Planning Commission

The East Goshen Township Planning Commission is an advisory board to the Township Board of Supervisors. The Commission reviews all subdivision and land development applications, conditional use applications, zoning hearing board applications and makes recommendations to the Board of Supervisors.  The Commission also reviews or drafts Zoning Ordinance Amendments. Each member is appointed by the Board of Supervisors.

  • Composed of seven East Goshen Township residents each serving a four-year term.
  • Formal Meetings are held the 4th Tuesday of each month at 7:00 P.M.
  • Workshop Meeting are held on an as needed basis
  • All township meetings are held at the Township Building and are open to the public
Planning Commission Members Term Expiration Date
John Stipe, Chair  2026
Dan Truitt, Vice Chair 2027
Daniel H. Daley 2027
Michael Koza 2026
Ernest Harkness 2026
Karen Martynick 2029
William Kaufman 2029
Larry Massaro, BOS Liaison
Kelly Krause, Staff Liaison

 

Draft Ordinance-Zoning Amendment Regulating Data Centers by Conditional Use 9.24.26

Click here to view – May 4th Documents for Malvern Institute and East Whiteland Special Study.

Related News

PLANNING COMMISSION CONSIDERS UPGRADES TO AQUA FACILITY

Wednesday, November 18, 2026

At its September meeting, the East Goshen Planning Commission reviewed a conditional use application from Aqua Pennsylvania to upgrade its Hunt Country well treatment facility located on Thorncroft Drive. The upgrade is required to meet new maximum contaminant levels (MCLs) for PFAS in drinking water that were enacted last year by the U.S. Environmental Protection […]

View Article

From the Planning Commission: Addressing Potential Data Center Development in East Goshen Township

Wednesday, September 30, 2026

As the demand for artificial intelligence accelerates, municipalities throughout Pennsylvania have found themselves navigating complex regulations, legal challenges, and community debates about large-scale data centers. While no data center projects are currently proposed in East Goshen, township officials are proactively addressing potential impacts by updating zoning ordinances to create strict standards that will apply should […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

EAST GOSHEN TOWNSHIP PLANNING COMMISSION

East Goshen Township Administration Building 1580 Paoli Pike, 2nd Floor, West Chester, PA 19380 Meeting Agenda Tuesday, September 22, 2026, at 7:00 PM

Planning Commission Members: John Stipe, Chairman Dan Truitt, Vice Chairman Daniel H. Daley Ernest Harkness William Kaufman Michael Koza Karen Martynick Larry Massaro, BOS Liaison Kelly Krause, Zoning Officer/Staff Liaison Agenda Items:

1. Call to Order / Pledge of Allegiance and Moment of Silence 2. Chairman will ask if anyone is going to record the meeting. 3. Review of Tracking Log / Determine need for Workshop Meeting 4. Public Comment on Non-Agenda Items 5. Approval of Minutes a. July 28, 2026 6. Acknowledge Receipt of New Applications (Initial Submission) a. Subdivision and Land Development Applications

i. 1352 Morstein Road- Prelim/Final 2-Lot Subdivision ii. 1409 Manley Road- Prelim/Final 3-Lot Subdivision b. Conditional Uses Applications

i. Aqua PA, between 620 & 622 Thorncroft Drive- Water treatment facility expansion c. Zoning Hearing Board Variances d. Ordinance Amendments 7. Old Business a. Zoning Ordinance Amendment- Data Center Regulations Draft b. 917 Cornwallis Drive- Prelim/Final 3-Lot Subdivision 8. New Business a. 1352 Morstein Road- Prelim/Final 2-Lot Subdivision

Applicant requested continuance to 10/27 meeting b. 1409 Manley Road- Prelim/Final 3-Lot Subdivision c. Aqua PA, between 620 & 622 Thorncroft Drive- Water treatment facility expansion 9. Liaison Reports 10. Correspondence 11. Announcements 12. Next Meeting – Tuesday, October 27, 2026, at 7:00 PM 13. Adjournment This agenda does not necessarily reflect the order in which the items will be heard.

Bold Items indicate new information to review or discuss.

PROJECT DESCRIPTION Date Filed Start Date Twp.

Engineer

Review

CCPC

Review

Conserv.

Board

Review

Extension

Date PC Deadline

Meeting

BOS

Deadline

Meeting

Hearing

Date

Final Action

Deadline (90

days) Comments

1409 Manley Road- Prelim/Final 3-Lot Subdivision 9/8/2026 9/22/2026 pending pending 10/14/2026 n/a 11/24/2026 12/15/2026 n/a 12/21/2026 Variance granted on 5/12/2026- Awaiting submission

of subdivision plans

Aqua Easement 620 & 622 Thorncroft Drive-

Conditional Use 8/24/2026 8/24/2026 pending n/a n/a n/a 10/27/2026 11/17/2026 10/20/2026 11/23/2026 Exiting facilty expanding to meet new EPA water

quality regulations for microplastics

Zoning Ordinance Amendment- Data

Centers n/a 11/25/2025 n/a 9/3/2026 n/a n/a n/a n/a n/a n/a Received ABC's and CCPC recommendations

Anticipated to be sent to BoS for 10/2026

1352 Morstein Road Prelim/Final 2- Lot Subdivision 8/14/2026 8/25/2026 pending 9/10/2026 10/14/2026 n/a 10/27/2026 11/17/2026 n/a 11/23/2026 Requires pipeline study/recommendation

971 Cornwallis Drive- Prelim/Final 3-Lot Subdivision 5/14/2026 5/26/2026 6/23/2026 7/2/2026 7/8/2026 10/21/2026 7/28/2026 8/18/2026 n/a 10/21/2026 Pending revised plans

10-Year Comprehensive Plan Review n/a 4/22/2025 n/a n/a n/a n/a n/a n/a n/a n/a RFP Approved by BoS- Soon to be issued

Westtown Comprehensive Plan 3/3/2026 3/3/2026 n/a n/a n/a n/a 3/24/2026 4/16/2026 n/a 4/17/2026 BoS recommended support 4/16/2026

949 & 951 Cornwallis Drive- Sketch Plan 2/4/2026 2/24/2026 4/13/2026 pending n/a n/a n/a n/a n/a n/a Prelim/Final Plan Submitted

1409 Manley Road- Dimensional Variance 2/13/2026 2/13/2026 n/a n/a n/a 5/15/2026 3/24/2026 4/16/2026 5/12/2026 5/15/2026 Variance granted on 5/12/2026- Awaiting submission of

subdivision plans

West Whiteland Comprehensive Plan 4/9/2026 n/a n/a n/a n/a n/a 4/28/2026 5/5/2026 n/a 6/3/2026 BoS recommended support 5/5/2026

17 Treemont Drive- Dimensional Variance 5/8/2026 5/8/2026 n/a n/a n/a n/a 5/26/2026 6/2/2026 6/9/2026 6/7/2026 Variance granted by ZHB 6/9/2026

949 & 951 Cornwallis Drive- Line Change 4/28/2026 4/28/2026 6/10/2026 pending n/a n/a 6/23/2026 7/21/2026 n/a 7/27/2026 Approved by BoS on 7/21/2026

Yardley Village HOA Open Space- Variance 7/9/2026 7/9/2026 n/a n/a n/a n/a 7/28/2026 8/18/2026 8/20/2026 9/7/2026 ZHB approved variance 9/10/2026

PROJECTS COMPLETED IN 2026

Bold = New application or action required

East Goshen Township Planning Commission

Application Tracking Log

September 22, 2026

PENDING PROJECTS

PC 7-28-26 draft 1

DRAFT 1 EAST GOSHEN TOWNSHIP 2 PLANNING COMMISSION 3 July 28, 2026 4 5 The East Goshen Township Planning Commission held a regularly scheduled meeting on Tuesday, 6 July 28, 2026 at 7:00 pm in the Township Building. 7 8 Members present are highlighted: 9 John Stipe – Chairman 10 Dan Truitt, Vice Chairman 11 Dan Daley 12 Ernest Harkness 13 Willian Kaufman 14 Michael Koza 15 Karen Martynick 16 17 Also present was: 18 Kelly A. Krause, Zoning Officer 19 Larry Massaro , BOS Liaison, Township Supervisor 20 Ann Duffield, Township Supervisor 21 22 COMMON ACRONYMS: 23 BOS – Board of Supervisors CPTF – Comprehensive Plan Task Force 24 BC – Brandywine Conservancy CVS – Community Visioning Session 25 CB – Conservancy Board SWM – Storm Water Management 26 CCPC – Chester Co Planning Commission ZHB – Zoning Hearing Board 27 28 FORMAL MEETING – 7 p.m. 29 1. John called the meeting to order at 7:00 pm. He led the Pledge of Allegiance and asked for a 30 moment of silence to remember our first responders and military and East Goshen Public 31 Works Director Mark Miller. 32 2. John asked if anyone would be recording the meeting and if there were any public comments 33 about non-agenda items. There was no response. 34 3. The minutes of the July 14, 2026 meeting were approved as amended. 35 36 CHAIRMAN’S REPORT – 37 None 38 39 PUBLIC COMMENT ON NON-AGENDA ITEMS 40 1. Judi DiFonzo, member of the Pipeline Task Force, spoke about noise related to Data Centers. 41 There are typical noise and low noise. She is investigating DBC noise above 70 which can cause 42 headache and nausea. 43 Kelly reported that Nate, our Pennoni rep, is reviewing the ordinance and will investigate noise. 44 45 46 ACKNOWLEDGE RECEIPT OF NEW APPLICATIONS 47 1. Zoning Hearing Board Variances – Yardley Village HOA – Representatives were Stephen 48 Keefer, John McKenna and John Devlin. John McKenna commented that they provided a packet 49 for a location of a proposed shed for Yardley households to use for storage. There are 138 50 households in Yardley Village at Hershey Mill. It would be about 10 feet from the wall that 51 surrounds Hershey Mill. The Variance is the distance from the wall. Mike confirmed that the are 52 asking for 42 feet of relief. Stephen explained that the original location they considered was in an 53

PC 7-28-26 draft 2

area of possible flooding. He spoke about the other locations they looked at and why they didn’t 1 select them. Dan D. mentioned that he has worked with this organization. It cannot be seen from 2 the street because the wall blocks it. He doesn’t object to this. 3 Ernest mentioned that they have to show a hardship. He doesn’t think it shows a hardship well 4 enough, so it may not get through the Zoning Hearing Board. 5 John Devlin mentioned that he is in charge of the decorating committee and has 22 bins in his 6 basement. They have 4 committees that would use this shed. 7 John Mckenna commented that the original location had more problems so they will add this 8 information. 9 Dan T. also spoke about hardship. He totally agrees with the second location. 10 Dan D. made a motion that we recommend to the Board of Supervisors to support the 11 dimensional variance request from the Yardley HOA to construct a 10 x 14 or similar size storage 12 shed which will encroach into the required 50’ perimeter setback by 42’. Dan T. seconded the 13 motion. The motion passed unanimously. 14 15 16 LIASION REPORT 17 Board of Supervisors – Larry reported that at the meeting last week the Comprehensive Plan was 18 discussed. They approved a pilot composting program for 50 households for 5 months. This 19 was presented by ESAC and the BOS will subsidize the initial program. Most of the discussion 20 was about our trash service. The bids are in and are much higher. Our program is kind of 21 deluxe. Residents who spoke did not want their service changed. 22 23 ANY OTHER MATTER 24 None 25 26 27 CORRESPONDENCE 28 None 29 30 31 ADJOURNMENT 32 There being no further business, Dan T. made a motion to adjourn the meeting. Ernest seconded the 33 motion. The meeting was adjourned at 8:00 pm. 34 The next regular meeting will be held on Tuesday August 25, 2026 at 7 p.m. 35 36 Respectfully submitted, 37 38 39 40 41 Ruth Kiefer, Recording Secretary 42

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 1 of 14

§ 240-6 Definitions; word usage.

B. Definitions. When used in this chapter, the following words, terms and phrases shall have the following meanings, unless expressly stated otherwise or unless the context clearly indicates otherwise.

CLOSED-LOOP COOLING SYSTEM – A cooling system that circulates a single contained coolant or fluid that is not discharged to the environment as a normal part of operation (may include plate-and-frame heat exchangers, rear-door heat exchangers, immersion, or other sealed liquid cooling approaches).

DATA CENTER – A facility used primarily for the storage, management, processing, and transmission of digital data, which houses computer or network equipment, systems, servers, appliances and other associated components related to digital data operations.

The facility may also include air handlers, power generators, water cooling and storage facilities, utility substations, and other associated utility infrastructure to support sustained operations at the Data Center.

