Conservancy Board
The Conservancy Board advises the Board of Supervisors, the Planning Commission, the Park and Recreation Commission and other agencies, officials and employees of East Goshen Township on matters dealing with conservation, management, protection and use of natural resources in the Township of East Goshen.
Meetings are on the 2nd Wednesday of the month at 7:00 P.M. In addition the Conservancy Board will conduct site inspections the following Saturday at 9:00 AM; as needed.
| Board Members | Term Expiration Dates |
| Vacant, Chair | 2026 |
| Walter Wujcik, Vice Chair | 2027 |
| Jackie Ahlborn | 2027 |
| Julieta Calmon | 2027 |
| Erich Meyer | 2028 |
| Sandy Snyder | 2026 |
| Susan Vanesse | 2028 |
| Ann Duffield, BOS Liaison | |
| Ashley Nowak, Staff Liaison |
Articles of Interest
Related News
The Goshen250 Nature Challenge: We Have a Winner!
Wednesday, November 4, 2026
This neighborly challenge between West Goshen and East Goshen townships began as the brainchild of East Goshen Township’s (EGT) Conservancy Board. Jason Lang, EGT’s Parks and Recreation director, contacted his West Goshen peer Ken Lehr, who shared the idea with the Sustainability Advisory Committee, and the idea became a reality. Planning for the iNaturalist-inspired “BioBlitz” […]
View ArticleEast Goshen Township Receives Bird Town PA Recognition!
Wednesday, October 7, 2026
The Conservancy Board and Environmental & Sustainability Advisory Council have worked together to have East Goshen Township recognized as a Bird Town PA. The program encourages municipalities to work towards four key strategies: Creating and Protecting Habitat, Threats to Birds, Education and Engagement and Sustainability. Here are just some of […]
View Article“Leave the Leaves”
Friday, October 2, 2026
Take a break from the rake and help your yard and the planet. Did you know that the leaves that fall from your trees can act as a natural mulch to improve the soil and retain moisture through the winter? Leaves provide nutrients to your yard as they decompose naturally. They also provide valuable habitat […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
AGENDA EAST GOSHEN TOWNSHIP CONSERVANCY BOARD MEETING
December 15, 2017
7:00 PM
F:\Data\Shared Data\Agendas\Conservancy Board\2017\2017-12-15 - Conservancy Board Agenda.doc
1. CALL TO ORDER / PLEDGE OF ALLEGIANCE / MOMENT OF SILENCE 2. APPROVAL OF MINUTES
November 08, 2017 3. NEW BUSINESS
4. SUB DIVISION/LAND DEVELOPMENT REVIEW
West Chester School District (LD)
5. OLD BUSINESS
6. CHAIRMAN’S REPORT
7. VARIANCES
8. BOARD MEMBER CONCERNS
9. LIAISON REPORTS
10. CORRESPONDENCE
11. DATES OF IMPORTANCE
Dec 18, 2017 Futurist Committee 07:00pm Dec 19, 2017 Board of Supervisors 07:00pm Dec 25, 2017 Office Closed – Christmas ----------- Jan 01, 2018 Office Closed – New Year’s Day ----------- Jan 02, 2018 Board of Supervisors 06:00pm Jan 03, 2018 Planning Commission 07:00pm Jan 04, 2018 Park & Recreation Commission 07:00pm Jan 06, 2018 Annual Planning Session 08:00am Jan 08, 2018 Municipal Authority 07:00pm Jan 10, 2018 Conservancy Board 07:00pm
12. PUBLIC COMMENT
13. ADJOURNMENT
Draft
EAST GOSHEN TOWNSHIP
CONSERVANCY BOARD MEETING
NOVEMBER 8, 2017
The East Goshen Township Conservancy Board held a regularly scheduled meeting on Wednesday, November 8, 2017 at 7:00 p.m. at the Township Building. In attendance were: Chairman Sandy Snyder, Erich Meyer, Walter Wujcik, John Scheidt, Patti Brown and Andy Tyler.
Call to Order
Sandy called the meeting to order at 7:00 p.m.
Pledge of Allegiance & Moment of Silence
Sandy led those present in the Pledge of Allegiance and then asked for a moment of silence to remember those who serve in our military and our first responders.
Minutes
The minutes of the October 11, 2017 meeting were approved.
New Business
2018 Officers – Sandy reminded the Board members that her term is up the end of 2017. The term is 2 years. Come ready next month to elect at new Chairman
2018 Goals – Sandy reminded everyone that next month they have to get their presentation ready for the January ABC meeting. She will make the presentation. They need to list accomplishments for 2017 and goals for 2018.
Old Business
Pond Study - Walter had an email that showed that dates have been set for the meetings to present the results of the pond study as follows:
Monday, Nov. 27 – Hershey Mill Estates
Wednesday, Nov. 29 – Bow Tree
Monday, Dec. 4 – Pin Oaks & Marydell
The report will be on the Township website about November 14th.
Public Comment
Mary Ellen Miller, 1507 Wilson Rd. - Someone at the township building told her the report would be available tonight. Sandy apologized to her for the mistake.
Fall Planting – Sandy commented that the planting will be done near the boardwalk at the Plank House on E. Boot Road. She explained about the maintenance of the buffer along the creek. Ten trees will be planted. The board decided to stake the area this Saturday November 11 at 9:00 am. The planting will be done on Saturday November 18 at 9:00 am.
Serpentine Rock – Sandy reviewed Unionville’s Serpentine Barrens Restoration and Maintenance Plan for invasive removal, burnings, monitoring, etc. of their serpentine rock. This is listed as a goal in the Comprehensive Plan for the Conservancy Board and Park & Recreation Commission. For our barren, the area should be blocked off and burned again in the Spring probably March and then use a blower to remove organic debris. Future burns
CB 11-8-17 draft 1
will be done depending on what grows back, probably in 3 years. There should be before and after photos taken of the conditions of the barren. To start our Maintenance Plan: quarterly inspections should be done; organic material should be removed; check with invasives and pest control services (especially for poison ivy); and manage the area for deer. Construction and installation of a kiosk was discussed. Sandy will send a copy of her notes to the Park & Rec Commission.
Public Comment:
Mary Ellen Miller, 1507 Wilson Rd – She voiced concern about the burning especially regarding poison ivy, which can be dangerous if breathed in. Besides notifying the residents on the website and/or mail, she suggested they post a sign in the park informing residents of the burning.
Any Other Matter
2018 Budget - The 2018 Budget will be presented at the November 14 Board of Supervisors meeting.
Adjournment
There being no further business, Walter moved to adjourn the meeting. Patti seconded the motion. The meeting was adjourned at 8:00 p.m. The next meeting will be December 13, 2017 at 7:00 pm.
Respectfully submitted,
Ruth Kiefer
Recording Secretary
CB 11-8-17 draft 2
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PA
SUBDIVISION AND / OR LAND DEVELOPMENT APPLICATION
Date Filed: 11/28/2017
Application for (Circle one):
◯ Subdivision ◉ Land Development ◯ Subdivision & Land Development
A. Application is hereby made by the undersigned for approval of a Subdivision and or Land Development Plan, more particularly described below.
- Applicant's name: West Chester Area School District c/o Kevin Campbell Address: 782 Springdale Drive, Exton, PA 19341 Phone: (484) 266-1260 Fax: Email: KCAMPBELL@wcasd.k12.pa.us
- Name and address of present owner (if other than 1. above) Name: Address: Phone: Fax: Email:
- Location of plan: 800 N. Chester Road, West Chester, PA 19830
- Proposed name of plan: Proposed Building Addition (East Goshen Elementary School)
- County Tax Parcel No.: 53-4-78.0E Zoning District: R-2; Low Density Residential District
- Area of proposed plan (ac.): 18.085 Acres Number of lots: 1
- Area of open space (ac.): Maintained as existing
- Type of structures to be constructed: Building Addition
- What provisions are to be made for water supply and sanitary sewer? Only building additions are proposed and will be serviced by existing sanitary sewer and water.
