Planning Commission
The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors. The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.
- Composed of seven East Goshen Township residents each serving a four-year term.
- Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
- Workshop Meeting are held on an as needed basis
- All township meetings are held at the Township Building and are open to the public
| Planning Commission Members | Term Expiration Date |
| John Stipe, Chair | 2026 |
| Dan Truitt, Vice Chair | 2027 |
| Daniel H. Daley | 2027 |
| Michael Koza | 2026 |
| Ernest Harkness | 2026 |
| Karen Martynick | 2029 |
| William Kaufman | 2029 |
| Larry Massaro, BOS Liaison | |
| Kelly Krause, Staff Liaison |
Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26
Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.
Related News
PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY
Wednesday, November 18, 2026
At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]
View ArticleFrom the Planning Commission: Addressing Potential Data Center Development in East Goshen Township
Wednesday, September 30, 2026
As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
EAST GOSHEN TOWNSHIP
PLANNING COMMISSION Meeting Agenda Tuesday, November 26, 2024
7:00 PM
A. Call to Order / Pledge of Allegiance and Moment of Silence B. Chairman will ask if anyone is going to record the meeting. C. Review of Tracking Log / Determine need for Workshop Meeting D. Public Comment on Non-Agenda Items E. Approval of Minutes
1. October 22, 2024 F. Acknowledge Receipt of New Applications (Initial Submission) G. Subdivision and Land Development Applications
1. 1344 Morstein Road- K.A. Thomas- Preliminary/Final Subdivision Plan H. Conditional Uses Applications- I. Zoning Hearing Board Variances J. Ordinance Amendments K. Old Business L. New Business M. Liaison Reports N. Correspondence O. Announcements P. Next Meeting – Tuesday, January 21, 2025 at 7:00 PM
Bold Items indicate new information to review or discuss.
Application Name
Application (CU,LD,ZO, SD, SE, CA)
Type (Sk, P, F)
Date Filed
Start Date
Date to Township Engineer
Date to CCPC
Date to Abutting Prop. / ABC's
Extension
PC MUST Act Date (70-Days)
BOS Must Act Date (90-Days)
Hearing Date
Drop Dead date
Comments
1344 Morstein Road- K.A. Thomas SD P/F 9/19/2024 9/24/2024 9/19/2024 NA 11/26/2024 12/17/2024 NA 12/23/2024 Preliminary plan for review 11/26/2024
Enterprise Drive- CTDI LD F pending Preliminary approved granted- Final plan to follow
Malvern Institute LD P 6/28/2021 7/1/2021 6/30/2021 6/29/2021 8/13/2021 2/2/2022 2/15/2022 NA 2/28/2022 ZHB condition of approval for barn renovations expired 11/2024
1338 Morstein Road- WCU Foundation SD P/F 2/5/2024 2/27/2024 9/13/2024 11/3/2024 5/3/2024 8/3/2024 11/3/2024
5/3/2024 11/3/2024 NA 5/3/2024 8/3/2024 11/3/2024 PC recommeded approval on 10/22/2024
1302 Goshen Pkwy - ZEKS CU n/a 10/3/2024 10/3/2024 10/3/2024 NA 11/17/2024 12/2/2024 12/17/2022 1/3/2025 PC recommeded approval on 10/22/2024
1306 West Chester Pike CU NA 3/15/2024 3/15/2024 NA NA NA NA 4/30/2024 5/15/2024 4/16/2024 5/15/2024 Approved at BoS meeting:4/16/2024
1344 Morstein Road Sketch Plan SD SK 2/16/2024 2/27/2024 NA NA NA NA NA NA NA NA PC Meeting: 2/27/24 (initial submission), 3/26/2024 (discussion)
Timbermill- 301 Reservoir Road SD P 1/29/2024 2/27/2024 4/11/2024 7/3/2024 7/3/2024 7/3/2024 Approved at BoS meeting: 6/18/2024
Millstone Meadows- 1010 Hershey Mill Rd SD P 5/16/2023 5/16/2023 5/5/2023 6/28/2024 9/25/2024 9/25/2024 9/25/2024 Approved at BoS meeting: 9/3/2024
Timbermill SD- 301 Reservoir Road SD F Approved at BoS meeting: 9/3/2024
14 Reservoir Road SD F 9/28/2022 9/28/2022 10/12/2022 10/19/2022 5/13/2024 8/28/2024 8/28/2024 8/28/2024 Approved at BoS meeting: 9/17/2024
Enterprise Drive- CTDI LD P 5/7/2024 5/7/2024 7/9/2024 10/31/2024 9/24/2024 10/31/2024 10/31/2024 Approved at BoS meeting: 10/15/24
1671 & 1681 E. Strasburg Road- Connors CU n/a 9/27/2024 9/27/2024 9/27/2024 NA 11/11/2024 11/26/2024 11/19/2024 1/3/2025 Conditional Use approved by BoS on 11/19/2024
PROJECTS COMPLETED IN 2024
Bold = New Application or PC action required
East Goshen Township Planning Commission
Application Tracking Log
NOVEMBER 26, 2024
PENDING PROJECTS
PC 10-22-24 draft 1
DRAFT 1 EAST GOSHEN TOWNSHIP 2 PLANNING COMMISSION MEETING 3 October 22, 2024 4 5 The East Goshen Township Planning Commission held their regular monthly meeting on Tuesday, 6 October 22, 2024 at 7:00 pm in the Township Building. 7 Members present are highlighted: 8 Chair – Ernest Harkness 9 Vice Chair – John Stipe 10 Dan Daley 11 Michael Koza 12 Michael Pagnanelli 13 Fred Pioggia 14 Dan Truitt 15 16 Also present was: 17 Duane Brady, Fire Marshall 18 Kelly A. Krause, Zoning Officer 19 John Hertzog , BOS Liaison 20 Nathan Cline, Township Engineer 21 Mark Thompson, Township Solicitor 22 23 COMMON ACRONYMS: 24 BOS – Board of Supervisors CPTF – Comprehensive Plan Task Force 25 BC – Brandywine Conservancy CVS – Community Visioning Session 26 CB – Conservancy Board SWM – Storm Water Management 27 CCPC – Chester Co Planning Commission ZHB – Zoning Hearing Board 28 29 FORMAL MEETING – 7 p.m. 30 1. Ernest called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and asked for a 31 moment of silence to remember our first responders, police, military, and all who protect us. 32 2. Ernest asked if anyone would be recording the meeting and if there were any public 33 comments about non-agenda items. There was no response. 34 3. The tracking log was checked and no need for a workshop meeting. 35 4. The minutes of the September 24, 2024 meeting were approved. 36 37 CHAIRMAN’S REPORT – None 38 39 40 Acknowledge Receipt of New Applications (initial Submission) 41 1. 1302 Goshen Parkway – ZEKS – Amendment to Conditional Use (Outdoor storage) – Steve Savselen 42 and Henry Mark were present. Steve explained the property and its use – refrigerants. They want to add 43 3 new external areas to the building, one with a lean to roof and 2 smaller areas. He described the uses. 44 Henry explained the necessity of this request. Refrigerants are changing. Global warming is a cause. 45 Additional systems have to be added to handle these refrigerants. There are leak detection systems to 46 prevent buildup in the building. Only a certain amount is allowed to be stored in the building. The 47 additional tanks are stored on pads outside. Henry has all the information needed to respond to the Fire 48 Marshall’s letter. Duane mentioned that he did a walk through the building with them. The response 49 letter must be received before they go to the BOS. 50 Dan Truitt made a motion that the Planning Commission recommend that the Board of Supervisors 51 approve an amendment to the Conditional Use approval for the property located at 1302 Goshen Parkway 52 contingent upon the applicant resolving all items identified within the review letter dated October 16, 53
PC 10-22-24 draft 2