DATA CENTER ACCESSORY USE – Ancillary uses or structures secondary and incidental to a Data Center use, including but not limited to: administrative, logistical, fiber optic, storage, and security buildings or structures; sources of electrical power such as generators used to provide temporary power when the main source of power is interrupted; electrical substations; utility lines, domestic and non-contact cooling water and wastewater treatment facilities; water holding facilities; pump stations; water towers; environmental controls (air conditioning or cooling towers; fire suppression, and related equipment), and security features, provided such Data Center Accessory Uses/structures are located on the same tract or assemblage of adjacent parcels developed as a unified development with a Data Center.

DATA CENTER CAMPUS – A data center campus includes all of the structures and real estate owned, controlled, leased or otherwise occupied primarily for the use and purpose as Data Center(s), including: (i) Data Center(s); (ii) Data Center Accessory Uses; and (iii) all other systems, equipment, piping, conduit and other ancillary equipment, structures, and other appurtenances that are incidental to and/or needed for the construction, support, operation, repair, maintenance, and/or protection of the Data Center(s) and/or the data center campus.

ENERGY GENERATION SYSTEM – Any energy generation system designed or used to supply power directly to a Data Center during normal operations, including solar, wind, fossil fuel, fuel cells, or nuclear energy generating systems.

SENSITIVE RECEPTOR – Buildings used for residences (including institutional uses with a residential component), schools, daycare centers, preschools, hospitals, community centers, and similar institutional uses.

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 2 of 14

§ 240-19 I-1 Light Industrial District.

C. Permitted conditional uses. The following principal uses may be permitted in the I-1 District in accordance with § 240-31:

(34) Data Centers in accordance with § 240-31C(3)(xx).

(34) (35) Any lawful use not otherwise permitted in the Township.

§ 240-31 Conditional uses; additional standards for specific principal uses.

C. Standards for conditional uses and special exception uses and certain permitted-by-right uses.

(3) Specific standards for specific principal uses (including but not limited to conditional uses and special exception uses). Each of the following principal uses shall meet the following additional specific standards. In addition, each conditional or special exception use shall meet the general standards in Subsection C(2). The following specific standards shall be met for the applicable use, unless a more restrictive standard is established by another section of this chapter:

(xx) Data Centers

[1] All Data Center and Data Center Accessory Uses

shall be set back a minimum of 300 feet from any residentially zoned district and from

the property boundary of all Sensitive Receptor uses.

[2] The owner of the data center shall provide the Township with an emergency liaison

that may be reached 24 hours a day, seven days a week, in the event of an emergency.

[3] The owner of the data center shall submit an emergency response plan to the

Township Fire Marshal for review and approval, which shall be implemented and followed in the event of an emergency at the facility. The emergency response plan shall include coordination with local emergency responders, as applicable.

[4] The data center facility and accessory buildings shall be fully screened in

accordance with the criteria set forth in § 240-27C(3).

[5] In addition to the Supplementary studies as required pursuant to Chapter 205,

Subdivision and Land Development, an applicant shall submit the following:

[a] A noise and vibration study as described in the Noise and Vibration section (10).

[b] No use shall produce any heat perceptible at or beyond the lot boundaries,

as demonstrated by qualified professional analysis conducted in accordance with applicable state and federal standards.

[c] No use shall emit potentially harmful radiation in excess of levels permitted

under applicable state and federal standards, as demonstrated by qualified professional analysis.

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 3 of 14

[d] The applicant shall provide documentation from the applicable electric

service provider certifying that that the necessary capacity is available and that electric service provider will serve the Data Center. Known impacts on electric availability for other uses directly attributable to the Data Center project shall be noted. An analysis in accordance with applicable utility, state, and federal standards, shall show Data Center operation shall not cause electrical interference or fluctuations in line voltage on and off the operating premises.

[e] A Pipeline awareness study in accordance with § 205-40.1, with review and

recommendation made by the East Goshen Township Pipeline Task Force.

[f] Any system designed for cooling and operation of the facility (electricity,

water, or other means) shall be demonstrated, through qualified professional analysis and in accordance with applicable state and federal standards, to be adequate and to not negatively impact the surrounding region, and routinely tested for possible pathogens such as Legionella bacilli.

[g] A Decommissioning Plan prepared by a qualified professional shall be

submitted. The plan shall outline the procedures for safe shutdown, removal of equipment, disposal or recycling of materials, and site restoration. The plan shall address at a minimum the following:

[i] Owner shall submit a notification of closure if operations are

permanently ceased.

[ii] Decommissioning shall begin within 1 year of cessation of data

center operations, or upon notice of abandonment by the operator, whichever occurs first. An extension of 1 year may be granted by the Board of Supervisors if the property owner can demonstrate that they are actively marketing the site for a compatible replacement use. Decommissioning shall be completed within 18 months thereafter, unless granted an extended for good cause.

[iii] All above-ground structures, equipment, and accessory facilities

shall be removed.

[iv] Hazardous materials, including batteries, fuel, or refrigerants, shall

be disposed of in compliance with state and federal law.

[v] Disturbed soils shall be stabilized and re-vegetated.

[vi] Any utility connections shall be safely disconnected and capped.

[vii] The site shall be restored to a condition compatible with surrounding

land uses or consistent with the most restrictive adjacent zoning district.

[6] Data Centers shall be designed and constructed to meet the current USGBC LEED

BD+C: Data Centers rating system, or equivalent design standard, as approved by the municipal engineer.

Commented [KK1]: Pipeline Task Force recommended addition KK notes regarding recommendation:

How often is “routinely”? Would this be more appropriate in new section [h] Cooling Fluid Containment and Leak Prevention?

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 4 of 14

[7] Energy Sources, Power Lines, and Co-Location of Energy Generation Systems.

[a] Any energy generation system designed or used to supply power directly to

a Data Center during normal operations, including solar, wind, fossil fuel, fuel cells, or nuclear energy generating systems, shall not be considered part of the Data Center use but shall be subject to existing municipal or utility regulations. Such systems shall be considered a separate principal use and shall be approved according to all applicable state and federal regulations along with municipal zoning regulations applicable to such use. The applicant shall select, design, and locate the energy generation systems to limit noise, emissions, and visual impacts to adjacent and nearby uses as much as possible. Data center principal buildings shall be located between energy generation systems and residential districts or any other sensitive receptors.

[b] Electric Utility Substations on the same property as the Data Center they

serve shall be located on the side or rear of a Data Center principal building so they are screened from public view and shall not be located in a required front yard. On-site substations do not require a buffer or screening between the Data Center Principal Building and the substation.

[c] Data Center electric utility substations visible from an arterial roadway shall

include a combination of year-round opaque landscaping and screening walls to minimize visual impact.

[d] Burying power lines serving the property is strongly encouraged. On-site

power lines of 34.5 kV and below shall be buried.

[e] Proposed substations on a parcel that abuts a zoning district boundary other

than industrial, and/or a boundary with a property with a sensitive receptor shall be set back a minimum of 300 feet from the property line. If abutting both another industrial-zoned parcel and use, substations shall meet the requirements for accessory uses in the underlying zoning district.

[f] Utility Infrastructure Upgrade Costs. Applicant shall agree to fund the costs

of any public utility infrastructure upgrades that may be required or reasonably anticipated based on Applicant’s proposed use or plan unless: (1) Certified documentation is provided from the public utility provider that no upgrades are or will be necessary for Applicant’s proposed use or plan, or (2) such upgrade costs are otherwise prohibited by Pennsylvania statute or Pennsylvania Utility Commission Regulation.

[8] Backup Power

[a] Diesel generators shall meet the emission standards of the U.S.

Environmental Protection Agency for Backup Emergency Deisel Generators.

[b] Diesel generators shall undergo annual testing, and reports shall be

provided to the municipality to ensure that data center equipment is performing as designed and that emissions from the data center do not exceed permitted limits.

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 5 of 14

[c] Emergency energy generation that uses diesel, gasoline, or another fossil

fuel shall be used only at the following times:

[i] When the primary source of energy is not available due to an

emergency outage.

[ii] During routine maintenance, or readiness testing for a short duration

of time and capped at 100 hours per year.

[iii] Routine maintenance testing of back-up fossil fuel-powered

generators is restricted to the hours of 9 am through 3 pm Monday through Friday.

[9] Water Usage

[a] No principal use on a data center site shall use private groundwater wells

or direct withdrawals from surface watercourses as its primary source of water for cooling purposes if a public water source is available.

[b] Data centers shall be designed to include a closed-loop water circulation system to cool data center processing equipment. An applicant may propose an alternative cooling system that can be demonstrated to use less water and energy than closed-loop systems to the satisfaction of the municipal engineer. An alternative cooling system shall not be approved unless the applicant also demonstrates that the alternative does not increase the volume, toxicity, mobility, flammability, or persistence of cooling fluid held on the site as compared to a closed-loop water or water-glycol system. No cooling system shall use a fluid containing per- and polyfluoroalkyl substances (PFAS). Approval of any cooling system under this subsection shall not relieve the applicant of the requirements of subsection [h].

[c] If the proposed source is from a public system, the applicant shall submit

certified documentation that the public authority has the capacity to supply the water needed.

[d] Where the data center is served entirely by a public water supply, items [ii],

[iii], [iv], and [v] may be waived by the municipal engineer upon written request; items [i], [vi], [vii], and [viii] shall not be waived., The applicant shall provide a water feasibility study, prepared by a qualified professional. The purpose of the water feasibility study is to determine if an adequate supply of water is present to support the proposed data center's water use and to evaluate the potential adverse effects on the quantity and quality of existing wells or nearby surface waters.

The water feasibility study shall include, at minimum, the following information:

[i] Calculations of the projected water needs, including seasonal

fluctuations.

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 6 of 14

[ii] A geologic map of the proposed project area within a radius of at least

one mile from the site property boundary.

[iii] The location of all existing and proposed wells within 1,000 feet of

the site property boundary with a notation of the capacity of all high- yield wells.

[iv] The location of all surface waters within 1,000 feet of the site property

boundary and all known point sources of pollution.

[v] A determination of the long-term safe yield of the water source.

[vi] A determination that the proposed water supply system poses no

adverse impacts on the quantity and quality of water in nearby wells, streams, and the groundwater table.

[vii] Identification of how water will be recycled, treated, or released into

surrounding water bodies.

[viii] A statement of the qualifications and the signature(s) of the

person(s) preparing the study.

[e] No approvals shall be granted until all required state and regional permits

have been obtained (i.e., PADEP, DRBC).

[f] The applicant shall provide a drought response plan to demonstrate

compliance with state, water supplier, and local drought declaration requirements.

[g] Wastewater disposal analysis:

[i] The applicant shall submit an analysis of wastewater disposal needs

to either a public sewer system or private system, indicating the quantity of wastewater generation expected. Wastewater shall include sewage and water discharged as part of the data center's HVAC system.

[ii] No wastewater, cooling fluid, or other liquid generated, used, or

stored at the data center shall be discharged or released, directly or indirectly, to any stormwater system, storm sewer, inlet, swale, basin, roof conductor, surface water, ground surface, soil, or groundwater. This prohibition shall not apply to (A) discharges expressly authorized under a valid NPDES permit or a valid industrial waste discharge permit issued under Chapter 188, Article IV of this Code; (B) de minimis quantities of untreated potable water; or (C) precipitation that has not come into contact with cooling fluid.

[iii] If wastewater will be conveyed and/or treated by a public system, the

applicant shall submit documentation certified by the public authority that the public authority can support the conveyance and treatment needed.

[iv] If the data center is to rely upon a private system of wastewater

disposal, a wastewater feasibility study shall be required. The

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 7 of 14

purpose of the study is to determine if there is an adequate capacity to dispose of wastewater and that the disposal technique does not pose adverse impacts on surrounding water bodies. A wastewater feasibility study shall include the following information at a minimum:

[A] Calculations of the projected wastewater generation including

the sources of wastewater.

[B] A geologic map of the area with a radius of at least one mile

from the site property boundary.

[C] The location of all existing and proposed wells within 1,000

feet of the property boundary, with reference to the capacity of all high-yield wells.

[D] The location of all surface waters within 1,000 feet of the

property boundary and all known point sources of pollution.

[E] Identification of the process by which water will be recycled

or released into surrounding water bodies.

[F] A determination that the proposed wastewater disposal

system has no adverse impact on the quantity and quality of water in nearby wells, surface waters, and the groundwater table.

[G] A statement of the qualifications and the signature(s) of the

person(s) preparing the study.

[h] Cooling Fluid Containment and Leak Prevention

[i] Definitions. For purposes of this subsection:

COOLING FLUID — Any liquid used to absorb, transport, or reject heat at a data center, together with any additive, corrosion inhibitor, scale inhibitor, biocide, or other chemical dosed into such liquid. The term includes chilled water, condenser water, deionized water, water- glycol solutions employing ethylene glycol or propylene glycol, direct- to-chip coolant, and single-phase and two-phase dielectric immersion fluid. The term does not include potable water prior to introduction into a cooling system, or stormwater.