- Linear feet of road to be constructed: N/A
- Name of Engineer: Bohler Engineering PA, LLC c/o George J. Hartman III, P.E. Phone Number: (215) 996-9100 Fax: (215) 996-9102 Email address: ghartman@bohlereng.com
f:\data\shared data\code deptpplication & forms\current forms and applications\subdivision and land dev application.doc
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA
SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
- Name of Land Planner: Bohler Engineering PA, LLC c/o George J. Hartman III, P.E. Phone Number: (215) 996-9100 Fax: (215) 996-9102 Email address: ghartman@bohlereng.com
B. I/We agree to reimburse the Township of East Goshen for such fees and expenses the Township may incur for the services of an Engineer(s) in investigations, tests, and review in relation to the Subdivision Plan.
C. I/We agree to post financial security for the improvements depicted on the Subdivision and or land Development Plan pursuant to the Subdivision and Land Development Ordinance.
D. I/We agree to reimburse the Township of East Goshen for all inspection fees at the actual cost to Township.
NOTICE
The Township requires an Occupancy Permit before any building can be occupied; no Occupancy Permit will be issued until final inspection and approved by the Zoning Officer and Building Inspector.
[Signature]
Owner Signature
West Chester Area School District
[Signature]
Applicant Signature
Administrative Use
Fees received from applicant $ 350.00 basic fee, plus $ — per lot
For — lots = $ 350.00
Application and plan received by: [Signature] Date: 11/29/2017
(Signature)
Application accepted as complete on: 11/29/2017
(Date)
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc 2
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA
SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
SUBDIVISION AND/OR LAND DEVELOPMENT CHECKLIST
This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the State of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application Process and the Review Process. The application process must be completed in its entirety prior to the advancement into the Review Process.
* Review the formal Planning Commission review procedure on page five.
Application for (Circle all appropriate): ◯ Subdivision ◉ Land Development
Applicant Information:
Name of Applicant: West Chester Area School District c/o Kevin Campbell
Address: 782 Springdale Drive, Exton, PA 19341
Telephone Number: (484) 266-1260 Fax:
Email Address: KCAMPBELL@wcasd.k12.pa.us
Property Address: 800 N. Chester Road, West Chester, PA 19830
Property Information:
Owner's Name: West Chester Area School District
Address: 800 N. Chester Road, West Chester, PA 19830
Tax Parcel Number: 53-4-78.0E Zoning District: R-2, Low Density Residential District Acreage: 18.085
Description of proposed subdivision and or land Development:
The West Chester Area School District proposes to demolish a portion of the existing East Goshen Elementary School and replace it with a 1-story, 2,240 sq addition in an alternate location. An additional 1-story portion of the existing building is proposed to be demolished and replaced with a 2-story, 21,248 sf (Gross) addition in place.
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc 3
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA
SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
Application Process Checklist (Administrative use only):
| Item | Date Complete |
|---|---|
| 1. Completed Township Application Form: | 11-28-17 |
| 2. Township application and review fees paid: | " |
| 3. County Act 247 Form complete: | " |
| 4. Appropriate County Fees included: | " |
| 5. 11 Copies of sealed Sub / LD plans: | " |
| 6. 11 copies of other required plans: | |
| a. Landscape: (sealed) | " |
| b. Conservancy: (sealed) | NA |
| c. Stormwater Management: (sealed) | " |
| 7. Three copies of the stormwater report and calculations: | " |
| 8. Copies of supplementary studies, if required: | |
| a. Traffic Impact Study: | NOT INCLUDED |
| b. Water Study: | NOT INCLUDED |
Application accepted on 11/29/2017 by MARK A. GORDON
Official Signature [Signature] Title ZONING OFFICER
Review Process Checklist (Administrative use only)
| Item | Date Complete |
|---|---|
| 1. Date of first formal Planning Commission Meeting following complete submission of application, (Day 1): | 12-6-17 |
| Date Abutting property letter sent: | 11-30-17 |
| 2. Date presented to Planning Commission: | 12-6-2017 |
| 3. Date submitted to CCPC: | 11-30-2017 |
| 4. Date submitted to Township Engineer: | 11-30-2017 |
| 5. Date by which the PC must act, (Day 70): | 2-14-2018 |
| 6. Date by which Board of Supervisors must act, (Day 90): | 3-6-2018 |
| 7. Date sent to CB: | 11-30-17 |
| 8. Date sent To MA: | " |
| 9. Date sent to HC: | NA |
| 10. Date sent to PRB: | 11-30-17 |
| 11. Date sent to TAB: | " |
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc 4
CHESTER ROAD
(A.K.A. N. CHESTER ROAD)
(A.K.A. T.R. 352)
(A.K.A. S.R. 0352)
(40' WIDE R.O.W.)
10
10
13
4
4
11
6
9
15
5 6
PROPOSED BUILDING ADDITION
(3,412 S.F.)
EXISTING COMMEMORATIVE PAVERS (TO REMAIN)
STONE / GRAVEL AREA
131'
204'
111'
134.1'
26.7'
PROPOSED STAIRS &
LANDING (REFER TO
ARCHITECTURAL PLANS FOR DETAIL)
83.7'
54'
10.5'
14'
73.2'
39'
PROP. 5' X 10' CONCRETE
PAD FOR EMERGENCY GENERATOR (REFER TO STRUCTURAL PLAN FOR
DETAIL)
PROPERTY LINE DRAWING LEGEND
RIGHT-OF-WAY LINE
ADJACENT PROPERTY LINE
10
EXISTING FENCE LINE
EXISTING TREE LINE
EXISTING PARKING SPACE COUNT
EXISTING AREA LIGHT
EXISTING SANITARY MANHOLE
EXISTING STORMWATER MANHOLE
EXISTING INLET
EXISTING WATER VALVE
EXISTING ROOF DRAIN
EXISTING CLEAN OUT
EXISTING UTILITY POLE
EXISTING SIGN
EXISTING FIRE HYDRANT
EXISTING TREE
PROPOSED BUILDING ADDITION
PROPOSED STONE/GRAVEL AREA
1
SHEET DESCRIPTION
2
1 SITE PLAN
3
EXISTING CONDITIONS & DEMOLITION PLAN
4
GRADING & UTILITY PLAN
5
LIST OF DRAWINGS
SOIL EROSION & SEDIMENT POLLUTION CONTROL PLAN
DETAILS
GENERAL NOTES
CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH THE NOTES AND SPECIFICATIONS CONTAINED HEREIN.
CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL SUBCONTRACTORS FULLY AND COMPLETELY CONFORM TO AND COMPLY WITH THESE REQUIREMENTS.
1. THE FOLLOWING DOCUMENTS ARE INCORPORATED BY REFERENCE AS PART OF THIS SITE PLAN:
· SURVEY
CONTROL POINT ASSOCIATES, INC. 1600 MANOR DRIVE SUITE 210 CHALFONT, PA 18914 ENTITLED: "BOUNDARY & PARTIAL TOPOGRAPHIC SURVEY" PREPARED FOR: EAST GOSHEN ELEMENTARY SCHOOL SHEETS: 1-4 FILE NO: 02-160513-00 DATED: 2017.12.15 LAST REVISED: 2017-01-27
· OWNER/APPLICANT
WEST CHESTER AREA SCHOOL DISTRICT 1181 MCDERMOTT DRIVE WEST CHESTER, PA 19830
· "ARCHITECTURAL PLANS" - PREPARED BY BLACKNEY HAYES ARCHITECTS, DATED 12/16/16. LAST REVISED 04/28/17.