2024 to the satisfaction of the Township Fire Marshal. John seconded the motion. The motion passed 1 unanimously. 2 3 2. 1671 & 1681 E. Strasburg Road – Connors – Conditional Use (R-2 animal husbandry) - Gina Gerber, 4 Esq. and Andrea Connors (property owner) were present. Gina gave an overview of the application. 5 They are building a home and a horse barn. The intent is to raise and train horses there. There will be a 6 1,200 sf apartment on the second floor of the barn. Andrea explained the set-up of the barn. Willistown 7 Conservation Trust has been reviewing the plans from the start. It is a training facility. Her daughter has 8 competed in tournaments. They are requesting conditional use for animal husbandry. They have a water 9 management system. 10 John made a motion that the Planning Commission recommend that the Board of Supervisors approve the 11 Condition Use application to allow animal husbandry at the property located at 1671 & 1681 E. Strasburg 12 Road. Dan Truitt seconded the motion. The motion passed unanimously. 13 14 Subdivision and Land Development Applications 15 1. 1338 Morstein Road – Preliminary/Final Plan Review – Dave Gibbons, Howell Engineering, 16 mentioned that this plan is for 16 lots, 3 of which are in East Goshen. Since they were here in the spring, 17 they met with West Whiteland. One issue is access through Phoenixville Pike which is very narrow. 18 Current residents are concerned about traffic and water runoff. They agreed to make the width of the road 19 20 feet. Also, they are going to collect current ponding water and send it to the SWM system they will be 20 installing. East Goshen requires a green center in the cul-de-sac. They want a waiver to exclude the 21 green center. Gas Pipelines – he is going out with them to determine the depth of the gas pipelines. They 22 need approval from the pipeline company to allow the houses near the pipeline. Trash services, etc. will 23 be worked out by an intermunicipal agreement. 24 Ernest made a motion to recommend that the Board of Supervisors approve the Preliminary/Final Plan for 25 1338 Morestein Road provided that the Board of Supervisors approves the following two waiver requests 26 and the Fire Marshall and Township Engineer approve the response to questions identified in their 27 review: 28 1. Remove the green center island 29 2. Joint Submission of Preliminary and Final subdivision and land development 30 The Board of Supervisors will have to discuss an intermunicipal agreement with West Whiteland 31 Township. Mike K seconded the motion. The motion passed unanimously. 32 33 34 CONDITIONAL USES AND VARIANCES - None 35 36 37 ZONING HEARING BOARD VARIANCES - None 38 39 40 ORDINANCE AMENDMENTS - None 41 42 43 OLD BUSINESS 44 1. New Member Package - Ernest mentioned that the Commission needs to review the new member 45 package at the next meeting. 46 2. By Laws – Ernest has to sign the Bylaws. 47 48 49 NEW BUSINESS – None 50 . 51 52 LIAISON REPORTS 53
PC 10-22-24 draft 3
1. Board of Supervisors – John mentioned that they are keeping Pennoni as the township engineer. The 1 Police Commission is considering cutting down the number of cars to save money. The Municipal 2 Authority has two new members. 3 4 5 ANY OTHER MATTER – None 6 7 8 CORRESPONDENCE - None 9 10 11 ADJOURNMENT 12 There being no further business, Dan T. made a motion to adjourn the meeting. John seconded the 13 motion. The meeting was adjourned at 8:35 pm. 14 The next meeting will be held on Tuesday November 26, 2024 at 7 p.m. 15 16 Respectfully submitted, 17 18 19 20 21 Ruth Kiefer, Recording Secretary 22
Memorandum
[Drawing: East Goshen Township seal depicting a historic stone building, inscribed "TOWNSHIP OF EAST GOSHEN CHESTER COUNTY, PENNSYLVANIA INCORPORATED 1817"]
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
610-692-7171 ext. 3103
kkrause@eastgoshen.org
| Date: | October 17, 2024 |
|---|---|
| To: | East Goshen Township Planning Commission |
| From: | Kelly A. Krause, Zoning Officer |
| Re: | 1344 Morstein Road- 2 Lot Preliminary/Final Subdivision Plan |
The Township Staff has received a Preliminary/Final Subdivision Plan application for 1344 Morstein Road. The proposal is to develop the property into two (2) single family residential lots, accessed by private road.
Background information:
- Existing single-family residential lot on 5.5 acres with multiple structures.
- The property was subdivided in 1998 from one (1) lot into two (2) lots as they exist today.
- A sketch plan was previously presented to the Planning Commission as a three (3) lot subdivision. The plan has been revised to create (1) one new lot, with the existing house to remain, shown on the plan as Lot 2.
- The revised plan proposes an easement on Lot 2 (existing house) for the construction and maintenance of the required stormwater facilities for the new house proposed on Lot 1.
Zoning Information:
- The property is in the R-2 Low Density Residential District (240-9).
- Single family detached dwellings are a use permitted by right.
- The minimum lot area is 1 acre.
- The front yard is 45 feet, the side yard is 20 feet, and the rear yard is 50 feet.
- The minimum building height is 30 feet (3 stories).
- Total impervious cover is 35%.
- Total building cover is 25%.
- The zoning also notes that design and landscape controls in 240-27D shall apply to residential development in this district.
- The property is outside the flood area.
- The property may be located within the 660 feet requirement for a pipeline awareness study for 2 separate pipelines.
Comments:
- 1344 & 1344 A Morstien Road are currently accessed by a private “driveway”, as defined in §205-7 of the Subdivision and Land Development Ordinance, which is a permitted access for a maximum of two residential parcels. The existing driveway is proposed to become a private street, with a cartway width of 20 feet where 22 feet is the minimum
Memorandum
required. §205-44E(2) allows the Board of Supervisors to reduce the minimum width to 20 feet if a cul-de-sac street is proposed and meets the following standards:
A cul-de-sac street is a minor street. Turnaround shall have a right-of-way diameter of 120 feet. Turnaround cartway paving width shall be 40 feet with a ten-foot radius center island. See Appendix and Subsection E(1) and (2).
In lieu of a cul-de-sac, a 30’x 39.73’ rectangular turnaround is proposed to be located on Lot 1.
- The plan proposes an easement to be located on Lot 2 (existing house) for the purpose of providing the required stormwater management facilities for the new house on Lot 1. Consideration should be given to adjust the proposed lot lines to incorporate the stormwater facilities onto Lot 1.
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: dbrady@eastgoshen.org
| Date: | October 17, 2024 |
|---|---|
| To: | Zoning Officer |
| From: | Duane J. Brady Sr., East Goshen Township Fire Marshal |
| Re: | 1344 Morstein Road Subdivision Plan Application |
Dear Zoning Officer,
The Township Fire Marshal has reviewed the Subdivision Plan dated April 11, 2024, for the creation of a new two lot Subdivision. The plan shows that the road will be a private road with one new lot and one existing lot. I provide following comments:
All code information is from the International Fire Code 2018 Edition (IFC) and East Goshen Township Code Chapter 205 Subdivision and Land Development section 205-30 Preliminary plan requirements, Part C.3.D.
- Private road (fire access road) shall be installed to carry a minimum of 75,000 pounds as required for a fire access road. IFC 2018 section 503.2.3 Surface.
- Private road (fire access road) shall be installed with a grade that does not exceed 10 percent in grade. 2018 section 503.2.7 Grade.
- Private road (fire access road) shall meet the required apparatus turning requirements. As required in the IFC 2018 section 503.2 Specifications.
- Private road (fire access road) the private road is required to have Fire Lane No Parking signs if the minimum of 20 feet width is installed. 2018 section 503.3 Marking.
- Private road (fire access road) shall meet the required apparatus turning requirements. As required in the IFC 2018 section 503.2 Specifications.