TOTAL COOLING FLUID INVENTORY — The aggregate maximum design volume, in gallons, of all cooling fluid on the site at any one time, including fluid held in reserve for make-up or replacement.

[ii] Applicability. This subsection applies to any data center with a Total Cooling Fluid Inventory of 1,000 gallons or more or employing any cooling fluid other than untreated potable water. Designation of a system as closed-loop under subsection [b] shall not exempt a data center from this subsection.

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 8 of 14

[iii] Secondary containment. All cooling fluid tanks, buffer tanks, day tanks, immersion tanks, coolant distribution units, heat exchangers, dry coolers, and associated piping that are located outside a fully enclosed building, and all such components with an individual capacity of 250 gallons or more wherever located, shall be provided with secondary containment. Secondary containment shall:

[A] Hold not less than 110% of the capacity of the largest single component served, plus, where open to precipitation, the runoff volume from a 25-year, 24-hour storm event falling within the containment area;

[B] Be constructed of materials impervious to and chemically compatible with the cooling fluid contained and be sealed against infiltration to soil or groundwater. Earthen berms alone shall not satisfy this subsection;

[C] Contain no drain or penetration discharging outside the containment area; and

[D] Where cooling fluid piping crosses above or within 50 feet of any stormwater management facility, riparian buffer, wetland, watercourse, floodplain, well, or wellhead protection area, be provided as continuous secondary containment or a jacketed double-wall piping configuration.

Interior rooms containing coolant distribution units, immersion tanks, buffer tanks, or heat exchangers shall have liquid-tight floors with curbs or recessed slabs draining to a containment sump. No such floor drain shall discharge to the sanitary sewer, to any stormwater facility, or to the ground.

[iv] Leak detection and isolation. Each cooling fluid loop and each secondary containment area shall be equipped with automatic leak detection annunciating at a continuously attended location or by automatic remote notification to on-call personnel, twenty-four hours per day. Loops of 1,000 gallons or more shall be equipped with segment isolation valves and automatic pump shutdown upon a confirmed leak. Make-up fluid volume shall be metered and recorded; cumulative unexplained make-up exceeding 5% of a loop's design volume in any 30-day period shall be investigated and reported in writing to the Township within 10 days.

[v] Cooling Fluid Management Plan. As a submission item for preliminary land development approval, and prior to issuance of any occupancy permit, the applicant shall submit for municipal engineer review a Cooling Fluid Management Plan containing:

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 9 of 14

[A] Each cooling fluid to be used, by trade name and chemical constituents, with a Safety Data Sheet for each, and the identity and dosing rate of every treatment chemical;

[B] Total Cooling Fluid Inventory and the design volume of each individual loop and component;

[C] Plans showing all cooling fluid components, all secondary containment areas with volume calculations, all leak detection devices, and all isolation valves;

[D] The management procedure for each release pathway, expressly addressing maintenance draindown, expansion tank and relief valve discharge, filter and strainer flushing, scheduled fluid changeout, and freeze protection of outdoor components;

[E] The method, licensed hauler, and permitted destination facility for off-site management of spent cooling fluid, with acknowledgment of the applicant's obligation to make a waste determination under 25 Pa. Code Chapter 287 and, where applicable, 40 CFR Part 261;

[F] Any Preparedness, Prevention and Contingency Plan prepared consistent with PA DEP Document 400-2200-001, and any Spill Prevention, Control and Countermeasure Plan required under 40 CFR Part 112;

[G] Backflow prevention details for every connection between the potable water system and any cooling loop containing glycol or treatment chemicals, consistent with the adopted plumbing code; and

[H] Certification by a professional engineer licensed in the Commonwealth of Pennsylvania that clauses [iii] and [iv] are satisfied.

The Plan shall be updated and resubmitted prior to any change in cooling fluid type, any increase in Total Cooling Fluid Inventory exceeding 10%, and not less than once every three years.

[vi] Release notification. Upon any release of cooling fluid not fully retained within secondary containment, the operator shall immediately notify by telephone the Township, the East Goshen Township Municipal Authority, and, where required by 25 Pa. Code § 91.33, the Pennsylvania Department of Environmental Protection, stating the location, the fluid and additives involved, the estimated volume, and corrective actions planned or taken. Within five days the operator shall submit to the Township a written report describing the cause, the volume released and recovered, the media affected, and measures to

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 10 of 14

prevent recurrence. Notification shall not relieve the operator of liability.

[vii] Annual reporting and testing. The operator shall file annually with the Township a Cooling Fluid Inventory Report stating, for each cooling fluid, the volume on site, make-up volume added during the year, volume removed for disposal or recycling, and the destination facility for each removal. Secondary containment integrity and leak detection function shall be tested at least annually, with records retained five years and available to the Township on request.

[viii] Continuing condition. Compliance with this subsection is a continuing condition of conditional use approval and shall survive issuance of the certificate of occupancy.

[10] Noise and Vibration.

[a] The applicant shall submit a pre-construction noise and vibration study with

the conditional use application prepared and sealed by a qualified professional. Such qualified professional shall be an engineer licensed in the Commonwealth of Pennsylvania or other environmental or technical professional with demonstrated education, training and experience in acoustical noise or vibration analysis applicable to the scope of work being performed (defined herein as "Qualified Professional") to include the predicted noise and vibration levels from the operation of the Data Center.

[b] Simultaneous Operation Assumption. All noise evaluations, studies,

modeling, and compliance determinations shall assume the concurrent operation of all generators, cooling systems, mechanical equipment, and other noise-producing devices operating at maximum rated capacity, unless a more restrictive operating condition is required by approval.

[c] Within 90 days following issuance of a use and occupancy certificate and

commencement of operations at the Data Center, the applicant shall submit to the Township an as-built post-construction noise and vibration study. The study shall:

[i] Be conducted by a Qualified Professional using applicable ANSI

standards and generally accepted criteria.

[ii] Demonstrate compliance with all applicable noise regulations set

forth in the Data Center Noise Standards Tables at the end of this section. Compliance shall be demonstrated using objective sound level limits expressed in A‑weighted decibels (dBA), measured and evaluated in accordance with standardized methodologies acceptable to the Township.

[iii] Include sound measurements taken at all property lines.

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 11 of 14

[iv] Include measurements taken during normal operations, peak

cooling load, and during operation of emergency generators under load.

[v] Address low‑frequency noise impacts, including compliance with

applicable decibels (dBC) limits set forth in the Data Center Noise Standards Tables.

[vi] Vibration Standards to be used in the study. Vibration shall be

evaluated using three distinct criteria:

[A] Building Damage: Ground vibration shall not exceed 0.2 to

0.5 inches per second peak particle velocity (PPV), measured in accordance with USBM RI 8507 or successor standard; and,

[B] Human Perception: Vibration levels shall not exceed 65 VdB,

measured in accordance with ISO 2631‑1 or successor standard.

[C] Vibration at nearest Residential Receptor Limit shall use

standard ISO 2631-2 / FTA and not to exceed 72 Vd(B).

[vii] Identify all measurement locations, instrumentation used,

calibration documentation, testing methodology, operational conditions during testing, and meteorological conditions.

[viii] The timing of the post construction noise and vibration study shall

not preclude enforcement by the Township at any time upon identification of a violation. The applicant shall provide reasonable access to monitoring data, equipment specifications, and operating conditions to the Township Engineer, designee or other consultant acting on behalf of the Township.

[d] If the post construction study demonstrates non-compliance with any

applicable noise or vibration standard, the applicant shall, within 30 days of written notice from the Township, submit a corrective action plan prepared by a Qualified Professional. All violations shall be fully remediated within a timeframe approved by the Township, but in no event later than 90 days following Township notice of non-compliance, unless extended by the Township for good cause shown.

[e] If the pre-construction noise study establishes a baseline sound level in

excess of the maximum sound level permitted under Data Center Noise Standards Tables, the post-construction study shall demonstrate that operations of the proposed use do not increase baseline ambient sound levels. Sound levels within 1 dBA of ambient sound levels will meet this requirement.

[f] Objective Noise Standards. Noise limits shall be established by land use

category, measurement location, time‑of‑day, and averaging period, and

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 12 of 14

shall include provisions for instrumentation and low‑frequency noise evaluation.

[g] The Township may require additional noise and vibration testing upon

receipt of substantiated complaints or following material modification, replacement, or addition of mechanical equipment, cooling systems, generators, or other vibration-generating equipment.

[h] If initial monitoring or complaints indicate a probable violation, the Township

may require interim mitigation measures, which may include operational modifications, equipment limitations, or temporary curtailment of specific noise producing activities until compliance is demonstrated.

[i] Data Center Noise Standards Tables

Data Center Noise Standards Tables

The following tables establish objective noise limits, modeling requirements, and enforcement procedures applicable to Data Center use. These standards shall supersede noise standards set forth in any noise chapters or noise provisions of the Code for Data Centers only.

Table 1: Data Center Noise Limits, Measurement, and Compliance Requirements

Requirement Category Applicable Uses

Applicable Uses Data Centers, including all accessory mechanical equipment, generators, cooling systems, and substations

Measurement Basis A-weighted sound levels (dBA), unless noted otherwise for low-frequency noise

Receptor Locations Measurements and modeling shall be conducted at or beyond the nearest property line

Operating Condition Assumption

All compliance evaluations shall assume simultaneous operation of all generators, cooling equipment, and other noise-producing devices at maximum rated capacity

Table 2: Numeric Noise Limits by Zoning Use

Receiving Land Use Daytime (7:00 AM – 10:00 PM) 7:00 PM

Nighttime 7:00 PM (10:00 PM – 7:00 AM)

Residential 55 dBA Leq (1-hour) 45 dBA Leq (1-hour)

Mixed-Use / Commercial 60 dBA Leq (1-hour) 50 dBA Leq (1-hour)

Industrial 65 dBA Leq (1-hour) 55 dBA Leq (1-hour)

Short-term tonal or impulsive noise exceeding the above limits by 5 dBA or more shall constitute a violation.

Commented [KK2]: Pipeline Task Force recommendation to revise daytime/nightime hours

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 13 of 14

Table 3: Low-Frequency Noise Criteria

Parameter Requirement

Frequency Sensitivity C-weighted sound levels (dBC), capturing enhanced sensitivity to low-frequency noise

Measurement Metric Equivalent continuous sound level (Leq, 1-hour) in dBC

Measurement Locations At the nearest property line

Daytime Limit (7:00 AM – 10:00 PM) 7:00 PM 70 dBC Leq (1-hour) 60 dBC Leq (1-hour)

Nighttime Limit 7:00 AM (10:00 PM – 7:00 AM) 60 dBC Leq (1-hour) 50 dBC Leq (1-hour)

Tonal / Narrowband Noise

Clearly perceptible low-frequency tonal noise shall require mitigation regardless of overall dBC compliance, as determined by the Qualified Professional or the Township based on clearly perceptible tonal characteristics

Applicability Limits apply under simultaneous operation of all generators, cooling systems, and mechanical equipment

Table 4: Modeling and Study Requirements

Requirement Standard

Pre-construction Study Required with conditional use application

Post-construction Verification Required within 90 days of commencement of operations

Prepared By Qualified Professional with demonstrated noise expertise

Modeling Methodology ISO 9613-2, CadnaA, SoundPLAN, or equivalent accepted industry model

Meteorological Assumptions Downwind propagation, ISO-conservative conditions

Equipment Data Manufacturer sound power levels and octave-band spectra

Low-Frequency Evaluation

Required where large generators or cooling systems are used

Table 5: Measurement Procedures

Element Requirement

Commented [KK3]: Pipeline Task Force recommendation for daytime/nightime hours and reduced dBC limits

Commented [KK4]: Pipeline Task Force recommendation: “The term ‘large’ should be defined to state a specific size for the generator or cooling system. This could be accomplished in Section 1 Definitions or by a reference.”

Yellow highlight- Amended prior to 9/1/26 Green highlight- New recommendations as of 9/17/26

Page 14 of 14

Instrumentation Type 1 or Type 2 ANSI-certified sound level meter

Calibration Pre- and post-measurement field calibration required

Measurement Duration

Minimum 15 minutes per location unless otherwise specified. Sound level limits expressed as hourly equivalent levels (Leq, 1‑hour) may be evaluated using shorter‑duration measurements, including the minimum durations identified in this table, where such measurements are conducted under steady‑state operating conditions and are representative of normal operations.

