERIALS SUCH AS SILICONE, HOT OR COLD-POURED RUBBERIZED ASPHALT OR NITRILE RUBBER MEETING THE MANUFACTURER'S SPECIFICATIONS MAY BE USED.
- CAR TRAFFIC SHOULD NOT BE ALLOWED ON THE NEW PAVEMENT FOR AT LEAST 3-DAYS; SIMILARLY NO TRUCK TRAFFIC FOR 7-DAYS.
PAVEMENT MARKING NOTES:
- MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE DEPARTMENT'S SPECIFICATIONS, PUBLICATION 408.
- THESE PAVEMENT MARKINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE REGULATIONS GOVERNING THE DESIGN, LOCATION, AND OPERATION OF ALL OFFICIAL TRAFFIC SIGNS, SIGNALS, AND MARKINGS ON AND ALONG HIGHWAYS WITHIN THE COMMONWEALTH OF PENNSYLVANIA.
- ALL PAVEMENT MARKING SHALL BE REFLECTORIZED.
- THE CONTRACTOR SHALL PREPARE THE PAVEMENT SURFACE FOR THE PROPER ADHESION. ANY SWEEPING OR REMOVAL OF DEBRIS, GRAVEL, DIRT, OR OTHER FOREIGN MATERIALS SHALL BE CONSIDERED INCIDENTAL TO THE INSTALLATION OF THE NEW PAVEMENT MARKINGS, AND NO SEPARATE PAYMENT SHALL BE MADE THEREFORE.
- THE CONTRACTOR SHALL REMOVE ALL PREVIOUS PAVEMENT MARKINGS, WHICH IN THE OPINION OF THE ENGINEER CONFLICT WITH THE NEW PAVEMENT MARKINGS. UNLESS SPECIFICALLY STATED OTHERWISE THIS WORK SHALL BE CONSIDERED INCIDENTAL TO THE INSTALLATION OF THE NEW PAVEMENT MARKINGS, AND NO SEPARATE PAYMENT WILL BE MADE THEREFORE.
- PRIOR TO THE APPLICATION, THE CONTRACTOR SHALL FIELD CHECK AND LOCATE ALL PAVEMENT MARKINGS TO THE SATISFACTION OF THE INSPECTOR.
- ALL MARKING IMPROPERLY APPLIED OR LOCATED SHALL BE COMPLETELY REMOVED AND CORRECTLY RE-APPLIED AT THE SOLE EXPENSE OF THE CONTRACTOR.
- WHERE BITUMINOUS SEALANTS PREVENTS OR MAKES IMPRACTICAL THE EXTENDING OF LINES TO THE FACE OF CURB, THE CONTRACTOR SHALL EXTEND LINES TO EDGE OF SEALANT OR WITHIN ONE FOOT OF THE FACE OF CURB, WHICHEVER IS LESS.
- ALL PROPOSED PAVEMENT MARKINGS (ARROWS, STOP BARS, CROSSWALKS, ETC.) MUST BE HOT THERMOPLASTIC ON BITUMINOUS PAVEMENT, INCLUDING LONG AND SHORT LINES AND PAVEMENT MARKING LEGENDS. ALL PROPOSED PAVEMENT MARKINGS MUST BE EPOXY ON CONCRETE PAVEMENT, INCLUDING LONG AND SHORT LINES AND PAVEMENT MARKING LEGENDS.
PROPOSED BITUMINOUS PAVEMENT ADJACENT TO EXISTING BITUMINOUS PAVEMENT
N.T.S.
* - SEE "REQUIRED BITUMINOUS PAVEMENT SECTION"
Cross-section diagram showing: PROPOSED BITUMINOUS PAVEMENT, EXISTING CURBLINE, EXISTING DRIVEWAY ACCESS OR PARKING LOT (12" and 12"), EXISTING CURB TO BE REMOVED, MATCH GRADE OF EXISTING BITUMINOUS PAVEMENT, SAW CUT AND SEAL WITH AC-20, EXISTING PAVEMENT SECTION, WEARING COURSE, BINDER/BASE COURSE, PADOT NO. 2A COARSE AGGREGATE.
PAVING NOTCH DETAIL
N.T.S.
Cross-section diagram showing: EXISTING PAVEMENT, NEW PAVEMENT, SAWCUT & SEAL JOINT W/ AC-20, 12", 1 1/2", TACK COAT.
DETECTIBLE WARNING SURFACE (DWS) DETAILS ON TYPE 2 CURB CUT
N.T.S.
Diagrams of DWS Truncated Dome Detail, Section D-D, DWS Embedding Detail, and Plan View:
| DIM | MIN (INCH) | MAX (INCH) |
|---|---|---|
| A | 1.6" | 2.4" |
| B | 0.65" | --- |
| C | * | * |
| D | 0.9" | 1.4" |
* THE C DIMENSION IS 50% TO 65% OF THE D DIMENSION
DWS EMBEDDING NOTES: CONSTRUCT NOTCH AS SHOWN TO PROVIDE FULL THICKNESS SIDEWALK UNDER DETECTIBLE WARNING SURFACE. OPTIONAL: CONSTRUCT 3" MAX. CONCRETE BORDER AROUND DWS TO PROVIDE PROPER INSTALLATION.
Labels: SURFACE OF TURNING AREA AND DEPRESSED CURB FLUSH WITH DRIVEWAY SURFACE; DRIVEWAY SURFACE; SLOPE OF DWS TO MATCH THE SLOPE OF THE TURNING SPACE; DWS THICKNESS: EMBED WET SET DWS TILE ONLY. SURFACE APPLIED DWS IS NOT PERMITTED; 12"; 6" AGGREGATE SUBBASE; 6" CONC. SIDEWALK; PLAIN CEM. CONCRETE DEPRESSED CURB; MANUFACTURED SURFACE TO MANUFACTURED SURFACE JOINTS: PLACE ADJACENT DWS TILES WITH MANUFACTURED SURFACE TO MANUFACTURED SURFACE, CUT TILES ALONG THE PERIMETER ONLY; PLAIN CEMENT CONCRETE CURB CHEEK WALL; PEDESTRIAN TRAVEL; SLOPE; 24" MIN.; LEADING EDGE OF DWS; PLAIN CEMENT CONCRETE DEPRESSED CURB; MATCH EXISTING CURB HEIGHT.
ADA TYPE 2 CURB CUT AND SLOPED WALKWAY DETAILS
N.T.S.
Isometric View, Section B-B, and Elevation View showing:
NOTES:
- 8.33% MAXIMUM RAMP SLOPE
- SLOPE: 0 TO 2.00% MAXIMUM
- PROVIDE A TURNING SPACE WITH A MAXIMUM CROSS SLOPE AND LONGITUDINAL SLOPE OF 2.00% WHERE PEDESTRIANS PERFORM TURNING MANEUVERS.
Labels: EXISTING SIDEWALK, NON-WALK SURFACE, PLAIN CEMENT CONCRETE CURB CHEEK WALL, DETECTABLE WARNING SURFACE (DWS) SEE DETAILS ON THIS SHEET, TURNING SPACE WIDTH 5'-0" MIN., PLAIN CEMENT CONCRETE DEPRESSED CURB, 24" MINIMUM SEE DWS DETAILS, SIDEWALK WIDTH 5.0' SEE SITE PLANS, 2.00% MAX SLOPE, SLOPED WALKWAY / CURB CHEEK WALL, PREMOLDED EXPANSION JOINT FILLER, DRIVEWAY SURFACE, TURNING SPACE TO BE FLUSH WITH DRIVEWAY SURFACE, 6" CONCRETE SIDEWALK, AGGREGATE SUBBASE (SEE DWS EMBEDDING DETAIL ON THIS SHEET), MAXIMUM SLOPE @ 8.33%, ROUNDED EDGE (TYP.), STREET LEVEL TURNING SPACE, TOP OF CURB, DETECTABLE WARNING SURFACE (DWS) FULL WIDTH OF TURNING SPACE.
30" STOP SIGN R1-1 & TYPICAL STOP SIGN
N.T.S.
Diagrams of 30" x 30" STOP sign (12 1/2", 12 1/2", 10", 10", 10", 3/4" Typ.) and post installation (R1-1 (30"x30"), 7'-0" height, TYPE "B" BREAKAWAY POST AS APPROVED BY PENNDOT).
COLOR: LEGEND AND BORDER WHITE (REFLECTORIZED); BACKGROUND RED (REFLECTORIZED); SERIES: C; BLANK STD: B1-30.
PARKING SIGNS
- "RESERVED PARKING FOR HANDICAPPED" SIGN R7-8 (12"), N.T.S. (RESERVED PARKING with wheelchair symbol)
- "VAN ACCESSIBLE" SIGN R7-8P (18"), N.T.S. (VAN ACCESSIBLE)
- "RESERVED PARKING FINE" SIGN R7-8F (12"), N.T.S. (VIOLATORS SUBJECT TO FINE AND TOWING / MIN. FINE $50 / MAX. FINE $200)
- "RESERVED PARKING" SIGN (R7-8) WITH "VAN ACCESSIBLE" SIGN (R7-8P), N.T.S.: Post detail showing WHERE NOTED VAN ACCESSIBLE, MOUND CONC., 5'-0" MIN. to ground line, "EZE ERECT" POST (ASTM A499-76) OR EQUAL, 6" STEEL BOLLARD CONC. FILLED, GROUND LINE, 3'-0", TOPSOIL, 3'-0" footing depth, 6", CLASS "A" CONC. 3500 PSI @ 28 DAYS, 6" / 6".
TYPICAL PARKING STALL STRIPING, DETAIL 1 WHITE STOP BARS & A.D.A ACCESSIBLE PARKING STRIPING
N.T.S.
- TYPICAL PARKING STALL STRIPING: 18' stall length, 9.0' - 9.5' (VARIES) width, 90°, CONCRETE VERT. CURB, 4" WHITE PAINT STRIPE TYP. (90° PARKING).
- DETAIL 1 WHITE STOP BARS: 24" width, FULL WIDTH OF APPROACH.
- A.D.A ACCESSIBLE PARKING STRIPING: PAINTED 4" AZURE BLUE SYMBOL ON WHITE BACKGROUND (36"W x 40"H), 4" AZURE BLUE STRIPING (TYP.), FLUSH CURB, BUMPER BLOCK (SEE DETAIL), 18' stall length, 5'-4", 4.5', 9', 5' (8' FOR VAN ACCESSIBLE SPACES). NOTES: 1.) CURB RAMPS MAY NOT EXTEND INTO ANY PORTION OF THE PARKING SPACE OR ASSOCIATED STRIPED ISLAND. 2.) CURB RAMPS, PAVEMENT MARKINGS, & APPLICABLE SIGNAGE SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST A.D.A. ACCESSIBILITY GUIDELINES.
TITLE BLOCK
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
CVE Chester Valley Engineers, Inc., 830 Paoli Pike, Post Office Box 447, Paoli, PA 19301, 610-644-4623, www.chevaleng.com
Professional Seal & Signature: COMMONWEALTH OF PENNSYLVANIA, REGISTERED PROFESSIONAL, JEREMY R. MAZIARZ, ENGINEER, PE-050557-E
PROJECT NO. 22024 | SCALE: AS NOTED | DATE: 4/29/2024 | DRAWN BY: RRD | CHECKED BY: JRM | SHEET 9 OF 17
PROFILES
Stormwater profile drawings and Lane Enterprises pipe installation and trench backfill specifications for One CTDI Place.
STORMWATER PROFILES
Six stormwater profile diagrams (SCALE: 1"=30' HORIZ. 1"=3' VERT.):
- STORMWATER PROFILE FROM SW104 TO SWM100: SW104: T/G: 403.42, TYPE "C" INLET, INV OUT: 400.67 (SW103); SW103: T/G: 404.92, TYPE "C" INLET, INV IN: 400.50 (SW104), INV OUT: 400.30 (); Pipes: 24 L.F. 15"Ø HDPE @ 0.71%; 6 L.F. 15"Ø HDPE @ 0.85% into SWM #100 (Existing Grade / Proposed Grade shown, Elevations 395 to 410).
- STORMWATER PROFILE FROM SW107 TO SW105: SW107: T/G: 408.25, 2'X2' YARD DRAIN, INV OUT: 405.00 (SW106); SW106: T/G: 408.25, 2'X2' YARD DRAIN, INV IN: 404.20 (SW107), INV OUT: 404.00 (SW105); SW105: RIM 407.42, STORM MANHOLE, INV IN: 401.75 (SW106); Pipes: 60 L.F. 15" HDPE @ 1.33%; CONNECTION FROM 8" PIPE INV.=403.72; 165 L.F. 15" HDPE @ 1.36% into SWM #100 (Elevations 395 to 420).
- STORMWATER PROFILE FROM SW102 TO SW101: SW102: RIM 406.86, TYPE-S INLET BOX W/ 2 MH RIMS, INV OUT: 399.75 (SW101); SW101: RIM 402.52, STORM MANHOLE, INV IN: 399.42 (SW102), INV OUT: 399.30 (); Pipe: SWM #100 to SW102, 47 L.F. 15"Ø HDPE @ 0.70%, CONTRACTOR TO REPLACE MANHOLE IF DAMAGED DURING CONSTRUCTION (Elevations 395 to 410).
- STORMWATER PROFILE FROM SW204 TO SW202: SW204: T/G: 402.15, TYPE "C" INLET, INV OUT: 399.00 (SW203); SW203: T/G: 403.00, TYPE "C" INLET, INV IN: 398.60 (SW204), INV OUT: 398.40 (SW202); SW202: RIM 403.56, TYPE-6 INLET BOX W/ 2 MH RIMS, INV IN: 398.25 (SW203), INV OUT: 397.50 (SW201); Pipes: 62 L.F. 15"Ø HDPE @ 0.65%; 15 L.F. 15"Ø HDPE @ 1.00% into SWM #200 (Elevations 395 to 410).
- STORMWATER PROFILE FROM SW202 TO SW201: SW202: RIM 403.56, TYPE-6 INLET BOX W/ 2 MH RIMS, INV IN: 398.25 (SW203), INV OUT: 397.50 (SW201); SW201: RIM 402.40, STORM MANHOLE, INV IN: 396.00 (SW202), INV IN: 394.20 (SW217), INV OUT: 394.14 (); Pipe: SWM #200 to SW202, 49 L.F. 18" HDPE @ 3.07% (Elevations 390 to 410).
- STORMWATER PROFILE FROM SW209 TO SW205: SW209: TRENCH DRAIN; SW208: T/G: 405.55, 2'X2' YARD DRAIN, INV IN: 402.88 (), INV OUT: 402.30 (SW207); SW207: T/G: 405.55, 2'X2' YARD DRAIN, INV IN: 402.00 (SW208), INV OUT: 401.80 (SW206); SW206: T/G: 406.00, 2'X2' YARD DRAIN, INV IN: 400.90 (SW207), INV IN: 403.33 (), INV IN: 403.33 (), INV OUT: 400.70 (SW205); SW205: T/G: 405.70, TYPE "C" INLET, INV IN: 399.70 (SW206); Pipes: 23 L.F. 8"Ø HDPE @ 2.59%; 30 L.F. 15"Ø HDPE @ 1.00%; 91 L.F. 15" HDPE @ 0.99%; 102 L.F. 15" HDPE @ 0.98% into SWM #200 (Elevations 395 to 410).
ASTM D2321 SOIL CLASSIFICATIONS
Soil classifications are grouped by typical soil stiffness when compacted. Class I indicates a soil that generally provides the highest soil stiffness at any given percent compaction, and provides a given soil stiffness with the least compactive effort. Each higher-number soil class provides successively less soil stiffness at a given percent compaction and requires greater compactive effort to provide a given level of soil stiffness.
Thermoplastic pipe installations develop structural stability from the strength and relative stiffness of the embedment material. It is the resulting soil-pipe interaction system that defines the ability of a flexible pipe to withstand service loads. Using the stiffer pipe embedment materials is key to minimizing pipe deflection and the need for detailed installation inspection and compaction testing. For these reasons only soil classifications I and II are presented here.
Succeeding soil classifications (III through V) may be appropriate for use but will require a more thorough analysis to determine suitability and optimum water content for compaction. Although reasonable levels of pipe support are provided when properly placed and compacted, these materials may not be suitable under the deeper fills, shallower covers, and instances where water conditions in the trench may prevent proper placement and compaction. Since these materials may represent native soils that bring an economy to the installation, the user is advised to consult ASTM D2321 directly as a guide to their appropriate use.
Class I materials provide maximum stability and pipe support for a given percent compaction. With minimum effort, these materials can be installed at relatively high stiffnesses over a wide range of moisture contents. Suitable compaction is typically achieved with a dumped placement provided material is worked into the haunch zone. Vibration or impact compaction methods will ensure the highest levels of stiffness for the deeper fills.
The high permeability of Class I materials may aid in the control of water, and these materials are often desirable for embedment in rock cuts where water is frequently encountered. However, when groundwater flow is anticipated, consideration should be given to the potential for migration of fines from adjacent materials into the open-graded Class I materials.
ASTM D2321 Soil Class I Manufactured Aggregates: Crushed rock with angular, fractured particle faces. 100% passing the 1½" sieve, 10% or less passing the #4 sieve, 25% or less passing the ⅜" sieve, 12% or less passing the #200 sieve. Open graded, high permeability AASHTO No. 57 stone commonly used.
CLASS I MATERIALS ADDENDUM
Densely-graded manufactured/processed aggregates were included as Class I materials in former editions of ASTM D2321 due to the high stiffnesses of these materials when compacted. The stone-sand mixtures of these materials are graded to minimize migration of adjacent soils and contain little or no fines. Since these materials do not flow as readily into the haunch region and require moderate compactive effort, these materials are now relegated to Class II. It should be noted that when properly placed and compacted, this material can provide an equivalent strength to Class I materials provided soil migration into adjacent soils is not a concern or has been addressed.
Class II materials provide a relatively high level of pipe support when moderately compacted with either vibration or impact compaction methods.
Class I materials have more stiffness than Class II materials, but data indicates that the stiffness of uncompacted Class I materials can be taken equivalent to Class II materials compacted to 95%, and the stiffness of compacted Class I materials can be taken equivalent to Class II materials compacted to 100%.
The open-graded groups within this classification may allow migration, and the particle size distributions should be reviewed for compatibility with adjacent material.
Uniform fine sands (SP) with more than 50% passing the #100 sieve behave like silts and are not considered Class II materials.
ASTM D2321 Soil Class II Clean, Coarse-Grained Soils: Sands and gravels with 12% or less fines. ASTM D2487 Soil Group: GW Well-graded gravels and gravel-sand mixtures; GP Poorly-graded gravels and gravel-sand mixtures; SW Well-graded sands and gravelly sands; SP Poorly-graded sands and gravelly sands. AASHTO M145 Soil Groups A1 and A3.