- Driveway (fire access road) a driveway is considered a fire access road and shall be a minimum of twenty feet as required pre the IFC 2018 section 503.2. specifications.
- The driveway (fire access road) shall be installed to carry a minimum of 75,000 pounds as required for a fire access road. IFC 2018 section 503.2.3 Surface.
- The driveway (fire access road) shall be installed with a grade that does not exceed 10 percent in grade. 2018 section 503.2.7 Grade.
- The driveway (fire access road) shall meet the required apparatus dead ends requirements. 2018 section 503.2.5 Dead ends. Please provide a Fire Turck Pathway Plan showing the requirements will meet code.
- Fire hydrant, locations are not marked or located on the plans.
- Fire hydrants show existing locations of hydrants in the area and distance to new development.
- Fire hydrant will the new fire hydrant/s installed system be private or public.
- Fire hydrants and fire flow rate must meet the IFC 2018 code requirements.
- Provide the size of the largest dwelling unit to calculate the required fire flow rate for the development.
- Provide the existing available fire flow rate to the development.
- East Goshen Township Code Chapter 205 Subdivision and Land Development section 205-30 Preliminary plan requirements, Part C.3.D. requires size and location of fire hydrants be shown on plans. Fire hydrants were not marked on plans.
- The existing driveway is a shared driveway with 1344 A Morstein Road. If an easement exists for the driveway, please provide a copy as this may affect this project.
Sincerely,
Duane J. Brady Sr.
Duane J. Brady Sr.
East Goshen Township
Fire Marshal
[Drawing: East Goshen Township seal depicting a historic stone building, inscribed "East Goshen Township Incorporated 1817 Chester County, Pennsylvania"]
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: dbrady@eastgoshen.org
| Date: | 2-17-2024 |
|---|---|
| To: | Planning Commission |
| From: | Duane J. Brady Sr., East Goshen Township Zoning Officer |
| Re: | 1344 Morstein Road Subdivision/Sketch Plan Application |
Dear Commissioners,
The Township Staff has received a Sketch Plan application for 1344 Morstein Road. The proposal is to develop the property into three (3) single family residential lots. The application has been reviewed for completeness and was accepted by Township Staff on 2-16-2024.
Background information:
- Existing single-family residential lot on 5.5 acres with multiple structures.
- The property was subdivided in 1998 from 1 lot into 2 lots as they exist today.
- The proposed plan is to create 3 building lots with 1 lot being used for the existing house and accessory structures.
- The proposal is to do a straightforward zoning by-right planning process.
Zoning Information:
- The property is in the R-2 Low Density Residential District (240-9).
- Single family detached dwellings are a use permitted by right.
- The minimum lot area is 1 acre.
- The front yard is 45 feet, the side yard is 20 feet, and the rear yard is 50 feet.
- The minimum building height is 30 feet (3 stories).
- Total impervious cover is 35%.
- Total building cover is 25%.
- The zoning also notes that design and landscape controls in 240-27D shall apply to residential development in this district.
- The property is outside the flood area.
- The property may be located within the 660 feet requirement for a pipeline awareness study for 2 separate pipelines.
This is the initial sketch plan submission with background and zoning information. The plan will also be reviewed for comments by the Township Engineer, Township Zoning Officer, Township Fire Marshal, and will be offered for review by the Township Sewer Authority, Township Parks & Recreation Board, and Township Conservancy Board or review and comments.
Page 1 | 2
The applicant will be at the March 26, 2024, Planning Commission Meeting to review comments and ask questions of the Planning Commission.
Respectfully,
Duane J. Brady Sr.
East Goshen Township
Zoning Officer (PA-CZO)
[Seal: East Goshen Township, Incorporated 1817, Chester County, Pennsylvania]
Page 2 | 2
PRELIMINARY/FINAL TITLE PLAN - SUBDIVISION PLAN FOR 1344 MORSTEIN ROAD
[Engineering subdivision title plan for 1344 Morstein Road (UPI No. 53-1-11.1) showing Lot 1 (1.251 AC.) and Lot 2 (3.608 AC. gross / 3.401 AC. net) along Morstein Road opposite Amstel Way, a 50 ft wide right of way with a 20 ft wide private road, location map, legend, zoning data, impervious cover breakdown, general notes, and certifications.]
LEGEND
- EXISTING FENCE
- EXISTING SIGN
- EXISTING CURB
- EXISTING EDGE OF PAVING/DRIVEWAY
- PROPOSED EDGE OF PAVING/DRIVEWAY
- WIDENING OF EXISTING DRIVE
- EXISTING BUILDING
- PROPOSED BUILDING
ZONING DATA (R-2 ZONING DISTRICT)
| Requirement | REQUIRED | LOT 1 | LOT 2 |
|---|---|---|---|
| MINIMUM LOT AREA | 1 ACRE | 1.251 AC | 3.401 AC |
| MINIMUM LOT WIDTH | 150 FEET AT BUILDING LINE / 60 FEET AT STREET LINE | 290 FT / 60 FT | 274 FT / 50 FT (FLAG LOT) |
| MINIMUM FRONT YARD | 60 FEET / 60 FEET AVERAGE | 60 FT | 60 FT |
| MINIMUM SIDE YARD | 20 FEET | 20 FT | 20 FT |
| MINIMUM REAR YARD | 50 FEET | 50 FT | 50 FT |
| MAXIMUM COVERAGE | 25% BUILDINGS / 35% TOTAL | 2,446 SF, 4.49% / 5,417 SF, 9.95% | 2,800 SF, 1.89% / 11,432 SF, 7.72% |
IMPERVIOUS COVER BREAKDOWN
| Category | LOT 1 | LOT 2 |
|---|---|---|
| HOUSE | 2,446 SF | 2,800 SF |
| DRIVEWAY | 2,719 SF | 6,687 SF |
| ACCESSORY BUILDINGS | 504 SF | |
| SIDEWALK/PATIO | 252 SF | 1,441 SF |
| TOTAL | 5,417 SF | 11,432 SF |
LOCATION MAP
SCALE: 1"=800'. Labels: WEST WHITELAND TOWNSHIP, EAST GOSHEN TOWNSHIP, WEST GOSHEN TOWNSHIP, ROUTE 202, BOOT RD., MORSTEIN RD., KING RD., BARKWAY LN., GREAT OAK CIR., WHITEULLEN LN., LIMERICK LN., HIGHGATE RD., JOSHUA DR., SITE.