· "REPORT OF GEOTECHNICAL INVESTIGATION" PREPARED BY WHITESTONE ASSOCIATES, DATED 12/16/16.
PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR MUST VERIFY THAT HE/SHE HAS THE LATEST EDITION OF THE DOCUMENTS REFERENCED ABOVE. THIS IS CONTRACTOR'S RESPONSIBILITY.
2. ALL ACCESSIBLE ADA PARKING SPACES MUST BE CONSTRUCTED TO MEET, AT A MINIMUM, THE MORE STRINGENT OF THE REQUIREMENTS OF THE "AMERICANS WITH DISABILITIES ACT" (ADA) CODE (42 U.S.C. § 12101 et seq. AND 42 U.S.C. § 4151 et seq.) OR THE REQUIREMENTS OF THE JURISDICTION WHERE THE PROJECT IS TO BE CONSTRUCTED, AND ANY AND ALL AMENDMENTS TO BOTH WHICH ARE IN EFFECT WHEN THESE PLANS ARE COMPLETED.
3. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED THE COMMENTS TO ALL PLANS AND OTHER DOCUMENTS REVIEWED AND APPROVED BY THE PERMITTING AUTHORITIES AND CONFIRMED THAT ALL NECESSARY OR REQUIRED PERMITS HAVE BEEN OBTAINED. CONTRACTOR MUST HAVE COPIES OF ALL PERMITS AND APPROVALS ON SITE AT ALL TIMES.
4. THE OWNER/CONTRACTOR MUST BE FAMILIAR WITH AND RESPONSIBLE FOR THE PROCUREMENT OF ANY AND ALL CERTIFICATIONS REQUIRED FOR THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
5. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS,. SPECIFICATIONS AND CONDITIONS OF APPROVAL, AND ALL APPLICABLE REQUIREMENTS, RULES, REGULATIONS, STATUTORY REQUIREMENTS, CODES, LAWS AND STANDARDS OF ALL GOVERNMENTAL ENTITIES WITH JURISDICTION OVER THIS PROJECT.
6. THE REPORT OF GEOTECHNICAL INVESTIGATION AND RECOMMENDATIONS SET FORTH HEREIN ARE A PART OF THE REQUIRED CONSTRUCTION DOCUMENTS AND, IN CASE OF CONFLICT, DISCREPANCY OR AMBIGUITY, THE MORE STRINGENT REQUIREMENTS AND/OR RECOMMENDATIONS CONTAINED IN THE PLANS AND THE REPORT OF GEOTECHNICAL INVESTIGATION AND RECOMMENDATIONS SHALL TAKE PRECEDENCE UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS. THE CONTRACTOR MUST NOTIFY THE ENGINEER, IN WRITING, OF ANY SUCH CONFLICT, DISCREPANCY OR AMBIGUITY BETWEEN THE REPORT OF GEOTECHNICAL INVESTIGATION AND PLANS AND SPECIFICATIONS PRIOR TO PROCEEDING WITH ANY FURTHER WORK.
7. THESE PLANS ARE BASED ON INFORMATION PROVIDED TO BOHLER ENGINEERING BY THE OWNER AND OTHERS PRIOR TO THE TIME OF PLAN PREPARATION. CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS AND NOTIFY BOHLER ENGINEERING, IN WRITING, IMMEDIATELY IF ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLAN, OR IF THE PROPOSED WORK CONFLICTS WITH ANY OTHER SITE FEATURES.
8. ALL DIMENSIONS SHOWN ON THE PLANS MUST BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR MUST NOTIFY ENGINEER, IN WRITING, IF ANY CONFLICTS, DISCREPANCIES, OR AMBIGUITIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION. NO EXTRA COMPENSATION WILL BE PAID TO THE CONTRACTOR FOR WORK WHICH HAS TO BE REDONE OR REPAIRED DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS PRIOR TO CONTRACTOR GIVING ENGINEER WRITTEN NOTIFICATION OF SAME AND ENGINEER, THEREAFTER, PROVIDING CONTRACTOR WITH WRITTEN AUTHORIZATION TO PROCEED WITH SUCH ADDITIONAL WORK.
9. CONTRACTOR MUST REFER TO THE ARCHITECTURAL/BUILDING PLANS "OF RECORD" FOR EXACT LOCATIONS AND DIMENSIONS OF ENTRY/EXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY LOCATIONS.
10. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR MUST COORDINATE THE BUILDING LAYOUT BY CAREFUL REVIEW OF THE LATEST CIVIL PLANS AND THE LATEST ARCHITECTURAL PLANS (INCLUDING, BUT NOT LIMITED TO, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION PLAN, WHERE APPLICABLE). CONTRACTOR MUST IMMEDIATELY NOTIFY OWNER, ARCHITECT AND BOHLER ENGINEERING, IN WRITING, OF ANY CONFLICTS, DISCREPANCIES OR AMBIGUITIES WHICH EXIST.
11. DEBRIS MUST NOT BE BURIED ON THE SUBJECT SITE AND ALL UNSUITABLE EXCAVATED MATERIAL AND DEBRIS (SOLID WASTE) MUST BE DISPOSED OF IN ACCORDANCE WITH THE REQUIREMENTS OF ANY AND ALL GOVERNMENTAL AUTHORITIES WHICH HAVE JURISDICTION OVER THIS PROJECT OR OVER CONTRACTOR.
12. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING WHEN SHORING IS REQUIRED AND FOR INSTALLING ALL SHORING REQUIRED DURING EXCAVATION (TO BE PERFORMED IN ACCORDANCE WITH CURRENT OSHA STANDARDS) AND ANY ADDITIONAL PRECAUTIONS TO BE TAKEN TO ASSURE THE STABILITY OF ADJACENT, NEARBY AND CONTIGUOUS STRUCTURES AND PROPERTIES.
13. THE CONTRACTOR IS TO EXERCISE EXTREME CARE WHEN PERFORMING ANY WORK ACTIVITIES ADJACENT TO PAVEMENT, STRUCTURES, ETC. WHICH ARE TO REMAIN EITHER FOR AN INITIAL PHASE OF THE PROJECT OR AS PART OF THE FINAL CONDITION. CONTRACTOR IS RESPONSIBLE FOR TAKING ALL APPROPRIATE MEASURES REQUIRED TO ENSURE THE STRUCTURAL STABILITY OF SIDEWALKS AND PAVEMENT, UTILITIES, BUILDINGS, AND INFRASTRUCTURE WHICH ARE TO REMAIN, AND TO PROVIDE A SAFE WORK AREA FOR THIRD PARTIES, PEDESTRIANS AND ANYONE INVOLVED WITH THE PROJECT.
14. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE DONE TO ANY NEW OR EXISTING CONSTRUCTION OR PROPERTY DURING THE COURSE OF CONSTRUCTION, INCLUDING BUT NOT LIMITED TO DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC. AND SHALL BEAR ALL COSTS ASSOCIATED WITH SAME TO INCLUDE, BUT NOT BE LIMITED TO, REDESIGN, RE-SURVEY, RE}PERMITTING AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR AND MUST REPLACE ALL SIGNAL INTERCONNECTION CABLE, WIRING CONDUITS, AND ANY UNDERGROUND ACCESSORY EQUIPMENT DAMAGED DURING CONSTRUCTION AND MUST BEAR ALL COSTS ASSOCIATED WITH SAME. THE REPAIR OF ANY SUCH NEW OR EXISTING CONSTRUCTION OR PROPERTY MUST RESTORE SUCH CONSTRUCTION OR PROPERTY TO A CONDITION EQUIVALENT TO OR BETTER THAN THE CONDITIONS PRIOR TO COMMENCEMENT OF THE CONSTRUCTION, AND IN CONFORMANCE WITH APPLICABLE CODES, LAWS RULES, REGULATIONS, STATUTORY REQUIREMENTS AND STATUTES. CONTRACTOR MUST BEAR ALL COSTS ASSOCIATED WITH SAME. CONTRACTOR IS RESPONSIBLE TO DOCUMENT ALL EXISTING DAMAGE AND TO NOTIFY THE OWNER AND THE CONSTRUCTION MANAGER PRIOR TO THE START OF CONSTRUCTION.