EXCAVATED TRENCH WIDTH
Trench width should be sufficient to allow proper placement and compaction of the backfill. Narrower trench widths normally provide better pipe support and it is generally recommended to maintain the minimum width unless more clearance is needed to accommodate compaction equipment in use on the project. If the native soils forming the trench wall are unstable but can sustain a vertical cut, the trench width should be increased to provide one-half diameter width of structural backfill on either side of the pipe; otherwise, a full diameter should be provided on either side of the pipe.
| ID (in) | OD (in) | Tmin (in) | ID (in) | OD (in) | Tmin (in) |
|---|---|---|---|---|---|
| 6 | 7.05 | 24 | 24 | 28.00 | 47 |
| 8 | 9.40 | 26 | 30 | 34.50 | 55 |
| 10 | 12.00 | 28 | 36 | 41.00 | 64 |
| 12 | 14.60 | 31 | 42 | 47.50 | 72 |
| 15 | 17.50 | 34 | 48 | 54.50 | 81 |
| 18 | 21.50 | 39 | 60 | 66.85 | 96 |
Minimum trench width per ASTM D2321 for stable trench walls is taken as the greater of the OD plus 16 inches or 1.25 times the OD plus 12 inches.
Embankment installations are typically conducted in the same manner as trench installations except that the embankment is constructed to a height corresponding to one foot above the top of pipe before the trench is cut. The trench width is then managed as if cut in unstable native soils.
TRENCH BOTTOM
The trench bottom should be firm and stable. Rock or unyielding material should be removed and replaced to provide at least a 6-inch cushion of bedding below the bottom of the pipe. An unstable foundation should be over-excavated and replaced with a suitable foundation or bedding material and compacted as necessary to ensure a firm and stable trench bottom.
BEDDING
Bedding under the pipe for the central one-third of the OD should be left uncompacted for a depth of 3 inches to cushion the pipe and mitigate the effects of poor haunching.
PIPE EMBEDMENT
Trenches must be free of water when placing and compacting backfill.
Use of trench boxes in the backfill zone at the side of the pipe should be avoided unless measures are taken to ensure the backfill is not disrupted or left with a void when the trench box is advanced.
Maximum stone size for embedment is generally limited to 1½". Smaller maximum sizes may be required to enhance placement around small diameter pipe and to prevent damage to the pipe wall.
Haunch filling is carried out on both sides simultaneously to avoid rolling the pipe, and controlling the compaction force will prevent the pipe from lifting off grade. Filling adjacent sidefill zones will provide lateral support for the haunch material during the process.
Material cannot be properly worked into the haunch zone and compacted if the pipe is backfilled to the springline on the first lift. Smaller lift thicknesses may therefore be necessary initially depending on the diameter of the pipe.
Lift thickness and compaction must be done evenly on each side of the pipe. The maximum difference in the sidefill surface elevations at any given time is generally limited to one lift thickness.
While 6-inch lifts are commonly specified, 12-inch lifts can produce good results with coarse-grained backfills provided placement and compaction practices are appropriate.
It may be beneficial to require a minimum number of compaction passes and to specify a minimum density. If the specified density is 95% of maximum standard Proctor density, then good pipe performance will result even if the compaction is slightly less than specified. An additional 6 inches of structural backfill over the top of the pipe provides a complete envelope that better locks underlying material together and protects the pipe from any damaging impacts from the final backfill.
FINAL BACKFILL
Final backfill does not directly support the pipe and is more appropriately dealt with in connection with the intended use at the surface. Selection, placement and compaction of final backfill is therefore directed by the design engineer. However, when final backfill contains large fragments or cobbles, the initial backfill cover levels may need to be increased accordingly to protect the pipe from any potential impact or point loading.
MAXIMUM COVER HEIGHTS
Maximum burial depths corresponding to the soil classification system of ASTM D2321 are shown in the table below, with the best results obtained using manufactured or processed aggregates (i.e. crushed rock).
| Diameter (in) | Class I Compacted | Class I Dumped | Class II 95% | Class II 90% | Class III 95% | Class III 90% |
|---|---|---|---|---|---|---|
| 12 | 38 | 20 | 26 | 18 | 19 | 11 |
| 15 | 45 | 22 | 30 | 21 | 21 | 12 |
| 18 | 30 | 17 | 20 | 14 | 14 | 9 |
| 24 | 28 | 17 | 19 | 13 | 14 | 8 |
| 30 | 27 | 17 | 18 | 13 | 13 | 8 |
| 36 | 38 | 19 | 25 | 17 | 17 | 10 |
| 42 | 37 | 19 | 24 | 16 | 17 | 10 |
| 48 | 30 | 17 | 20 | 13 | 14 | 8 |
| 60 | 28 | 16 | 19 | 12 | 13 | 8 |
- Installation in accordance with ASTM D2321.
- Class I indicates a soil that generally provides the highest soil stiffness at any given percent compaction, and provides a given soil stiffness with the least compactive effort. Each higher-number soil class provides successively less soil stiffness at a given compaction and requires greater compactive effort to provide a given level of soil stiffness.
- All acceptable backfill materials are not presented here. See ASTM D2321 for a complete listing of classifications.
- Results based on the AASHTO LRFD design method using zero hydrostatic pressure and a soil density of 120 pcf. Greater cover heights are attainable with appropriate modifications to the design method - Contact Lane for further details.
- Dumped Class I material is estimated at 90% maximum standard Proctor density.
| Load Type | Minimum Cover |
|---|---|
| Truck Loadings (H20, H25 or HL93)1, 6 thru 48 inch dia. | 12 inches |
| Truck Loadings (H20, H25 or HL93)1, 60 inch dia. | 24 inches |
| Minimum Cover for E-80 (Rail Road) Loads | 24 inches |
| Temporary Cover for Construction Loads2 | 2 to 4 feet |
1 May be subject to local or state agency minimum cover requirements.
2 Cover for construction loads depends on pipe diameter and construction equipment (see table to right).
| Nominal Pipe Diameter (ft) | Axle Loads (kips) 18-50 | Axle Loads (kips) 50-75 | Axle Loads (kips) 75-110 | Axle Loads (kips) 110-150 |
|---|---|---|---|---|
| 2.0 - 3.0 | 24.0 | 30.0 | 36.0 | 36.0 |
| 3.5 - 5.0 | 36.0 | 36.0 | 42.0 | 48.0 |
Minimum cover shall be measured from the top of the pipe to the top of the maintained construction roadway surface.
NOTE: Information contained herein is meant as a discretionary guide and is not intended to supersede any governing specifications or requirements of record.
About Lane
As a full-line manufacturer of metal and plastic drainage products, Lane Enterprises, Inc., operates multiple plants in the Mid-Atlantic and Northeastern regions of the United States, producing corrugated metal and plastic drainage pipe for the construction industry.
For more than 75 years, Lane has partnered with contractors, engineers and municipalities to supply reliable products that provide the highest service life, strength, versatility and economy. Our focus on quality products, responsive customer service and technical expertise has established a long, proven history of successful partnerships within the industries we serve.
Lane Enterprises, Inc. Corporate Headquarters, 3905 Hartzdale Drive, Suite 514, Camp Hill, PA 17011, P 717-761-8175 • F 717-761-5055, lane-enterprises.com
NOTE: PIPE INSTALLATION AND TRENCH BACKFILL PER MANUFACTURER'S SPECIFICATIONS AND DETAILS.
TITLE BLOCK
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
CVE Chester Valley Engineers, Inc., PROJECT NO. 22024 | SCALE: AS NOTED | DATE: 4/29/2024 | DRAWN BY: RRD | CHECKED BY: JRM | SHEET 10 OF 17
EROSION & SEDIMENTATION CONTROL PLAN
Site plan drawing showing erosion and sedimentation control measures, grading contours, compost filter socks, topsoil stockpiles, and discharge points for One CTDI Place along Enterprise Drive (Scale: 1" = 30').
PLAN LABELS AND CALLOUTS
- Adjoining Properties (West): N/L CHRISTOPHER R. & ERIN E. SMYTH, D.B. 9566 PG. 2294, UPI #53-3M-28 (N 68°20'47" E); N/L DAVID & DEBRA BASARUB, D.B. 6708 PG. 192, UPI #53-3M-27 (150.44', N 68°20'47" E); N/L RAYMOND L. & MYRNA J. LEBRE, D.B. 10392 PG. 1097, UPI #53-3M-26 (414.82'); N/L CATHERINE A. BECK, D.B. 9226 PG. 41, UPI #53-3M-25 (DECK, 50', 30')
- Subject & Adjoining Parcels: U.P.I. # 53-4-161, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-161, BRICK OFFICE BUILDING, 1373 ENTERPRISE DRIVE; U.P.I. # 53-4-174, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-174 (across ENTERPRISE DRIVE, 50' right-of-way); U.P.I. # 53-4-162, N/L PARSONS 1365, LLC D.B. 10507 PG. 1528 UPI #53-4-162, BRICK OFFICE BUILDING, 1365 ENTERPRISE DRIVE; U.P.I. # 53-4-163, N/L PARSONS 1365, LLC D.B. 10507 PG. 1528 UPI #53-4-163
- Site E&S Features: LIMIT OF DISTURBANCE (LOD), TYP.; PROJECT (NPDES) SITE BOUNDARY; 18" COMPOST FILTER SOCK AROUND STOCKPILES (TYP.); TOPSOIL STOCKPILE (multiple locations); SWM #100 (BMP ID:1) INFILTRATION BED; SWM #200 (BMP ID:2) INFILTRATION BED; PROPOSED BUILDING ADDITION (FFE: 407.33); EXTERIOR SITE CANOPY BETWEEN PROPOSED ADDITION AND THE 1365 BUILDING; TEMPORARILY SEAL INLETS DURING CONSTRUCTION (TYP.); CONCRETE WASHOUT AREA; ROCK CONSTRUCTION ENTRANCE WITH WASH RACK; DP #001, DP #002; 18" COMPOST FILTER SOCK (#1), 24" COMPOST FILTER SOCK (#2), 18" COMPOST FILTER SOCK (#3), 18" COMPOST FILTER SOCK (#4); 6" HDPEP @ 1.00% MIN., 8" HDPEP @ 1.00% MIN., 15" REDUCER WYE (8"), STONE TRENCH WITH 8" PERF. HDPEP (TYP.)
- Stream Classification Note: DRAINS TO E. BRANCH CHESTER CREEK, CHAPTER 93 CLASSIFICATION: TROUT STOCKING FISHES, MIGRATORY FISHES (TSF-MF)
LOCATION MAP
SCALE 1"=2000' map showing SITE in EAST GOSHEN along Enterprise Drive and Paoli Pike.
LEGEND
EXISTING FEATURES
- EXISTING PROPERTY BOUNDARY
- EXISTING ADJOINING PROP. LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING EASEMENT
- EXISTING SETBACK BOUNDARY
- EXISTING BUILDING
- EXISTING 1' CONTOURS (404)
- EXISTING 5' CONTOURS (405)
- EXISTING SPOT ELEVATION (× 406.00)
- EXISTING SOIL TYPE (GnB2 / GeC3)
- EXISTING CURB
- EXISTING EDGE OF PAVEMENT
- EXISTING FENCE
- EXISTING STORM INLET AND PIPE
- EXISTING MANHOLE AND PIPE
- EXISTING U/G FIRE LINE
- EXISTING U/G WATER LINE
- EXISTING U/G ELECTRIC LINE
- EXISTING U/G TELEPHONE LINE
- EXISTING U/G GAS LINE
- EXISTING OVERHEAD WIRES
- EXISTING LIGHT POLE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING CONIFEROUS TREE
- EXISTING DECIDUOUS TREE
- EXISTING TREE & SHRUB LINE
PROPOSED FEATURES
- PROPOSED BUILDING
- PROPOSED HEAVY DUTY PAVEMENT
- PROPOSED CONCRETE PAD/SIDEWALK
- PROPOSED PAVERS
- PROPOSED RETAINING WALL
- PROPOSED CONCRETE CURB
- NUMBER OF PROPOSED PARKING SPACES (9)
- PROPOSED SIGN
- PROPOSED 1' CONTOURS (404)
- PROPOSED 5' CONTOURS (405)
- PROPOSED SPOT ELEVATION (× 406.00)
- PROPOSED STORMWATER MANAGEMENT FACILITY
- PROPOSED STORM PIPE AND INLET
- PROPOSED STORM PIPE AND MANHOLE
- PROPOSED STORM PIPE AND CLEANOUT
- PROPOSED PIPE FLOW ARROW
EROSION CONTROL FEATURES
- PROJECT (NPDES) SITE BOUNDARY
- LIMIT OF DISTURBANCE (2.81 ACRES)
- ROCK CONSTRUCTION ENTRANCE WITH WASH RACK
- EROSION CONTROL BLANKET
- COMPOST FILTER SOCK
- TREE PROTECTION FENCE
- TEMPORARY INLET PROTECTION
- TEMPORARY INLET/PIPE BLOCK
- DISCHARGE POINT (DP 001)
SOILS LIST
| SYMBOL | DESCRIPTION | DEPTH TO SEASONALLY HIGH WATER TABLE | DEPTH TO BEDROCK | FREQUENCY OF FLOODING | FREQUENCY OF PONDING | HYDROLOGIC SOIL GROUP | HYDRIC SOIL RATING |
|---|---|---|---|---|---|---|---|
| URBAN LAND-UDORTHENTS | |||||||
| UugB | 0% TO 8% SLOPES | 60" | 20"-70" | NONE | NONE | C | NO |
| UugD | 8% TO 25% SLOPES | 60" | 20"-70" | NONE | NONE | C | NO |
PENNSYLVANIA ACT 187 & PLAN NOTES
COPYRIGHT & NOTE TO USER OF THESE PLANS: Standard engineering copyright and field verification notes by Chester Valley Engineers, Inc. [illegible]
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20232130344. SEE SHEET 1 FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER. PENNSYLVANIA ONE CALL SYSTEM, INC., CALL 3 WORKING DAYS BEFORE YOU DIG, 1-800-242-1776, POCS SERIAL NUMBER: 20232130344.
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
TITLE BLOCK
PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
CVE Chester Valley Engineers, Inc., PROJECT NO. 22024 | SCALE: 1"=30' | DATE: 4/29/2024 | DRAWN BY: RRD | CHECKED BY: JRM | SHEET 11 OF 17
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
EROSION & SEDIMENTATION CONTROL NOTES
GENERAL EROSION AND SEDIMENTATION CONTROL NOTES
CONTRACTOR WILL BE RESPONSIBLE FOR THE PROPER CONSTRUCTION, STABILIZATION, AND MAINTENANCE OF ALL EROSION AND SEDIMENTATION CONTROLS AND RELATED ITEMS INCLUDED WITHIN THESE PLANS.
ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS, SHALL BE DONE IN ACCORDANCE WITH APPROVED E&S PLANS. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN (STAMPED, SIGNED, AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO THE IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.
THE OPERATOR SHALL ASSURE THAT AN EROSION AND SEDIMENT CONTROL PLAN HAS BEEN PREPARED, APPROVED BY THE COUNTY CONSERVATION DISTRICT, AND IS BEING IMPLEMENTED AND MAINTAINED FOR ALL SOIL AND/OR ROCK SPOIL AND BORROW AREAS, REGARDLESS OF THEIR LOCATIONS.
- THE CHESTER COUNTY CONSERVATION DISTRICT (CCCD) 674 UNIONVILLE ROAD, SUITE #105 KENNETT SQUARE, PA 19348 PHONE: (610) 455-1360 FAX: (610) 455-1361
- THE RECEIVING WATER FOR THIS PROJECT IS EAST BRANCH OF CHESTER CREEK. THE CHAPTER 93 CLASSIFICATION FOR EAST BRANCH OF CHESTER CREEK IS TROUT STOCKING FISHES, MIGRATORY FISHES (TSF-MF).
- NOTIFY THE CHESTER COUNTY CONSERVATION DISTRICT AND ARRANGE A PRE-CONSTRUCTION MEETING FOR ALL INVOLVED PARTIES (INCLUDING CCCD, APPLICANT, ENGINEER, AND TOWNSHIP OFFICIALS).
- NOTIFY THE TOWNSHIP ENGINEER AT LEAST 48 HOURS PRIOR TO ANY EARTH DISTURBANCE ACTIVITIES.
- CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN A MANNER SUCH THAT ALL EROSION AND AIR/WATER POLLUTION IS MINIMIZED. STATE AND LOCAL LAWS CONCERNING ABATEMENT SHALL BE FOLLOWED.
- AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL.
- THE LIMITS OF WORK SHOWN ON THIS PLAN ARE THE REAL EXTENT REQUIRED FOR CONSTRUCTION. THE CONTRACTOR SHALL ADHERE TO THESE LIMITS IN MINIMIZING DISTURBED LAND, AND ALL CONSTRUCTION SHALL BE CONDUCTED WITHIN THESE LIMITS. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
- TOPSOIL TAKEN FROM CONSTRUCTION AREAS SHALL BE SEEDED WITH A VEGETATIVE COVER AND STOCKPILED FOR REUSE IN FINISH GRADING. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET, STOCKPILE SLOPES SHALL BE 2:1 OR FLATTER. SEDIMENT BARRIER SHALL BE INSTALLED ON THE LOW SIDE OF THE PILE. THERE SHALL BE NO EARTH DISTURBANCE WITHIN THE STOCKPILE AREA.
- SHOULD UNFORESEEN EROSIVE CONDITIONS DEVELOP DURING CONSTRUCTION, THE CONTRACTOR SHALL TAKE ACTION TO REMEDY SUCH CONDITIONS AND TO PREVENT DAMAGE TO ADJACENT PROPERTIES AND STREAMS IN ACCORDANCE WITH PADOT 408, SECTION 845. STOCKPILES OF CRUSHED STONE AND MULCHES MUST BE MAINTAINED AT THE SITE IN READINESS TO DEAL IMMEDIATELY WITH EMERGENCY PROBLEMS OF EROSION.
- THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ. THE CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIAL OR WASTES AT THE SITE. CONSTRUCTION WASTES MUST BE RECYCLED TO THE EXTENT PRACTICABLE, AND DISPOSAL METHODS MUST COMPLY WITH FEDERAL, STATE AND LOCAL REQUIREMENTS.
- ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
- THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
- UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION BMP'S MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENTATION BMP'S AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS.
- ALL SITE INSPECTIONS WILL BE DOCUMENTED IN AN INSPECTION LOG KEPT FOR THIS PURPOSE. THE COMPLIANCE ACTIONS AND THE DATE, TIME AND NAME OF THE PERSON CONDUCTING THE INSPECTION. THE INSPECTION LOG WILL BE KEPT ON SITE AT ALL TIMES AND MADE AVAILABLE TO THE DISTRICT UPON REQUEST.