Plan Drawing Labels
- MORSTEIN RD. POSTED SPEED LIMIT = 35 MPH (50 FT R/W)
- AMSTEL WAY
- Northbound Sight Distance: REQUIRED SIGHT DISTANCE = 350', SIGHT DISTANCE PROVIDED = 923'
- Southbound Sight Distance: REQUIRED SIGHT DISTANCE = 440', SIGHT DISTANCE PROVIDED = 834'
- R1-1 STOP SIGN, 24" SOLID WHITE LINE
- 50 FT WIDE RIGHT OF WAY, PRIVATE ROAD - 20 FT WIDE, END PRIVATE ROAD RIGHT OF WAY
- TURN-AROUND ACCESS EASEMENT AREA=0.027 AC
- LOT 1: AREA: 1.251 AC., BUILDING SETBACK (50', 20', 20', 60')
- LOT 2: AREA: 3.608 AC. (GROSS), 3.401 AC. (NET), 2 STORY SINGLE FAMILY DWELLING, LOT #1 STORM WATER SYSTEM EASEMENT AREA=0.104 AC, 20 FT WIDE SANITARY SEWER EASEMENT FOR LOT 1, GREENHOUSE, CHICKEN COOP, SHED
- N/L AMY D. KOVACH, D.B. 8968, PG. 2002, UPI 53-1-11.2
- N/L IAN REGINO, D.B. 9325, PG. 403, UPI 53-10-138
- N/L JOANN & GARY PETERS, D.B. 6255, PG. 2189, UPI 53-1-11.4
- N/L CHRISTOPHER CAMPIONE & DEBORAH ANN CAMPIONE, D.B. 7927, PG. 362, UPI 53-1-10.1
- N/L MARYELLEN & ROBERT YOEGEL, D.B. 4851, PG. 114, UPI 53-1-45
- N/L CAROLINE BARBARA TOMLINSON & ALBERT BRYAN TOMLINSON, D.B. 10760, PG. 360, UPI 53-1-44
- N/L JESSICA E. STRAGHAN, D.B. 8308, PG. 526, UPI 53-1-43
- N/L GINA J. DADDAZIO & STEVEN P. DADDAZIO, D.B. 9207, PG. 169, UPI 53-1-42
- N/L MAJA N. PATTON, D.B. 10579, PG. 2184, UPI 53-1-41
- N/L PATRICIA A. PICKARD & ROBERT J. PICKARD SR., D.B. 4895, PG. 279, UPI 53-1-40
- N/L LENA D. & GILFORD J. ROY, D.B. 10034, PG. 0371, UPI 53-1-12.1
GENERAL NOTES:
- 1. BOUNDARY, EXISTING FEATURES AND TOPOGRAPHIC INFORMATION IS FROM A FIELD SURVEY PERFORMED BY EDWARD B. WALSH & ASSOCIATES, INC. ON APRIL 11, 2024.
- 2. BOUNDARY SURVEY WAS BASED UPON DEEDS OF RECORD. A TITLE REPORT WAS NOT PROVIDED, THEREFORE, THE SURVEY MAY NOT DEPICT ALL RIGHTS, EASEMENTS, ETC. ATTACHED TO THE PROPERTY THAT A CURRENT AND COMPLETE TITLE REPORT MAY DISCLOSE.
- 3. OWNER OF RECORD: KYONG-AIE THOMAS
- 4. SITE ADDRESS: 1344 MORSTEIN RD., WEST CHESTER, PA 19380
- 5. RECORDING INFORMATION: DEED BOOK 10543, PAGE 119 RECORDED AT THE CHESTER COUNTY RECORDER OF DEEDS. BEING UPI 53-1-11.1 AT THE CHESTER COUNTY TAX BUREAU.
- 6. BEARING BASIS FOR THE SURVEY AS SHOWN ARE REFERENCED TO NAD 83, PA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE AS DERIVED FROM GPS OBSERVATIONS.
- 7. VERTICAL DATUM - NAVD 88
- 8. LOT AREA = 240,226.21 SQ. FT. (5.515 ACRES)
- 9. UTILITY LOCATIONS SHOWN HEREON ARE BASE UPON VISIBLE EVIDENCE, SUPPLEMENTED WITH INFORMATION SHOWN ON UTILITY COMPANY PLANS. EDWARD B. WALSH & ASSOCIATES, INC. (EBWA) DOES NOT GUARANTEE THE ACCURACY OF THE LOCATIONS OF EXISTING SUBSURFACE UTILITY LINES, STRUCTURES, ETC. SHOWN ON THESE PLANS, NOR DOES EBWA GUARANTEE THAT ALL SUBSURFACE UTILITY LINES, STRUCTURES, ETC. ARE SHOWN.
- 10. THE PROPOSED LOT WILL CONNECT TO PUBLIC SANITARY SEWER AND WATER SUPPLY.
- 11. A HOMEOWNERS ASSOCIATION WILL BE CREATED AND WILL BE RESPONSIBLE FOR THE MAINTENANCE OF THE PRIVATE ROAD LOCATED IN THE 50 FT WIDE RIGHT OF WAY AREA.
- 12. THE HOMEOWNER OF LOT 1 WILL BE RESPONSIBLE FOR THE MAINTENANCE OF THE STORMWATER MANAGEMENT SYSTEM LOCATED ON LOTS 1 AND 2.
SHEET INDEX
| Sheet Title | Sheet Number |
|---|---|
| TITLE PLAN | 1 OF 9 |
| EXISTING FEATURES PLAN | 2 OF 9 |
| CONSTRUCTION IMPROVEMENT PLAN | 3 OF 9 |
| EROSION & SEDIMENTATION CONTROL PLAN | 4 OF 9 |
| POST CONSTRUCTION STORMWATER MANAGEMENT PLAN | 5 OF 9 |
| LANDSCAPE PLAN | 6 OF 9 |
| PROFILE SHEET | 7 OF 9 |
| DETAIL SHEET | 8-9 OF 9 |
Property Owners Certification:
The landowner acknowledges that, per the provisions of the East Goshen Township Stormwater Management Ordinance, it is unlawful to modify, remove, fill, landscape, alter or impair the effectiveness of, or place any structure, other vegetation, yard waste, brush cuttings, or other waste or debris into any permanent stormwater management BMP or conveyance described in this O&M plan or to allow the BMP conveyance to exist in a condition which does not conform to this O&M plan, without written approval from the Township. The individual lot owner, his/her heirs, assigns or successors, shall be responsible for the perpetual maintenance of the said facilities. A blanket stormwater management easement is provided over the entire development in favor of East Goshen Township to allow the Township and its agent and designees access to the various stormwater facilities. The Township is granted the right, but not the duty, to access and conduct periodic inspections and to undertake other actions that may be necessary to enforce the requirements of the Township's Stormwater Management Ordinance or of any applicable O&M plan or O&M agreement." If the property owner, his/her heirs, assigns or successors fails in any way to maintain the said facilities or causes these facilities to be altered or removed, upon written notification by the Township, the defects shall promptly be corrected by property owner. Upon the owner's failure to correct the defects within time specified by the Township, the owner, his/her heirs, assigns or successors do hereby authorize the Township and/or their contractor to enter upon the said property and cause the repair, maintenance, and/or correction to be made, a lien may be filed against the property for the cost of all corrections including applicable engineering and/or attorney's fees. The Township is under no obligation to take any action. All subsequent real estate transactions, the existence of these stormwater facilities and their maintenance responsibilities shall be disclosed to the new owners. Any revision to the approved SWM site plan shall be submitted to the Township along with an Erosion & Sedimentation Control Plan for review and approval.
SIGNATURE / DATE / NAME
ENGINEER CERTIFICATION:
I, ________________, ON THIS DATE ________________, HEREBY CERTIFY THAT TO THE BEST OF KNOWLEDGE THAT THE SWM SITE PLAN MEETS ALL DESIGN STANDARDS AND CRITERIA OF THE EAST GOSHEN TOWNSHIP ORDINANCE NO. 129-F "EAST GOSHEN TOWNSHIP STORMWATER MANAGEMENT ORDINANCE."
SIGNATURE / NAME
OWNER OF RECORD
KYONG-AIE THOMAS
1344 MORSTEIN RD.
WEST CHESTER, PA 19380
D.B. 10543 PG. 119
Certifications and Approvals
COMMONWEALTH OF PENNSYLVANIA COUNTY OF CHESTER: On the ___ day of ___, A.D. 20___, before me, the subscriber, a Notary Public in said Commonwealth of Pennsylvania, residing in ___ personally appeared ___ who acknowledged herself to be the owner of/or on said property as depicted hereon, and that as such she executed the foregoing plan by signing her name ___; that she is the owner of the designated land, that all necessary approval of the plan has been obtained and is endorsed hereon, and that the said he desires that the foregoing plan may be duly recorded. Notary Public / My Commission Expires: ___
REVIEWED by the Planning Commission of East Goshen Township, Chester County, Pa., this ___ day of ___, 20___. Chairman / Vice-Chairman / Member
APPROVED by the Board of Supervisors of East Goshen Township, Chester County, Pa., this ___ day of ___, 20___. Chairman / Vice-Chairman / Supervisor
REVIEWED by the Chester County Planning Commission this ___ day of ___, 20___. Secretary
APPROVED by the East Goshen Township Engineer: Date
Recorded in the Office of the Recorder of Deeds of Chester County at West Chester, Pennsylvania in Plan Book ___, Page ___ on the ___ day of ___, 20___. (Deputy) Recorder of Deeds
SURVEYOR'S CERTIFICATION: I, ___ hereby certify that the boundary shown hereon was calculated by me and that the plan and survey accuracy is in conformance with all East Goshen Township Ordinances. Signature / Date
ACT 287 PENNSYLVANIA ONE CALL NOTIFICATION
Preliminary Serial No. 20241000545 / Final Serial No.