15. ALL CONCRETE MUST BE AIR ENTRAINED AND HAVE THE MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI AT 28 DAYS UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND/OR REPORT OF GEOTECHNICAL INVESTIGATION.
16. THE ENGINEER IS NOT RESPONSIBLE FOR CONSTRUCTION METHODS, MEANS, TECHNIQUES OR PROCEDURES, GENERALLY OR FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES OR PROCEDURES FOR COMPLETION OF THE WORK DEPICTED BOTH ON THESE PLANS, AND FOR ANY CONFLICTS/SCOPE REVISIONS WHICH RESULT FROM SAME. CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE METHODS/MEANS FOR COMPLETION OF THE WORK PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
17. THE ENGINEER OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY. THE ENGINEER OF RECORD HAS NOT BEEN RETAINED TO PERFORM OR BE RESPONSIBLE FOR JOB SITE SAFETY, SAME BEING WHOLLY OUTSIDE OF ENGINEER'S SERVICES AS RELATED TO THE PROJECT. THE ENGINEER OF RECORD IS NOT RESPONSIBLE TO IDENTIFY OR REPORT ANY JOB SITE SAFETY ISSUES, AT ANY TIME.
18. ALL CONTRACTORS MUST CARRY THE SPECIFIED STATUTORY WORKER'S COMPENSATION INSURANCE, EMPLOYER'S LIABILITY INSURANCE AND LIMITS OF COMMERCIAL GENERAL LIABILITY INSURANCE (CGL). ALL CONTRACTORS MUST HAVE THEIR CGL POLICIES ENDORSED TO NAME BOHLER ENGINEERING, AND ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AS ADDITIONAL NAMED INSUREDS AND TO PROVIDE CONTRACTUAL LIABILITY COVERAGE SUFFICIENT TO INSURE THIS HOLD HARMLESS AND INDEMNITY OBLIGATIONS ASSUMED BY THE CONTRACTORS. ALL CONTRACTORS MUST FURNISH BOHLER ENGINEERING WITH CERTIFICATIONS OF INSURANCE AS EVIDENCE OF THE REQUIRED INSURANCE PRIOR TO COMMENCING WORK AND UPON RENEWAL OF EACH POLICY DURING THE ENTIRE PERIOD OF CONSTRUCTION AND FOR ONE YEAR AFTER THE COMPLETION OF CONSTRUCTION. IN ADDITION, ALL CONTRACTORS WILL, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, INDEMNIFY, DEFEND AND HOLD HARMLESS BOHLER ENGINEERING AND ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS FROM AND AGAINST ANY DAMAGES, INJURIES, CLAIMS, ACTIONS, PENALTIES, EXPENSES, PUNITIVE DAMAGES, TORT DAMAGES, STATUTORY CLAIMS, STATUTORY CAUSES OF ACTION, LOSSES, CAUSES OF ACTION, LIABILITIES OR COSTS, INCLUDING, BUT NOT LIMITED TO, REASONABLE ATTORNEYS' FEES AND DEFENSE COSTS, ARISING OUT OF OR IN ANY WAY CONNECTED WITH OR TO THE PROJECT, INCLUDING ALL CLAIMS BY EMPLOYEES OF THE CONTRACTORS, ALL CLAIMS BY THIRD PARTIES AND ALL CLAIMS RELATED TO THE PROJECT. CONTRACTOR MUST NOTIFY ENGINEER, IN WRITING, AT LEAST THIRTY (30) DAYS PRIOR TO ANY TERMINATION, SUSPENSION OR CHANGE OF ITS INSURANCE HEREUNDER.
19. BOHLER ENGINEERING WILL REVIEW OR TAKE OTHER APPROPRIATE ACTION ON THE CONTRACTOR SUBMITTALS, SUCH AS SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND OTHER DATA, WHICH THE CONTRACTOR IS REQUIRED TO SUBMIT, BUT ONLY FOR THE LIMITED PURPOSE OF CHECKING FOR CONFORMANCE WITH THE DESIGN INTENT AND THE INFORMATION SHOWN IN THE CONSTRUCTION CONTRACT DOCUMENTS. CONSTRUCTION MEANS AND/OR METHODS AND/OR TECHNIQUES OR PROCEDURES, COORDINATION OF THE WORK WITH OTHER TRADES, AND CONSTRUCTION SAFETY PRECAUTIONS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND BOHLER HAS NO RESPONSIBILITY OR LIABILITY FOR SAME HEREUNDER. BOHLER ENGINEERING'S SHOP DRAWING REVIEW WILL BE CONDUCTED WITH REASONABLE PROMPTNESS WHILE ALLOWING SUFFICIENT TIME TO PERMIT ADEQUATE REVIEW. REVIEW OF A SPECIFIC ITEM MUST NOT INDICATE THAT BOHLER ENGINEERING HAS REVIEWED THE ENTIRE ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. BOHLER ENGINEERING WILL NOT BE RESPONSIBLE FOR ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS NOT PROMPTLY AND IMMEDIATELY BROUGHT TO ITS ATTENTION, IN WRITING, BY THE CONTRACTOR. BOHLER ENGINEERING WILL NOT BE REQUIRED TO REVIEW PARTIAL SUBMISSIONS OR THOSE FOR WHICH SUBMISSIONS OF CORRELATED ITEMS HAVE NOT BEEN RECEIVED.
20. NEITHER THE PROFESSIONAL ACTIVITIES OF BOHLER ENGINEERING, NOR THE PRESENCE OF BOHLER ENGINEERING AND/OR ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AT A CONSTRUCTION/PROJECT SITE, SHALL RELIEVE THE GENERAL CONTRACTOR OF ITS OBLIGATIONS, DUTIES AND RESPONSIBILITIES INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING, OVERSEEING, SUPERINTENDING AND COORDINATING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND COMPLIANCE ANY HEALTH OR SAFETY PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES WITH JURISDICTION OVER THE PROJECT AND/OR PROPERTY. BOHLER ENGINEERING AND ITS PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY CONTROL OVER ANY CONSTRUCTION CONTRACTOR OR ITS EMPLOYEES IN CONNECTION WITH THEIR WORK OR ANY HEALTH OR SAFETY PROGRAMS OR PROCEDURES. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETY. BOHLER ENGINEERING SHALL BE INDEMNIFIED BY THE GENERAL CONTRACTOR AND MUST BE NAMED AN ADDITIONAL INSURED UNDER THE GENERAL CONTRACTOR'S POLICIES OF GENERAL LIABILITY INSURANCE AS DESCRIBED ABOVE FOR JOB SITE SAFETY.
21. IF THE CONTRACTOR DEVIATES FROM THE PLANS AND SPECIFICATIONS, INCLUDING THE NOTES CONTAINED HEREIN, WITHOUT FIRST OBTAINING THE PRIOR WRITTEN AUTHORIZATION OF THE ENGINEER FOR SUCH DEVIATIONS, THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PAYMENT OF ALL COSTS INCURRED IN CORRECTING ANY WORK DONE WHICH DEVIATES FROM THE PLANS, ALL FINES AND/OR PENALTIES ASSESSED WITH RESPECT THERETO AND ALL COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM AND, FURTHER, SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS THE ENGINEER, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, IN ACCORDANCE WITH THESE NOTES HEREIN, FOR AND FROM ALL FEES, ATTORNEYS' FEES, DAMAGES, COSTS, JUDGMENTS, PENALTIES AND THE LIKE RELATED TO SAME.