- ALL PREVENTIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING, MUST BE PERFORMED IMMEDIATELY. IF EROSION AND SEDIMENTATION BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS OR MODIFICATIONS OF THOSE INSTALLED WILL BE NEEDED.
- SEDIMENT TRACKED ONTO A PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY OR AS NEEDED THROUGHOUT THE WORKDAY, OR AS DIRECTED BY THE CONSERVATION DISTRICT OR MUNICIPALITY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
- ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.
- AREAS WHICH ARE TO BE TOP-SOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES (6 TO 12 INCHES ON COMPACTED SOILS) PRIOR TO THE PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING, I.E. YARDS.
- ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES, CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
- ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES IN THICKNESS.
- FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
- FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.
- FILLS SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
- SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATIONS FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
- ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THE PLAN.
- ANY DISTURBED AREA, ON WHICH ACTIVITY HAS CEASED FOR ANY AMOUNT OF TIME, MUST BE SEEDED AND MULCHED IMMEDIATELY. DURING NON-GERMINATING PERIODS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. DISTURBED AREAS WHICH ARE NOT AT FINISH GRADE AND WHICH WILL BE RE-DISTURBED WITHIN ONE YEAR MAY BE SEEDED AND MULCHED WITH A QUICK GROWING TEMPORARY SEED MIXTURE AND MULCH. DISTURBED AREAS WHICH ARE EITHER AT FINISH GRADE OR WILL NOT BE RE-DISTURBED WITHIN ONE YEAR MUST BE SEEDED WITH A PERMANENT SEED MIXTURE AND MULCHED.
- AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED PERMANENT STABILIZATION WHEN IT HAS A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
- E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT.
- UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT FOR AN INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS.
- AFTER FINAL STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST-CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING THE REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID VEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
- UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT TO SCHEDULE A FINAL INSPECTION.
- FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT LADEN RUNOFF FROM LEAVING THE SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAM LAW. THE CLEAN STREAM LAW PROVIDES FOR UP TO $10,000 PER DAY CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR OR CRIMINAL PENALTIES FOR EACH VIOLATION.
- THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH THE PROVISIONS OF THE APPENDIX 64, EROSION CONTROL RULES AND REGULATIONS, TITLE 25, PART I, DEPARTMENT OF ENVIRONMENTAL PROTECTION, SUBPART C, PROTECTION OF NATURAL RESOURCES, ARTICLE III, WATER RESOURCES, CHAPTER 102, EROSION CONTROL.
- THE PERMITTEE SHALL NOTIFY THE CHESTER COUNTY CONSERVATION DISTRICT IMMEDIATELY PRIOR TO ANY CESSATION IN EARTHMOVING ACTIVITIES.
- EROSION AND SEDIMENTATION CONTROLS MUST BE CONSTRUCTED, STABILIZED AND FUNCTIONAL BEFORE GENERAL SITE DISTURBANCE WITHIN THE TRIBUTARY AREA OF THOSE CONTROLS BEGINS. RUNOFF FROM DISTURBED AREAS MUST PASS THROUGH A SEDIMENT REMOVAL OR RETENTION FACILITY BEFORE LEAVING THE SITE.
- ONLY LIMITED UP SLOPE DISTURBANCE WILL BE PERMITTED TO PROVIDE ACCESS TO SEDIMENT TRAPS AND CHANNELS OF CONVEYANCE FOR GRADING AND ACQUIRING BORROW TO CONSTRUCT THOSE CONTROLS.
- WHERE BMPS ARE FOUND TO FAIL TO ALLEVIATE EROSION OR SEDIMENT POLLUTION THE PERMITTEE OR CO-PERMITTEE SHALL INCLUDE THE FOLLOWING INFORMATION: THE LOCATION AND SEVERITY OF THE BMPS FAILURE AND ANY POLLUTION EVENTS.; ALL STEPS TAKEN TO, REDUCE, ELIMINATE AND PREVENT THE RECURRENCE OF THE NON-COMPLIANCE.; THE TIME FRAME TO CORRECT THE NON-COMPLIANCE, INCLUDING THE EXACT DATES WHEN THE ACTIVITY WILL RETURN TO COMPLIANCE.
- ACCUMULATED SILT SHALL BE REMOVED ALONG SILT FENCING OR COMPOST FILTER SOCKS, REGRADED, AND STABILIZED ELSEWHERE ON THE SITE. SILT SHALL ALSO BE REMOVED FROM THE SEDIMENT TRAPS AT THE CLEANOUT ELEVATIONS. THE SILT SHALL BE SPREAD ELSEWHERE ON THE SITE AND SEEDED.
- SHOULD ANY MEASURED EROSION OR SILTATION PROVE TO BE INCAPABLE OF ADEQUATELY REMOVING SEDIMENT FROM ON-SITE FLOWS PRIOR TO THE DISCHARGE OF OR STABILIZING OF SURFACES INVOLVED, ADDITIONAL MEASUREMENT MUST BE IMPLEMENTED IMMEDIATELY BY THE OWNER/ DEVELOPER TO ELIMINATE SUCH PROBLEMS.
- CHANNELS, SEDIMENTATION BASINS, SEDIMENTATION TRAPS AND STOCKPILES MUST BE SEEDED AND MULCHED IMMEDIATELY.
- GRADED AREAS ARE TO BE TEMPORARILY SEEDED AND MULCHED IMMEDIATELY FOLLOWING EARTHMOVING PROCEDURES. TEMPORARY SEED SHALL BE A.R.G. AT THE SPECIFIED RATE AND MULCH SHALL BE APPLIED AT THE RATE OF AT LEAST 3 TONS PER ACRE.
- LIME SHALL BE APPLIED TO ALL TEMPORARILY SEEDED AREAS AT A MINIMUM RATE AS SPECIFIED.
- ALL TEMPORARILY SEEDED AREAS SHALL HAVE 5-5-5 FERTILIZER APPLIED AT THE MINIMUM RATES SPECIFIED.
- ESTABLISH PERMANENT SEEDING AS SOON AS POSSIBLE AFTER FINAL GRADING IS COMPLETED. PERMANENT SEEDING SHALL BE AT THE RATES SPECIFIED. FERTILIZER AND LIME SHALL BE APPLIED AT THE MINIMUM RATES SPECIFIED.
- PERMANENTLY SEEDED AREAS SHALL HAVE HAY OR STRAW APPLIED AT THE RATE OF AT LEAST 3 TONS PER ACRE.
- ANY AREAS WHERE HYDROSEED IS USED, MULCH IS NEEDED AT A MINIMUM RATE OF 3 TONS PER ACRE.
- SILT FENCING AND COMPOST FILTER SOCKS ARE TO BE MAINTAINED, AND REPLACED IF NECESSARY, DURING THE ENTIRE CONSTRUCTION PERIOD UNTIL A PERMANENT VEGETATIVE COVER WITHIN THE TRIBUTARY AREA IS ESTABLISHED.
- DUST CONTROL SHALL BE PROVIDED BY THE CONTRACTOR AT ALL TIMES DURING CONSTRUCTION.
- CONSTRUCTION VEHICLES LEAVING THE SITE SHALL NOT DEPOSIT ANY MATERIAL OUTSIDE OF THE PROJECT SITE BOUNDARIES AND/OR A PUBLIC RIGHT-OF-WAY. ANY MATERIAL DEPOSITED SHALL BE IMMEDIATELY REMOVED.
- IF ANY SIGNIFICANT CHANGES ARE TO BE MADE TO THE EROSION AND SEDIMENTATION CONTROL PLAN, THE BUILDER OR LANDOWNER WILL CONTACT THE CHESTER COUNTY CONSERVATION DISTRICT AT (610) 692-9484 FOR THE ADEQUACY OF THESE CHANGES.
- SEDIMENT MUST BE REMOVED FROM STORMWATER INLETS NOT DRAINING TO A SEDIMENT TRAP WITH INLET PROTECTION AFTER EACH RUNOFF EVENT.
- EACH SEDIMENT TRAP/BASIN MUST BE STABILIZED AND FUNCTIONING PROPERLY PRIOR TO ANY FURTHER EARTH DISTURBANCE ACTIVITY. UPON INSTALLATION OF THE TEMPORARY SEDIMENT TRAP/BASIN RISER(S), AN IMMEDIATE INSPECTION OF THE RISER(S) SHALL BE CONDUCTED BY A QUALIFIED SITE REPRESENTATIVE AND THE CHESTER COUNTY CONSERVATION DISTRICT SHALL BE NOTIFIED IN WRITING THAT THE PROPER RISER IS INSTALLED AND SEALED, PER PLAN. SEDIMENT TRAPS/BASINS MUST BE PROTECTED FROM UNAUTHORIZED ACTS OF THIRD PARTIES.
- UPON REQUEST, THE PERMIT HOLDER AND/OR HIS CONTRACTOR SHALL PROVIDE AN AS-BUILT FOR ANY SEDIMENT BASIN OR TRAP TO THE MUNICIPAL INSPECTOR, LOCAL CONSERVATION DISTRICT, OR DEP.
- BEFORE INITIATING ANY REVISION TO THE APPROVED EROSION AND SEDIMENT CONTROL PLAN OR REVISIONS TO OTHER PLANS WHICH MAY AFFECT THE EFFECTIVENESS OF THE APPROVED E & S CONTROL PLAN, THE OPERATOR MUST RECEIVE APPROVAL OF THE REVISIONS FROM THE CHESTER COUNTY CONSERVATION DISTRICT. THE OPERATOR SHALL ASSURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY IMPLEMENTED. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO ELIMINATE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION.
- ALL CONCRETE TRUCKS SHALL UTILIZE THE CONCRETE WASHOUT AREA PRIOR TO LEAVING THE SITE.
- UTILITY LINE TRENCH EXCAVATION NOTES: LIMIT ADVANCED CLEARING AND GRUBBING OPERATIONS TO A DISTANCE EQUAL TO TWO TIMES THE LENGTH OF PIPE INSTALLATION THAT CAN BE COMPLETED IN ONE DAY.; WORK CREWS AND EQUIPMENT FOR TRENCHING, PLACEMENT OF PIPE, PLUG CONSTRUCTION AND BACKFILLING WILL BE SELF CONTAINED AND SEPARATE FROM CLEARING AND GRUBBING AND SITE RESTORATION AND STABILIZATION OPERATIONS.; ALL SOIL EXCAVATED FROM THE TRENCH WILL BE PLACED ON THE UPHILL SIDE OF THE TRENCH.; LIMIT DAILY TRENCH EXCAVATION TO THE LENGTH OF PIPE PLACEMENT, PLUG INSTALLATION AND BACKFILLING THAT CAN BE COMPLETED THE SAME DAY.; WATER WHICH ACCUMULATES IN THE OPEN TRENCH WILL BE COMPLETELY REMOVED BY PUMPING BEFORE PIPE PLACEMENT AND/ OR BACKFILLING BEGINS. WATER REMOVED FROM THE TRENCH SHALL BE PUMPED THROUGH A FILTRATION DEVICE.; ON THE DAY FOLLOWING PIPE PLACEMENT AND TRENCH BACKFILLING, THE DISTURBED AREA WILL BE GRADED TO FINAL CONTOURS AND IMMEDIATELY STABILIZED.
SPECIAL GEOLOGIC AND SOIL CONDITIONS
NO SPECIAL SOIL OR GEOLOGICAL ISSUES ARE KNOWN.
CONSTRUCTION SEQUENCE
AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES (INCLUDING CLEARING AND GRUBBING), THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, TOWNSHIP ENGINEER/INSPECTOR, AND LICENSED PROFESSIONAL ENGINEER OR DESIGNEE TO AN ON-SITE PRE-CONSTRUCTION MEETING.
UPON INSTALLATION OR STABILIZATION OF ALL PERIMETER SEDIMENT CONTROL BMPS AND AT LEAST 3 DAYS PRIOR TO PROCEEDING WITH THE BULK EARTH DISTURBANCE ACTIVITIES, THE PERMITTEE OR CO-PERMITTEE SHALL PROVIDE NOTIFICATION TO THE TOWNSHIP.
AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED BY THE TOWNSHIP PRIOR TO IMPLEMENTATION. EACH STEP OF THE SEQUENCE SHALL BE COMPLETED BEFORE PROCEEDING TO THE NEXT STEP, EXCEPT WHERE NOTED.
PRIOR TO EARTH DISTURBANCE ACTIVITY DESCRIBED IN ANY STEP OF THE CONSTRUCTION SEQUENCE, CLEAR AND GRUB AND STRIP TOPSOIL. STOCKPILE TOPSOIL IN THE DESIGNATED LOCATIONS.
UPON COMPLETION OR TEMPORARY CESSATION OF EARTH DISTURBANCE ACTIVITY, OR ANY STAGE THEREOF, THE PROJECT SITE SHALL BE IMMEDIATELY STABILIZED WITH THE APPROPRIATE TEMPORARY OR PERMANENT STABILIZATION.
- FIELD DELINEATE LIMITS OF DISTURBANCE PRIOR TO EARTH MOVING ACTIVITIES.
- INSTALL TREE PROTECTION FENCING AND COMPOST FILTER SOCKS. NOTIFY THE TOWNSHIP ENGINEER FOLLOWING THE INSTALLATION OF PROTECTIVE MEASURES AND PRIOR TO EARTH DISTURBANCE.
- INSTALL THE ROCK CONSTRUCTION ENTRANCE AND CONCRETE WASHOUT AREA AS DEPICTED ON THE EROSION & SEDIMENTATION CONTROL PLANS.
- THROUGHOUT CONSTRUCTION, THE CONTRACTOR SHALL ENSURE THAT ALL SITE STORM WATER, INCLUDING THAT COMING OFF OF THE ROCK CONSTRUCTION ENTRANCE (RCE), IS DIRECTED INTO AN E&S CONTROL BMP.
- PRIOR TO DEMOLITION, ALL EXISTING UTILITIES TO BE RELOCATED (WATER, ELECTRIC, TELECOMMUNICATIONS, ETC.) ARE TO BE SHUT DOWN.
- PERFORM DEMOLITION ACTIVITIES, AS INDICATED ON THE PLANS. RELOCATE EXISTING UTILITIES AS NECESSARY.
- CLEAR AND GRUB, STRIP TOPSOIL AND STOCKPILE IN LOCATIONS SHOWN ON EROSION & SEDIMENTATION CONTROL PLAN. TEMPORARILY STABILIZE TOPSOIL STOCKPILE.
- PERFORM ROUGH GRADING.
- BEGIN CONSTRUCTION OF THE BUILDING ADDITION.
- CONTRACTOR SHALL GUARANTEE POSITIVE DRAINAGE AWAY FROM ALL BUILDINGS, WALLS, SIDEWALKS AND ADA RAMPS.
- WHEN THE BUILDING ADDITION ACHIEVES SUBSTANTIAL COMPLETION, CONSTRUCTION OF SWM #100 AND SWM #200 MAY COMMENCE. INSTALL STORMWATER MANAGEMENT FACILITIES WITH ASSOCIATED STORM STRUCTURES AND DISTRIBUTION PIPE. CRITICAL STAGE OF CONSTRUCTION: CONTACT ENGINEER PRIOR TO EXCAVATION AND FINAL GRADING OF SWM #100 & SWM #200. CONTACT ENGINEER PRIOR TO PLACEMENT OF GEOTEXTILE FABRIC, STONE AND DISTRIBUTION PIPE INSIDE SWM #100 & SWM #200. TEMPORARILY SEAL INLETS AS INDICATED ON THE PLANS. CONTRACTOR SHOULD ENSURE THAT NO SEDIMENT OR SEDIMENT LADEN RUNOFF IS ALLOWED TO ENTER THE INFILTRATION BMPS DURING SITE CONSTRUCTION. ONLY AFTER THE TRIBUTARY DRAINAGE AREA TO THE INFILTRATION BMPS IS FULLY STABILIZED (I.E. 70% STABILIZATION), CAN RUNOFF BE INTRODUCED TO THESE FACILITIES. IF SEDIMENT ENTERS THE STONE WITHIN THESE FACILITIES, THE STONE SHALL BE REMOVED AND REPLACED.
- INSTALL REMAINING STORM STRUCTURES AND ASSOCIATED PIPES. IMMEDIATELY BLOCK/SEAL INLETS AS INDICATED ON THE PLANS. THESE INLETS MUST REMAIN BLOCKED/SEALED UNTIL THE TRIBUTARY DRAINAGE AREA ACHIEVES FINAL STABILIZATION.
- BEGIN CONSTRUCTION OF THE PARKING LOT & HARDSCAPE AREAS. STABILIZE WITH STONE BASE AS CONSTRUCTION ALLOWS.
- FINALIZE BUILDING CONSTRUCTION.
- FINE GRADE ALL PREVIOUSLY DISTURBED AREAS THAT ARE READY FOR FINAL STABILIZATION. STABILIZE WITH SEEDING AND HAY OR STRAW MULCH CONSISTENT WITH STABILIZATION CRITERIA.
- INSTALL WEARING COURSE AND PAVEMENT STRIPING AS INDICATED ON THE PLANS AND DETAILS.
- COLLECT ALL SILT AND SEDIMENT DEPOSITS IN EROSION CONTROL DEVICES AND PLACE ON SITE IN NON-ERODIBLE AREAS. PERMANENTLY STABILIZE ALL DISTURBED AREAS. TEMPORARY EROSION CONTROLS MAY NOT BE REMOVED UNTIL STABILIZATION IS ATTAINED (70% UNIFORM COVERAGE OF A PERENNIAL VEGETATIVE SPECIES).
- UPON STABILIZATION OF ALL DISTURBED AREAS, REMOVE REMAINING SEDIMENT BARRIERS AND CONTROLS. IMMEDIATELY STABILIZE AREAS DISTURBED BY REMOVAL PROCESS IN ACCORDANCE WITH PERMANENT SEED AND MULCH SPECIFICATIONS.
OPERATION AND MAINTENANCE PROCEDURE
TEMPORARY EROSION AND SEDIMENT CONTROL BMPs
- THE PERMITTEE SHALL BE RESPONSIBLE FOR THE PROPER CONSTRUCTION, STABILIZATION AND MAINTENANCE OF ALL EROSION AND SEDIMENTATION CONTROL MEASURES. INSPECTION/MAINTENANCE OF THESE MEASURES SHALL BE CONDUCTED ON A WEEKLY BASIS AND AFTER EVERY MEASURABLE RAINFALL. A WRITTEN REPORT DOCUMENTING THE INSPECTION AND APPLICABLE REPAIRS SHALL BE KEPT ON SITE AND AVAILABLE FOR INSPECTION UPON REQUEST.