UNDERGROUND UTILITY LINE PROTECTION LAW (ACT 287, AS AMENDED): E. B. Walsh & Associates, Inc. (EBWA) does not guarantee the accuracy of the locations for existing subsurface utility lines, structures, etc. shown on the plans, nor does EBWA guarantee that all subsurface utility lines, structures, etc. are shown. Contractor shall verify the location and elevations of all subsurface utility lines, structures, etc. before the start of work, by calling the Pennsylvania One Call System at 1-800-242-1776. If construction does not occur within 90-days of the above final one-call notification, the project owner is required to make notification to Pa One Call not less than 10 nor more than 90 business days before initiating construction, as per Section 4 of Act 287.
UTILITIES NOTIFIED: COMCAST PLMG, EAST GOSHEN TOWNSHIP, AQUA PA DESIGN, COMCAST CABLE, PECO EXELON CO., TRANSCO GAS PL, VERIZON EASTERN
UPI NO. 53-1-11.1 | GRAPHIC SCALE 1"=50'
Title Block
PRELIMINARY/FINAL TITLE PLAN | SUBDIVISION PLAN FOR 1344 MORSTEIN ROAD | EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA. | Edward B. Walsh & Associates, Inc., Civil Engineers & Surveyors, Whiteland Business Park, 855 Springdale Drive, Suite 202, Exton, Pennsylvania 19341, Phone: 610-903-0060, Fax: 610-903-0080 | Project: 5019 | Date: 4/11/24 | Scale: 1" = 50' | Drawn: D.B. | Checked: A.J.B. | Sheet: 1 OF 9 | Plotted: 8/30/2024 | File: F:\EB\5019\FPS\5019-B.pro
PRELIMINARY/FINAL EXISTING FEATURES PLAN - SUBDIVISION PLAN FOR 1344 MORSTEIN ROAD
[Engineering existing features plan for 1344 Morstein Road (UPI No. 53-1-11.1) showing existing contours, soil classifications, trees to remain and to be removed, a 1 story cinderblock building to be removed, existing 2 story single family dwelling, utilities, location map, and legend.]
SOILS CLASSIFICATION
- MaB - MANOR LOAM, 3 TO 8 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
- MaC - MANOR LOAM, 8 TO 15 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
- MaD - MANOR LOAM, 15 TO 25 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
- UugB - URBAN LAND - UDORTHENTS, SHIST AND GNEISS COMPLEX, 0 TO 8 PERCENT SLOPES, HYDROLOGIC GROUP C
LOCATION MAP
SCALE: 1"=800'. Labels: WEST WHITELAND TOWNSHIP, EAST GOSHEN TOWNSHIP, WEST GOSHEN TOWNSHIP, ROUTE 202, BOOT RD., MORSTEIN RD., KING RD., BARKWAY LN., GREAT OAK CIR., WHITEULLEN LN., LIMERICK LN., HIGHGATE RD., JOSHUA DR., SITE.
Plan Drawing Labels
- MORSTEIN RD. POSTED SPEED LIMIT = 35 MPH (50 FT R/W)
- AMSTEL WAY (SAN. MH RIM 574.49, SAN. MH RIM 576.34)
- 50 FT WIDE RIGHT OF WAY
- 1 STORY CINDERBLOCK BUILDING TO BE REMOVED
- 2 STORY SINGLE FAMILY DWELLING, LILY POND, WOOD BRIDGE, GREENHOUSE, CHICKEN COOP, SHED
- Soils on site: MaB, MaC, MaD, UugB
- Contour elevations: 532 through 564
- N/L AMY D. KOVACH, D.B. 8968, PG. 2002, UPI 53-1-11.2
- N/L IAN REGINO, D.B. 9325, PG. 403, UPI 53-10-138
- N/L JOANN & GARY PETERS, D.B. 6255, PG. 2189, UPI 53-1-11.4
- N/L CHRISTOPHER CAMPIONE & DEBORAH ANN CAMPIONE, D.B. 7927, PG. 362, UPI 53-1-10.1
- N/L MARYELLEN & ROBERT VOEGEL, D.B. 4851, PG. 114, UPI 53-1-45
- N/L CAROLINE BARBARA TOMLINSON & ALBERT BRYAN TOMLINSON, D.B. 10760, PG. 360, UPI 53-1-44
- N/L JESSICA E. STRAGHAN, D.B. 8308, PG. 526, UPI 53-1-43
- N/L GINA J. DADDAZIO & STEVEN P. DADDAZIO, D.B. 9207, PG. 169, UPI 53-1-42
- N/L MAJA N. PATTON, D.B. 10579, PG. 2184, UPI 53-1-41
- N/L PATRICIA A. PICKARD & ROBERT J. PICKARD SR., D.B. 4895, PG. 279, UPI 53-1-40
- N/L LENA D. & GILFORD J. ROY, D.B. 10034, PG. 0371, UPI 53-1-12.1
LEGEND
- 430 - EXISTING INDEX CONTOUR
- EXISTING INTERIOR CONTOUR
- W - EXISTING WATER SERVICE
- WV - WATER VALVE
- S - EXISTING SANITARY SEWER PIPE
- FM - EXISTING FORCE MAIN PIPE
- EXISTING SANITARY MANHOLE
- G - EXISTING GAS SERVICE
- E - EXISTING ELECTRIC SERVICE
- EXISTING UTILITY POLE
- SOILS BOUNDARY LINE
- X - EXISTING FENCE
- STEEP SLOPES 15-25%
- STEEP SLOPES 25%+
- EXISTING SIGN
- EXISTING CURB
- EXISTING EDGE OF PAVING/DRIVEWAY
- EXISTING CONCRETE
- EXISTING BUILDING
- EXISTING DECIDUOUS TREE
- EXISTING EVERGREEN TREE
- EXISTING DECIDUOUS TREE TO BE REMOVED
- EXISTING EVERGREEN TREE TO BE REMOVED
ACT 287 PENNSYLVANIA ONE CALL NOTIFICATION
Preliminary Serial No. 20241000545 / Final Serial No. UNDERGROUND UTILITY LINE PROTECTION LAW (ACT 287, AS AMENDED). UTILITIES NOTIFIED: COMCAST PLMG, EAST GOSHEN TOWNSHIP, AQUA PA DESIGN, COMCAST CABLE, PECO EXELON CO., TRANSCO GAS PL, VERIZON EASTERN. Pennsylvania One Call System: 1-800-242-1776.