CONTINUATION OF GENERAL NOTES
22. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE AND PROTECTION OF TRAFFIC PLAN FOR ALL WORK THAT AFFECTS PUBLIC TRAVEL EITHER IN THE R.O.W. OR ON SITE. THE COST FOR THIS ITEM MUST BE INCLUDED IN THE CONTRACTOR'S PRICE.
23. ALL SIGNING AND PAVEMENT STRIPING MUST CONFORM TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES OR LOCALLY APPROVED SUPPLEMENT.
24. ENGINEER IS NOT RESPONSIBLE FOR ANY INJURY OR DAMAGES RESULTING FROM CONTRACTOR'S FAILURE TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH THE APPROVED PLANS. IF CONTRACTOR AND/OR OWNER FAIL TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH APPROVED PLANS, THEY AGREE TO JOINTLY AND SEVERALLY INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS.
25. OWNER MUST MAINTAIN AND PRESERVE ALL PHYSICAL SITE FEATURES AND DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS, IN STRICT ACCORDANCE WITH THE APPROVED PLAN(S) AND DESIGN AND, FURTHER ENGINEER IS NOT RESPONSIBLE FOR ANY FAILURE TO SO MAINTAIN OR PRESERVE SITE AND/OR DESIGN FEATURES. IF OWNER FAILS TO MAINTAIN AND/OR PRESERVE ALL PHYSICAL SITE FEATURES AND/OR DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS, OWNER AGREES TO INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS
AND COSTS THAT ENGINEER INCURS AS A RESULT OF SAID FAILURE.
26. ALL DIMENSIONS MUST BE TO FACE OF CURB, EDGE OF PAVEMENT, OR EDGE OF BUILDING, UNLESS NOTED OTHERWISE.
27. ALL CONSTRUCTION AND MATERIALS MUST COMPLY WITH AND CONFORM TO APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, LAWS, ORDINANCES, RULES AND CODES, AND ALL APPLICABLE OSHA REQUIREMENTS.
28. CONTRACTOR AND OWNER MUST INSTALL ALL ELEMENTS AND COMPONENTS IN STRICT COMPLIANCE WITH AND ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDED INSTALLATION CRITERIA AND SPECIFICATIONS. IF CONTRACTOR AND/OR OWNER FAIL TO DO SO, THEY AGREE TO JOINTLY AND SEVERALLY INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS
AND COSTS THAT ENGINEER INCURS AS A RESULT OF SAID FAILURE.
29. AS CONTAINED IN THESE DRAWINGS AND ASSOCIATED APPLICATION DOCUMENTS PREPARED BY THE SIGNATORY PROFESSIONAL ENGINEER, THE USE OF THE WORDS CERTIFY OR CERTIFICATION CONSTITUTES AN EXPRESSION OF "PROFESSIONAL OPINION" REGARDING THE INFORMATION WHICH IS THE SUBJECT OF THE UNDERSIGNED PROFESSIONAL KNOWLEDGE OR BELIEF AND IN ACCORDANCE WITH COMMON ACCEPTED PROCEDURE CONSISTENT WITH THE APPLICABLE STANDARDS OF PRACTICE, AND DOES NOT CONSTITUTE A
WARRANTY OR GUARANTEE, EITHER EXPRESSED OR IMPLIED.
ZONED: R-2; LOW DENSITY RESIDENTIAL DISTRICT
EXISTING USE: PUBLIC SCHOOL (PERMITTED BY CONDITIONAL USE)
REQUIRED EXISTING PROPOSED
MIN. LOT AREA
MIN. LOT WIDTH
AT BLDG. SETBACK
AT STREETLINE
MAX. BLDG. COVERAGE
MAX. IMPERVIOUS COVERAGE
MAX. BLDG. HEIGHT
MIN. FRONT YARD
MIN. SIDE YARD
MIN. REAR YARD
10AC 18.085 AC 18.085 AC
300' 656' 656'
150' 658' 658'
25% 8.5% (67,021 S.F.) 8.6% (67,482 S.F.)
35% 23.6% (186,024 S.F.) 23.5% (185,452 S.F.)
3 STORIES / 30' 28' ± (1 STORY) 28' ± (1 STORY)
65' 99.3' 99.3'
40' 26.7' (ENC) 26.7' (ENC)
75' 204' 204'
ZONING CHART
(ENC) - EXISTING NON-CONFORMITY
PARKING REQUIREMENTS
TOTAL REQUIRED = 1 SPACE PER FACULTY MEMBER AND OTHER FULL TIME EMPLOYEE
PLUS 1 PER EVERY 2 CLASSROOMS OR OFFICES = (75 FACULTY / EMPLOYEES) X 1 + 36/2 (CLASSROOMS OR OFFICES) = 75 + 18 = 93 SPACES
TOTAL PROVIDED = 105 SPACES (INCLUDING 3 ADA ACCESSIBLE SPACES)
· ZONING DATA
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP CHESTER COUNTY, PA
TMP #53-4-78.0E
1"=1,000' LOCATION MAP
SITE
1"= 30'
0 30 7.5 15 30
R:\16\PC161321\_CAD\LAND DEV\REV-0\PC161321BASE-0----->LAYOUT: 01-SITE SD
1515 MARKET STREET, SUITE 920 PHILADELPHIA, PENNSYLVANIA 19102
Phone: (267) 402-3400 Fax: (267) 402-3401 www.BohlerEngineering.com
CONSTRUCTION NOT APPROVED FOR
REVISIONS
REV DATE COMMENT BY
FOR
SHEET NUMBER:
SHEET TITLE:
PROJECT:
OF
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
19380
5
REVISION 0 - 2017.04.28
1-800-242-1776 P 1
SYSTEM, INC. A
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10
WORKING DAYS IN DESIGN
STAGE - STOP CALL
POCS SERIAL NUMBER
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: PC161321BASE-0
PC161321 E.N.P./S.R.D. G.J.H. 2017.04.28
NEW ENGLAND UPSTATE NEW YORK
NEW YORK, NY
PHILADELPHIA, PA
LEHIGH VALLEY, PA
BALTIMORE, MD
REHOBOTH BEACH, DE WASHINGTON, DC
NORTHERN VIRGINIA
RALEIGH, NC CENTRAL VIRGINIA
SOUTHERN MARYLAND
NORTHERN NEW JERSEY SOUTHEASTERN, PA
CHARLOTTE, NC
BOSTON, MA
SOUTHERN NEW JERSEY
NEW YORK METRO
TAMPA, FL
SOUTH FLORIDA
DALLAS, TX
ATLANTA, GA
PITTSBURGH, PA
TM
SUSTAINABLE DESIGN LANDSCAPE ARCHITECTURE SITE CIVIL AND CONSULTING ENGINEERING
LAND SURVEYING PROGRAM MANAGEMENT
PERMITTING SERVICES TRANSPORTATION SERVICES
2017 BOHLER ENGINEERING
20163131545
PROFESSIONAL ENGINEER
1"=30'
SITE PLAN
1
DRAWING LEGEND
PROPERTY LINE RIGHT-OF-WAY LINE
ADJACENT PROPERTY LINE
10
EXISTING FENCE LINE
EXISTING TREE LINE
EXISTING PARKING SPACE COUNT
EXISTING AREA LIGHT
EXISTING SANITARY MANHOLE
EXISTING STORMWATER MANHOLE
EXISTING INLET
EXISTING WATER VALVE
EXISTING ROOF DRAIN
EXISTING CLEAN OUT
EXISTING UTILITY POLE
EXISTING SIGN
EXISTING FIRE HYDRANT
EXISTING TREE
EXISTING CONTOUR INDEX
EXISTING CONTOUR INTERVAL
EXISTING STORMWATER PIPE
EXISTING SANITARY SEWER PIPE EXISTING ELECTRIC LINE
EXISTING GAS LINE
EXISTING OPTIC LINE
EXISTING GAS LINE
EXISTING WATER LINE
EXISTING OVERHEAD LINE
EXISTING TREE BOX TO BE REMOVED
GENERAL DEMOLITION NOTES
1. THIS PLAN REFERENCES DOCUMENTS AND INFORMATION BY:
· SURVEY
CONTROL POINT ASSOCIATES, INC. 1600 MANOR DRIVE SUITE 210 CHALFONT, PA 18914 ENTITLED: "BOUNDARY & PARTIAL TOPOGRAPHIC SURVEY" PREPARED FOR: EAST GOSHEN ELEMENTARY SCHOOL SHEETS: 1-4 FILE NO: 02-160513-00 DATED: 2017.12.15 LAST REVISED: 2017-01-27
2. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, (29 U.S.C. 651 et seq.), AS AMENDED AND ANY MODIFICATIONS, AMENDMENTS OR REVISIONS TO SAME.