- THE OPERATION AND MAINTENANCE REQUIREMENTS FOR THE TEMPORARY E&S BMPs FOR THIS PROJECT INCLUDE THE FOLLOWING: COMPOST FILTER SOCK SHALL BE INSPECTED/MAINTAINED TO ENSURE THAT THE WOODEN STAKES AND FABRIC CONFORM TO THE STANDARD DETAIL. FABRIC WHICH IS TORN, DISTENDED/DEFORMED OR OTHERWISE COMPROMISED SHALL BE REPLACED. ALL MATERIAL DEPOSITED BEHIND THE COMPOST FILTER SOCK SHALL BE DISTRIBUTED ON SITE AND IMMEDIATELY STABILIZED USING SEED AND MULCH.; STABILIZED CONSTRUCTION ENTRANCE (SCE) – THE SCE SHALL BE INSPECTED/MAINTAINED TO ENSURE THAT THE STRUCTURE CONFORMS TO THE STANDARD DETAIL. ROCK SHOULD BE MAINTAINED AT FULL DEPTH AND MAY REQUIRE REPLACEMENT AND/OR REDISTRIBUTION. MATERIAL DEPOSITED ON THE SCE SHALL BE DISTRIBUTED ON SITE AND IMMEDIATELY STABILIZED USING SEED AND MULCH.; INLET PROTECTION – SHALL BE CLEANED AND CLEANED AFTER EACH RUNOFF EVENT, SEDIMENT SHALL BE DISTRIBUTED ON SITE AND IMMEDIATELY STABILIZED.; ROCK FILTER OUTLET – IF INSTALLED, OUTLET SHALL BE INSPECTED/MAINTAINED TO ENSURE THAT MATERIAL IS NOT DISPLACED OR DAMAGED.
STAGING OF EARTH MOVING ACTIVITIES
- THE OVERALL SCHEDULE OF THE PROJECT IS THAT CONSTRUCTION WILL START APPROXIMATELY DURING FALL, 2024. THE CONTRACTOR MAY SELECT HIS SCHEDULE FOR THE SPECIFIC PORTIONS OF THE PROJECT, UNLESS OTHERWISE SPECIFIED.
- SPECIFIED EROSION CONTROL MEASURES AND FACILITIES INCLUDING BUT NOT LIMITED TO CONSTRUCTION ENTRANCES MUST BE INSTALLED AND BE OPERATIONAL PRIOR TO ANY EARTH MOVING ACTIVITIES WITHIN THE UPSLOPE DRAINAGE AREAS.
- FOR PIPELINE CONSTRUCTION WITHIN DRIVEWAYS AND PAVED AREAS, THE FOLLOWING STAGES ARE TO BE IMPLEMENTED SEQUENTIALLY AS WORK PROCEEDS: INSTALL INLET PROTECTION AND OTHER MEASURES AS SHOWN ON THE PLANS. THESE MEASURES SHALL BE INSTALLED AT LEAST 500 FEET AHEAD OF PIPE INSTALLATION.; EXCAVATE TRENCHES AND DISCHARGE MATERIAL DIRECTLY INTO TRUCKS. CLEAN UP SPILLAGE WITH EACH TRUCKLOAD.; INSTALL PIPELINE AND BACKFILL. EROSION CONTROL FACILITIES MAY BE REMOVED WHEN TEMPORARY OR PERMANENT REPAVING IS INSTALLED AND THE AREA HAS BEEN CLEANED OF ALL DEBRIS.; PLACE TEMPORARY PAVING OR GRAVEL SURFACE OVER TRENCH AT THE END OF EACH WORK DAY.
EROSION CONTROL MAINTENANCE PROGRAM TEMPORARY
UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION BMP'S MUST BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENTATION BMP'S ON A DAILY BASIS AND AFTER EACH RUNOFF EVENT. ALL SITE INSPECTIONS SHALL BE DOCUMENTED IN AN INSPECTION LOG KEPT FOR THIS PURPOSE. THE COMPLIANCE ACTIONS AND THE DATE, TIME AND NAME OF THE PERSON CONDUCTING THE INSPECTION SHALL BE NOTED. THE INSPECTION LOG SHALL BE KEPT ON SITE AT ALL TIMES AND MADE AVAILABLE TO THE TOWNSHIP UPON REQUEST.
ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEANOUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING, AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF EROSION AND SEDIMENTATION BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS OR MODIFICATIONS OF THOSE INSTALLED WILL BE NEEDED.
WHERE BMPS ARE FOUND TO FAIL TO ALLEVIATE EROSION AND SEDIMENTATION POLLUTION, THE CONTRACTOR SHALL INCLUDE THE FOLLOWING INFORMATION:
- THE LOCATION AND SEVERITY OF THE BMP'S FAILURE AND ANY POLLUTION EVENTS.
- ALL STEPS TAKEN TO REDUCE, ELIMINATE AND PREVENT THE RECURRENCE OF THE NON-COMPLIANCE.
- THE TIME FRAME TO CORRECT THE NON-COMPLIANCE, INCLUDING THE EXACT DATES WHEN THE ACTIVITY WILL RETURN TO COMPLIANCE.
VEGETATIVE STABILIZATION NOTES
- AS DISTURBED AREAS WITHIN A PROJECT APPROACH FINAL GRADE, PREPARATIONS SHOULD BE MADE FOR SEEDING AND MULCHING TO BEGIN (I.E. ANTICIPATE THE COMPLETION DATE AND SCHEDULE THE SEEDER). IN NO CASE SHOULD AN AREA EXCEEDING 15,000 SQUARE FEET, WHICH IS TO BE STABILIZED BY VEGETATION, REACH FINAL GRADE WITHOUT BEING SEEDED AND MULCHED. WAITING UNTIL EARTHMOVING IS COMPLETED BEFORE MAKING PREPARATIONS FOR SEEDING AND MULCHING IS NOT ACCEPTABLE. THIS REQUIREMENT SHOULD BE CLEARLY STATED IN THE SEEDING AND MULCHING SPECIFICATIONS CONTAINED ON THE PLAN DRAWINGS.
- BEFORE THE SEEDING BEGINS, TOPSOIL SHOULD BE APPLIED AND ANY REQUIRED SOIL AMENDMENTS WORKED INTO THE SOIL TO A DEPTH OF 4 TO 6 INCHES. IF COMPOST IS TO BE ADDED TO THE TOPSOIL, IT SHOULD BE WORKED INTO THE SOIL WITH THE OTHER SOIL AMENDMENTS UNLESS IT IS BEING APPLIED AS AN EROSION CONTROL BMP.
- UPON COMPLETION OR TEMPORARY CESSATION OF THE EARTH DISTURBANCE ACTIVITY IN A SPECIAL PROTECTION WATERSHED, THAT PORTION OF THE PROJECT SITE TRIBUTARY TO THE SPECIAL PROTECTION WATERS MUST BE IMMEDIATELY STABILIZED. IN ALL OTHER WATERSHEDS, CESSATION OF ACTIVITY FOR AT LEAST 4 DAYS REQUIRES TEMPORARY STABILIZATION.
- SURFACE ROUGHENING SHOULD BE APPLIED TO SLOPES 3H:1V OR STEEPER UNLESS A STABLE ROCK FACE IS PROVIDED OR IT CAN BE SHOWN THAT THERE IS NOT A POTENTIAL FOR SEDIMENT POLLUTION TO SURFACE WATERS. FOR ROUGHENED SURFACES WITHIN 50 FEET OF A SURFACE WATER, AND WHERE BLANKETING OF SEEDED AREAS IS PROPOSED AS THE MEANS TO ACHIEVING PERMANENT STABILIZATION, SPRAY ON TYPE BLANKETS ARE RECOMMENDED.
- FILL SLOPES SHOULD BE SEEDED AND MULCHED AT REGULAR VERTICAL INCREMENTS -- 15 TO 25 FEET MAXIMUM -- AS THE FILL IS BEING CONSTRUCTED. THIS WILL ALLOW THE BOTTOM OF THE FILL TO PROGRESS TOWARD STABILIZATION WHILE WORK CONTINUES ON THE UPPER PORTION, MAKING FINAL STABILIZATION EASIER TO ACHIEVE AND PROVIDING SOME VEGETATIVE BUFFERING AT THE BOTTOM OF THE SLOPE.
- WHEREVER SEED AND MULCH IS APPLIED BY HYDROSEEDING METHODS, THE SEED AND MULCH SHOULD BE APPLIED IN SEPARATE APPLICATIONS WITH THE SEED BEING APPLIED FIRST AND THE MULCH SPRAYED ON TOP OF THE SEED. THIS IS TO ENSURE THAT THE SEED MAKES CONTACT WITH THE UNDERLYING SOIL. SOIL PREPARATION SHOULD BE COMPLETED PRIOR TO ADDING SEED TO THE HYDROSEEDING EQUIPMENT. RUNNING SEED THROUGH THE PUMPING SYSTEM CAN RESULT IN EXCESSIVE ABRASION OF THE SEED AND REDUCE THE PERCENTAGE OF PURE LIVE SEED IN THE APPLICATION. THEREFORE ALL SITE PREPARATION SHOULD BE COMPLETED PRIOR TO THE ARRIVAL OF THE HYDROSEEDER.
- IN CRITICAL AREAS (E.G. ADJACENT TO OR WITHIN 50 FEET OF STREAMS, PONDS, OR WETLANDS) A PROTECTIVE BLANKET SHOULD BE PROVIDED FOR ALL SEEDED AREAS. CONSIDERATION SHOULD BE GIVEN TO USE OF MULCH WITH NETTING OR PROTECTIVE BLANKETS FOR ALL SEEDED AREAS ON SLOPES 3H:1V OR STEEPER.
- VEHICULAR TRAFFIC SHOULD BE RESTRICTED FROM AREAS TO BE SEEDED TO PREVENT SOIL COMPACTION.
- AS SOON AS SLOPES, CHANNELS, DITCHES AND OTHER AREAS DISTURBED DURING CONSTRUCTION, REACH FINAL GRADE, STABILIZE IMMEDIATELY, IN ACCORDANCE WITH SEEDING, MULCHING AND STABILIZATION SPECIFICATIONS.
- NO MORE THAN 15,000 SQUARE FEET OF DISTURBED AREA REACH FINAL GRADE BEFORE INITIATING SEEDING AND MULCHING OPERATIONS.
- CESSATION OF ACTIVITY FOR 4 DAYS OR LONGER REQUIRES TEMPORARY STABILIZATION.
SOIL TYPE USE LIMITATIONS AND RESOLUTIONS
- SOIL TYPES POORLY SUITED AS SOURCES OF TOPSOIL RESTRICT OR PLACE CONDITIONS ON PLANNING VEGETATIVE STABILIZATION. ACIDIC, LOW FERTILITY, EXCESSIVE DRYNESS AND EXCESSIVE WETNESS LIMIT PLANT GROWTH. RESOLUTIONS: IDENTIFYING AND RESOLVING CHARACTERISTICS, THAT RENDER THE SOIL TYPES POORLY, SUITED AS TOPSOIL.
- ACIDIC SOIL TYPES EXHIBITING PH REACTION VALUES LOWER THAN ABOUT 5.5, LIMIT VEGETATIVE STABILIZATION. SOIL TESTS MIGHT BE NECESSARY TO DETERMINE SITE SPECIFIC PH REACTION. RESOLUTIONS: APPLYING LIME CONSISTENT WITH RATES DETERMINED BY SOIL TESTING; SELECTING VEGETATIVE SPECIES TOLERANT TO ACIDIC SOIL CONDITIONS; AND IMPLEMENTING COMBINATIONS OF THESE AND/OR OTHER METHODS. SPECIFIC TOLERANCE INFORMATION IS PROVIDED IN TABLE 1 OF THE EROSION CONTROL & CONSERVATION PLANTINGS ON NONCROPLAND PUBLISHED BY PENN STATE.
- LOW FERTILITY SOIL TYPES LACKING IN SUFFICIENT AMOUNTS OF ESSENTIAL PLANT NUTRIENTS SUCH AS: NITROGEN, PHOSPHOROUS, POTASSIUM, SULFUR, MAGNESIUM, CALCIUM, IRON, MANGANESE, BORON, CHLORINE, ZINC, COPPER AND MOLYBDENUM, LIMIT VEGETATION STABILIZATION. SOIL TESTS MIGHT BE NECESSARY TO DETERMINE SITE SPECIFIC SOIL FERTILITY. RESOLUTIONS: INCORPORATING SOIL NUTRIENTS CONSISTENT WITH RATES DETERMINED BY SOIL TESTING; SELECTING VEGETATIVE SPECIES TOLERANT TO LOW FERTILITY SOIL CONDITIONS; AND IMPLEMENTING COMBINATIONS OF THESE AND OR OTHER METHODS. SPECIFIC TOLERANCE INFORMATION IS PROVIDED IN TABLE 1 OF THE EROSION CONTROL & CONSERVATION PLANTINGS ON NONCROPLAND PUBLISHED BY PENN STATE.
- ERODIBLE SOIL TYPES EXHIBITING K VALUES GREATER THAN 0.36 OR PLASTICITY INDEX VALUES LOWER THAN 10, LIMIT VEGETATIVE STABILIZATION OF CHANNELS. RESOLUTIONS: PROVIDING TEMPORARY CHANNEL LINING, PROVIDING PERMANENT CHANNEL LINING, DECREASING CHANNEL GRADE, INCREASING CHANNEL WIDTH, SELECTING VEGETATIVE WITH GREATER RETARDANCE, SELECTING PERMANENT LININGS OTHER THAN GRASSES, AND IMPLEMENTING COMBINATION OF THESE AND/OR METHODS. VEGETATIVE RETARDANCE INFORMATION IS PROVIDED IN TABLES 6 AND 7 OF THE EROSION AND SEDIMENT POLLUTION CONTROL MANUAL PUBLISHED BY PADEP.
- WET SOIL TYPES HAVE EXCESSIVE ROOT ZONE AND SOIL MOISTURES. SOME SOIL SURVEYS INDICATE WETNESS, HIGH WATER TABLE AND FLOODING. THIS INDICATOR IS AFFECTED BY SOIL DISTURBANCE. RESOLUTIONS: SELECTING VEGETATIVE SPECIES TOLERANT TO WET CONDITIONS, TILING VEGETATIVE AREAS, AND IMPLEMENTING COMBINATIONS OF THESE AND/OR OTHER METHODS. SPECIFIC TOLERANCE INFORMATION IS PROVIDED IN TABLE 1 OF THE EROSION CONTROL & CONSERVATION PLANTINGS ON NONCROPLAND PUBLISHED BY PENN STATE.
- DRY SOIL TYPES LACK SUFFICIENT ROOT ZONE SOIL MOISTURES. THIS INDICATOR IS AFFECTED BY SOIL DISTURBANCE. RESOLUTIONS: SELECTING VEGETATIVE SPECIES TOLERANT TO DRY CONDITIONS, IRRIGATING VEGETATED AREAS AND IMPLEMENTING COMBINATION OF THESE AND/OR OTHER METHODS. SPECIFIC TOLERANCE INFORMATION IS PROVIDED IN TABLE 1 OF THE EROSION CONTROL & CONSERVATION PLANTINGS ON NONCROPLAND PUBLISHED BY PENN STATE.
- SOIL TYPES SUSCEPTIBLE TO SINKHOLE AND SOLUTION CHANNEL/CHAMBER FORMATION POSE LIMITATIONS ON LOCATING RESERVOIR AREAS OF SEDIMENT BASINS, SEDIMENT TRAPS, STORMWATER RETENTION BASINS, AND STORMWATER DETENTION BASINS. RESOLUTIONS: LOCATING THOSE FACILITIES ON OTHER SOIL TYPES, LINING RESERVOIR AREAS WITH IMPERVIOUS LININGS, LIMITING STANDING WATER DEPTHS, LIMITING RETENTION TIMES AND IMPLEMENTING COMBINATIONS OF THESE AND/OR OTHER METHODS.
- SOIL TYPES THAT EXHIBIT INSTABILITY IN POND EMBANKMENTS OR SUSCEPTIBILITY TO PIPING AND SEEPING POSE LIMITATIONS ON PLANNING EMBANKMENTS OF SEDIMENT BASINS, SEDIMENT TRAPS, STORMWATER RETENTION BASINS AND STORMWATER DETENTION BASINS. RESOLUTIONS: IMPORTING OTHER SOIL FOR EMBANKMENT OF THOSE FACILITIES, LOCATING THOSE FACILITIES ON OTHER SOIL TYPES, LIMITING EMBANKMENT SLOPE STEEPNESS AND IMPLEMENTING COMBINATIONS OF THESE AND/OR OTHER METHODS.
- SOILS THAT ARE DIFFICULT TO COMPACT, UNSUITABLE FOR WINTER GRADING, OR SUSCEPTIBLE TO FROST ACTION POSE LIMITATIONS ON PLANNING EMBANKMENTS OF SEDIMENT BASINS, SEDIMENT TRAPS, STORM WATER RETENTION BASINS AND STORMWATER DETENTION BASINS. RESOLUTIONS: IMPORTING OTHER SOIL FOR EMBANKMENT OF THOSE FACILITIES, LOCATING THOSE FACILITIES ON OTHER SOILS TYPES, NOT CONSTRUCTING EMBANKMENTS DURING PERIODS PRONE TO FROST AND IMPLEMENTING COMBINATIONS OF THESE AND/OR OTHER METHODS.
DISPOSAL AND RECYCLING
CONTRACTOR IS RESPONSIBLE FOR THE PROPER DISPOSAL OF ALL DEMOLISHED OR UNUSED CONSTRUCTION MATERIALS. GARBAGE SHALL BE COLLECTED ON-SITE UNTIL RETRIEVED BY AN APPROVED DISPOSAL OR RECYCLING COMPANY, CONTRACTOR SHALL NOT INCINERATE EXCESS MATERIALS.
LIKELY WASTE TO BE GENERATED AT THIS SITE:
- UNUSED CONCRETE TO BE PLACED IN CONCRETE WASHOUT AREAS;
- EXCESS SILT SOCK AND FENCING MATERIALS;
- GENERAL RUBBISH AND DEBRIS
THERMAL IMPACTS
THE RUNOFF FROM THE PROJECT AREA THAT OUTLETS TO SURFACE WATERS OR EXISTING STORM SEWER FLOWS THROUGH COMPOST FILTER SOCKS.