Operating Conditions Measurements shall include peak cooling load and generator operation under load

Background Noise Baseline ambient levels documented prior to construction

Table 6: Compliance

Item Requirement

Material Increase Definition An increase of ≥ 3 dBA above baseline ambient sound level

Violation Determination Exceedance of numeric limits or material increase

Retesting Authority Township may require additional testing following substantiated complaints or equipment change

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

-

“ ”

PS

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

—

—

—

—

—

—

—

—

-

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS PS

PS

PS

PS

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

’

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

- -

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

P

E

N

N

S

Y

L

V

A

N

I

A

GEORGE S. MAALOUF ENGINEER

PROFESSIONAL

REGISTERED

PE074617

C

O

M

M

O

N

W

E

A

L

T

H

O

F

’

’

CIVIL AND SITE DESIGN SPECIALISTS

BY ALPHA DESIGNS, LLC

GENERAL NOTES:

—

—

—

—

—

—

—

—

1" = 1000'

HUNT COUNTRY - COVER SHEET

20 G-001

JJ JJ BD

SCALE: 1" = 1000'

GENERAL

N

CONSULTANT

CLIENT

AQUA PENNSYLVANIA, INC.

762 Lancaster Ave Bryn Mawr, PA 19010 877.987.2782 tel www.aquawater.com

PROJECT

PFAS TREATMENT WELL PACKAGE A.4

REGISTRATION

CONSULTANTS

60754405

AECOM 625 West Ridge Pk, Ste E-100 Conshohocken, PA 19428 610.234.5402 tel www.aecom.com

I/R DATE DESCRIPTION

ISSUE/REVISION

1

1 2 3 4 5

2 3 4 5

D

Designed By:

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

DISCIPLINE

Drawn By:

Dept Check:

Proj Check:

Date:

Scale:

C

B

A

BD

HUNT COUNTRY LOCATION MAP

SITE LOCATION: THORNCROFT DR WEST CHESTER, PA LAT: 39.9920 LONG: -75.5245

MAIN SYSTEM EAST GOSHEN TOWNSHIP LAND DEVELOPMENT PLANS FOR AQUA PA PFAS TREATMENT WELL PACKAGE A.4 - MAIN SYSTEM

AUGUST 2026

SHEET INDEX

SHEET NO. TITLE

20 G-001 HUNT COUNTRY - COVER SHEET

00 C-001 CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES

20 C-101 HUNT COUNTRY - SITE PLAN

99 C-501 DETAILS I

99 C-502 DETAILS II

99 C-503 E&S DETAILS I

99 C-504 E&S DETAILS II

99 C-505 E&S DETAILS III

99 C-506 PLANTING DETAILS

AUGUST 2026

JJ JJ BD

-

00 C-001

CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES

CIVIL

X X

X X X

LOD LOD LOD LOD

CONSULTANT

CLIENT

AQUA PENNSYLVANIA, INC.

762 Lancaster Ave Bryn Mawr, PA 19010 877.987.2782 tel www.aquawater.com

PROJECT

PFAS TREATMENT WELL PACKAGE A.4

REGISTRATION

CONSULTANTS

60754405

AECOM 625 West Ridge Pk, Ste E-100 Conshohocken, PA 19428 610.234.5402 tel www.aecom.com

I/R DATE DESCRIPTION

ISSUE/REVISION

1

1 2 3 4 5

2 3 4 5

D

Designed By:

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

DISCIPLINE

Drawn By:

Dept Check:

Proj Check:

Date:

Scale:

C

B

A

BD

W W

MAIN SYSTEM

AUGUST 2026

THORNCROFT DRIVE

(T-594, 50' WIDE)

JEFFERSON DOWNS

(T-596, 50' WIDE)

11°19'07" L=117.54' CH=117.35' S28°13'46"E

N67°25'46"E 295.00'

N16

N67°25'46"E 295.00'

S13°30'01"E 167.90'

R=595.00' D =10°52'08" L=112.87' CH=112.70' N17°08'09"W

HUNT COUNTRY

WELL FACILITY

6' DIA IX SYSTEM ON 10'x22' CONCRETE PAD TOC EL 392.25 (SEE SHT. 20 D-101)

COMPOST FILTER SOCK (SEE DETAIL)

INSTALL PRE-CONSTRUCTED RUMBLE PADS (SEE DETAIL)

LIMIT OF DISTURBANCE

6" DI FIL IX INFLUENT (SEE D DWGS)

6" DI IX EFFLUENT (SEE D DWGS)

6" DI FROM WELLS C & D (SEE D DWGS)

WELL B LOCATION; REPLACE WELL PUMP

AND PRESSURE

TRANSDUCER (REFER TO MECHANICAL

PUMP SCHEDULE)

BOLLARD (TYP.)

6" DI FILTER BYPASS WELLS C & D (SEE D DWGS)

6" DI FILTER BYPASS WELLS A & B (SEE D DWGS)

DEMO EXISTING 3'x14' CONCRETE RAMP TO INSTALL PIPING SHOWN

AND REPLACE IN KIND EL VARIES, MAX TOC EL 393.78

(SEE S DWGS)

CONCRETE RAMP BW EL 392.42

CONCRETE RAMP

BW EL 393.39

SCREENING TREES (TYP.)

TEMPORARY IX BYPASS

(SEE D DWGS)

CONCRETE LANDING (TYP) (SEE SIDEWALK DETAIL)

AQUA PA EXISTING UTILITY EASEMENT BOUNDARY

WELL C LOCATION;

LAT: 39.990595 LONG:-75.524687 REPLACE WELL PUMP AND

PRESSURE TRANSDUCER

(REFER TO MECHANICAL

PUMP SCHEDULE)

WELL D LOCATION;

LAT:39.988867 LONG:-75.524006 REPLACE WELL PUMP AND

PRESSURE TRANSDUCER

(REFER TO MECHANICAL

PUMP SCHEDULE)

SCALE: 1" = 20'

0 20 20 40

N

1" = 20'

C:\USERS\JULIANOJ\DC\ACCDOCS\AECOM\CI-AMER(US)-60754405-AQUA PFAS WELL PACKAGE A.4\PROJECT FILES\900 DESIGN\20-SHEETS\C\EAST GOSHEN LD\20 C-101.DWG PATH/FILENAME:

LAST UPDATE:

PLOT DATE: Wednesday, August 19, 2026 3:25:21 PM

Wednesday, August 19, 2026 3:24:44 PM

CONSULTANT

CLIENT

AQUA PENNSYLVANIA, INC.

762 Lancaster Ave Bryn Mawr, PA 19010 877.987.2782 tel www.aquawater.com

PROJECT

PFAS TREATMENT

WELL PACKAGE A.4

REGISTRATION

CONSULTANTS

60754405

AECOM 625 West Ridge Pk, Ste E-100 Conshohocken, PA 19428 610.234.5402 tel www.aecom.com

I/R DATE DESCRIPTION

ISSUE/REVISION

1

1 2 3 4 5

2 3 4 5

D

Designed By:

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

DISCIPLINE

Drawn By:

Dept Check:

Proj Check:

Date:

Scale:

C

B

A

BD

HUNT COUNTRY - SITE PLAN

SCALE: 1" = 20'

JJ DK BD

1" = 20'

20 C-101

HUNT COUNTRY - SITE PLAN

CIVIL

NOTES:

1. FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES, SEE SHEET 00 C-001.

2. FOR DETAILS, SEE 99 SERIES OF CIVIL SHEETS.

3. WELL B IS LOCATED AT THE SITE OF THE WELL HOUSE BUILDING. WELLS A, C, AND D ARE LOCATED AT SATELLITE LOCATIONS. SEE INSET MAPS.

4. LIMIT OF DISTURBANCE: 4,504 SQFT.

5. ALL EXISTING IMPERVIOUS WITHIN THE EASEMENT WAS INSTALLED PRIOR TO OCTOBER 22, 2003 (RECORD DRAWINGS 1986-87).

WELL A LOCATION WELL C LOCATION

SCALE: 1" = 20'

WELL D LOCATION

SCALE: 1" = 20'

WELL A LOCATION;

LAT: 39.993326 LONG:-75.525261

NOT TO SCALE

REPLACE WELL PUMP AND PRESSURE TRANSDUCER (REFER TO MECHANICAL PUMP SCHEDULE)

TABLE 1: SITE INFORMATION

LOT 53 LOT 54 AQUA PA UTILITY EASEMENT

ADDRESS 620 THORNCROFT DR, WEST CHESTER, PA 19380

622 THORNCROFT DR, WEST CHESTER, PA 19380

BETWEEN 620 AND 622 THORNCROFT DR, WEST CHESTER,

PA 19380

PARCEL ID 53-4-132.35 53-4-132.36 N/A

ACREAGE 0.9229 ACRES (40,202 SQFT) 0.9749 ACRES (42,468 SQFT) 0.2365 ACRES (10,302 SQFT)

TABLE 2: ZONING INFORMATION

ZONING DISTRICT R-2

MAX. BUILDING HEIGHT 30'

TOTAL EXISTING IMPERVIOUS WITHIN

EASEMENT 4,525 SQFT

TOTAL PROPOSED IMPERVIOUS 244 SQFT

REMOVAL OF EXISTING IMPERVIOUS 100 SQFT

PROPOSED NET IMPERVIOUS 144 SQFT

AUGUST 2026

MAIN SYSTEM

JJ JJ BD

-

DETAILS I

CIVIL

99 C-501

EXISTING PAVEMENT, 3" THICK (TYP.)

10" PROCESS STONE BASE COURSE BACKFILL

9" MIN. (TYP.)

UNDISTURBED MATERIAL

NOTE:

1.

COMPACTED TRENCH

REMOVE AND DISPOSE OF EXCESS MATERIAL TO LOCATION AS DIRECTED BY THE ENGINEER.

ASPHALT BINDER COURSE. MATCH EXISTING BINDER AND TOP COURSE THICKNESS. MAXIMUM PAYMENT WIDTH IS 9.5 FT.

CONSULTANT

CLIENT

AQUA PENNSYLVANIA, INC.

762 Lancaster Ave Bryn Mawr, PA 19010 877.987.2782 tel www.aquawater.com

PROJECT

PFAS TREATMENT WELL PACKAGE A.4

REGISTRATION

CONSULTANTS

60754405

AECOM 625 West Ridge Pk, Ste E-100 Conshohocken, PA 19428 610.234.5402 tel www.aecom.com

I/R DATE DESCRIPTION

ISSUE/REVISION

1

1 2 3 4 5

2 3 4 5

D

Designed By:

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

DISCIPLINE

Drawn By:

Dept Check:

Proj Check:

Date:

Scale:

C

B

A

BD

OR SHEETING 6"

AGAINST UNDISTURBED MATERIAL

COMPACTED SCREENED GRAVEL

EXCAVATION

FOR NORMAL

PAYMENT LIMITS

MATERIAL

UNDISTURBED

ROCK EXCAVATION

PAYMENT LIMITS FOR

AS SPECIFIED

MATERIAL, COMPACTED

SELECTED EXCAVATED

PIPE ZONE

THIS LINE

PROJECT BEYOND

MATERIAL SHALL

UNEXCAVATED

NO LEDGE OR

INDICATED OR DIRECTED

EXCEPT WHERE OTHERWISE

OF PIPE ZONE,

PLACE BELOW TOP

SHALL BE LEFT IN

SHEETING IF USED

D

2 2 2 Wu/ Ws/ OR Wu/

TRENCH WIDTH Ws OR Wu

IN EARTH

HALF SECTION IN ROCK

HALF SECTION

12"

6"

6"

6" MIN.

D + 7-0"

9'-0"

>20' D 0 TO 12' 12' TO 20'

DIAMETER

LEFT IN PLACE BELOW A LINE 1'-0" ABOVE THE TOP OF PIPE.

OVER 24" D + 5'-0"

7'-0" 24" AND SMALLER D + 3'-0"

5'-0"

BELOW GROUND SURFACE

DEPTH OF PIPE INVERT NOMINAL PIPE

3.

2.

1.

BELOW NORMAL DEPTH, IS REQUIRED. SHEETING SHALL BE

SHEETING MUST BE USED IF EXCAVATION AND BACKFILL,

Wu BELOW THE TOP OF PIPE ZONE.

TRENCHES SHALL NOT BE EXCAVATED BEYOND THE TRENCH WIDTH

Ws (SHEETED) OR Wu (UNSHEETED) ABOVE THE TOP OF PIPE ZONE.

PIPE TRENCHES MAY BE EXCAVATED WIDER THAN TRENCH WIDTH

2D + 10-0" TWO 24" 2D + 8'-0" 2D + 6'-0"

12" OF GRAVEL

AS DIRECTED

SCREENED GRAVEL OR SAND,

PIPE BACKFILLED WITH

COMPACTED ZONE AROUND

BETWEEN PIPES

CLEARANCE

3'-0" MIN.

TYP.

6" MIN.