3. BOHLER ENGINEERING HAS NO CONTRACTUAL, LEGAL, OR OTHER RESPONSIBILITY FOR JOB SITE SAFETY OR JOB SITE SUPERVISION, OR ANYTHING RELATED TO SAME.
4. THE DEMOLITION PLAN IS INTENDED TO PROVIDE GENERAL INFORMATION, ONLY, REGARDING ITEMS TO BE DEMOLISHED AND/OR REMOVED. THE CONTRACTOR MUST ALSO REVIEW THE OTHER SITE PLAN DRAWINGS AND INCLUDE IN DEMOLITION ACTIVITIES ALL INCIDENTAL WORK NECESSARY FOR THE CONSTRUCTION OF THE NEW SITE IMPROVEMENTS.
5. CONTRACTOR MUST RAISE ANY QUESTIONS CONCERNING THE ACCURACY OR INTENT OF THESE PLANS OR SPECIFICATIONS, CONCERNS REGARDING THE APPLICABLE SAFETY STANDARDS, OR THE SAFETY OF THE CONTRACTOR OR THIRD PARTIES IN PERFORMING THE WORK ON THIS PROJECT, WITH BOHLER ENGINEERING, IN WRITING, AND RESPONDED TO BY BOHLER, IN WRITING, PRIOR TO THE INITIATION OF ANY SITE ACTIVITY AND ANY DEMOLITION ACTIVITY. ALL DEMOLITION ACTIVITIES MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, RULES, REQUIREMENTS, STATUTES, ORDINANCES AND CODES.
6. PRIOR TO STARTING ANY DEMOLITION, CONTRACTOR IS RESPONSIBLE FOR/TO:
A. OBTAINING ALL REQUIRED PERMITS AND MAINTAINING THE SAME ON SITE FOR REVIEW BY THE ENGINEER AND OTHER PUBLIC
AGENCIES HAVING JURISDICTION THROUGHOUT THE DURATION OF THE PROJECT, SITE WORK AND DEMOLITION WORK.
7. ALL DEMOLITION ACTIVITIES ARE TO BE PERFORMED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS, AND REFERENCED DOCUMENTS AS WELL AS ALL FEDERAL, STATE AND LOCAL REGULATIONS. ANY DISCREPANCIES OR DEVIATIONS SHALL BE IDENTIFIED BY THE CONTRACTOR TO THE ENGINEER IN WRITING FOR RESOLUTION PRIOR TO INITIATION OF ACTIVITY.
8. PRIOR TO STARTING ANY DEMOLITION CONTRACTOR IS RESPONSIBLE FOR/TO:
A. ENSURE COPIES OF ALL PERMITS AND APPROVALS ARE ON SITE FOR REVIEW.
B. THE REQUIRED SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN PLACE PRIOR TO SITE DISTURBANCE.
C. ALL UTILITIES AND SERVICES, INCLUDING BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE,
CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE LIMITS OF DISTURBANCE, SHALL BE VERTICALLY AND HORIZONTALLY LOCATED. THE CONTRACTOR SHALL USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE UNDERGROUND UTILITIES.
D. PROTECT AND MAINTAIN IN OPERATION, ALL ACTIVE SYSTEMS THAT ARE NOT BEING REMOVED DURING ALL DEMOLITION ACTIVITIES.
E. FAMILIARIZE THEMSELVES WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENT AND IS RESPONSIBLE FOR ALL
COORDINATION REGARDING UTILITY DEMOLITION AS IDENTIFIED OR REQUIRED FOR PROJECT. THE CONTRACTOR SHALL PROVIDE THE OWNER WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH JURISDICTION AND UTILITY COMPANY REQUIREMENTS.
F. COORDINATION WITH UTILITY COMPANIES REGARDING WORKING "OFF-PEAK" HOURS OR ON WEEKENDS AS MAY BE REQUIRED TO
MINIMIZE THE IMPACT ON THE AFFECTED PARTIES.
G. A COMPLETE INSPECTION FOR CONTAMINANTS, BY A LICENSED ENVIRONMENTAL TESTING AGENCY, OF ALL BUILDINGS AND/OR
STRUCTURES TO BE REMOVED SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL ENVIRONMENTAL REGULATIONS. ALL CONTAMINANTS SHALL BE REMOVED AND DISPOSED OF BY A FEDERALLY LICENSED CONTRACTOR IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS. ALL ENVIRONMENTAL WORK INCLUDING HAZARDOUS MATERIAL, SOILS, ASBESTOS, OR OTHER REFERENCED OR IMPLIED HEREIN IS SOLELY THE RESPONSIBILITY OF THE OWNER'S ENVIRONMENTAL CONSULTANT.
9. THE CONTRACTOR SHALL PROVIDE ALL THE "MEANS AND METHODS" NECESSARY TO PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF EXISTING STRUCTURES, AND ANY OTHER IMPROVEMENTS THAT ARE REMAINING ON OR OFF SITE.
10. IN THE ABSENCE OF SPECIFIC REQUIREMENTS, THE CONTRACTOR SHALL PERFORM EARTH MOVEMENT ACTIVITIES, DEMOLITION AND REMOVAL OF ALL FOUNDATION WALLS, FOOTINGS, AND OTHER MATERIALS WITHIN THE LIMITS OF DISTURBANCE IN ACCORDANCE WITH DIRECTION BY OWNER'S GEOTECHNICAL ENGINEER.
11. EXPLOSIVES SHALL NOT BE USED WITHOUT PRIOR WRITTEN CONSENT OF BOTH THE OWNER AND APPLICABLE GOVERNMENTAL AUTHORITIES. ALL THE REQUIRED PERMITS AND EXPLOSIVE CONTROL MEASURES THAT ARE REQUIRED BY THE FEDERAL, STATE, AND LOCAL GOVERNMENTS SHALL BE IN PLACE PRIOR TO STARTING AN EXPLOSIVE PROGRAM. THE CONTRACTOR IS ALSO RESPONSIBLE FOR ALL INSPECTION AND SEISMIC VIBRATION TESTING THAT IS REQUIRED TO MONITOR THE EFFECTS ON ALL LOCAL STRUCTURES.
12. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL AND GENERALLY ACCEPTED SAFE PRACTICES IN CONFORMANCE WITH: THE "MANUAL ON UNIFORM TRAFFIC CONTROL," AS WELL AS FEDERAL, STATE, AND LOCAL REGULATIONS WHEN DEMOLITION RELATED ACTIVITIES IMPACT ROADWAYS OR ROADWAY RIGHTS-OF-WAY.