INTERCEPTING THE RUNOFF WITH THE ONSITE TEMPORARY BMP'S WILL TEMPORARILY STORE THE SEDIMENT LADEN WATER BEHIND THE PROPOSED E&S MEASURES AND SLOWLY ALLOW CLEAN WATER TO FILTER THROUGH (I.E. REDUCING FLOW RATE AND VELOCITY). THE NATURAL COOLING EFFECTS OF FILTERING SEDIMENT LADEN WATER WILL HELP TO DISSIPATE THE HEAT ENERGY ABSORBED BY THE STORMWATER.
EROSION AND SEDIMENT CONTROL PLAN OBJECTIVES
- FIT THE LAND-DISTURBING ACTIVITY TO THE TERRAIN THROUGH MATCHING PROPOSED GRADES AS CLOSE TO EXISTING AS POSSIBLE.
- MINIMIZE BARE SOIL EXPOSURE AND THE EXTENT AND DURATION OF EARTH DISTURBANCE THROUGH THE USE OF TEMPORARY STABILIZATION TECHNIQUES AND A DETAILED CONSTRUCTION SEQUENCE.
- RETAIN EXISTING VEGETATION WHENEVER FEASIBLE AND APPROPRIATE BY MAXIMIZING PROTECTION OF EXISTING DRAINAGE FEATURES AND VEGETATION.
- MINIMIZE SOIL COMPACTION BY DELINEATING LIMITS OF DISTURBANCE IN ONLY THOSE AREAS NECESSARY FOR CONSTRUCTION.
- STABILIZE DISTURBED AREAS IMMEDIATELY AFTER GRADING WITH TEMPORARY SEEDING AND MULCHING.
- DIRECT RUNOFF AWAY FROM BARE SOIL AREAS.
- MINIMIZE LENGTH AND STEEPNESS OF SLOPES BY IMPLEMENTING THE APPROPRIATE TEMPORARY E&S BMP.
- UTILIZE OTHER MEASURES OR CONTROLS THAT PREVENT OR MINIMIZE GENERATION OF INCREASED STORMWATER RUNOFF.
- PREPARE DRAINAGE WAYS AND OUTLETS TO HANDLE INCREASED RUNOFF AND CONCENTRATION FLOWS.
- REDUCE SEDIMENTATION BY APPLYING EROSION CONTROL AND WATER QUALITY PRACTICES ON-SITE.
- AVOID, MINIMIZE OR MITIGATE THERMAL IMPACTS.
SEEDING AND MULCHING SPECIFICATIONS
TEMPORARY:
SEEDING SHALL BE ANNUAL RYE GRASS APPLIED AT 48 LBS. PER ACRE.
LIMING TO BE APPLIED AT 1 TON/ACRE.
10-10-10 FERTILIZER TO BE APPLIED AT 500 LBS./ACRE.
HAY OR STRAW MULCH TO BE APPLIED AT 3 TONS/ACRE.
PERMANENT:
LIMING TO BE APPLIED AT 6 TON/ACRE.
10-20-20 FERTILIZER TO BE APPLIED AT 1000 LBS./ACRE.
HAY OR STRAW MULCH TO BE APPLIED AT 3 TONS/ACRE.
CONTRACTOR SHALL VERIFY PERMANENT SEEDING CRITERIA WITH OWNER PRIOR TO APPLICATION.
NON-STEEP AREAS < 3:1, HIGHLY MAINTAINED AND MOWED, USE ONLY ON TOP SOIL AREAS.
- SEEDING SHALL BE 50% KENTUCKY BLUEGRASS, 30% RED FESCUE, AND 20% PERENNIAL RYE GRASS, AT A RATE OF 21 LBS. PER 1000 SQUARE YARDS.
SLOPES STEEPER THAN 3:1, NO-MOW AREAS
- THERE ARE NO AREAS OF NO-MOW STEEP SLOPE ON THIS PROJECT.
GENERAL:
- THE NON-GERMINATING PERIODS ARE BETWEEN JUNE 15 THRU AUGUST 15, AND SEPTEMBER 30 THRU APRIL 15. AREAS DISTURBED DURING THESE PERIODS MUST BE LIMED, FERTILIZED, SEEDED AND MULCHED WITHIN TWENTY (20) DAYS OF THE ENDING OF THOSE PERIODS.
- ALL SEED MIXTURES SHALL HAVE A MINIMUM LIVE SEED AND GERMINATION PERCENTAGE OF 85% TO 95%.
- TOPSOIL TAKEN FROM CONSTRUCTION AREAS SHALL BE SEEDED WITH VEGETATIVE COVER AND STOCKPILED FOR RE-USE IN FINISH GRADING. THERE IS TO BE NO EARTH DISTURBANCE OR VEGETATIVE CLEARING IN AREAS OF STAKED (OR FENCED) WETLANDS. EARTH DISTURBANCE WITHIN THESE AREAS WITHOUT THE REQUIRED PERMITS WILL RESULT IN POTENTIAL VIOLATION OF COMMONWEALTH AND FEDERAL WETLANDS REGULATIONS.
- ANY DISTURBED AREA ON WHICH ACTIVITY HAS CEASED AND WHICH WILL REMAIN EXPOSED MUST BE SEEDED AND MULCHED IMMEDIATELY. DISTURBED AREAS WHICH ARE NOT A FINISHED GRADE AND WHICH WILL BE RE-DISTURBED WITHIN ONE (1) YEAR MAY BE SEEDED AND MULCHED WITH A QUICK GROWING, TEMPORARY SEEDING MIXTURE AND MULCH. DISTURBED AREAS WHICH ARE EITHER AT FINISHED GRADE OR WILL NOT BE RE-DISTURBED WITHIN ONE (1) YEAR MUST BE SEEDED AND MULCHED WITH A PERMANENT SEED MIXTURE AND MULCH. CHANNELS, SEDIMENTATION TRAPS, BASINS AND STOCKPILES MUST BE SEEDED AND MULCHED IMMEDIATELY.
MULCHING NOTES
- ALL SEEDED AREAS SHOULD BE MULCHED OR BLANKETED TO MINIMIZE THE POTENTIAL FOR FAILURE TO ESTABLISH AN ADEQUATE VEGETATIVE COVER. MULCHING MAY ALSO BE USED AS A TEMPORARY STABILIZATION OF SOME DISTURBED AREAS IN NON-GERMINATING SEASONS.
- STRAW AND HAY MULCH SHOULD BE ANCHORED OR TACKIFIED IMMEDIATELY AFTER APPLICATION TO PREVENT BEING WINDBLOWN. A TRACTOR-DRAWN IMPLEMENT MAY BE USED TO "CRIMP" THE STRAW OR HAY INTO THE SOIL -- ABOUT 3 INCHES. THIS METHOD SHOULD BE LIMITED TO SLOPES NO STEEPER THAN 3H:1V. THE MACHINERY SHOULD BE OPERATED ON THE CONTOUR. NOTE: CRIMPING OF HAY OR STRAW BY RUNNING OVER IT WITH TRACKED MACHINERY IS NOT RECOMMENDED.
- POLYMERIC AND GUM TACKIFIERS MIXED AND APPLIED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS MAY BE USED TO TACK MULCH. AVOID APPLICATION DURING RAIN AND ON WINDY DAYS. A 24-HOUR CURING PERIOD AND A SOIL TEMPERATURE HIGHER THAN 45 DEG. FAHRENHEIT ARE TYPICALLY REQUIRED. APPLICATION SHOULD BE GENERALLY BE HEAVIEST AT EDGES OF SEEDED AREAS AND AT CRESTS OF RIDGES AND BANKS TO PREVENT LOSS BY WIND. THE REMAINDER OF THE AREA SHOULD HAVE BINDER APPLIED UNIFORMLY. BINDERS MAY BE APPLIED AFTER MULCH IS SPREAD OR SPRAYED INTO THE MULCH AS IT IS BEING BLOWN ONTO THE SOIL. APPLYING STRAW AND BINDER TOGETHER IS GENERALLY MORE EFFECTIVE.
- SYNTHETIC BINDERS, OR CHEMICAL BINDERS, MAY BE USED AS RECOMMENDED BY THE MANUFACTURER TO ANCHOR MULCH PROVIDED SUFFICIENT DOCUMENTATION IS PROVIDED TO SHOW THEY ARE NON-TOXIC TO NATIVE PLANT AND ANIMAL SPECIES.
- MULCH ON SLOPES OF 8% OR STEEPER SHOULD BE HELD IN PLACE WITH NETTING. LIGHTWEIGHT PLASTIC, FIBER, OR PAPER NETS MAY BE STAPLED OVER THE MULCH ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
- IT IS THE CONTRACTORS RESPONSIBILITY TO KEEP BASIN SEEDING UNIFORMLY SPREAD THROUGHOUT BASIN BOTTOM. IN THE EVENT SEEDS COLLECT IN ONE AREA OR DISCHARGE FROM THE BASIN, THE CONTRACTOR SHALL RE-SEED, REMULCH AND SECURE SEED/MULCH WITH THE APPROPRIATE LIGHTWEIGHT PLASTIC, FIBER OR PAPER NETTING, IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
- SHREDDED PAPER HYDROMULCH SHOULD NOT BE USED ON SLOPES STEEPER THAN 5%. WOOD FIBER HYDROMULCH MAY BE APPLIED ON STEEPER SLOPES PROVIDED A TACKIFIER IS USED. THE APPLICATION RATE FOR ANY HYDROMULCH SHOULD BE AS NOTED IN THE MULCHING CHART (SEE THIS SHEET).
TOPSOIL APPLICATION NOTES
- GRADED AREAS SHOULD BE SCARIFIED OR OTHERWISE LOOSENED TO A DEPTH OF 3 TO 5 INCHES TO PERMIT BONDING OF THE TOPSOIL TO THE SURFACE AREAS AND TO PROVIDE A ROUGHENED SURFACE TO PREVENT TOPSOIL FROM SLIDING DOWN SLOPE.
- TOPSOIL SHOULD BE UNIFORMLY DISTRIBUTED ACROSS THE DISTURBED AREA TO A DEPTH OF SIX (6) INCHES MINIMUM. SPREADING SHOULD BE DONE IN SUCH A MANNER THAT SODDING OR SEEDING CAN PROCEED WITH A MINIMUM OF ADDITIONAL PREPARATION OR TILLAGE. IRREGULARITIES IN THE SURFACE RESULTING FROM TOPSOIL PLACEMENT SHOULD BE CORRECTED IN ORDER TO PREVENT FORMATION OF DEPRESSIONS UNLESS SUCH DEPRESSIONS ARE PART OF THE PCSM PLAN.
- TOPSOIL SHOULD NOT BE PLACED WHILE THE TOPSOIL OR SUBSOIL IS IN A FROZEN OR MUDDY CONDITION, WHEN THE SUBSOIL IS EXCESSIVELY WET, OR IN A CONDITION THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER GRADING AND SEEDBED PREPARATION. COMPACTED SOILS SHOULD BE SCARIFIED 6 TO 12 INCHES ALONG CONTOUR WHEREVER POSSIBLE PRIOR TO SEEDING.
SOIL AMENDMENT APPLICATION RATE EQUIVALENTS
| SOIL AMENDMENT | PER ACRE | PER 1,000 SF | PER 1,000 SY | Notes |
|---|---|---|---|---|
| PERMANENT SEEDING APPLICATION RATE (MIN.) | ||||
| AGRICULTURAL LIME | 6 TONS | 240 LB. | 2,480 LB. | OR AS PER SOIL TEST; MAY NOT BE REQUIRED IN AGRICULTURAL FIELDS |
| 10-20-20 FERTILIZER | 1,000 LB | 25 LB. | 210 LB. | OR AS PER SOIL TEST; MAY NOT BE REQUIRED IN AGRICULTURAL FIELDS |
| TEMPORARY SEEDING APPLICATION RATE (MIN.) | ||||
| AGRICULTURAL LIME | 1 TON | 40 LB. | 410 LB. | TYPICALLY NOT REQUIRED FOR TOPSOIL STOCKPILES |
| 10-10-10 FERTILIZER | 500 LB. | 12.5 LB. | 100 LB. | TYPICALLY NOT REQUIRED FOR TOPSOIL STOCKPILES |
MULCH APPLICATION RATES
| MULCH TYPE | APPLICATION RATE (MIN.) PER ACRE | APPLICATION RATE (MIN.) PER 1,000 SF | APPLICATION RATE (MIN.) PER 1,000 SY | Notes |
|---|---|---|---|---|
| STRAW | 3 TONS | 140 LB. | 1,240 LB. | EITHER WHEAT OR OAT STRAW, FREE OF WEEDS, NOT CHOPPED OR FINELY BROKEN |
| HAY | 3 TONS | 140 LB. | 1,240 LB. | TIMOTHY, MIXED CLOVER AND TIMOTHY OR OTHER NATIVE FORAGE GRASSES |
| WOOD CHIPS | 4-6 TONS | 185-275 LB. | 1,650-2,500 LB. | MAY PREVENT GERMINATION OF GRASSES AND LEGUMES |
| HYDROMULCH | 1 TON | 47 LB. | 415 LB. | SEE LIMITATIONS ABOVE |
TOPSOIL APPLICATION RATES
| DEPTH (IN) | PER 1,000 SF | PER ACRE |
|---|---|---|
| 1 | 3.1 CY | 134 CY |
| 2 | 6.2 CY | 269 CY |
| 3 | 9.3 CY | 403 CY |
| 4 | 12.4 CY | 537 CY |
| 5 | 15.5 CY | 672 CY |
| 6 | 18.6 CY | 806 CY |
| 7 | 21.7 CY | 940 CY |
| 8 | 24.8 CY | 1,074 CY |
TITLE BLOCK
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
CVE Chester Valley Engineers, Inc., PROJECT NO. 22024 | SCALE: AS NOTED | DATE: 4/29/2024 | DRAWN BY: RRD | CHECKED BY: JRM | SHEET 12 OF 17
EROSION & SEDIMENTATION CONTROL DETAILS
Engineering details sheet for One CTDI Place containing erosion control blanket installation, filter bag inlet protection, inlet temporary seal, stockpile detail, rock construction entrance, rock construction entrance with wash rack, pumped water filter bag with compost sock, compost filter sock concrete washout, compost filter sock detail and specifications, rock filter outlet, tree protection fence, and tree protection barrier fence.
Installation Made Easy & Slope Installation
Manufacturer diagrams showing staple patterns (A, B, C, D, E) and slope installation steps for erosion control blankets. [illegible]
IF SLOPES EXCEED 4:1, USE NAG S75 WITH STAPLE PATTERN "C"
FILTER BAG INLET PROTECTION – TYPE M INLET DETAIL
N.T.S.
Diagrams of Isometric View, Installation Detail, Elevation View, and Plan View:
- INLET GRATE, 1" REBAR FOR BAG REMOVAL FROM INLET, WIDTH, LENGTH
- EXPANSION RESTRAINT (1/4" NYLON ROPE), 2" x 2" x 3/4" RUBBER BLOCK
- EARTHEN BERM TO BE STABILIZED WITH TEMPORARY OR PERMANENT VEGETATION, 2 MIN. (TYP.), FLOW, STORM INLET, 2 MIN:1, 6" MIN. HEIGHT, BERM
NOTES:
- MAXIMUM DRAINAGE AREA = ½ ACRE.
- INLET PROTECTION SHALL NOT BE REQUIRED FOR INLET TRIBUTARY TO SEDIMENT BASIN OR TRAP. BERMS SHALL BE REQUIRED FOR ALL INSTALLATIONS.
- ROLLED EARTHEN BERM SHALL BE MAINTAINED UNTIL ROADWAY IS STONED. ROAD SUBBASE BERM SHALL BE MAINTAINED UNTIL ROADWAY IS PAVED. EARTHEN BERM IN CHANNEL SHALL BE MAINTAINED UNTIL PERMANENT STABILIZATION IS COMPLETED OR REMAIN PERMANENTLY.
- AT A MINIMUM, THE FABRIC SHALL HAVE A MINIMUM GRAB TENSILE STRENGTH OF 120 LBS, A MINIMUM BURST STRENGTH OF 200 PSI, AND A MINIMUM TRAPEZOIDAL TEAR STRENGTH OF 50 LBS. FILTER BAGS SHALL BE CAPABLE OF TRAPPING ALL PARTICLES NOT PASSING A NO. 40 SIEVE.
- INLET FILTER BAGS SHALL BE INSPECTED ON A WEEKLY BASIS AND AFTER EACH RUNOFF EVENT. BAGS SHALL BE EMPTIED AND RINSED OR REPLACED WHEN HALF FULL OR WHEN FLOW CAPACITY HAS BEEN REDUCED SO AS TO CAUSE FLOODING OR BYPASSING OF THE INLET. DAMAGED OR CLOGGED BAGS SHALL BE REPLACED. A SUPPLY SHALL BE MAINTAINED ON SITE FOR REPLACEMENT OF BAGS. ALL NEEDED REPAIRS SHALL BE INITIATED IMMEDIATELY AFTER THE INSPECTION. DISPOSE OF ACCUMULATED SEDIMENT AS WELL AS ALL USED BAGS ACCORDING TO THE PLAN NOTES.
DO NOT USE ON MAJOR PAVED ROADWAYS WHERE PONDING MAY CAUSE TRAFFIC HAZARDS.
INLET TEMPORARY SEAL DETAIL
N.T.S.
Installation Detail and Isometric View showing: GRATE 2'x2' or 2'x4', 1/2" MARINE-GRADE PLYWOOD, WATERPROOF SEAL - EXTERIOR GRADE CAULK OR APPROVED EQUAL, Length=Varies 2 ft./4 ft., Width=2 ft.
STOCKPILE DETAIL
N.T.S.
Plan View and Section A-A showing: COMPOST FILTER SOCK, contours 97, 98, 99, 100, 5' MIN., 2:1 slope, EXISTING GRADE.
NOTES:
- PLACE STOCKPILES AT LOCATIONS AS SHOWN ON THE EROSION AND SEDIMENTATION CONTROL PLAN.
- ALL SIDE SLOPES SHALL BE 2 TO 1 OR FLATTER.
- STOCKPILE SHALL RECEIVE A VEGETATIVE COVER IN ACCORDANCE WITH MINIMUM STABILIZATION REQUIREMENTS.
- COMPOST FILTER SOCK SHALL BE INSTALLED AS DETAILED HEREON.
- LOCATION OF PROPOSED STOCKPILE WHICH AFFECT EROSION CONTROLS ARE SHOWN SCHEMATICALLY ONLY. ACTUAL STOCKPILE LOCATION MAY CHANGE DURING CONSTRUCTION.
- STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET.
ROCK CONSTRUCTION ENTRANCE DETAIL
N.T.S.
Profile and Plan View showing: MIN. 8" AASHTO #1, MOUNTABLE BERM (6" MIN.)*, EXISTING ROADWAY, GEOTEXTILE, EARTH FILL, PIPE AS NECESSARY, DRIVEWAY WIDTH (20' MIN.), 50' MINIMUM, 3', 10' MIN.