UPI NO. 53-1-11.1 | GRAPHIC SCALE 1"=50'
Title Block
PRELIMINARY/FINAL EXISTING FEATURES PLAN | SUBDIVISION PLAN FOR 1344 MORSTEIN ROAD | EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA. | Edward B. Walsh & Associates, Inc., Civil Engineers & Surveyors, Whiteland Business Park, 855 Springdale Drive, Suite 202, Exton, Pennsylvania 19341, Phone: 610-903-0060, Fax: 610-903-0080 | Project: 5019 | Date: 4/11/24 | Scale: 1" = 50' | Drawn: D.B. | Checked: A.J.B. | Sheet: 2 OF 9 | Plotted: 9/3/2024 | File: F:\EB\5019\FPS\5019-B.pro
PRELIMINARY/FINAL CONSTRUCTION IMPROVEMENT PLAN - SUBDIVISION PLAN FOR 1344 MORSTEIN ROAD
[Engineering construction improvement plan for 1344 Morstein Road (UPI No. 53-1-11.1) showing proposed grading, Lot 1 house footprint (FF 562.00, GAR 560.50, BSMT 553.00), infiltration basin with emergency spillway, storm inlets and piping, directional-drilled force main connection, private road improvements, location map, and legend.]
SOILS CLASSIFICATION
- MaB - MANOR LOAM, 3 TO 8 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
- MaC - MANOR LOAM, 8 TO 15 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
- MaD - MANOR LOAM, 15 TO 25 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
- UugB - URBAN LAND - UDORTHENTS, SHIST AND GNEISS COMPLEX, 0 TO 8 PERCENT SLOPES, HYDROLOGIC GROUP C
LOCATION MAP
SCALE: 1"=800'. Labels: WEST WHITELAND TOWNSHIP, EAST GOSHEN TOWNSHIP, WEST GOSHEN TOWNSHIP, ROUTE 202, BOOT RD., MORSTEIN RD., KING RD., BARKWAY LN., GREAT OAK CIR., WHITEULLEN LN., LIMERICK LN., HIGHGATE RD., JOSHUA DR., SITE.
Plan Drawing Labels
- MORSTEIN RD. POSTED SPEED LIMIT = 35 MPH (50 FT R/W)
- AMSTEL WAY
- 50 FT WIDE RIGHT OF WAY, PRIVATE ROAD - 20 FT WIDE, END PRIVATE ROAD RIGHT OF WAY
- LOT 1: Proposed Dwelling (FF 562.00, GAR 560.50, BSMT 553.00), BUILDING SETBACK
- TYPE 'M' INLET #1, TYPE 'M' INLET #2, R3 RIP RAP, END SECTION #1, END SECTION #2
- INFILTRATION BASIN, EMERGENCY SPILLWAY, POINT OF INTEREST
- LOT 2: 2 STORY SINGLE FAMILY DWELLING, PIPE INSTALLATION BY DIRECTIONAL DRILLING, TIE INTO EXISTING FORCE MAIN
- Adjoining property owners (N/L Kovach, Regino, Peters, Campione, Voegel, Tomlinson, Straghan, Daddazio, Patton, Pickard, Roy)
LEGEND
- 430 - EXISTING INDEX CONTOUR
- EXISTING INTERIOR CONTOUR
- 432 - PROPOSED CONTOUR
- 94.50 - PROPOSED SPOT ELEVATION
- PROPOSED INLET
- PROPOSED STORM SEWER PIPE
- D - PROPOSED FLARED END SECTION
- W - EXISTING WATER SERVICE
- W - PROPOSED WATER SERVICE
- WV - WATER VALVE
- S - EXISTING SANITARY SEWER PIPE
- FM - EXISTING FORCE MAIN PIPE
- FM - PROPOSED FORCE MAIN PIPE
- EXISTING SANITARY MANHOLE
- G - EXISTING GAS SERVICE
- E - EXISTING ELECTRIC SERVICE
- EXISTING UTILITY POLE
- SOILS BOUNDARY LINE
- X - EXISTING FENCE
- STEEP SLOPES 15-25%
- STEEP SLOPES 25%+
- EXISTING SIGN
- EXISTING CURB
- EXISTING EDGE OF PAVING/DRIVEWAY
- PROPOSED EDGE OF PAVING/DRIVEWAY
- EXISTING CONCRETE
- PROPOSED CONCRETE
- EXISTING BUILDING
- EXISTING DECIDUOUS TREE
- EXISTING EVERGREEN TREE
ACT 287 PENNSYLVANIA ONE CALL NOTIFICATION
Preliminary Serial No. 20241000545 / Final Serial No. UNDERGROUND UTILITY LINE PROTECTION LAW (ACT 287, AS AMENDED). UTILITIES NOTIFIED: COMCAST PLMG, EAST GOSHEN TOWNSHIP, AQUA PA DESIGN, COMCAST CABLE, PECO EXELON CO., TRANSCO GAS PL, VERIZON EASTERN. Pennsylvania One Call System: 1-800-242-1776.
UPI NO. 53-1-11.1 | GRAPHIC SCALE 1"=50'
Title Block
PRELIMINARY/FINAL CONSTRUCTION IMPROVEMENT PLAN | SUBDIVISION PLAN FOR 1344 MORSTEIN ROAD | EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA. | Edward B. Walsh & Associates, Inc., Civil Engineers & Surveyors, Whiteland Business Park, 855 Springdale Drive, Suite 202, Exton, Pennsylvania 19341, Phone: 610-903-0060, Fax: 610-903-0080 | Project: 5019 | Date: 4/11/24 | Scale: 1" = 50' | Drawn: D.B. | Checked: A.J.B. | Sheet: 3 OF 9 | Plotted: 9/3/2024 | File: F:\EB\5019\FPS\5019-B.pro
A plan drawing showing erosion and sedimentation control measures, limit of disturbance, filter socks, construction entrance, construction sequence, and general notes for 1344 Morstein Road.
SUBDIVISION PLAN FOR 1344 MORSTEIN ROAD
EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA.
Edward B. Walsh & Associates, Inc.
CIVIL ENGINEERS & SURVEYORS
Whiteland Business Park
855 Springdale Drive, Suite 202
Exton, Pennsylvania 19341
Phone: 610-903-0060
Fax: 610-903-0080
Project-5019
Date-4/11/24
Scale-1"=50'
Drawn-D.B.
Checked-A.J.B.
Sheet-4 OF 9
Plotted: 8/30/2024
File: F:\JE\5019\FPS\5019-B.pro
PRELIMINARY/FINAL EROSION & SEDIMENTATION CONTROL PLAN
DISTURBED AREA = .924 ACRES
SOILS CLASSIFICATION
MaB - MANOR LOAM, 3 TO 8 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
MaC - MANOR LOAM, 8 TO 15 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
MaD - MANOR LOAM, 15 TO 25 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
UugB - URBAN LAND - UDORTHENTS, SHIST AND GNEISS COMPLEX, 0 TO 8 PERCENT SLOPES, HYDROLOGIC GROUP C
LOCATION MAP
SCALE: 1"=800'
Location map showing West Whiteland Township, East Goshen Township, Route 202, Morstein Road, Green Hill Road, Highlands Dr., Allison Ln., Joshua Dr., Eastwick Dr., and Site.