COMPACTED FILL

MATERIAL OR

UNDISTURBED NORMAL EXCAVATION

LIMITS FOR

IN EARTH

6" BELOW LOWEST PIPE

BOLLARD DETAIL

6"Ø SCH. 40 STL. PIPE FILLED WITH CONCRETE

4' 0" 4' 0"

NOTES: 1. A METALLIC LINED UNDERGROUND WARNING TAPE SHALL BE PLACED AT 12" DEEP, THE ENTIRE LENGTH OF ALL BURIED WATER PIPE. THE TAPE SHALL BE 6", METALLIC CORE, COLOR BLUE, MARKED "BURIED WATER LINE BELOW". TAPE SHALL BE EQUAL TO "SETON NAMEPLATE CORPORATION". 2. ALL CONSTRUCTION IN ROADWAYS SHALL MEET PENNDOT REQUIREMENTS AT A MINIMUM. 3. CONTRACTOR SHALL REPLACE ALL DAMAGED PAVEMENT OUTSIDE OF SAW CUT WIDTH SHOWN AT NO COST TO OWNER. 4. SPECIFICATIONS PROVIDE ADDITIONAL REQUIREMENTS. 5. 12 GA COPPER TRACER WIRE SHALL BE PLACED ALONG ENTIRE LENGTH OF THE WATER LINE AND SHALL BE ACCESSIBLE FROM INSIDE VALVE COVERS.

4" TOPSOIL, SEED & MULCH

BACKFILL SHALL BY TYPE B BORROW COMPACTED TO 95% STANDARD PROCTOR

METALLIC WARNING TAPE AT 12" DEPTH

FILTER FABRIC

12 GA COPPER TRACER WIRE (SEE NOTE 6)

TYPE C (PA 1B) STONE TO 4" OVER THE PIPE

6" MIN

TYPE C (PA 1B) STONE BEDDING

36" MIN.

4' MIN.

12"

2A (MAX 6" LIFTS) COMPACTED TO 95% STANDARD PROCTOR

UNPAVED TO EDGE OF CARTWAY

NOTE: PAVING RESTORATION SHALL MEET MINIMUM THICKNESS SHOWN OR MATCH EXISTING CONDITIONS, WHICHEVER IS GREATER.

SAW CUT AND MATCH GRADE

MILL AND OVERLAY W/2" (9.5 mm) SUPERPAVE BINDER COURSE

4.5" (19.5mm) SUPERPAVE BASE COURSE

6" (2A) STONE

PIPE (SEE PLANS FOR PIPE SIZES)

YELLOW BOLLARD SLEEVE

FINISH CONC. TO MATCH GRADE

FILL WITH CONC. 18"Ø MIN.

CONCRETE BRICK

MULTIPLE PIPE TRENCH SECTION

PAVEMENT TRENCH REPAIR

TYPICAL TRENCH DETAIL

GENERAL NOTES FOR PIPE TRENCHES

TRENCH SECTION FOR PIPE 18 INCH DIAMETER OR SMALLER

NOT TO SCALE

FOOTING SEE FENCE SECTION

2 3/8" O.D. LINE POSTS 2 7/8" O.D. END, CORNER AND PULL POSTS

BARBED SELVAGE

2" X 2" X 9 GA. WOVEN WIRE FABRIC

7 GA. TENSION WIRE

1 5/8" O.D. TOP RAIL

10' MAX.

NOT TO SCALE

STRAND OF BARBED WIRE

AT GATE POST

TIES 1'-2" O.C. (MAX.)

POSTS @ 10' MAXIMUM SPACING.

FINISH GRADE

3000 PSI CONCRETE FOOTING

6" + POST O.D. MINIMUM DIAMETER

EXTENSION ARM

3'-0" LINE POSTS 3'-6" END, CORNER PULL AND GATE POSTS

MATCH EXISTING 6"

3"

CHAIN LINK FENCE DETAIL

CHAIN LINK FENCED SECTION WITH BARBED WIRE

FINISH GRADE

PREPARED SUBGRADE

3000 PSI CONCRETE

6x6-W1.4xW1.4 WELDED WIRE FABRIC

2A MODIFIED CRUSHED STONE GRAVEL BASE COURSE

NOT TO SCALE

VARIES

6" 4"

CONCRETE SIDEWALK DETAIL

MATCH EXISTING

HEIGHT

MAIN SYSTEM

AUGUST 2026

JJ DK BD

NO SCALE

99 C-502

DETAILS II

CIVIL

CONSULTANT

CLIENT

AQUA PENNSYLVANIA, INC.

762 Lancaster Ave Bryn Mawr, PA 19010 877.987.2782 tel www.aquawater.com

PROJECT

PFAS TREATMENT WELL PACKAGE A.4

REGISTRATION

CONSULTANTS

60754405

AECOM 625 West Ridge Pk, Ste E-100 Conshohocken, PA 19428 610.234.5402 tel www.aecom.com

I/R DATE DESCRIPTION

ISSUE/REVISION

1

1 2 3 4 5

2 3 4 5

D

Designed By:

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

DISCIPLINE

Drawn By:

Dept Check:

Proj Check:

Date:

Scale:

C

B

A

BD

BUTTRESS FOR TEES

SCALE: NTS

BUTTRESS FOR CAPS

SCALE: NTS

BUTTRESS FOR HORIZONTAL BENDS

SCALE: NTS

ANCHORAGE FOR UPPER VERTICAL BENDS

SCALE: NTS

ANCHORAGE FOR UPPER LOWER VERTICAL BENDS

SCALE: NTS

BUTTRESS FOR WYE CONNECTION

SCALE: NTS

MAIN SYSTEM

AUGUST 2026

JJ JJ BD

-

E&S DETAILS I

CIVIL

99 C-503

CONSULTANT

CLIENT

AQUA PENNSYLVANIA, INC.

762 Lancaster Ave Bryn Mawr, PA 19010 877.987.2782 tel www.aquawater.com

PROJECT

PFAS TREATMENT WELL PACKAGE A.4

REGISTRATION

CONSULTANTS

60754405

AECOM 625 West Ridge Pk, Ste E-100 Conshohocken, PA 19428 610.234.5402 tel www.aecom.com

I/R DATE DESCRIPTION

ISSUE/REVISION

1

1 2 3 4 5

2 3 4 5

D

Designed By:

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

DISCIPLINE

Drawn By:

Dept Check:

Proj Check:

Date:

Scale:

C

B

A

BD

CONCRETE WASHOUT

NOT TO SCALE

NOTES:

1. INSTALL ON FLAT (<2%) GRADE FOR OPTIMUM PERFORMANCE.

2. 18" DIAMETER FILTER SOCK MAY BE STACKED ONTO DOUBLE 24" DIAMETER SOCKS IN PYRAMIDAL CONFIGURATION FOR ADDED HEIGHT.

3. A SUITABLE IMPERMEABLE GEOMEMBRANE SHALL BE PLACED AT THE LOCATION OF THE WASHOUT PRIOR TO INSTALLING THE SOCKS.

4. DO NOT PLACE WASHOUT FACILITY WITHIN 50 FEET OF STORM DRAINS, OPEN DITCHES, OR SURFACE WATERS.

5. CONCRETE WASHOUT IS INCIDENTAL TO RESPECTIVE CONCRETE CONSTRUCTION ITEMS.

SITE INFORMATION

CH. 93 DESIGNATED USE IMPAIRMENTS REQUIRING ANTIDEGRADATION ANALYSIS ABACT REQUIRED? (Y/N)

DEER RUN HQ-TSF NONE Y

HUNT COUNTRY HQ-TSF NONE Y

IVY RIDGE TSF EUTROPHICATION, FLOW REGIME MODIFICATION

Y

MEYERS TRACT TSF SILTATION, FLOW REGIME MODIFICATION

Y

PEDDLER'S VIEW HQ-CWF FLOW REGIME MODIFICATION, HABITAT ALTERATIONS, SILTATION

Y

*ABACT IS REQUIRED FOR RECEIVING STREAMS WITH A CH. 93 DESIGNATED USE OF HIGH QUALITY (HQ) OR EXCEPTIONAL VALUE (EV) OR IF THE STREAM HAS IMPAIRMENTS REQUIRING ANTIDEGRADATION ANALYSIS. **IMPAIRMENTS REQUIRING ANTIDEGRADATION ANALYSIS ACCORDING TO THE 2024 DEP INTEGRATED WATER QUALITY REPORT INCLUDE: SILATATION, TURBIDITY, TSS, ALGAE, EUTROPHICATION, NUTRIENTS, FLOW REGIME MODIFICATION, AND HABITAT ALTERATIONS

1. CONDUCT ALL EARTH DISTURBANCE ACTIVITIES WITHIN THE LIMIT OF DISTURBANCE. CLEARLY MARK THE LIMIT OF DISTURBANCE PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES.

2. STABILIZED DISTURBED AREAS THAT ARE TO BE IMMEDIATELY STABILIZED BEFORE THE END OF EACH WORKING DAY.

3. PERMANENTLY STABILIZE DISTURBED AREAS PROMPTLY AFTER FINAL EARTH MOVING HAS BEEN COMPLETED. WHERE IT IS NOT POSSIBLE TO PROVIDE PERMANENT STABILIZATION, PROMPTLY IMPLEMENT INTERIM STABILIZATION MEASURES AND MAINTAIN UNTIL FINAL STABILIZATION CAN BE ACHIEVED.

4. CLEAN UP DISCARDED MATERIAL AND DEBRIS WITHIN EACH SCHEDULED SECTION OF CONSTRUCTION IMMEDIATELY AFTER COMPLETION OF EACH SECTION. MAINTAIN AN AREA THAT IS CLEAN AND FREE OF ANY MATERIAL RESULTING FROM THE WORK.

5. FOR MATERIALS THAT MAY REQUIRE SPECIAL DISPOSAL (SUCH AS DISCARDED HAZARDOUS MATERIALS), ENSURE THE MATERIAL IS DISPOSED OF AT A FACILITY PERMITTED TO ACCEPT SUCH MATERIALS.

6. ENSURE THAT ALL OFF-SITE WASTE AND BORROW SITES HAVE AN APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN.

7. ENSURE ALL FILL MATERIAL BROUGHT ON SITE IS CLEAN FILL. CLEAN FILL IN ACCORDANCE WITH THE PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION'S MANAGEMENT OF FILL POLICY.

8. PLACE EARTHEN FILL IN COMPACTED LAYERS NOT EXCEEDING 9 INCHES IN THICKNESS.

9. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHOULD NOT BE INCORPORATED INTO FILLS.

10. DO NOT PLACE FILL ON SATURATED OR FROZEN SURFACES.

11. ASSIGN A QUALIFIED INDIVIDUAL TRAINED AND EXPERIENCED IN EROSION AND SEDIMENT POLLUTION CONTROL AS THE OPERATOR/RESPONSIBLE PERSON (O/RP) TO PERFORM THE DUTIES DESCRIBED HEREIN.

12. DIRECT THE O/RP TO PERFORM VISUAL INSPECTIONS OF ALL E&SPC BMPS ON A WEEKLY BASIS AND AFTER ALL RUNOFF EVENTS TO ENSURE PROPER INSTALLATION AND MAINTENANCE TO EFFECTIVELY MINIMIZE POLLUTION TO WATERS OF THE COMMONWEALTH. SUBMIT A WRITTEN REPORT TO THE ENGINEER AND BUCKS COUNTY CONSERVATION DISTRICT. INCLUDE AT A MINIMUM (1) A SUMMARY OF SITE CONDITIONS, E&SPC BMP IMPLEMENTATION, MAINTENANCE ACTIVITIES, AND COMPLIANCE ACTIONS, AND (2) THE DATE, TIME, NAME, AND SIGNATURE OF THE OR/P WHO PERFORMED THE INSPECTION.

NOTES:

1. PROVIDE A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. IT IS RECOMMENDED THAT BAGS BE PLACED ON STRAPS TO FACILITATE REMOVAL.

2. BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.

3. NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHOULD BE INSTALLED BELOW BAGS LOCATED WITHIN 50 FEET OF RECEIVING STREAM OR WHERE GRASSY AREA IS NOT AVAILABLE. A COMPOST BERM OR COMPOST FILTER SOCK SHALL BE PLACED BELOW ANY BAG DISCHARGING TO A SPECIAL PROTECTION SURFACE WATER.

4. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.

5. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1.2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHOULD BE FLOATING AND SCREENED.

6. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.

7. LOCATE BAG IN LEVEL AREAS (LESS THAN 5% GRADE). WHEN LEVEL AREAS ARE NOT AVAILABLE, PLACE AASHTO NO. 57 COARSE AGGREGATE TO LEVEL THE BAG.