* MOUNTABLE BERM USED TO PROVIDE COVER FOR PIPE.
NOTES:
- REMOVE TOPSOIL PRIOR TO INSTALLATION OF ROCK CONSTRUCTION ENTRANCE. EXTEND ROCK OVER FULL WIDTH OF ENTRANCE.
- RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL BMP PRIOR TO ENTERING ROCK CONSTRUCTION ENTRANCE.
- MOUNTABLE BERM SHALL BE INSTALLED WHEREVER OPTIONAL CULVERT PIPE IS USED AND PROPER PIPE COVER AS SPECIFIED BY MANUFACTURER IS NOT OTHERWISE PROVIDED. PIPE SHALL BE SIZED APPROPRIATELY FOR SIZE OF DITCH BEING CROSSED.
MAINTENANCE:
ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE IMMEDIATELY. IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION ENTRANCE BY 50 FOOT INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK. WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES IS NOT ACCEPTABLE.
ROCK CONSTRUCTION ENTRANCE WITH WASH RACK DETAIL
N.T.S.
Isometric and Cross-Section Views showing: WASH RACK, AASHTO #1 ROCK (8" THICK) EXTENDING 25' MIN. ON BOTH APPROACHES TO WASH RACK, 6' (MIN.), REINFORCED CONCRETE OR WELDED STEEL PIPE, DRAIN SPACE.
NOTES:
- WASH RACK SHALL BE 20 FEET (MIN.) WIDE OR TOTAL WIDTH OF ACCESS.
- WASH RACK SHALL BE DESIGNED AND CONSTRUCTED TO ACCOMMODATE ANTICIPATED CONSTRUCTION VEHICULAR TRAFFIC.
- A WATER SUPPLY SHALL BE MADE AVAILABLE TO WASH THE WHEELS OF ALL VEHICLES EXITING THE SITE.
MAINTENANCE:
ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE OF ROCK MATERIAL SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. DRAIN SPACE UNDER WASH RACK SHALL BE KEPT OPEN AT ALL TIMES. DAMAGE TO THE WASH RACK SHALL BE REPAIRED PRIOR TO FURTHER USE OF THE RACK. ALL SEDIMENT DEPOSITED ON ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE IMMEDIATELY. WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES IS NOT ACCEPTABLE.
PUMPED WATER FILTER BAG WITH COMPOST SOCK DETAIL
N.T.S.
Plan View and Elevation View showing: WELL VEGETATED, GRASSY AREA, FILTER BAG, COMPOST FILTER SOCK, DISCHARGE HOSE, PUMP, INTAKE HOSE, CLAMPS.
NOTES:
- LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS: PROPERTY TEST METHOD MINIMUM STANDARD AVG. WIDE WIDTH STRENGTH ASTM D-4884 60 LB/IN GRAB TENSILE ASTM D-4632 205 LB PUNCTURE ASTM D-4833 110 LB MULLEN BURST ASTM D-3786 350 PSI UV RESISTANCE ASTM D-4355 70% AOS % RETAINED ASTM D-4751 80 SIEVE
- A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME ½ FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
- BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
- NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
- THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
- THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR ½ THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED.
- FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
COMPOST FILTER SOCK CONCRETE WASHOUT DETAIL
N.T.S.
Section View and Plan View showing: 2"x2"x36" WOODEN STAKES PLACED 5' O.C., MAXIMUM DEPTH OF CONCRETE WASHOUT WATER IS 50% OF FILTER RING HEIGHT, 24" DIAMETER COMPOST FILTER SOCK, 12" MINIMUM, DIRECT CONCRETE WASHOUT WATER INTO FILTER RING, 24" DIAMETER COMPOST FILTER SOCK. 4' MIN. OVERLAP ON UPSLOPE SIDE OF FILTER RING.
NOTES:
- INSTALL ON FLAT GRADE FOR OPTIMUM PERFORMANCE.
- 18" DIAMETER SILT SOCK MAY BE STACKED ONTO DOUBLE 24" DIAMETER SILT SOCKS IN PYRAMIDAL CONFIGURATION FOR ADDED HEIGHT.
- A SUITABLE IMPERVIOUS GEOMEMBRANE SHALL BE PLACED AT THE LOCATION OF THE WASHOUT PRIOR TO INSTALLING THE SOCKS.
COMPOST FILTER SOCK DETAIL
N.T.S.
Section View and Plan View showing: BLOWN/PLACED FILTER MEDIA, DISTURBED AREA, UNDISTURBED AREA, 2"x2" WOODEN STAKES PLACED 10' O.C., COMPOST FILTER SOCK, 12" MINIMUM, EXISTING CONTOURS, FLOW.
NOTES:
- SOCK FABRIC SHALL MEET THE STANDARDS OF TABLE 4.1. COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2.
- COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE SOCK SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN SOCK ALIGNMENT. STAKES MAY BE INSTALLED IMMEDIATELY DOWNSLOPE OF THE SOCK IF SO SPECIFIED BY THE MANUFACTURER.
- TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS.
- ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVEGROUND HEIGHT OF THE SOCK AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
- SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION.
- BIODEGRADABLE FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
- UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
- REFER TO E&S PLAN FOR COMPOST SOCK LOCATIONS, SIZE, IDENTIFICATIONS AND CONSTRUCTION SPECIFICATIONS.
ROCK FILTER OUTLET DETAIL
N.T.S.
Outlet Cross-Section and Up-Slope Face showing: 6" COMPOST LAYER FIRMLY ANCHORED, 1 MIN. : 1, 1 MIN. : 1, OPTIONAL 6" SUMP, R-3 ROCK, AASHTO #57 6" MIN., WOOD POSTS, STRAW BALES OR FILTER FABRIC, HEIGHT OF ROCK FILTER = 5/6 HEIGHT OF STRAW BALES OR FILTER FABRIC FENCE, 3' MIN.
NOTES:
- A ROCK FILTER OUTLET SHALL BE INSTALLED WHERE FAILURE OF A SILT FENCE OR STRAW BALE BARRIER HAS OCCURRED DUE TO CONCENTRATED FLOW. ANCHORED COMPOST LAYER SHALL BE USED ON UPSLOPE FACE IN HQ AND EV WATERSHEDS.
- IF INSTALLED, INSPECT WEEKLY AND AFTER EACH RUNOFF EVENT. SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH 1/3 THE HEIGHT OF THE OUTLET.
TREE PROTECTION FENCE DETAIL
N.T.S.
Diagram showing tree with DRIP LINE and TREE PROTECTION FENCE.
ALL WOODY VEGETATION TO BE RETAINED WITHIN 25 FEET OF A BUILDING SITE, PARKING AREA, DRIVEWAY OR OTHER PROPOSED IMPROVEMENT SHALL BE PROTECTED FROM EQUIPMENT DAMAGE BY FENCING OR OTHER EFFECTIVE BARRIERS APPROVED BY THE TOWNSHIP ENGINEER / LANDSCAPE ARCHITECT. FENCING OR BARRIERS SHALL BE PLACED AS NOTED BELOW, UNLESS PRIOR DETERMINATION HAS BEEN MADE BY THE TOWNSHIP ENGINEER / LANDSCAPE ARCHITECT REGARDING A MORE APPROPRIATE LOCATION.
DESCRIPTION: TREES ARE OFTEN DAMAGED BY MOVING CONSTRUCTION EQUIPMENT OR BY SEDIMENT BUILDUP AROUND THE ROOTS. TREE PROTECTION FENCING, WHEN PLACED ALONG OR AROUND TREES, SERVES AS A BOUNDARY MARKER TO INDICATE THAT CLEARING AND STOCKPILING ARE NOT PERMITTED BEYOND THAT POINT.
WHEN USED: TREE PROTECTION FENCE MAY BE USED WHENEVER THERE ARE SPECIFIC TREES OR WOODED AREAS THAT MUST BE PROTECTED.
REQUIREMENTS FOR INSTALLATION: THE TREE PROTECTION FENCE IS INSTALLED BY HAMMERING WOOD OR METAL STAKES INTO THE GROUND AND CONNECTING THE FENCING MATERIAL SECURELY TO THE POSTS PER THE MANUFACTURERS' INSTRUCTIONS.
PLACE THE TREE PROTECTION FENCE ALONG THE DRIPLINES OF TREES OR 1 FOOT FROM THE TREE TRUNK FOR EVERY INCH OF TRUNK DIAMETER, WHICHEVER IS GREATER. A DRIPLINE IS AN IMAGINARY LINE EXTENDING DOWN FROM THE OUTER-MOST BRANCHES OF A TREE TO THE GROUND. THIS IS GENERALLY THE OUTER BOUNDARY FOR TREE ROOTS. IF THE TREE PROTECTION FENCE IS PLACED ANY CLOSER TO A TREE, ITS PURPOSE MAY BE DEFEATED.
MAINTENANCE: INSPECT THE TREE PROTECTION FENCING PERIODICALLY DURING CONSTRUCTION TO MAKE SURE THAT IT IS POSITIONED SECURELY.
TREE PROTECTION BARRIER FENCE DETAIL
N.T.S.
Diagram showing: ANCHOR POSTS MUST BE MIN. 2" STEEL "U" CHANNEL, MAX. 8' SPACING, FENCING ATTACHED TO EACH POST IN AT LEAST 3 PLACES, POSTS MUST BE SET AT LEAST 18" INTO GROUND, MAX. 6" CLEARANCE ABOVE GROUND.
NOTES
- PROTECTION BARRIER SHALL BE 4 FEET HIGH, CONSTRUCTED OF DURABLE AND HIGHLY VISIBLE MATERIAL (PLASTIC ORANGE CONSTRUCTION FENCE AND/OR SNOW-FENCE MAY BE USED).
- PROTECTION BARRIERS SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE WORK AT THE SITE.
TABLE 4.1 – COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
| MATERIAL TYPE | 3 MIL HDPE | 5 MIL HDPE | 5 MIL HDPE | MULTI-FILAMENT POLYPROPYLENE (MFPP) | HEAVY DUTY MULTI-FILAMENT POLYPROPYLENE (HDMFPP) |
|---|---|---|---|---|---|
| MATERIAL CHARACTERISTICS | PHOTO-DEGRADABLE | PHOTO-DEGRADABLE | BIO-DEGRADABLE | PHOTO-DEGRADABLE | PHOTO-DEGRADABLE |
| SOCK DIAMETERS | 12" 18" |
12" 18" 24" 32" |
12" 18" 24" 32" |
12" 18" 24" 32" |
12" 18" 24" 32" |
| MESH OPENING | 3/8" | 3/8" | 3/8" | 3/8" | 1/8" |
| TENSILE STRENGTH | 26 PSI | 26 PSI | 44 PSI | 202 PSI | |
| ULTRAVIOLET STABILITY % ORIGINAL STRENGTH (ASTM G-155) | 23% AT 1000 HR. | 23% AT 1000 HR. | 100% AT 1000 HR. | 100% AT 1000 HR. | |
| MINIMUM FUNCTIONAL LONGEVITY | 6 MONTHS | 9 MONTHS | 6 MONTHS | 1 YEAR | 2 YEARS |
| TWO-PLY SYSTEMS | |||||
| INNER CONTAINMENT NETTING | HDPE BIAXIAL NET CONTINUOUSLY WOUND FUSION-WELDED JUNCTURES 3/4" x 3/4" MAX. APERTURE SIZE |
||||
| OUTER FILTRATION MESH | COMPOSITE POLYPROPYLENE FABRIC (WOVEN LAYER AND NON-WOVEN FLEECE MECHANICALLY FUSED VIA NEEDLE PUNCH) 3/16" MAX. APERTURE SIZE |
||||
| SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS. | |||||
TABLE 4.2 – COMPOST STANDARDS
| Parameter | Standard |
|---|---|
| ORGANIC MATTER CONTENT | 80% - 100% (DRY WEIGHT BASIS) |
| ORGANIC PORTION | FIBROUS AND ELONGATED |
| pH | 5.5 - 8.0 |
| MOISTURE CONTENT | 35% - 55% |
| PARTICLE SIZE | 98% PASS THROUGH 1" SCREEN |
| SOLUBLE SALT CONCENTRATION | 5.0 dS/m (mmhos/cm) MAXIMUM |
TITLE BLOCK
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
CVE Chester Valley Engineers, Inc., PROJECT NO. 22024 | SCALE: AS NOTED | DATE: 4/29/2024 | DRAWN BY: RRD | CHECKED BY: JRM | SHEET 13 OF 17
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
POST-CONSTRUCTION STORMWATER MANAGEMENT PLAN
Site plan drawing showing post-construction stormwater management (PCSM) facilities, infiltration beds SWM #100 and SWM #200, drainage areas, storm pipes, inlets, grading contours, soil types, and infiltration test results for One CTDI Place (Scale: 1" = 30').
PLAN LABELS AND CALLOUTS
- Stream Classification Note: DRAINS TO E. BRANCH CHESTER CREEK, CHAPTER 93 CLASSIFICATION: TROUT STOCKING FISHES, MIGRATORY FISHES (TSF-MF)
- Adjoining Properties (West): N/L CHRISTOPHER R. & ERIN E. SMYTH, D.B. 9566 PG. 2294, UPI #53-3M-28 (N 68°20'47" E); N/L DAVID & DEBRA BASARUB, D.B. 6708 PG. 192, UPI #53-3M-27 (N 68°20'47" E); N/L RAYMOND L. & MYRNA J. LEBRE, D.B. 10392 PG. 1097, UPI #53-3M-26 (414.82'); N/L CATHERINE A. BECK, D.B. 9226 PG. 41, UPI #53-3M-25 (DECK, 50', 30')
- Subject & Adjoining Parcels: U.P.I. # 53-4-161, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-161, BRICK OFFICE BUILDING, 1373 ENTERPRISE DRIVE; U.P.I. # 53-4-174, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-174 (across ENTERPRISE DRIVE, 50' right-of-way); U.P.I. # 53-4-162, N/L PARSONS 1365, LLC D.B. 10507 PG. 1528 UPI #53-4-162, BRICK OFFICE BUILDING, 1365 ENTERPRISE DRIVE; U.P.I. # 53-4-163, N/L PARSONS 1365, LLC D.B. 10507 PG. 1528 UPI #53-4-163
- PCSM & Drainage Callouts: LIMIT OF DISTURBANCE (LOD), TYP.; PROJECT (NPDES) SITE BOUNDARY; SWM #100 (BMP ID:1) INFILTRATION BED; SWM #200 (BMP ID:2) INFILTRATION BED; PROPOSED BUILDING ADDITION (FFE: 407.33); EXTERIOR SITE CANOPY BETWEEN PROPOSED ADDITION AND THE 1365 BUILDING; DP #001, DP #002; 8" HDPEP @ 1.00% MIN., 8" HDPEP @ 2.00% MIN., 15" REDUCER WYE (8"), STONE TRENCH WITH 8" PERF. HDPEP (TYP.); REPLACE TYPE-M TOP WITH TOP SLAB & MH RIM; REPLACE STRUCTURE WITH 4X4 INLET BOX & MH RIM; INLET T.G. 391.9 / INV. 388.8 / INV. 388.7; INLET T.G. 392.98 / INV. 389.93 OU; INLET GRATE: 399.91 / INV.IN: 395.93 / INV.OUT: 395.75
APPLICANT STATEMENT
ANY REVISION TO THE APPROVED SWM SITE PLAN SHALL BE SUBMITTED TO AND APPROVED BY THE MUNICIPALITY, AND THAT A REVISED EROSION AND SEDIMENT CONTROL PLAN SHALL BE SUBMITTED TO, AND APPROVED BY, THE CONSERVATION DISTRICT OR MUNICIPALITY (AS APPLICABLE) FOR A DETERMINATION OF ADEQUACY PRIOR TO CONSTRUCTION OF THE REVISED FEATURES.
APPLICANT / DATE
DESIGN ENGINEER
I, JEREMY R. MAZIARZ, ON THIS DATE, 4/29/2024, HEREBY CERTIFY TO THE BEST OF MY KNOWLEDGE THAT THE SWM SITE PLAN MEETS ALL DESIGN STANDARDS AND CRITERIA OF THE EAST GOSHEN TOWNSHIP STORMWATER MANAGEMENT ORDINANCE (NO. 195).
SIGNATURE (JEREMY R. MAZIARZ, P.E. 50557-E) | DATE: 4/29/2024
INFILTRATION TESTING RESULTS
| TEST ID | EX. GROUND ELEVATION | TEST DEPTH (FT) | TEST ELEVATION | MEASURED INF. RATE | LIMITING ZONE | LIMITING ZONE ELEVATION | BMP NAME | BMP BOTTOM ELEVATION |
|---|---|---|---|---|---|---|---|---|
| TP-1 | 406.00 | 6.00 | 400.00 | 0.31 IN/HR | NOT ENCOUNTERED | N/A | SWM #100 | 399.75 |
| TP-2 | 406.00 | 6.00 | 400.00 | 0.22 IN/HR | NOT ENCOUNTERED | N/A | SWM #100 | 399.75 |
| TP-3 | 406.00 | 8.50 | 397.50 | 0.25 IN/HR | NOT ENCOUNTERED | N/A | SWM #200 | 397.50 |
| TP-4 | 406.00 | 8.00 | 398.00 | 0.25 IN/HR | NOT ENCOUNTERED | N/A | SWM #200 | 397.50 |
SOILS LIST
| SYMBOL | DESCRIPTION | DEPTH TO SEASONALLY HIGH WATER TABLE | DEPTH TO BEDROCK | FREQUENCY OF FLOODING | FREQUENCY OF PONDING | HYDROLOGIC SOIL GROUP | HYDRIC SOIL RATING |
|---|---|---|---|---|---|---|---|
| URBAN LAND-UDORTHENTS | |||||||
| UugB | 0% TO 8% SLOPES | 60" | 20"-70" | NONE | NONE | C | NO |
| UugD | 8% TO 25% SLOPES | 60" | 20"-70" | NONE | NONE | C | NO |
LOCATION MAP & LEGEND
LOCATION MAP (SCALE 1"=2000') showing SITE in EAST GOSHEN.
LEGEND includes EXISTING FEATURES, PROPOSED FEATURES (same as Sheet 11), and PCSM FEATURES:
- PROJECT (NPDES) SITE BOUNDARY
- LIMIT OF DISTURBANCE (2.81 ACRES)
- DRAINAGE AREA TO PCSM BMPS
- DISCHARGE POINT (DP 001)
- WATER QUALITY INSERT
PENNSYLVANIA ACT 187 & PLAN NOTES
COPYRIGHT & NOTE TO USER OF THESE PLANS: Standard engineering copyright and field verification notes by Chester Valley Engineers, Inc. [illegible]
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20232130344. SEE SHEET 1 FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER. PENNSYLVANIA ONE CALL SYSTEM, INC., CALL 3 WORKING DAYS BEFORE YOU DIG, 1-800-242-1776, POCS SERIAL NUMBER: 20232130344.