LEGEND
- 430 - EXISTING INDEX CONTOUR
- EXISTING INTERIOR CONTOUR
- 430 - PROPOSED CONTOUR
- 54.50 - PROPOSED SPOT ELEVATION
- PROPOSED INLET
- PROPOSED STORM SEWER PIPE
- PROPOSED FLARED END SECTION
- EXISTING WATER SERVICE
- PROPOSED WATER SERVICE
- WATER VALVE
- EXISTING SANITARY SEWER PIPE
- EXISTING FORCE MAIN PIPE
- PROPOSED FORCE MAIN PIPE
- EXISTING SANITARY MANHOLE
- EXISTING GAS SERVICE
- EXISTING ELECTRIC SERVICE
- EXISTING UTILITY POLE
- SOILS BOUNDARY LINE
- EXISTING FENCE
- STEEP SLOPES 15-25%
- STEEP SLOPES 25%+
- EXISTING SIGN
- EXISTING CURB
- EXISTING EDGE OF PAVING/DRIVEWAY
- PROPOSED EDGE OF PAVING/DRIVEWAY
- EXISTING CONCRETE
- PROPOSED CONCRETE
- EXISTING BUILDING
- EXISTING DECIDUOUS TREE
- EXISTING EVERGREEN TREE
EROSION & SEDIMENTATION CONTROL LEGEND
- LIMIT OF DISTURBANCE
- FS - FILTER SOCK
- X - TEMPORARY ORANGE CONSTRUCTION FENCE
- TS - TOPSOIL STOCKPILE
- RCE - ROCK CONSTR. ENTRANCE
CONSTRUCTION SEQUENCE
- LIMIT OF DISTURBANCE IS TO BE FIELD DELINEATED PRIOR TO START OF ANY EARTH MOVING ACTIVITIES. THE LIMIT OF DISTURBANCE SHALL BE DELINEATED WITH ROPE AND STAKE OR ORANGE CONSTRUCTION FENCE. NO DISTURBANCE BEYOND THE STAKED LIMIT OF DISTURBANCE IS ALLOWED.
- INSTALL STONE CONSTRUCTION ENTRANCE.
- INSTALL FILTER SOCK AND ORANGE CONSTRUCTION FENCE AS SHOWN. ANY COMPACTION OF STORMWATER FACILITIES MUST BE AVOIDED.
- PERFORM CLEARING IN AREA TO BE DISTURBED. STRIP TOPSOIL AND STOCKPILE WHERE SHOWN. INSTALL CONCRETE WASHOUT.
- GRADE DRIVEWAY AND LOT. NOTE DISTURBANCE OF STORMWATER SWM MUST BE AVOIDED UNTIL IT IS INSTALLED. INSTALL UTILITIES TO SERVICE THE RESIDENCE.
- INSTALL STONE BASE COURSE IN DRIVEWAY.
- BEGIN HOUSE CONSTRUCTION.
- INSTALL WATER SERVICE AND SANITARY SEWER SERVICE PIPING.
- FINE GRADE AND SEED AND MULCH.
- EXCAVATE AND CONSTRUCT STORMWATER SWM PER DETAIL. INSTALL EROSION CONTROL BLANKET IN SPILLWAY.
- INSTALL INLET AND PIPING.
- FINISH PAVE DRIVEWAY.
- REMOVE ANY SEDIMENT IN THE BOTTOM OF SWM AND INSTALL AMENDED SOILS. STABILIZE, SEED AND MULCH WITH RAIN GARDEN SEED MIX.
- REMOVE FILTER SOCK WHEN GRADED AREAS HAVE STABILIZED TO 70% DENSITY.
NOTE:
- NO WORK IS PERMITTED TO TAKE PLACE UNTIL ALL EROSION AND SEDIMENTATION PROTECTION CONTROL MEASURES HAVE BEEN SATISFACTORILY INSTALLED.
- EXCAVATION SHALL BE PERFORMED WITH EQUIPMENT THAT WILL NOT COMPACT THE BOTTOM OF THE BED. EQUIPMENT SHALL NOT BE ALLOWED ON EXCAVATED AREAS OF THE SEEPAGE BEDS AT ANY TIME DURING ITS CONSTRUCTION.
GENERAL NOTES
- CONSTRUCTION SHALL IMMEDIATELY CEASE IF THE EARTH DISTURBANCE AREA EXCEEDS 1 ACRE AND NOT RESUME UNTIL A NPDES PERMIT OR APPROVAL OF A CORRECTIVE ACTION PLAN IS OBTAINED.
- *DURING SITE CONSTRUCTION, ALL INFILTRATION PRACTICE COMPONENTS SHALL BE PROTECTED FROM COMPACTION DUE TO HEAVY EQUIPMENT OPERATION OR STORAGE OF FILL OR CONSTRUCTION MATERIAL. INFILTRATION AREAS SHALL BE REMEDIATED TO RESTORE SOIL COMPOSITION AND POROSITY. ADEQUATE DOCUMENTATION TO THIS EFFECT SHALL BE SUBMITTED TO THE MUNICIPAL ENGINEER FOR REVIEW. ALL AREAS DESIGNATED FOR INFILTRATION SHALL NOT RECEIVE RUNOFF UNTIL THE CONTRIBUTORY DRAINAGE AREA HAS ACHIEVED FINAL STABILIZATION.
ACT 287 PENNSYLVANIA ONE CALL NOTIFICATION
Preliminary Serial No. 20241000545
Final Serial No. ______ date ______
UNDERGROUND UTILITY LINE PROTECTION LAW (ACT 287, AS AMENDED)
E. B. Walsh & Associates, Inc. (EBWA) does not guarantee the accuracy of the locations for existing subsurface utility lines, structures, etc. shown on the plans, nor does EBWA guarantee that all subsurface utility lines, structures, etc. are shown.
Contractor shall verify the location and elevations of all subsurface utility lines, structures, etc., before the start of work, by calling the Pennsylvania One Call System at 1-800-242-1776.
If construction does not occur within 90-days of the above final one-call notification, the project owner is required to make notification to Pa One Call not less than 10 nor more than 90 business days before initiating construction, as per Section 4 of Act 287.
UTILITIES NOTIFIED:
COMCAST PLMG
EAST GOSHEN TOWNSHIP
AQUA PA DESIGN
COMCAST CABLE
PECO EXELON CO.
TRANSCO GAS PL
VERIZON EASTERN
PENNSYLVANIA ONE CALL SYSTEM - STOP-CALL BEFORE YOU DIG! 1-800-242-1776
UPI NO. 53-1-11.1
Plan Labels: ROCK CONSTR. ENTRANCE; CONCRETE WASHOUT; TOPSOIL STOCKPILE; FILTER SOCK; ORANGE CONSTRUCTION FENCE; TYPE 'M' INLET #1; TYPE 'M' INLET #2; END SECTION #1; INFILTRATION BASIN; EMERGENCY SPILLWAY; PIPE INSTALLATION BY DIRECTIONAL DRILLING; TIE INTO EXISTING FORCE MAIN; POINT OF INTEREST; LOT 1; LOT 2; F.F. 561.00; BSMT 554.00; MORSTEIN RD. POSTED SPEED LIMIT = 35 MPH; AMSTEL WAY; PRIVATE ROAD 3+00 20 FT WIDE. GRAPHIC SCALE 1"=50'.
PRELIMINARY/FINAL POST CONSTRUCTION STORMWATER MANAGEMENT PLAN - SUBDIVISION PLAN FOR 1344 MORSTEIN ROAD
[Engineering post-construction stormwater management plan for 1344 Morstein Road (UPI No. 53-1-11.1) showing Lot 1 and Lot 2 stormwater facilities, infiltration basin, inlets, piping, maintenance notes, and East Goshen O&M notes.]
SOILS CLASSIFICATION
- MaB - MANOR LOAM, 3 TO 8 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
- MaC - MANOR LOAM, 8 TO 15 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
- MaD - MANOR LOAM, 15 TO 25 PERCENT SLOPES, HYDROLOGIC SOIL GROUP B
- UugB - URBAN LAND - UDORTHENTS, SHIST AND GNEISS COMPLEX, 0 TO 8 PERCENT SLOPES, HYDROLOGIC GROUP C
LOCATION MAP
SCALE: 1"=800'. Labels: WEST WHITELAND TOWNSHIP, EAST GOSHEN TOWNSHIP, WEST GOSHEN TOWNSHIP, ROUTE 202, BOOT RD., MORSTEIN RD., KING RD., BARKWAY LN., GREAT OAK CIR., WHITEULLEN LN., LIMERICK LN., HIGHGATE RD., JOSHUA DR., SITE.