PUMPED WATER FILTER BAG

NOT TO SCALE

NOT TO SCALE ROCK FILTER OUTLET

1 MIN.

1 MIN.

1 MIN. 1

1

1

OPTIONAL 6 IN. COMPOST LAYER FIRMLY ANCHORED

OPTIONAL 6 IN. SUMP

AASHTO NO. 57 6 IN. MIN

R-3 ROCK

WOOD POSTS

HEIGHT OF ROCK FILTER=5/6 HEIGHT OF STRAW BALES OR FILTER FABRIC FENCE

AASHTO NO. 57

STRAW BALES OR FILTER FABRIC

OUTLET CROSS-SECTION

UP-SLOPE FACE

NOTES:

A ROCK FILTER OUTLET SHALL BE INSTALLED WHERE FAILURE OF A SILT FENCE OR STRAW BALE BARRIER HAS OCCURRED DUE TO CONCENTRATED FLOW. ANCHORED COMPOST LAYER SHALL BE USED ON UPSLOPE FACE IN HQ AND EV WATERSHEDS.

SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH 1/3 THE HEIGHT OF THE OUTLET.

MAIN SYSTEM

AUGUST 2026

JJ JJ BD

1" = 20'

E&S DETAILS II

CIVIL

99 C-504

CONSULTANT

CLIENT

AQUA PENNSYLVANIA, INC.

762 Lancaster Ave Bryn Mawr, PA 19010 877.987.2782 tel www.aquawater.com

PROJECT

PFAS TREATMENT WELL PACKAGE A.4

REGISTRATION

CONSULTANTS

60754405

AECOM 625 West Ridge Pk, Ste E-100 Conshohocken, PA 19428 610.234.5402 tel www.aecom.com

I/R DATE DESCRIPTION

ISSUE/REVISION

1

1 2 3 4 5

2 3 4 5

D

Designed By:

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

DISCIPLINE

Drawn By:

Dept Check:

Proj Check:

Date:

Scale:

C

B

A

BD

2" X 2" WOOD STAKE

DISTURBED AREA

UNDISTURBED AREA

FLOW

DISTURBED AREA

FLOW

102

101

100

STAKE ON 10' CENTERS UNDISTURBED AREA

3"

NOT TO SCALE

12" COMPOST FILTER SOCK

COMPOST FILTER SOCK - VARIOUS DIAMETERS

12"

LOOSE COMPOST (TAMP INTO ANY GAPS)

1. REMOVE DEPOSITS WHEN SEDIMENT ACCUMULATION IS ONE THIRD THE HEIGHT OF THE EXPOSED COMPOST FILTER BERM OR ONE HALF OF THE EXPOSED COMPOST FILTER SOCK.

2. PLACE COMPOST FILTER SOCK/BERM ON LEVEL GRADE. EXTEND BOTH ENDS OF THE COMPOST FILTER SOCK/BERM AT LEAST 8'-0" UPSLOPE AT 45 DEGREES TO THE MAIN ALIGNMENT.

3. REPLACE BIODEGRADABLE FILTER SOCK AFTER 6 MONTHS; PHOTODEGRADABLE AFTER 12 MONTHS.

4. COMPLY WITH PENNDOT STANDARD SPECIFICATION 867 (PUBLICATION 408).

CUTBANKS CAVE RESOLUTION - CUT AND FILL SLOPES TO CONSTRUCT IN ACCORDANCE WITH PENNDOT SPECIFICATIONS.

CORROSIVE TO CONCRETE/STEEL RESOLUTION - ALTERNATE PIPE MATERIALS ARE PROVIDED. PLACE CONCRETE AND STEEL IN ACCORDANCE WITH PENNDOT SPECIFICATIONS.

DROUGHTY RESOLUTION - AT LOCATIONS WHERE DROUGHTY SOILS ARE PRESENT, PROVIDE ADEQUATE MEASURES TO INCREASE SOIL MOISTURE CONTENT.

EASILY ERODIBLE RESOLUTION - SOIL EROSION CONTROL DEVICES WILL BE USED WHERE NECEASSRY IN ACCORDANCE WITH PENNDOT SPECIFICATIONS.

DEPTH TO SATURATED ZONE/SEASONAL HIGH WATER TABLE RESOLUTION - ONLY USES COMPATIBLE WITH A HIGH WATER TABLE SHOULD BE LOCATED IN THESE AREAS. IF NO OTHER SUITABLE LOCATIONS ARE AVAILABLE FOR USES INCOMPATIBLE WITH A HIGH WATER TABLE, STRUCTURES OR FACILITIES IN THESE AREAS MUST BE DESIGNED TO WITHSTAND POTENTIAL SETTLEMENT DUE TO CONSOLIDATION (IF COHESIVE SOILS ARE PRESENT) AND DECREASED BEARING CAPACITY. APPROPRIATE DRAINAGE MEASURES ARE TO BE INSTALLED.

HYDRIC/HYDRIC INCLUSIONS RESOLUTION - ONLY USES COMPATIBLE WITH HYDRIC SOILS SHOULD BE LOCATED IN THESE AREAS. FOUNDATIONS FOR STRUCTURES ON HYDRIC SOILS SHOULD BE APPROPRIATELY DESIGNED. PERFORM NECESSARY SUBSURFACE INVESTIGATION.

LOW STRENGTH/LANDSLIDE PRONE RESOLUTION - PERFORM NECESSARY SUBSURFACE INVESTIGATION .

SLOW PERCOLATION RESOLUTION - N/A SINCE NO INFILTRATION SCMS ARE BEING PROPOSED AS PART OF THIS PROJECT.

PIPING RESOLUTION - PROVIDE ANTI SEEP COLLARS AT STORMWATER MANAGEMENT BMP OUTLETS TO PREVENT EMBANKMENT FAILURE.

POOR SOURCE OF TOPSOIL RESOLUTION - IF THERE ARE NO SUITABLE ON-SITE SOILS FOR TOPSOIL, SUITABLE MATERIAL WILL NEED TO BE IMPORTED. SUITABLE MATERIAL SHOULD CONFORM TO PUBLICATION 408, SECTION 802.2.

FROST ACTION RESOLUTION - STRUCTURES OR FACILITIES LOCATED ON SOILS SUSCEPTIBLE TO FROST ACTION MUST BE PLACED AT A MINIMUM DEPTH TO PREVENT FROST ACTION.

SHRINK-SWELL RESOLUTION - AT LOCATIONS WHERE SHRINK-SWELL SOILS ARE PRESENT, PROVIDE ADEQUATE MEASURES TO ACCOMMODATE POTENTIAL SOIL MOVEMENT.

POTENTIAL SINKHOLE RESOLUTION - N/A

PONDING RESOLUTION - AT LOCATIONS WHERE PONDING SOILS ARE PRESENT, PROVIDE ADEQUATE MEASURES TO MANAGE STANDING WATER CONDITIONS.

WETNESS RESOLUTION - ONLY USES COMPATIBLE WITH WET SOILS SHOULD BE LOCATED IN AREAS WITH THESE SOIL TYPES. IF NO OTHER SUITABLE LOCATIONS ARE AVAILABLE FOR USES INCOMPATIBLE WITH WET SOILS, STRUCTURES AND FACILITIES MUST BE DESIGNED TO ACCOMMODATE THE WET CONDITIONS AND APPROPRIATE DRAINAGE MEASURES ARE TO BE INSTALLED.

SOILS DATA OBTAINED FROM USDA NRCS WEB SOIL SURVEY

SITE SYMBOL DESCRIPTION EROSION HAZARD

DEER RUN NeB NESHAMINY SILT LOAM, 3 TO 8 PERCENT SLOPES

SOME EROSION IS LIKELY AND EROSION CONTROLS MAY BE NEEDED

HUNT COUNTRY Ha HATBORO SILT LOAM

EROSION UNLIKELY UNDER ORDINARY CLIMATIC CONDITIONS

IVY RIDGE

Bo BOWMANSVILLE-KNAUERS SILT LOAMS

SOME EROSION IS LIKELY AND EROSION CONTROLS MAY BE NEEDED PkD

PENN KLINESVILLE CHANNERY SILT LOAMS, 15 TO 25 PERCENT SLOPES

RhB REAVILLE SILT LOAM, 3 TO 8 PERCENT SLOPES

MEYERS TRACT

RhC REAVILLE SILT LOAM, 8 TO 15 PERCENT SLOPES

EROSION IS VERY LIKELY AND EROSION CONTROL MEASURES ARE ADVISED

UusD

URBAN LAND-UDORTHENTS, SHALE AND SANDSTONE COMPLEX, 8 TO 25 PERCENT SLOPES

NOT RATED

PEDDLER'S VIEW

AbB ABBOTTSTOWN SILT LOAM, 3 TO 8 PERCENT SLOPES SOME EROSION IS LIKELY AND EROSION CONTROLS MAY BE NEEDED Bo BOWMANSVILLE-KNAUERS SILT LOAMS

SOIL LIMITATIONS

CUTBANKS CAVE

CORROSIVE TO CONCRETE / STEEL

DROUGHTY

EASILY ERODIBLE

FLOODING

DEPTH TO SATURATED ZONE ZONE /

SEASONAL HIGH WATER TABLE

PIPING

POOR SOURCE OF TOPSOIL

FROST ACTION

POTENTIAL SINKHOLE

PONDING

WETNESS

HYDRIC / HYDRIC INCLUSIONS

SHRINK - SWELL

SLOW PERCOLATION

LOW STRENGTH / LANDSLIDE PRONE

SOIL NAME

X NESHAMINY C/S X X X X X X X

HATBORO

BOWMANSVILLE

PENN

KLINESVILLE

REAVILLE

GLADSTONE

GLENVILLE

TOWHEE

UDORTHENTS

ABBOTTSTOWN

X C/S X X X X X X X X X

X C

X X X X X X X X X

X X X X X X

X C/S X X X X X X

X C/S X

X

X X X X X X X

X C X X X X

X C/S X X X X X X X X

X X X X X X X X X X

X C/S X X X X X X

X C/S X X X X X X X X X

KNAUERS X C/S X X X X X X X X X X

X C/S

X

PRE CONSTRUCTED RUMBLE PAD

EXISTING ROADWAY

20'-0" MIN

EXISTING ROADWAY

LENGTH MUST ACCOMMODATE AT LEAST 4 TIRE ROTATIONS

NOT TO SCALE

1. INSTALL ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. PROVIDE A SUFFICIENT NUMBER OF PADS FOR A MINIMUM OF 4 TIRE REVOLUTIONS WHILE ON THE PAD. MORE PADS OR MANUAL CLEANING OF TIRES MAY BE NEEDED DEPENDING ON SITE CONDITIONS.

2. EXTEND ROCK OVER FULL WIDTH OF ENTRANCE.

3. RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL BMP PRIOR TO ENTERING RUMBLE PAD.

4. ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTED SITE IMMEDIATELY. IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF RUMBLE PAD BY 50 FT INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK. WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES IS NOT ACCEPTABLE.

PRE CONSTRUCTED RUMBLE PAD

SOIL STOCKPILE

NOT TO SCALE NOTES:

1. SILT FENCE MUST BE PLACED AROUND THE PERIMETER OF THE SOIL STOCKPILE.

2. APPLY TEMPORARY SEEDING AND MULCHING IMMEDIATELY.

MAIN SYSTEM

AUGUST 2026

JJ JJ BD

1" = 20'

CIVIL

1" = 20'

99 C-505

E&S DETAILS III

CONSULTANT

CLIENT

AQUA PENNSYLVANIA, INC.

762 Lancaster Ave Bryn Mawr, PA 19010 877.987.2782 tel www.aquawater.com

PROJECT

PFAS TREATMENT WELL PACKAGE A.4

REGISTRATION

CONSULTANTS

60754405

AECOM 625 West Ridge Pk, Ste E-100 Conshohocken, PA 19428 610.234.5402 tel www.aecom.com

I/R DATE DESCRIPTION

ISSUE/REVISION

1

1 2 3 4 5

2 3 4 5

D

Designed By:

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

DISCIPLINE

Drawn By:

Dept Check:

Proj Check:

Date:

Scale:

C

B

A

BD

SCHEDULE OF SEEDING AND SOIL SUPPLEMENTS

SEEDING AND SOIL SUPPLEMENT FORMULA APPLICATION

B

NONSTEEP AREAS (LESS THAN 4:1) HIGHLY MAINTAINED AND MOWED SURFACES, USE ONLY ON TOPSOIL

D

CUT/FILL SLOPES GREATER THAN 3:1 AND VEGETATED SWALE

RG RAIN GARDEN

E TEMPORARY SEEDING

1. SOIL SUPPLEMENTS AND SEEDING WILL BE IN ACCORDANCE WITH SECTION 408 OR OTHER APPROVED SPECIAL PROVISIONS.

2. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED WITHIN 4 DAYS UPON REACHING FINISHED GRADE. ROLLED EROSION CONTROL PRODUCTS SHALL BE INSTALLED IN SEEDED AREAS WITH 50 FEET OF SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, ACCORDING TO THE STANDARDS OF THIS PLAN.

3. WITHIN 4 DAYS AFTER EARTH DISTURBANCE CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. NON-GERMINATING MONTHS, MULCH, OR ROLLED EROSION CONTROL PRODUCTS SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITH 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATE WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.