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
TITLE BLOCK
PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
CVE Chester Valley Engineers, Inc., PROJECT NO. 22024 | SCALE: 1"=30' | DATE: 4/29/2024 | DRAWN BY: RRD | CHECKED BY: JRM | SHEET 14 OF 17
POST-CONSTRUCTION STORMWATER MANAGEMENT NOTES & DETAILS
GENERAL NOTES:
- STORMWATER MANAGEMENT DESIGN: REFER TO THE "POST-CONSTRUCTION STORMWATER MANAGEMENT REPORT", PREPARED BY CHESTER VALLEY ENGINEERS.
- MAINTENANCE NOTES: A. THE BMP'S LISTED BELOW WILL BE OWNED AND MAINTAINED BY THE PROPERTY OWNER. INFILTRATION BED(S); WATER QUALITY FILTER(S); STORM SEWER AND ASSOCIATED STRUCTURES
- DESIGN CONSIDERATIONS: SUBSURFACE BED(S) DESIGNED TO STORE AND MITIGATE POST-DEVELOPMENT RUNOFF TO RATES LESS THAN THOSE REQUIRED BY TOWNSHIP CODE. SUBSURFACE BED(S) DESIGNED TO MITIGATE THE POST-DEVELOPMENT VOLUME INCREASE DUE TO DEVELOPMENT. WATER QUALITY FILTERS DESIGNED TO FILTER ALL SURFACE RUNOFF.
- THE POST CONSTRUCTION STORMWATER MANAGEMENT PLAN HAS BEEN DESIGNED TO MEET THE FOLLOWING GOALS AND GUIDELINES: PRESERVE THE INTEGRITY OF STREAM CHANNELS AND MAINTAIN AND PROTECT THE PHYSICAL, BIOLOGICAL AND CHEMICAL QUALITIES OF RECEIVING STREAMS.; PREVENT AN INCREASE IN THE RATE OF STORMWATER RUNOFF.; MINIMIZE ANY INCREASE IN STORMWATER RUNOFF VOLUME.; MINIMIZE IMPERVIOUS AREAS.; MAXIMIZE THE PROTECTION OF EXISTING DRAINAGE FEATURES AND EXISTING VEGETATION.; MINIMIZE LAND CLEARING AND GRADING.; MINIMIZE SOIL COMPACTION.; UTILIZE OTHER STRUCTURAL OR NONSTRUCTURAL BMP'S THAT PREVENT OR MINIMIZE CHANGES IN STORMWATER RUNOFF.
- THE RECEIVING WATER FOR THIS PROJECT IS EAST BRANCH OF CHESTER CREEK. THE CHAPTER 93 CLASSIFICATION FOR EAST BRANCH OF CHESTER CREEK IS TROUT STOCKING FISHES, MIGRATORY FISHES (TSF-MF).
- THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ. THE CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIAL OR WASTES AT THE SITE. CONSTRUCTION WASTES MUST BE RECYCLED TO THE EXTENT PRACTICABLE, AND DISPOSAL METHODS MUST COMPLY WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS.
- THE PERMITTEE SHALL PROVIDE ENGINEERING CONSTRUCTION OVERSIGHT FOR THE PROPOSED STORMWATER BMPS. A LICENSED PROFESSIONAL ENGINEER KNOWLEDGEABLE IN THE DESIGN AND CONSTRUCTION OF STORMWATER BMPS, PREFERABLY THE DESIGN ENGINEER, SHALL CONDUCT THE OVERSIGHT.
- AS-BUILT PLANS OF THE STORMWATER BMP'S SHALL BE PROVIDED WITHIN SIX MONTHS FOLLOWING THE COMPLETION OF EACH PHASE. THE AS-BUILT PLANS SHALL BE SIGNED AND SEALED BY A PA REGISTERED PROFESSIONAL ENGINEER.
- A NOTICE OF TERMINATION (NOT) WILL BE REQUIRED TO BE SUBMITTED FOLLOWING APPROVAL OF THE FINAL AS-BUILT PLANS. PRIOR TO ACCEPTING THE NOT, THE DEPARTMENT AND/OR CONSERVATION DISTRICT STAFF WILL PERFORM A FINAL INSPECTION TO ENSURE SITE STABILIZATION AND VERIFY ADEQUATE INSTALLATION AND FUNCTION OF STORMWATER BMP'S.
- PCSM REPORTING AND RECORDKEEPING. THE PCSM PLAN, INSPECTION REPORTS AND MONITORING RECORDS SHALL BE AVAILABLE FOR REVIEW AND INSPECTION BY THE DEPARTMENT OR THE CONSERVATION DISTRICT.
- FINAL CERTIFICATION. THE PERMITTEE SHALL INCLUDE WITH THE NOTICE OF TERMINATION "RECORD DRAWINGS" WITH A FINAL CERTIFICATION STATEMENT FROM A LICENSED PROFESSIONAL, WHICH READS AS FOLLOWS: "I (NAME) DO HEREBY CERTIFY PURSUANT TO THE PENALTIES OF 18 PA.C.S.A. § 4904 TO THE BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF, THAT THE ACCOMPANYING RECORD DRAWINGS ACCURATELY REFLECT THE AS-BUILT CONDITIONS, ARE TRUE AND CORRECT, AND ARE IN CONFORMANCE WITH CHAPTER 102 OF THE RULES AND REGULATIONS OF THE DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THAT THE PROJECT SITE WAS CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PCSM PLAN, ALL APPROVED PLAN CHANGES AND ACCEPTED CONSTRUCTION PRACTICES." (1) THE PERMITTEE SHALL RETAIN A COPY OF THE RECORD DRAWINGS AS A PART OF THE APPROVED PCSM PLAN. (2) THE PERMITTEE SHALL PROVIDE A COPY OF THE RECORD DRAWINGS AS A PART OF THE APPROVED PCSM PLAN TO THE PERSON IDENTIFIED IN THIS SECTION AS BEING RESPONSIBLE FOR THE LONG-TERM OPERATION AND MAINTENANCE OF THE PCSM BMPS.
- UPON PERMANENT STABILIZATION OF THE EARTH DISTURBANCE ACTIVITY UNDER § 102.22(A)(2) (RELATING TO PERMANENT STABILIZATION), AND INSTALLATION OF BMPS IN ACCORDANCE WITH AN APPROVED PLAN PREPARED AND IMPLEMENTED IN ACCORDANCE WITH §§ 102.4 AND 102.8 (RELATING TO EROSION AND SEDIMENT CONTROL REQUIREMENTS; AND PCSM REQUIREMENTS), THE PERMITTEE OR CO-PERMITTEE SHALL SUBMIT A NOTICE OF TERMINATION TO THE DEPARTMENT OR CONSERVATION DISTRICT. THE NOTICE OF TERMINATION MUST INCLUDE: (1) THE FACILITY NAME, ADDRESS AND LOCATION. (2) THE OPERATOR NAME AND ADDRESS. (3) THE PERMIT NUMBER. (4) THE REASON FOR PERMIT TERMINATION. (5) IDENTIFICATION OF THE PERSONS WHO HAVE AGREED TO AND WILL BE RESPONSIBLE FOR LONG-TERM OPERATION AND MAINTENANCE OF THE PCSM BMPS IN ACCORDANCE WITH §102.8(M) AND PROOF OF COMPLIANCE WITH § 102.8(M)(2). PRIOR TO ACCEPTING THE NOT, THE DEPARTMENT AND/OR CONSERVATION DISTRICT STAFF WILL PERFORM A FINAL INSPECTION AND APPROVE OR DENY THE NOTICE OF TERMINATION.
GENERAL CONSERVATION NOTES AND SPECIFICATIONS
INTENT OF CONSERVATION PROGRAM: THE INTENT OF THIS PROGRAM IS TO PREVENT ACCELERATED EROSION OF THE EXPOSED SITE SOILS DURING THE CONSTRUCTION AND PERMANENT LIFE PERIODS OF THE DEVELOPMENT. THE PROGRAM REQUIRES RETENTION OF ALL SEDIMENTS ON THE CONSTRUCTION SITE TO MINIMIZE THE IMPACT OF DEVELOPMENT ON EXISTING STREAMS AND ADJACENT PROPERTY OWNERS. THESE OBJECTIVES WILL BE ACHIEVED BY MINIMIZING THE EXPOSURE TIME OF POTENTIALLY EROSIVE SOILS TO RUNOFF AND INSTALLATION OF THE TEMPORARY CONSTRUCTION. THE INTENT OF THIS PROGRAM SHOULD BE UNDERSTOOD AND IMPLEMENTED THROUGHOUT THE ENTIRE DEVELOPMENT. THE VARIOUS CONSTRUCTION TRADES SHOULD BE APPRAISED OF THIS PROGRAM AND DIRECTED TO PREVENT UNDUE DISTURBANCE OF PREPARED AND PROTECTED SURFACES.
SURFACE STABILIZATION CRITERIA: ALL DISTURBED SOIL SURFACES, INCLUDING SOIL STOCKPILES, ARE SUBJECT TO EROSION AND SHALL BE STABILIZED EITHER TEMPORARILY OR PERMANENTLY. IMMEDIATELY DURING NON-GERMINATION PERIODS MULCH MUST BE APPLIED AT THE RECOMMENDED RATES. CRUSHED STONE ON PAVEMENT SUBGRADES IS CONSIDERED ADEQUATE PROTECTION. ALL DISTURBED ZONES AND VEGETATED REGIONS SHALL BE STABILIZED, PREFERABLY WITH A PERMANENT TREATMENT.
CRITICAL VEGETATION AREAS (CVA)
CRITICAL VEGETATION AREAS ARE TO BE GRADED, HYDROSEEDED, AND MULCHED WITHIN 10 DAYS OF THE BEGINNING OF EXCAVATION. IN GENERAL, CRITICAL VEGETATION AREAS ARE DEFINED AS CUT SLOPES STEEPER THAN 3:1, ALL FILL SLOPES STEEPER THAN 4:1 AND IN ALL DRAINAGE SWALES.
DISPOSAL AND RECYCLING
CONTRACTOR IS RESPONSIBLE FOR THE PROPER DISPOSAL OF ALL DEMOLISHED OR UNUSED CONSTRUCTION MATERIALS. GARBAGE SHALL BE COLLECTED ON-SITE UNTIL RETRIEVED BY AN APPROVED DISPOSAL OR RECYCLING COMPANY, CONTRACTOR SHALL NOT INCINERATE EXCESS MATERIALS.
LIKELY WASTE TO BE GENERATED AT THIS SITE:
- UNUSED CONCRETE TO BE PLACED IN CONCRETE WASHOUT AREAS;
- EXCESS SILT SOCK AND FENCING MATERIALS;
- GENERAL RUBBISH AND DEBRIS
THERMAL IMPACT
STORMWATER RUNOFF FROM THE DRIVEWAY AND PARKING AREAS DRAIN TO A SUBSURFACE INFILTRATION BED AND UNDERGROUND STORM DRAIN PIPES. THEREFORE, THE INITIAL RUNOFF THAT IS MOST LIKELY TO WARMER IS SENT UNDERGROUND AND NOT DISCHARGED TO THE WATERCOURSE. WATER HAS TIME TO COOL PRIOR TO LEAVING THE SITE AND DRAINING TO THE WATER COURSE.
SPECIAL GEOLOGIC AND SOIL CONDITIONS
NO SPECIAL SOIL OR GEOLOGICAL ISSUES ARE KNOWN.
POST CONSTRUCTION STORMWATER MANAGEMENT (PCSWM) LONG-TERM OPERATIONS AND MAINTENANCE REQUIREMENTS
- UNTIL THE PERMITTEE OR CO-PERMITTEE HAS RECEIVED WRITTEN APPROVAL OF A NOTICE OF TERMINATION, THE PERMITTEE OR CO-PERMITTEE WILL REMAIN RESPONSIBLE FOR COMPLIANCE WITH THE PERMIT TERMS AND CONDITIONS INCLUDING LONG-TERM OPERATION AND MAINTENANCE OF ALL PCSWM BMPs ON THE PROJECT SITE AND IS RESPONSIBLE FOR VIOLATIONS OCCURRING ON THE PROJECT SITE.
- THE PERMITTEE OR CO-PERMITTEE SHALL BE RESPONSIBLE FOR LONG-TERM OPERATION AND MAINTENANCE OF PCSWM BMPs UNLESS A DIFFERENT PERSON IS IDENTIFIED IN THE NOTICE OF TERMINATION AND HAS AGREED TO LONG-TERM OPERATION AND MAINTENANCE OF PCSWM BMPs.
- FOR ANY PROPERTY CONTAINING A PCSWM BMP, THE PERMITTEE OR CO-PERMITTEE SHALL RECORD AN INSTRUMENT WITH THE RECORDER OF DEEDS WHICH WILL ASSURE DISCLOSURE OF THE PCSWM BMP AND THE RELATED OBLIGATIONS IN THE ORDINARY COURSE OF A TITLE SEARCH OF THE SUBJECT PROPERTY. THE RECORDED INSTRUMENT MUST IDENTIFY THE PCSWM BMP, PROVIDE FOR NECESSARY ACCESS RELATED TO LONG-TERM OPERATION AND MAINTENANCE FOR PCSWM BMPs AND PROVIDE NOTICE THAT THE RESPONSIBILITY FOR LONG-TERM OPERATION AND MAINTENANCE OF THE PCSWM BMP IS A COVENANT THAT RUNS WITH THE LAND THAT IS BINDING UPON AND ENFORCEABLE BY THE SUBSEQUENT GRANTEES, AND PROVIDE PROOF OF FILING WITH THE NOTICE OF TERMINATION UNDER § 102.7(b)(5) (RELATING TO PERMIT TERMINATION).
- THE PERSON RESPONSIBLE FOR PERFORMING LONG-TERM OPERATION AND MAINTENANCE MAY ENTER INTO AN AGREEMENT WITH ANOTHER PERSON INCLUDING A CONSERVATION DISTRICT, NONPROFIT ORGANIZATION, MUNICIPALITY, AUTHORITY, PRIVATE CORPORATION OR OTHER PERSON, TO TRANSFER THE RESPONSIBILITY FOR PCSWM BMPs OR TO PERFORM LONG-TERM OPERATION AND MAINTENANCE AND PROVIDE NOTICE THEREOF TO THE DEPARTMENT OF ENVIRONMENTAL PROTECTION.
- A PERMITTEE OR CO-PERMITTEE THAT FAILS TO TRANSFER LONG-TERM OPERATION AND MAINTENANCE OF THE PCSWM BMP OR OTHERWISE FAILS TO COMPLY WITH THIS REQUIREMENT SHALL REMAIN JOINTLY AND SEVERALLY RESPONSIBLE WITH THE LANDOWNER FOR LONG-TERM OPERATION AND MAINTENANCE OF THE PCSWM BMPs LOCATED ON THE PROPERTY.
- IN THE EVENT THAT THE BMP IS NOT FUNCTIONING PROPERLY, THE PERSON RESPONSIBLE FOR PERFORMING LONG-TERM OPERATION AND MAINTENANCE SHALL BE REQUIRED TO REPAIR OR REPLACE THE BMP TO ENSURE FUNCTION AND OPERATION.
- THE PERMITTEE SHALL BE REQUIRED TO SUBMIT A WRITTEN REPORT DOCUMENTING EACH INSPECTION AND ALL BMP REPAIR AND MAINTENANCE ACTIVITIES TO THE TOWNSHIP, CONSERVATION DISTRICT, AND THE DEPARTMENT UPON REQUEST.
BMP FAILURE NOTES (PER PROTOCOL 2 OF THE BMP MANUAL)
THE TERM "FAILURE" FOR THE PROPOSED SUBSURFACE BED SHALL BE DEFINED AS:
- THE LOSS OF FUNCTIONALITY OF THE PROPOSED OUTLET STRUCTURE OR DISCHARGE PIPE
- THE LOSS OF STRUCTURAL INTEGRITY OF THE STONE AND PIPES
- THE ACCUMULATION OF SEDIMENT, TRASH OR DEBRIS IN PERIMETER DRAINAGE STRUCTURES
- STANDING WATER IS OBSERVED IN THE BASIN AFTER 72 HOURS
THE PERMITTEE SHALL MAKE THE NECESSARY REPAIRS TO THE OUTLET STRUCTURE, DISCHARGE PIPING, STONE, AND PERFORATED PIPE AS NEEDED. IF STANDING WATER IS OBSERVED AFTER 72 HOURS, CONSULT ENGINEER FOR REMEDIATION OF THE UNDERGROUND BED.
THE TERM "FAILURE" FOR THE PROPOSED WATER QUALITY INLETS (FILTER INSERTS) SHALL BE DEFINED AS:
- DISCOVER EVIDENCE OF DAMAGED FILTER MEDIA
- DISCOVER EVIDENCE OF THE FILTER MEDIA'S INABILITY TO SUPPORT ACCUMULATED SEDIMENT OR DEBRIS.
THE PERMITTEE SHALL REPAIR BMP FAILURE BY REPLACING THE FILTER MEDIA IN ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS.
POST CONSTRUCTION STORMWATER MANAGEMENT REPORTING AND RECORD KEEPING
A WRITTEN REPORT DOCUMENTING EACH INSPECTION AND ALL BMP REPAIR AND MAINTENANCE ACTIVITIES MUST BE PROVIDED AS PART OF THE LONG-TERM OPERATION AND MAINTENANCE PROGRAM.
THE POST CONSTRUCTION STORMWATER MANAGEMENT PLAN, INSPECTION REPORTS, AND MONITORING RECORDS SHALL BE AVAILABLE FOR REVIEW AND INSPECTION BY THE DEPARTMENT OR THE CONSERVATION DISTRICT.
WATER QUALITY INLETS (FILTER INSERTS)
IT SHALL BE THE SOLE RESPONSIBILITY OF THE PROPERTY OWNER TO MAINTAIN ALL WATER QUALITY INLETS ON SITE.
INSPECTION REQUIREMENTS
- WATER QUALITY INLET INSERTS SHOULD BE INSPECTED THREE TIMES PER YEAR. DURING THE THREE ROUTINE INSPECTIONS, THE FILTER MEDIA SHALL BE CLEANED.; ONE REGULAR CHANGE AND DISPOSAL OF THE FILTER MEDIA SHALL OCCUR DURING THE CALENDAR YEAR AS WELL.
BMP FAILURE
- BMP FAILURE IS DEFINED AS DISCOVERING EVIDENCE OF TORN FILTER FABRIC OR FILTER MEDIA INABILITY TO SUPPORT ACCUMULATED SEDIMENT OR DEBRIS.