Plan Drawing Labels
- MORSTEIN RD. POSTED SPEED LIMIT = 35 MPH (50 FT R/W)
- AMSTEL WAY
- 50 FT WIDE RIGHT OF WAY, PRIVATE ROAD - 20 FT WIDE, END PRIVATE ROAD RIGHT OF WAY
- LOT 1: Proposed Dwelling (FF 562.00, GAR 560.50, BSMT 553.00), TYPE 'M' INLET #1, TYPE 'M' INLET #2, END SECTION #1, END SECTION #2, INFILTRATION BASIN, EMERGENCY SPILLWAY, POINT OF INTEREST
- LOT 2: 2 STORY SINGLE FAMILY DWELLING, PIPE INSTALLATION BY DIRECTIONAL DRILLING, TIE INTO EXISTING FORCE MAIN
LEGEND
- 430 - EXISTING INDEX CONTOUR
- EXISTING INTERIOR CONTOUR
- 432 - PROPOSED CONTOUR
- 94.50 - PROPOSED SPOT ELEVATION
- PROPOSED INLET
- PROPOSED STORM SEWER PIPE
- D - PROPOSED FLARED END SECTION
- W - EXISTING WATER SERVICE
- W - PROPOSED WATER SERVICE
- WV - WATER VALVE
- S - EXISTING SANITARY SEWER PIPE
- FM - EXISTING FORCE MAIN PIPE
- FM - PROPOSED FORCE MAIN PIPE
- EXISTING SANITARY MANHOLE
- G - EXISTING GAS SERVICE
- E - EXISTING ELECTRIC SERVICE
- EXISTING UTILITY POLE
- SOILS BOUNDARY LINE
- X - EXISTING FENCE
- STEEP SLOPES 15-25%
- STEEP SLOPES 25%+
- EXISTING SIGN
- EXISTING CURB
- EXISTING EDGE OF PAVING/DRIVEWAY
- PROPOSED EDGE OF PAVING/DRIVEWAY
- EXISTING CONCRETE
- PROPOSED CONCRETE
- EXISTING BUILDING
- EXISTING DECIDUOUS TREE
- EXISTING EVERGREEN TREE
- LIMIT OF DISTURBANCE
POST CONSTRUCTION RETENTION AREA AND STORMWATER FACILITIES MAINTENANCE NOTES
- 1. Regular removal of litter and debris within the property shall be performed. Stormwater facilities shall be inspected quarterly and any trash, debris, sediment, etc., shall be removed and properly disposed of.
- 2. Observations shall be made to determine the length of time needed for retained water to infiltrate into the soil after a storm event. The observations shall be made by reading the water level in the inlet box(es) of the underground system several times over a period of two (2) days after a large storm event. The first of these observations shall provide a record of how well the system is working when comparing future observations. Observations shall be made twice the first year and yearly thereafter.
- 3. Stormwater detention and retention basins or facilities shall be inspected by, or under the direction of, a registered professional engineer licensed in the Commonwealth of Pennsylvania on behalf of the applicant or responsible entity (including the Township Engineer for dedicated facilities) on the following basis: a. Annually for the first five (5) years. b. Once every three (3) years thereafter. c. During or immediately after the cessation of a 100-year or greater storm event. The professional engineer conducting the inspection shall be required to submit a written report to the Township within one (1) month following completion of the inspection. The report will present documentation and include pictures regarding the condition of the facility and recommend necessary repairs, if needed. Any needed repairs shall be implemented by the owner within one (1) month of the report issuance date.
- 4. The stormwater management facilities shown on these plans, including storm inlets, storm drain pipes, underground detention/retention systems, and roof drain connections, are permanent and are not to be removed. The individual lot owner, his successor or assigns shall assume the responsibility for perpetual maintenance of the said facilities. If the lot owner, his successor or assigns, fails in any way to maintain the said facilities or causes the facilities to be altered or removed, upon written notification by the municipality, the defects shall be promptly corrected at the owner's expense. Upon the owner's failure to correct the defect within the time specified by the municipality, the owner, his successor or assigns do hereby authorize the municipality or their contractor to enter upon the property and cause the repair, maintenance and/or corrections to be made. A lien may be filed against the property for all costs of all corrections, including applicable engineering and/or attorney fees, although the municipality is under no obligation to take action. The permission granted herein shall constitute an access easement for maintenance purposes should same be necessary by the municipality in the sole opinion of the municipality. This maintenance responsibility shall be added into the deed.
- 5. All inflow and outflow points to the individual on-lot systems should be kept clear of leaves and other debris. Any leaves or debris will negatively impact the performance of these systems. All downspouts and overflow pipes should be kept in good working order.
EAST GOSHEN O&M NOTES
- 1. THE PERSON OR ENTITY RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF A BMP OR CONVEYANCE SHALL MAKE RECORDS OF THE INSTALLATION AND OF ALL MAINTENANCE AND REPAIRS, AND SHALL RETAIN THE RECORDS FOR AT LEAST 10 YEARS. A COPY OF THESES RECORDS SHALL BE SUBMITTED TO THE TOWNSHIP
- 2. UPON FINAL INSPECTION, THE MUNICIPALITY SHALL INFORM THE PERSON RESPONSIBLE FOR THE OPERATION AND MAINTENANCE WHETHER THE SUBMISSION OF PERIODIC (ANNUAL OR OTHER FREQUENCY) INSPECTIONS AND MAINTENANCE REPORTS WILL BE REQUIRED.
- 3. THE OWNER OF EACH BMP AND CONVEYANCE SHALL KEEP ON FILE WITH THE TOWNSHIP THE NAME, ADDRESS AND TELEPHONE NUMBER OF THE PERSON RESPONSIBLE FOR MAINTENANCE ACTIVITIES AND IMPLEMENTATION OF THE O&M PLAN. IN THE EVENT OF A CHANGE, NEW INFORMATION SHALL BE SUBMITTED BY THE BMP OR CONVEYANCE OWNER TO THE TOWNSHIP WITHIN 10 DAYS OF THE CHANGE.
- 4. ALL INLETS SHOULD BE INSPECTED AND CLEANED AT LEAST 2 TIMES PER YEAR. THE OVERLYING VEGETATION SHOULD BE MAINTAINED IN GOOD CONDITION, AND CARE SHOULD BE TAKEN TO AVOID EXCESSIVE COMPACTION BY MOWERS.
ACT 287 PENNSYLVANIA ONE CALL NOTIFICATION
Preliminary Serial No. 20241000545 / Final Serial No. UNDERGROUND UTILITY LINE PROTECTION LAW (ACT 287, AS AMENDED). UTILITIES NOTIFIED: COMCAST PLMG, EAST GOSHEN TOWNSHIP, AQUA PA DESIGN, COMCAST CABLE, PECO EXELON CO., TRANSCO GAS PL, VERIZON EASTERN. Pennsylvania One Call System: 1-800-242-1776.
UPI NO. 53-1-11.1 | GRAPHIC SCALE 1"=50'
Title Block
PRELIMINARY/FINAL POST CONSTRUCTION STORMWATER MANAGEMENT PLAN | SUBDIVISION PLAN FOR 1344 MORSTEIN ROAD | EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA. | Edward B. Walsh & Associates, Inc., Civil Engineers & Surveyors, Whiteland Business Park, 855 Springdale Drive, Suite 202, Exton, Pennsylvania 19341, Phone: 610-903-0060, Fax: 610-903-0080 | Project: 5019 | Date: 4/11/24 | Scale: 1" = 50' | Drawn: D.B. | Checked: A.J.B. | Sheet: 5 OF 9 | Plotted: 9/3/2024 | File: F:\EB\5019\FPS\5019-B.pro
·
·
·
· ·
·
· · ·
· ·
· ·
· · · · ·
·
· · ·
· · ·
· · ·
·
Edward B. Walsh & Associates, Inc.