4. STOCKPILES MUST BE SEEDED AND MULCHED IMMEDIATELY.

SEEDING APPLICATION DATES:

1. SPREAD SEEDS WHERE INDICATED AND AT THE RATES AS INDICATED. SPREAD SEEDS WITHIN THE FOLLOWING DATES, OR OTHERWISE INDICATED OR DIRECTED.

1.1. FORMULA B,AND D - MARCH 15 TO JUNE 1, AUGUST 1 TO OCTOBER 15

1.2. FORMULA RG - APRIL 1 TO JUNE 15, AUGUST 16 TO SEPTEMBER 15

1.3. FORMULA E - MARCH 15 TO OCTOBER 15

* FOR INFORMATION ONLY. REFER TO PADOT'S PUBLICATION 408, SECTION 804 AND 805 FOR COMPLETE REGULATORY SPECIFICATION.

EXTEND SEEDING DATES WHERE PROJECT CONDITIONS WARRANT. APPLY FULL TREATMENT OR APPLY ONLY 50% OF THE PERMANENT SEEDING AND SOIL SUPPLEMENTS AND APPLY THE REMAINING 50% WITHIN THE NEXT SEEDING DATES, AS DIRECTED IN WRITING.

USE TILLAGE AND SOIL SUPPLEMENTS BEFORE PERMANENT SEEDING ON TOPSOILED AREAS, WHERE TEMPORARY SEEDING OR MULCHING HAS BEEN APPLIED.

THE CONTRACTOR MAY APPLY PERMANENT SEED AND/OR SOIL SUPPLEMENTS WITHOUT TILLING ON UNTOPSOILED AREAS, WHERE TEMPORARY SEEDING OR MULCHING HAS BEEN APPLIED.

SEEDING NOTES

MULCHING SEEDED AREAS:

1. PLACE MULCH IMMEDIATELY AFTER SEEDING OR WITHIN 48 HOURS AFTER SEEDING IS COMPLETED. UNLESS OTHERWISE INDICATED, PLACE ONLY STRAW OR WOOD FIBER OVER TOPSOILED AREAS. USE HAY, STRAW, OR WOOD FIBER IN OTHER AREAS, AS INDICATED OR SPECIFIED.

2. PLACE HAY OR STRAW UNIFORMLY, IN A CONTINUOUS BLANKET, AT A MINIMUM RATE OF 1,200 POUNDS PER 1,000 SQUARE YARDS, OR AS OTHERWISE INDICATED. IF DIRECTED, INCREASE THE RATE OF APPLICATION, DEPENDING UPON THE MATERIAL USE, SEASON, SOIL CONDITIONS, OR METHOD OF APPLICATION. AN ACCEPTABLE MECHANICAL BLOWER MAY BE USED TO APPLY MULCH. DO NOT USE MACHINE THAT CUT MULCH INTO SHORT PIECES. ANCHOR MULCH WITH SPECIFIED MULCH BINDERS AT THE FOLLOWING RATES:

2.1. RECYCLED CELLULOSE FIBER: 160 POUNDS PER 1,000 SQUARE YARDS. 2.2. WOOD FIBER: 160 POUNDS PER 1,000 SQUARE YARDS. 2.3. NONASPHALTIC EMULSION: AT MANUFACTURER'S RECOMMENDED RATE. 2.4. POLYVINYL ACETATE: AT MANUFACTURER'S RECOMMENDED RATE. 2.5. RECYCLED CELLULOSE FIBER/WOOD FIBER MIXTURE: 160 POUNDS PER 1,000 SQUARE YARDS.

3. THE MULCH BINDER APPLICATION IS INCIDENTAL TO THE APPLICATION OF STRAW AND HAY MULCH.

4. APPLY WOOD FIBER MULCH HYDRAULICALLY ACCORDING TO THE MANUFACTURER'S TANK-MIXING INSTRUCTION. IT MAY BE INCORPORATED AS AN INTEGRAL PART OF THE SLURRY AFTER THE SEED AND SOIL SUPPLEMENTS HAVE BEEN THOROUGHLY MIXED. APPLY UNIFORMLY AT THE RATE OF 320 POUNDS PER 1,000 SQUARE YARDS, UNLESS OTHERWISE INDICATED.

5. MULCH TEMPORARY SEEDED AREAS WITH HAY.

MULCHING NOTES

MULCHING PLANTED AREAS:

1. INDIVIDUAL PLAN PITS UNIFORMLY APPLY TO DESIGNATED MULCH SPECIFIC INSPECTION 805.2(A)2 TO THE ENTIRE PLANT PIT TO A LOOSE DEPTH OF 3 INCHES AND AS SHOWN ON THE STANDARD DRAWING. APPLY MULCH WITHIN 48 HOURS AFTER COMPLETION OF THE PLANTING OPERATION.

2. PLANING BEDS COVER DESIGNATED SHRUB BEDS WITH MULCH OR MULCH AND WEED BARRIER MAT OR MULCH AND WEED CONTROL MAT AS INDICATED. SECURE MAT THE TO THE SOIL SURFACE WITH STAPLES OR OTHER APPROVED ANCHORING DEVICES AT A MAXIMUM INTERVAL SPACING OF 3 FEET AND ALONG ALL EDGES AND OVERLAPS. OVERLAP MAT EDGE WITH 2 INCH MINIMUM.

3. UNIFORMLY APPLY A DESIGNATED MULCH SPECIFIED IN SECTION 805.2(A)2 OVER THE ENTIRE BED AREA TO A LOOSE DEPTH OF 3 INCHES. REDISTRIBUTE EXCESSIVE MULCH DEPTH. TAPER MULCH AT PLANT PIT. APPLY MAT AND MULCH WITHIN 48 HOURS AFTER COMPLETION OF THE PLANTING OPERATION.

MULCH TYPE

APPLICATION RATE (MIN.) NOTES

PER ACRE PER 1,000 SQ FT PER 1,000 SQ YD

STRAW 3 TONS 140 LB 1,240 LB

EITHER WHEAT OR OAT STRAW, FREE OF WEEDS, NOT CHOPPED OR FINELY BROKEN

HAY 3 TONS 140 LB 140 LB

TIMOTHY, MIXED CLOVER AND TIMOTHY OR OTHER NATIVE FORAGE GRASSES

WOOD CHIPS 4 - 6 TONS 185-275 LB 1,650-2,500 LB

MAY PREVENT GERMINATION OF GRASSES AND LEGUMES

HYDROMULCH 1 TON 47 LB 415 LB SEE LIMITATIONS ABOVE

SOIL AMENDMENT

PERMANENT SEEDING APPLICATION RATE NOTES PER ACRE PER 1,000 SQ FT PER 1,000 SQ YD

AGRICULTURAL LIME 6 TONS 240 LB 2,480 LB OR AS PER SOIL TEST; MAY NOT BE REQUIRED IN AGRICULTURAL FIELDS

10-20-20 FERTILIZER 1,000 LB 25 LB 210 LB

TEMPORARY SEEDING APPLICATION RATE

AGRICULTURAL LIME 1 TON 40 LB 410 LB TYPICALLY NOT REQUIRED FOR STOCKPILES 10-10-10 FERTILIZER 500 LB 12.5 LB 100 LB

MULCH APPLICATION RATES

SOIL AMENDMENT APPLICATION RATE EQUIVALENTS

MAIN SYSTEM

AUGUST 2026

JJ JJ BD

-

PLANTING DETAILS

CIVIL

99 C-506

CONSULTANT

CLIENT

AQUA PENNSYLVANIA, INC.

762 Lancaster Ave Bryn Mawr, PA 19010 877.987.2782 tel www.aquawater.com

PROJECT

PFAS TREATMENT WELL PACKAGE A.4

REGISTRATION

CONSULTANTS

60754405

AECOM 625 West Ridge Pk, Ste E-100 Conshohocken, PA 19428 610.234.5402 tel www.aecom.com

I/R DATE DESCRIPTION

ISSUE/REVISION

1

1 2 3 4 5

2 3 4 5

D

Designed By:

PROJECT NUMBER

SHEET TITLE

SHEET NUMBER

DISCIPLINE

Drawn By:

Dept Check:

Proj Check:

Date:

Scale:

C

B

A

BD

1. THE CONTRACTOR SHALL COORDINATE THIS WORK WITH OTHER CONTRACTORS PERFORMING WORK ON THE SITE.

2. CONTRACTOR SHALL STAKE OUT PLANTING ZONES FOR REVIEW BY OWNER OR ENGINEER PRIOR TO INSTALLING PLANTS.

3. ALL PLANTS SHALL BE HEALTHY, VIGOROUS, AND FREE OF PESTS AND DISEASE.

4. ALL PLANTS ARE SUBJECT TO THE APPROVAL OF THE DESIGN PROFESSIONAL BEFORE, DURING, AND AFTER INSTALLATION.

5. ALL PLANTS AND PLANTING AREAS SHALL BE COMPLETELY MULCHED AS SPECIFIED.

6. THE CONTRACTOR SHALL NOTIFY ALL NECESSARY UTILITY COMPANIES 48 HRS MINIMUM PRIOR TO DIGGING FOR FIELD VERIFICATION OF ALL UNDERGROUND UTILITIES, AND OTHER ELEMENTS, AND COORDINATE WITH THE DESIGN PROFESSIONAL PRIOR TO INITIATING OPERATIONS. THE CONTRACTOR SHALL AVOID DAMAGE TO ALL UTILITIES DURING THE COURSE OF WORK.

7. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE TO UTILITIES, STRUCTURES, SITE APPURTENANCES, ETC. WHICH OCCURS AS A RESULT OF LANDSCAPE CONSTRUCTION.

8. REFER TO THE SPECIFICATION FOR LANDSCAPE INSTALLATION, MAINTENANCE, WATERING, AND WARRANTY TERMS.

9. CONTRACTOR SHALL PROTECT ALL EXISTING PLANT MATERIALS INDICATED ON PLANS TO REMAIN. ALL PLANT MATERIAL INDICATED TO REMAIN THAT IS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER WITH THE SAME SIZE, QUALITY, AND TYPE OF PLANT MATERIAL OR AS REQUIRED BY THE LOCAL REVIEWING AUTHORITY, WHICHEVER HAS A GREATER RECOMPENSE VALUE.

10. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SAFETY MEASURES DURING CONSTRUCTION OPERATIONS TO PROTECT THE PUBLIC ACCORDING TO ALL APPLICABLE CODES AND RECOGNIZED LOCAL PRACTICES.

11. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DRAWING AND FIELD CONDITIONS TO THE DESIGN PROFESSIONAL PRIOR TO STARTING CONSTRUCTION. FOLLOW THE DESIGN PROFESSIONAL'S INSTRUCTIONS ON RESOLVING ANY DISCREPANCIES.

12. THE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIAL IN QUANTITIES SUFFICIENT TO COMPLETE THE PLANTING SHOWN ON THE DRAWING.

13. NO PLANT OR CULTIVAR SUBSTITUTIONS WILL BE ACCEPTABLE WITHOUT WRITTEN APPROVAL OF THE ENGINEER.

14. OWNERS REPRESENTATIVE SHALL INSPECT PLANT MATERIAL FOR ACCEPTANCE PRIOR TO PLANTING.

15. REFER TO PLANTING DETAILS AND SPECIFICATIONS FOR INFORMATION RELATING TO PLANTING PIT DIMENSIONS AND COMPOSITION OF PLANTING SOIL MIXTURE.

16. PLANT CONTAINERS SHALL BE REMOVED PRIOR TO PLANTING. NEVER LIFT OR HANDLE THE TREE BY THE TRUNK.

17. ALL AREAS THAT HAVE BEEN DISTURBED BY PLANTING ACTIVITY SHALL BE RESTORED TO A NEAT CONDITION. AREAS WITH BARE SOIL SHALL BE STABILIZED WITH THE APPROPRIATE MEASURE AS SPECIFIED ON THE PLANTING PLAN AND SPECIFICATIONS.

18. MULCHING SHALL BE COMPLETED WITHIN 48 HOURS AFTER PLANTING OF NEW PLANT MATERIAL. MULCH SHALL BE SPREAD TO A MINIMUM DEPTH OF 4" FOR INDIVIDUALLY PLANTED TREES AND SHRUBS AND SHOULD COVER THE ENTIRE EXCAVATED PIT AREA OF EACH PLANT.

19. PLANTS SHALL BE SPACED ACCORDING TO PLANT SCHEDULE WITH A DIVERSITY OF SPECIMENS SPREAD THROUGHOUT THE PLANTING ZONE.

20. IF POSSIBLE, PLANTS SHOULD BE PURCHASED FROM A SOURCE NEAR THE INSTALLATION SITE FOR THE BEST CHANCE OF SURVIVAL, BECAUSE THEY WILL BE WELL-ADAPTED TO LOCAL SOIL AND CLIMATIC CONDITIONS.