- REPAIR BMP FAILURE BY REPLACING THE FILTER MEDIA IN ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS.
GENERAL MAINTENANCE NOTES
- WATER QUALITY INLET INSERTS SHALL BE CHECKED TO ENSURE THEY ARE SECURELY FASTENED DURING EACH INSPECTION.
- RECOMMENDED MAINTENANCE IS PERFORMED INCLUDING REMOVAL AND DISPOSAL OF THE FILTER MEDIA OR EXCESS MATERIAL BY PERSONNEL.
DISPOSAL
- DISPOSAL OF REMOVED MATERIAL WILL DEPEND ON THE NATURE OF THE DRAINAGE AREA AND THE INTENT AND FUNCTION OF THE WATER QUALITY INSERT.
- MATERIAL REMOVED FROM WATER QUALITY INSERTS THAT SERVE "HOT SPOTS" SUCH AS FUELING STATIONS THAT RECEIVE A LARGE AMOUNT OF DEBRIS SHOULD BE HANDLED ACCORDING TO DEP REGULATIONS FOR THAT TYPE OF SOLID WASTE, SUCH AS A LANDFILL THAT IS APPROVED BY DEP TO ACCEPT SOLID WASTE. WATER QUALITY INSERTS THAT PRIMARILY CATCH SEDIMENT AND DETRITUS FROM AREAS SUCH AS LAWNS MAY REUSE THE WASTE ON SITE.
CONSTRUCTION SEQUENCE
- REMOVE THE GRATE OF THE INSTALLED INLET AND SET IT TO THE SIDE.
- REMOVE DEBRIS AND LITTER FROM THE INLET.
- CLEAN OFF THE GRATE BEARING LEDGE.
- LOWER THE FILTER ASSEMBLY INTO THE INLET UNTIL THE ASSEMBLY'S SUPPORT FLANGES REST ON THE GRATE BEARING LEDGE.
- INSURE THAT THE FOUR FILTER MEDIUM CARTRIDGES ARE ATTACHED TO THE D-RINGS IN THE BOTTOM CORNERS OF THE FILTER ASSEMBLY.
CRITICAL STAGE OF CONSTRUCTION: CONTACT ENGINEER TO VERIFY INSTALLATION OF WATER QUALITY INSERTS.
- REPLACE THE INLET GRATE.
SUBSURFACE INFILTRATION BEDS (SWM #100 & #200)
IT SHALL BE THE SOLE RESPONSIBILITY OF THE PROPERTY OWNER TO MAINTAIN THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM(S).
SPECIFICATIONS
- AGGREGATE: AGGREGATE FOR BEDS SHALL BE 3/8 INCH TO 3/4 INCH UNIFORMLY GRADED COARSE AGGREGATE, AASHTO NUMBER 57 PER TABLE 4, AASHTO SPECIFICATIONS, PART I, 13TH ED., 1988 (P. 47).
- NON-WOVEN GEOTEXTILE: SHALL CONSIST OF NEEDLED NON-WOVEN POLYPROPYLENE FIBERS AND MEET THE FOLLOWING PROPERTIES: a. GRAB TENSILE STRENGTH (ASTM-D4632): 120 LBS.; b. MULLEN BURST STRENGTH (ASTM-D3786): 225 PSI; c. FLOW RATE (ASTM-D4491): 95 GPM/FT²; d. UV RESISTANCE AFTER 500 HOURS (ASTM-D4355): 70%; e. HEAT-SET OR HEAT-CALENDARED FABRICS ARE NOT PERMITTED. ACCEPTABLE TYPES INCLUDE MIRAFI 140N, AMOCO 4547, AND GEOTEX 451.
- STORAGE PIPE: SHALL BE CONTINUOUSLY PERFORATED, SMOOTH INTERIOR, HIGH-DENSITY POLYETHYLENE (HDPE) PIPE SHALL MEET AASHTO M252, TYPE S OR AASHTO M294, TYPE S.
INSPECTION REQUIREMENTS
- ALL STORMWATER MANAGEMENT SYSTEMS SHALL BE INSPECTED ANNUALLY, OR AFTER EACH RAINFALL EVENT IN EXCESS OF TWO (2") INCHES (MAJOR STORM EVENT), FOR TRASH AND DEBRIS; ANY DISCOVERED TRASH OR DEBRIS SHALL BE REMOVED IMMEDIATELY.
GENERAL MAINTENANCE NOTES
- ACCESS FOR VIEWING OR VACUUMING IS PROVIDED THROUGH OBSERVATION PORTS AND STORM STRUCTURES.
- REMOVE SEDIMENT/TRASH/DEBRIS FROM PERIMETER DRAINAGE STRUCTURES AND OUTLET STRUCTURE.
- THE OVERLYING VEGETATION OF SUBSURFACE INFILTRATION FEATURES SHOULD BE MAINTAINED IN GOOD CONDITION, AND ANY BARE SPOTS REVEGETATED AS SOON AS POSSIBLE.
- VEHICULAR ACCESS ON SUBSURFACE INFILTRATION AREAS SHOULD BE PROHIBITED IN UNPAVED AREAS, AND CARE SHOULD BE TAKEN TO AVOID EXCESSIVE COMPACTION BY MOWERS. IF CONTINUAL ACCESS IS NEEDED, USE OF PERMEABLE, TURF REINFORCEMENT SHOULD BE CONSIDERED.
- CONTACT QUALIFIED ENGINEER IMMEDIATELY AFTER DISCOVERY OF SINKHOLE OCCURRENCE, SINKHOLE SHOULD BE PROMPTLY AND PROPERLY REPAIRED.
CONSTRUCTION SEQUENCE
- INSTALL AND MAINTAIN ADEQUATE EROSION AND SEDIMENT CONTROL MEASURES DURING CONSTRUCTION.
- INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF INFILTRATION AREA TO PREVENT CONSTRUCTION TRAFFIC FROM COMPACTING EXISTING SUBGRADE AREAS.
- INSTALL UPSTREAM AND DOWNSTREAM CONTROL STRUCTURES, CLEANOUTS, STORAGE PIPE, AND ALL OTHER NECESSARY STORMWATER STRUCTURES.
- CRITICAL STAGE OF CONSTRUCTION: CONTACT ENGINEER PRIOR TO PLACEMENT OF GEOTEXTILE. GEOTEXTILE, STORAGE PIPES, AND BED AGGREGATE SHOULD BE PLACED IMMEDIATELY AFTER APPROVAL OF SUB GRADE PREPARATION AND INSTALLATION OF STRUCTURES. GEOTEXTILE SHOULD BE PLACED IN ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDATIONS.
- CLEAN-WASHED, UNIFORMLY GRADED AGGREGATE SHOULD BE PLACED IN THE BED IN MAXIMUM 6-INCH LIFTS. EACH LAYER SHOULD BE LIGHTLY COMPACTED, WITH CONSTRUCTION EQUIPMENT KEPT OFF THE BED BOTTOM.
- APPROVED SOIL MEDIA OR PAVEMENT BASE COURSES SHOULD BE PLACED OVER DETENTION BED IN MAXIMUM 6-INCH LIFTS. SEED AND STABILIZE AREA IF APPLICABLE.
- DO NOT REMOVE INLET PROTECTION OR OTHER EROSION AND SEDIMENT CONTROL MEASURES UNTIL SITE IS FULLY STABILIZED.
STORM SEWER
INSPECTION REQUIREMENTS:
- ALL STORM COLLECTION STRUCTURES SHALL BE INSPECTED ANNUALLY, OR AFTER EACH RAINFALL EVENT IN EXCESS OF TWO (2") INCHES (MAJOR STORM EVENT), FOR TRASH, DEBRIS OR EVIDENCE OF PIPE LEAKAGE OR SAGGING; REMOVE TRASH OR DEBRIS IMMEDIATELY; IMMEDIATELY REPAIR OR REPLACE LEAKING/SAGGING DRAINAGE FEATURES.
GENERAL MAINTENANCE NOTES:
- ACCESS CAN BE GAINED TO EACH COLLECTION STRUCTURE THROUGH THE REMOVABLE INLET GRATE OR MANHOLE LID. STEEL OR OTHER APPROVED RUNGS HAVE BEEN INSTALLED ON THE INSIDE OF EACH STRUCTURE OVER FOUR FEET DEEP FOR ANY NECESSARY ENTRY. GRATES AND LIDS SHALL BE REPLACED SECURELY IMMEDIATELY AFTER MAINTENANCE.
- CONTACT DESIGN ENGINEER IMMEDIATELY AFTER DISCOVERY OF SINKHOLE OCCURRENCE, SINKHOLE SHOULD BE PROMPTLY AND PROPERLY REPAIRED.
- IF SEDIMENT/TRASH/DEBRIS IS FOUND IN THE CONVEYANCE SYSTEM, THE SYSTEM SHALL BE JETTED AND VACUUMED TO REMOVE ALL SEDIMENT/TRASH/DEBRIS AND DISPOSED OF APPROPRIATELY.
- REFER TO WATER QUALITY INLET MAINTENANCE GUIDELINES FOR ADDITIONAL DETAIL IN CLEANING OF THOSE STRUCTURES WITH WATER QUALITY APPARATUS INSTALLED.
CRITICAL STAGES OF CONSTRUCTION
A LICENSED ENGINEER OR HIS DESIGNEE SHALL BE PRESENT TO OBSERVE AND VERIFY INSTALLATION AND CONSTRUCTION OF THE PCSWM PLAN AT THE FOLLOWING CRITICAL STAGES:
- EXCAVATION AND FINAL GRADING OF SWM #100 & #200.
- PLACEMENT OF GEOTEXTILE FABRIC, STONE AND DISTRIBUTION PIPE INSIDE SWM #100 & #200.
- INSTALLATION OF WATER QUALITY INLET FILTERS.
- FOLLOWING CONSTRUCTION, ENGINEER TO VERIFY THAT ALL PCSM BMPS ARE INSTALLED, FUNCTIONING, AND HAVE NOT BEEN IMPACTED BY CONSTRUCTION ACTIVITIES.
WATER QUALITY INSERT DETAIL
N.T.S.
Isometric, Top View, and Section View diagrams of FLO-GARD™ CATCH BASIN FILTER INSERT, FLAT GRATED INLET (OR APPROVED EQUAL):
- Labels: INLET GRATE, CATCH BASIN, FLO-GARD™ INSERT MODEL NO. FG-F-2448D (TWO PIECES), STAINLESS STEEL SUPPORT FRAME, CORNER SUPPORT BRACKETS, NEOPRENE GASKET (TWO SIDES), DURABLE WOVEN MESH FILTER BODY, REPLACEABLE ABSORBENT-FILLED POUCHES, FILTER BODY ATTACHMENT SNAPS, HIGH FLOW BYPASS, SILT AND DEBRIS CONTAINMENT AREAS.
- NOTE: FILTER INSERTS TO BE INSTALLED INTO ALL PROPOSED INLETS.
INLET BOXES / INLET ASSEMBLIES – 1 (PENNDOT RC-46M)
Isometric and cross-section details from COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION, BUREAU OF DESIGN, INLET BOXES, INLET ASSEMBLIES - 1, RC-46M:
- CONCRETE TOP UNIT - TYPE C
- CONCRETE TOP UNIT - TYPE C ALTERNATE WITH TYPE C FRAME
- CONCRETE TOP UNIT - TYPE M
- INLET BOX WITH TYPE M FRAME
- CONCRETE TOP UNIT - TYPE S
- INLET BOX SUBBASE PREPARATION DETAIL (SEE FIELD CONSTRUCTION NOTES ON SHEET 1)
- WEEPHOLE DETAIL (SEE GENERAL NOTE 13 ON SHEET 1)
- NOTE: EITHER ALL METRIC OR ALL ENGLISH VALUES MUST BE USED ON PLANS. METRIC AND ENGLISH VALUES SHOWN MAY NOT BE MIXED.
4' TYPE C INLET TOP W/ 6" CURB REVEAL (RC-34 DESIGN)
Isometric, Plan, Section 'A-A', and Section 'B-B' diagrams:
- SPECIFICATIONS: MINIMUM CONCRETE STRENGTH 4000 PSI @ 28 DAYS (PENNDOT CLASS AA); MATERIALS AND WORKMANSHIP IN ACCORDANCE WITH THE REQUIREMENTS OF PENNDOT PUBLICATION 408 SECTION 605 & 714; STEEL REINFORCEMENT A615 GRADE 60 HORIZONTAL AND VERTICAL; WEIGHT: 1350 LBS.
- CCP Continental Concrete Products, Inc., 1 South Keim Street, Pottstown, PA 19464, Phone: (610) 327-3700, Fax: (610) 323-0478 | DATE: 2/08/16 | DWG: 34CTOP6R
STORM MANHOLE DETAIL
N.T.S.
Diagram of Precast Manhole, Detail A, Table A (Base Slab Dimensions), and Table B (Top/Bottom Steel Requirements):
- Labels: 27" MIN. TO 30 1/2" MAX I.D., ADJUST TO FINAL GRADE WITH PRECAST GRADE RINGS OR BRICK AND CEMENT MORTAR, TYPICAL CONICAL TOP SECTION, TYPICAL RISER SECTION, SEE DETAIL A, PRECAST OR CAST-IN-PLACE BASE SECTION, 8" MINIMUM, 6" MINIMUM, TOP STEEL SEE TABLE B, BOTTOM STEEL SEE TABLE B, PRECAST MANHOLE.
- NOTE: ALL MANHOLES IN NON-PAVED AREAS TO UTILIZE BOLTED COVER.
TITLE BLOCK
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
CVE Chester Valley Engineers, Inc., PROJECT NO. 22024 | SCALE: AS NOTED | DATE: 4/29/2024 | DRAWN BY: RRD | CHECKED BY: JRM | SHEET 15 OF 17
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
Post-Construction Stormwater Management Details
Preliminary Land Development Plan, One CTDI Place, East Goshen Township, Chester County, Pennsylvania. Project No. 22024. Scale as noted. Sheet 16 of 17.
HDPE riser installation notes (Lane Enterprises, Inc.)
Elevation view of a riser with lid and frame, concrete collar, riser sleeve and HDPE riser. Notes are too small to transcribe reliably.
ACO Drain KlassikDrain KS200 stainless steel edge rail channel system
ACO specification information sheet, April 2018. Note: Utilize KlassikDrain KS200 as manufactured by ACO Drain (or approved equal) for all trench drains.
Typical cleanout detail
Cleanout in grass areas and cleanout in paved areas; cleanout detail.
Manhole steps
Plan view, side view and typical step configurations. Table B of precast manhole reinforcement requirements.
Stormwater structure details
- SW#102 plan view detail; Section B-B; Section C-C
- SW#202 plan view detail; Section E-E; Section F-F
- SWM #100 infiltration bed (plan view); SWM #100 (BMP ID:1) Section A-A
- SWM #200 infiltration bed (plan view); SWM #200 (BMP ID:2) Section D-D
VEHICLE TRACKING PLAN
Site plan drawing showing vehicle tracking swept-path analysis for a fire truck entering and circulating through the proposed drive loop at One CTDI Place along Enterprise Drive (Scale: 1" = 30').
VEHICLE TRACKING EXHIBIT #2 (FIRE TRUCK)
SCALE: 1" = 30'
Plan Labels: ENTERPRISE DRIVE, N/L COMMUNICATIONS TEST DESIGN, INC., D.B. 8323 PG. 1058, UPI #53-4-174, BITUMINOUS PAVING, PARKING, FOUNTAIN, PROPOSED BUILDING ADDITION (FFE: 407.33), ADDITION ABOVE, CANOPY ADDITION BUILDING, ADA SIGNS.
Profile diagram of Goshen Fire Truck showing dimensions: 44.124 overall length, 7.916 front overhang, 20.583 wheelbase, 4.583 tandem axle spacing, 22.874.
| Parameter | Value |
|---|---|
| Overall Length | 44.124ft |
| Overall Width | 9.670ft |
| Overall Body Height | 11.000ft |
| Min Body Ground Clearance | 1.627ft |
| Track Width | 9.670ft |
| Lock-to-lock time | 6.00s |
| Max Wheel Angle | 40.00° |
LOCATION MAP & LEGEND
LOCATION MAP (SCALE 1"=2000') showing SITE in EAST GOSHEN.
LEGEND:
EXISTING FEATURES
- EXISTING PROPERTY BOUNDARY
- EXISTING ADJOINING PROP. LINE
- EXISTING RIGHT-OF-WAY LINE
- EXISTING EASEMENT
- EXISTING SETBACK BOUNDARY
- EXISTING BUILDING
- EXISTING CURB
- EXISTING EDGE OF PAVEMENT
- EXISTING FENCE
- EXISTING LIGHT POLE
- EXISTING SIGN
- EXISTING UTILITY POLE
- EXISTING CONIFEROUS TREE
- EXISTING DECIDUOUS TREE
- EXISTING TREE & SHRUB LINE
PROPOSED FEATURES
- PROPOSED BUILDING
- PROPOSED HEAVY DUTY PAVEMENT
- PROPOSED STANDARD PAVEMENT
- PROPOSED CONCRETE PAD/SIDEWALK
- PROPOSED PAVERS
- PROPOSED RETAINING WALL
- PROPOSED CONCRETE CURB
- NUMBER OF PROPOSED PARKING SPACES (9)
- PROPOSED SIGN
- PROPOSED STORMWATER MANAGEMENT FACILITY
PENNSYLVANIA ACT 187 & PLAN NOTES
COPYRIGHT & NOTE TO USER OF THESE PLANS: Standard engineering copyright and field verification notes by Chester Valley Engineers, Inc. [illegible]
PENNSYLVANIA ACT 187 REQUIREMENTS: UNDERGROUND UTILITIES SERIAL NO. 20232130344. SEE SHEET 1 FOR FACILITY OWNER'S DESIGNATED OFFICE ADDRESS AND TELEPHONE NUMBER. PENNSYLVANIA ONE CALL SYSTEM, INC., CALL 3 WORKING DAYS BEFORE YOU DIG, 1-800-242-1776, POCS SERIAL NUMBER: 20232130344.
UNIFORM PARCEL IDENTIFIERS: #53-4-161, #53-4-162, #53-4-163, #53-4-164
TITLE BLOCK
PRELIMINARY LAND DEVELOPMENT PLAN FOR ONE CTDI PLACE, EAST GOSHEN TOWNSHIP - CHESTER COUNTY - PENNSYLVANIA
CVE Chester Valley Engineers, Inc., PROJECT NO. 22024 | SCALE: 1"=30' | DATE: 4/29/2024 | DRAWN BY: RRD | CHECKED BY: JRM | SHEET 17 OF 17