13. THE CONTRACTOR SHALL CONDUCT DEMOLITION ACTIVITIES IN SUCH A MANNER TO INSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, SIDEWALKS, WALKWAYS, AND OTHER ADJACENT FACILITIES. STREET CLOSURE PERMITS MUST BE RECEIVED FROM THE APPROPRIATE GOVERNMENTAL AUTHORITY WHERE REQUIRED.
14. DEMOLITION ACTIVITIES AND EQUIPMENT SHALL NOT USE AREAS OUTSIDE THE DEFINED PROPERTY LINES, WITHOUT WRITTEN PERMISSION OF THE OWNER, AND/OR APPROPRIATE GOVERNMENT AGENCY.
15. USE DUST CONTROL MEASURES TO LIMIT THE AMOUNT OF AIRBORNE DUST AND DIRT RISING AND SCATTERING IN THE AIR TO WITHIN FEDERAL, STATE, AND/OR LOCAL STANDARDS. AFTER THE DEMOLITION IS COMPLETE, ADJACENT STRUCTURES AND IMPROVEMENTS SHALL BE CLEANED OF ALL DUST AND DEBRIS CAUSED BY THE DEMOLITION OPERATIONS. THE CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL ADJACENT AREAS TO THEIR "PRE-DEMOLITION" CONDITION.
16. THE CONTRACTOR IS RESPONSIBLE TO SAFEGUARD THE SITE AS NECESSARY TO PERFORM THE DEMOLITION IN SUCH A MANNER AS TO PREVENT THE UNAUTHORIZED ENTRY OF PERSONS AT ANY TIME.
17. THIS DEMOLITION PLAN IS INTENDED TO IDENTIFY THOSE EXISTING ITEMS/CONDITIONS WHICH ARE TO BE REMOVED. IT IS NOT INTENDED TO PROVIDE DIRECTION OTHER THAN THAT ALL METHODS AND MEANS ARE TO BE IN ACCORDANCE WITH STATE, FEDERAL, LOCAL, AND JURISDICTIONAL REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OSHA AND OTHER SAFETY PRECAUTIONS NECESSARY TO PROVIDE A SAFE WORK SITE.
18. THE DEMOLITION CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS OF DAMAGE TO ALL ITEMS THAT ARE TO REMAIN AS A RESULT OF HIS ACTIVITIES. ALL REPAIRS SHALL USE NEW MATERIAL. THE REPAIRS SHALL RESTORE THE ITEM TO THE PRE-DEMOLITION CONDITION.
19. DEBRIS SHALL NOT BE BURIED ON THE SUBJECT SITE. ALL EXCAVATED MATERIAL AND DEBRIS (SOLID WASTE) SHALL BE DISPOSED OF IN
CHESTER ROAD
(A.K.A. N. CHESTER ROAD)
(A.K.A. T.R. 352)
(A.K.A. S.R. 0352)
(40' WIDE R.O.W.)
10
10
13
4
4
11
6
9
15
5 6
EXISTING CONCRETE (TO BE REMOVED)
EXISTING SANITARY
(TO BE REPLACED)
EXISTING MANHOLE (TO BE REMOVED)
EXISTING U.G. TANK, FUEL LINES, AND CONCRETE PAD
(TO BE REMOVED) (REFER TO MEP PLANS FOR
ADDITIONAL DETAILS ON
DEMOLITION)
UTILITIES:
UTILITY COMPANY PHONE NUMBER
THE FOLLOWING COMPANIES WERE NOTIFIED BY PENNSYLVANIA ONE-CALL SYSTEM (1-800-242-1776) AND REQUESTED TO MARK OUT UNDERGROUND FACILITIES AFFECTING AND SERVICING THIS SITE. THE UNDERGROUND UTILITY INFORMATION SHOWN HEREON IS BASED UPON THE UTILITY COMPANIES RESPONSE TO THIS REQUEST. SERIAL NUMBER: 20163131545
AQUA PENNSYLVANIA, INC.
AT & T COMCAST CABLE COMMUNICATIONS, INC.
COMCAST CABLEVISION EAST GOSHEN TOWNSHIP
INTERSTATE ENERGY
PECO SUNOCO PIPELINE TRANS CONTINENTAL GAS PIPE CORP.
VERIZON
610-525-1400 215-233-3474 215-918-3137 215-961-3800 610-692-7171 610-933-4300 610-292-8057 215-669-3232 610-644-7373 800-479-1919
STATUS
RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED
RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED
COMMENTS
SHOWN NOT SHOWN NOT SHOWN NOT SHOWN NOT SHOWN NOT SHOWN
SHOWN NOT SHOWN NOT SHOWN NOT SHOWN
B
DESCRIPTION SOIL
- GLADSTONE GRAVELLY LOAM, 3 TO8 PERCENT SLOPES GdB
HYDROLOGIC SOIL GROUP SOIL DESCRIPTIONS
B/D - HATBORO SILT LOAM Ha
1"= 30'
0 30 7.5 15 30
R:\16\PC161321\_CAD\LAND DEV\REV-0\PC161321BASE-0----->LAYOUT: 02-EXISTING SD
1515 MARKET STREET, SUITE 920 PHILADELPHIA, PENNSYLVANIA 19102
Phone: (267) 402-3400 Fax: (267) 402-3401 www.BohlerEngineering.com
CONSTRUCTION NOT APPROVED FOR
REVISIONS
REV DATE COMMENT BY
FOR
SHEET NUMBER:
SHEET TITLE:
PROJECT:
OF
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
19380
5
REVISION 0 - 2017.04.28
1-800-242-1776 P 1
SYSTEM, INC. A
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10
WORKING DAYS IN DESIGN
STAGE - STOP CALL
POCS SERIAL NUMBER
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: PC161321BASE-0
PC161321 E.N.P./S.R.D. G.J.H. 2017.04.28
NEW ENGLAND UPSTATE NEW YORK
NEW YORK, NY
PHILADELPHIA, PA
LEHIGH VALLEY, PA
BALTIMORE, MD
REHOBOTH BEACH, DE WASHINGTON, DC
NORTHERN VIRGINIA
RALEIGH, NC CENTRAL VIRGINIA
SOUTHERN MARYLAND
NORTHERN NEW JERSEY SOUTHEASTERN, PA
CHARLOTTE, NC
BOSTON, MA
SOUTHERN NEW JERSEY
NEW YORK METRO
TAMPA, FL
SOUTH FLORIDA
DALLAS, TX
ATLANTA, GA
PITTSBURGH, PA
TM
SUSTAINABLE DESIGN LANDSCAPE ARCHITECTURE SITE CIVIL AND CONSULTING ENGINEERING
LAND SURVEYING PROGRAM MANAGEMENT
PERMITTING SERVICES TRANSPORTATION SERVICES
2017 BOHLER ENGINEERING
20163131545
PROFESSIONAL ENGINEER
1"=30'
EXISTING CONDITIONS &
DEMOLITION
PLAN
2
DRAWING LEGEND
PROPERTY LINE RIGHT-OF-WAY LINE
ADJACENT PROPERTY LINE
10
EXISTING FENCE LINE
EXISTING TREE LINE
EXISTING PARKING SPACE COUNT
EXISTING AREA LIGHT
EXISTING SANITARY MANHOLE
EXISTING STORMWATER MANHOLE
EXISTING INLET
EXISTING WATER VALVE
EXISTING ROOF DRAIN
EXISTING CLEAN OUT
EXISTING UTILITY POLE
EXISTING SIGN
EXISTING FIRE HYDRANT
EXISTING TREE
EXISTING CONTOUR INDEX
EXISTING CONTOUR INTERVAL
EXISTING STORMWATER PIPE
EXISTING SANITARY SEWER PIPE EXISTING ELECTRIC LINE
EXISTING GAS LINE
EXISTING OPTIC LINE
EXISTING GAS LINE
EXISTING WATER LINE
EXISTING OVERHEAD LINE
PROPOSED STORMWATER PIPE
PROPOSED SANITARY SEWER PIPE
PROPOSED SANITARY MANHOLE
PROPOSED ROOF DRAIN
PROPOSED CLEAN OUT CO
RD
1. LOCATIONS OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE AND MUST BE INDEPENDENTLY CONFIRMED WITH LOCAL UTILITY COMPANIES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OR EXCAVATION. SANITARY SEWER AND ALL OTHER UTILITY SERVICE CONNECTION POINTS MUST BE INDEPENDENTLY CONFIRMED BY THE CONTRACTOR IN THE FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ALL DISCREPANCIES MUST IMMEDIATELY BE REPORTED, IN WRITING, TO THE ENGINEER. CONSTRUCTION MUST COMMENCE BEGINNING AT THE LOWEST INVERT (POINT OF CONNECTION) AND PROGRESS UP GRADIENT. PROPOSED INTERFACE POINTS (CROSSINGS) WITH EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED BY TEST PITS PRIOR TO COMMENCEMENT OF CONSTRUCTION.