21. PLANT DENSITIES, QUANTITIES, AND AREAS SHOWN IN PLANTING SCHEDULES ARE FOR CONVENIENCE ONLY AND MAY NOT BE ACCURATE WITH AS-BUILT CONDITIONS. CONTRACTOR SHALL SUBMIT ESTIMATES FOR PLANT DENSITIES AND PLANTING AREAS IN THE PLANTING PLAN.

HUNT COUNTRY WELL TREATMENT FACILITY PLANT SCHEDULE

QUANTITY ABRBV. SCIENTIFIC NAME COMMON NAME HEIGHT CALIPER ROOT

6 GA THUJA PLICATA X STANDISHII 'GREEN GIANT'

THUJA GREEN GIANT ARBORVITAE

5-6' -- #3 CONT

THUJA GREEN GIANT ARBORVITAE

2 X BALL DIAMETER

TREE PLANTING DETAIL

N.T.S.

PLACE LOOSENED AND UNCOMPACTED EXISTING SOIL WITH FERTILIZER SOIL AMENDMENT, INSTALLED AS PER MANUFACTURER'S RECOMMENDATIONS.

PLACE 3" OF SHREDDED HARDWOOD BARK MULCH AROUND ALL TREES. BASE OF TRUNK REMAINS EXPOSED.

FINISHED GRADE

CAREFULLY REMOVE THE TREE FROM ITS CONTAINER TO AVOID BREAKING OFF ROOTS. UNWIND ALL CIRCLING ROOTS. KINKED, CIRCLED, OR KNOTTED ROOTS THAT CANNOT BE STRAIGHTENED OUT SHOULD BE CUT OFF CLEANLY WITH PRUNING SHEARS. MINIMIZE THE AMOUNT OF ROOT REMOVAL AND DAMAGE.

EXTENT OF EXCAVATION

GENTLY PLACE TREE IN PLANTING HOLE, LAYING ROOTS OUT SO THEY RADIATE AWAY FROM THE TRUNK. DON'T ALLOW ROOTS TO KINK OR DOUBLE BACK AT THE EDGE OF THE HOLE. EXPAND HOLE AS NECESSARY SO THAT ROOTS CAN SPREAD OUT. THE TOP OF THE ROOT BALL SHALL BE SLIGHTLY ABOVE THE FINAL GRADE OF THE SOIL. THE ROOT CROWN (WHERE THE FIRST ROOTS EMERGE FROM THE TRUNK) SHALL BE SET HIGHER THAN THE SURROUNDING SOIL TO PREVENT POOLING OF WATER NEXT TO THE TRUNK.

SCARIFY SIDES AND BOTTOM OF TREE PIT TO PROMOTE DRAINAGE.

TAMP SOIL SOLIDLY AROUND BASE OF ROOT BALL.

UNDISTURBED SUBGRADE

MAIN SYSTEM

AUGUST 2026 AUGUST 2026

AECOM
625 West Ridge Pike
Conshohocken, PA 19428
aecom.com

August 2026

Kelly A. Krause
Director of Code Enforcement,
Zoning Officer
East Goshen Township

RE: Hunt Country Well Treatment Facility – Land Development & Conditional Use Application

Dear Ms. Krause,

Aqua Pennsylvania, Inc. (Aqua) owns and operates the Hunt Country Well Treatment Facility located in East Goshen Township, on an easement within 620 and 622 Thorncroft Drive, West Chester, PA 19380. On behalf of Aqua, AECOM is submitting the Hunt Country Well Treatment Facility PFAS Improvements project to East Goshen Township for a land development permit and conditional use permit as well as the associated fees. The project will install PFAS treatment vessels on a concrete pad exterior to the existing building to follow the new Environmental Protection Agency maximum contaminant levels for PFAS. Aqua will also replace the well pump at the four existing well locations. This is considered a maintenance activity with no disturbance. Aqua is requesting conditional use within the R-2 district in accordance with Section 240-9C(9) of the Township code which allows use for a public utility facility. The facility complies with the standards set forth in Township Code Section 240-31C(3)(aa) which regulates public utility facilities.

The following attachments are included alongside this letter:

  • Attachment A – Land Development Application
  • Attachment B – Conditional Use Application
  • Attachment C – County Act 247
  • Attachment D – Stormwater Management Worksheet
  • Attachment E – Sealed Civil Plans
  • Attachment F – Easement Record
  • Attachment G – Chester County Response Letter to Act 67 and 68

aecom.com 1/2

AECOM

The Act 247 County review fees have not been included because, on July 30, 2026, AECOM spoke with the Chester County Planning Commission and was advised that the applicable review fees will be invoiced upon completion of the Commission's review.

Due to the scope of the proposed improvements, we formally request a waiver for the landscaping plan, conservancy plan, traffic study, and water study. The proposed site plan specifies landscaping in the form of screening trees and includes relevant details. The proposed work is outside of the floodplain as designated by the FEMA Flood Map 42029C0215G, effective 9/29/2017. As documented in the 1986-1987 record drawings, the existing impervious areas on the site were installed prior to October 22, 2003, and therefore do not qualify as a regulated impervious surface. Based on Table 195-6.1 of the East Goshen Township Municipal Code, the project is exempt from the Stormwater Management Site Plan requirements since there are less than 999 square feet of regulated impervious surface. The table below outlines the existing and proposed impervious areas within the easement. According to Section 195-6B, this exemption requires an erosion control plan which can be found in Attachment E with a limit of disturbance of 4,504 SF (0.104 acres). No grading is proposed as part of this project.

Table 1 - Impervious Summary

Total Existing Impervious (pre-2003) 4,525 SF
Total Proposed Regulated Impervious 244 SF
Proposed Removal of Existing Impervious 100 SF
Net Additional Impervious 144 SF

AECOM believes the enclosed materials satisfy the applicable permitting requirements and respectfully submit them for your review and approval. We are available to discuss the project as required and revise the plans if the Township identifies additional information that would assist the review. If you have any questions regarding the project or this letter, please contact me at (484) 238-0558 or benjamin.deatrich@aecom.com.

Yours sincerely,

Ben Deatrich, PE
AECOM Project Manager

Enclosures:

  • Attachment A – Land Development Permit Application
  • Attachment B – Conditional Use Permit Application
  • Attachment C – Act 247 Form
  • Attachment D – Stormwater Management Worksheet
  • Attachment E – Sealed Civil Plans
  • Attachment F – Easement Record
  • Attachment G – Chester County Act 67 and 68 Response Letter
  • 11 Hard Copies of the Sealed Civil Plans
  • Application Fees

aecom.com 2/2

Docusign Envelope ID: 765D0895-1B23-82FF-814A-B18A9CF9AA9E

Conditional Use Application and Checklist

East Goshen Township

To: Township Zoning Officer

Name of Applicant: Aqua Pennsylvania, Inc.

Applicant Address: 762 West Lancaster Ave, Bryn Mawr, PA 19010-3489

Telephone Number: 610-520-6448 Fax:

Email Address: JABallas@aquawater.com

Property Address: Easement within 620 and 622 Thorncroft Dr, West Chester, PA 19380

Tax Parcel Number: 53-4-132.35 (620)
53-4-132.36 (622) Zoning District: R-2 Acreage: 0.9229 (620)
0.9749 (622)
0.2365 (easement)

Description of proposed use:
Aqua PA is proposing PFAS treatment at the existing Hunt Country Well Facility to meet the new EPA guidelines. The existing Hunt Country Well Facility is located on an easement owned by Aqua within 620 and 622 Thorncroft Drive, West Chester, PA 19380. The proposed improvements include two (2) PFAS treatment vessels on a concrete pad outside the existing well facility building.

Conditional Use is provided in Zoning Ordinance Section: 240-9-C-9 Public Utility Facility

We hereby acknowledge that we have read this application and state that the above is correct and agree to comply with all provisions of the East Goshen Township Zoning Ordinance applicable to this project and property.

Signed by: Elizabeth Loughnane
Signature of Applicant

8/24/2026
Date

Attest: Signed by: Frances P. Orth

* Review the formal Planning Commission review procedure on page three.

F:\Data\Shared Data\Website\Forms\Conditional Use App and Checklist rev 102406.doc - 1 -

PHILADELPHIA SUBURBAN WATER CO. - PROPOSED PUMPING STATION EASEMENT

Survey plan (oriented vertically) of Proposed Pumping Station Easement in East Goshen Township, Chester County, PA, along Thorncroft Drive across Lot No. 53 and Lot No. 54 (Lands of Hunt Country Corporation) and adjacent to a 20' Wide Sanitary Sewer Easement and Lot No. 72 - Open Space, with an inset Location Map.

EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PA.
SCALE: 1"=30'
PLATE NO.: YY-25
DATE: 26 FEBRUARY 1986
ACC. NO. 39184
E-7647

INFORMATION OBTAINED FROM PLAN AND SURVEY PREPARED BY PENNONI ASSOCIATES INC., CONSULTING ENGINEERS, 1911 ARCH ST., PHILADELPHIA, PA., PLAN TITLED "FINAL PLAN HUNT COUNTRY ESTATES", DRAWING NO. 7924 010 307, PLAN DATED APRIL 28, 1980, LAST REVISION FEB. 19, 1986.

PROP. EASEMENT CONTAINS 0.2365 ACRES±

RECORDED IN D.B. 401 PG. 319
RECORDED ON AUG. 12, 1986
RECORDED AT WEST CHESTER, PA.

Plan Labels and Dimensions

  • J.J.W. 2-25-86
  • THORNCROFT DRIVE (50', 25', 25', R/W; RAD. = 595', ARC = 92.87'; RAD. = 595.00', ARC = 30.00'; RAD. = 595', ARC = 107.54')
  • C/L OF JEFFERSON DOWNS (50' WIDE), N 72° 52' 30" E
  • BEGINNING POINT
  • LOT NO. 53, LANDS OF HUNT COUNTRY CORPORATION
  • P.S.W. CO. PROPOSED PUMPING STATION EASEMENT (20', 10', R/W)
  • LOT NO. 54, LANDS OF HUNT COUNTRY CORPORATION, DEED DATED 15 SEPTEMBER 1980, DEED BOOK G-57 PAGE 254
  • 20' WIDE SANITARY SEWER EASEMENT (20')
  • LOT NO. 72 - OPEN SPACE
  • Bearings and Distances: S 83° 05' 40" W 284.30'; S 72° 13' 33" W 242.14'; N 72° 13' 33" E 296.12'; S 72° 13' 33" W 295.00'; N 08° 42' 14" W 29.82'; S 72° 13' 33" W 50.00'; S 08° 42' 14" E 50.07'; S 11° 48' 08" E 10.06'; S 11° 48' 08" E 150.67'; S 64° 38' 42" W
  • LOCATION MAP (NOT TO SCALE): THORNCROFT DRIVE (1691, 1693), SUFFOLK DOWNS, JEFFERSON DOWNS, CHURCHILL DOWNS
  • Surveyor Seal: COMMONWEALTH OF PENNSYLVANIA, DONALD I. BOUCHER, SURVEYOR

THE COUNTY OF CHESTER

COMMISSIONERS
Josh Maxwell
Marian D. Moskowitz
Eric M. Roe

Matthew J. Edmond, AICP
Executive Director

PLANNING COMMISSION
Government Services Center, Suite 270
601 Westtown Road
P. O. Box 2747
West Chester, PA 19380-0990
(610) 344-6285 Fax (610) 344-6515

Act 67 & 68 Notice of Permit Application - Chester County Response Letter

Date: August 20, 2025

Date Received July 29, 2025
Applicant Name AECOM Attn: Ben Deatrich, PE
Applicant Address 625 West Ridge Pike, Suite E-100
Conshohocken PA, 19428
benjamin.deatrich@aecom.com
Project Name Aqua PFAS Hunt Country Well Package A.4 Upgrades, East Goshen Township

Determination of Consistency with the Chester County Comprehensive Plan, Landscapes3 (2018) for the above referenced project:

□ The Chester County Planning Commission declines to review the project for consistency with Landscapes3.

□ The Chester County Planning Commission has previously reviewed this project and the Act 247 letter dated ______________ indicates that the project was:
□ Consistent with Landscapes3
□ Inconsistent with Landscapes3

☑ The Chester County Planning Commission finds the project to be:
☑ Consistent with Landscapes3
□ Inconsisistent with Landscapes3

Additional Comments:
The proposed upgrades to the Hunt Country Well Facility to treat PFAS is consistent with the Landscapes3 Protect Objective F, which states: "Ensure a safe, clean, long-term supply of water to meet the current and future needs of residents and businesses."

Reviewed by:

Name Carrie Conwell, AICP
Title Senior Environmental Planner
Signature Carrie J. Conwell

email: ccplanning@chesco.org • website: www.chescoplanning.org