2. CONTRACTOR MUST VERTICALLY AND HORIZONTALLY LOCATE ALL EXISTING UTILITIES AND SERVICES INCLUDING, BUT NOT LIMITED TO, GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE LIMITS OF DISTURBANCE OR WORK SPACE, WHICHEVER IS GREATER. THE CONTRACTOR MUST USE, REFER TO, AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION, AT NO COST TO THE OWNER. CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED WITH DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL CONSTRUCTION CONTRACT DOCUMENTS INCLUDING, BUT NOT LIMITED TO, ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR TO THE INITIATION AND COMMENCEMENT OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT AND/OR DISCREPANCY BETWEEN THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE OR APPLICABLE CODES, REGULATIONS, LAWS, RULES, STATUTES AND/OR ORDINANCES, IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD, IN WRITING, OF SAID CONFLICT AND/OR DISCREPANCY PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR'S FAILURE TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE CONTRACTOR'S FULL AND COMPLETE ACCEPTANCE OF ALL RESPONSIBILITY TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS, LAWS, STATUTES, ORDINANCES AND CODES AND, FURTHER, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH SAME.
4. THE CONTRACTOR MUST LOCATE AND CLEARLY AND UNAMBIGUOUSLY DEFINE VERTICALLY AND HORIZONTALLY ALL ACTIVE AND INACTIVE UTILITY AND/OR SERVICE SYSTEMS THAT ARE TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE TO PROTECT AND MAINTAIN ALL ACTIVE AND INACTIVE SYSTEMS THAT ARE NOT BEING REMOVED/RELOCATED DURING SITE ACTIVITY.
5. THE CONTRACTOR MUST FAMILIARIZE ITSELF WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AS IDENTIFIED OR REQUIRED FOR THE PROJECT. THE CONTRACTOR MUST PROVIDE THE OWNER WITH WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH THE JURISDICTION AND UTILITY COMPANY REQUIREMENTS AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES.
6. THE CONTRACTOR MUST INSTALL ALL STORM SEWER AND SANITARY SEWER COMPONENTS WHICH FUNCTION BY GRAVITY PRIOR TO THE INSTALLATION OF ALL OTHER UTILITIES.
7. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF SITE PLAN DOCUMENTS AND ARCHITECTURAL DESIGN FOR EXACT BUILDING UTILITY CONNECTION LOCATIONS, GREASE TRAP REQUIREMENTS/DETAILS, DOOR ACCESS,
AND EXTERIOR GRADING. THE ARCHITECT WILL DETERMINE THE UTILITY SERVICE SIZES. THE CONTRACTOR MUST COORDINATE INSTALLATION OF UTILITIES/SERVICES WITH THE INDIVIDUAL COMPANIES, TO AVOID CONFLICTS AND TO ENSURE THAT PROPER DEPTHS ARE ACHIEVED. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT INSTALLATION OF ALL IMPROVEMENTS COMPLIES WITH ALL UTILITY REQUIREMENTS WITH JURISDICTION AND/OR CONTROL OF THE SITE, AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES AND, FURTHER, IS RESPONSIBLE FOR COORDINATING THE UTILITY TIE-INS/CONNECTIONS PRIOR TO CONNECTING TO THE EXISTING UTILITY/SERVICE. WHERE A CONFLICT(S) EXISTS BETWEEN THESE PLANS AND THE ARCHITECTURAL PLANS, OR WHERE ARCHITECTURAL PLAN UTILITY CONNECTION POINTS DIFFER, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER, IN WRITING, AND PRIOR TO CONSTRUCTION, RESOLVE SAME.
8. WATER SERVICE MATERIALS, BURIAL DEPTH, AND COVER REQUIREMENTS MUST BE SPECIFIED BY THE LOCAL UTILITY COMPANY. CONTRACTOR'S PRICE FOR WATER SERVICE MUST INCLUDE ALL FEES, COSTS, TESTING AND
APPURTENANCES REQUIRED BY THE UTILITY COMPANY TO PROVIDE FULL AND COMPLETE WORKING SERVICE. CONTRACTOR MUST CONTACT THE APPLICABLE UTILITY COMPANY TO CONFIRM THE SIZE AND TYPE OF WATER METER AND/OR VAULT, PRIOR TO COMMENCING CONSTRUCTION.
9. ALL NEW UTILITIES/SERVICES, INCLUDING ELECTRIC, TELEPHONE, CABLE TV, ETC. ARE TO BE INSTALLED UNDERGROUND. ALL NEW UTILITIES/SERVICES MUST BE INSTALLED IN ACCORDANCE WITH THE UTILITY/SERVICE PROVIDER INSTALLATION SPECIFICATIONS AND STANDARDS.
10. SITE GRADING MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE REPORT OF GEOTECHNICAL INVESTIGATION REFERENCED IN THIS PLAN SET. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REPLACING UNSUITABLE MATERIALS WITH SUITABLE MATERIALS AS SPECIFIED IN THE REPORT OF GEOTECHNICAL INVESTIGATION. ALL EXCAVATED OR FILLED AREAS MUST BE COMPACTED AS OUTLINED IN THE REPORT OF GEOTECHNICAL INVESTIGATION. MOISTURE CONTENT AT TIME OF PLACEMENT MUST BE SUBMITTED IN A COMPACTION REPORT PREPARED BY A QUALIFIED GEOTECHNICAL ENGINEER, REGISTERED WITH THE STATE WHERE THE WORK IS PERFORMED, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE REPORT OF GEOTECHNICAL INVESTIGATION AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. SUBBASE MATERIAL FOR SIDEWALKS, CURB, OR ASPHALT MUST BE FREE OF ORGANICS AND OTHER UNSUITABLE MATERIALS. SHOULD SUBBASE BE DEEMED UNSUITABLE BY OWNER/DEVELOPER, OR OWNER/DEVELOPER'S REPRESENTATIVE, SUBBASE IS TO BE REMOVED AND FILLED WITH APPROVED FILL MATERIAL COMPACTED AS DIRECTED BY THE REPORT OF GEOTECHNICAL INVESTIGATION. EARTHWORK ACTIVITIES INCLUDING, BUT NOT LIMITED TO, EXCAVATION, BACKFILL, AND COMPACTING MUST COMPLY WITH THE RECOMMENDATIONS IN THE REPORT OF GEOTECHNICAL INVESTIGATION AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES.
11. ALL FILL, COMPACTION, AND BACKFILL MATERIALS REQUIRED FOR UTILITY INSTALLATION MUST BE AS PER THE RECOMMENDATIONS PROVIDED IN THE REPORT OF GEOTECHNICAL INVESTIGATION AND MUST BE COORDINATED WITH THE APPLICABLE UTILITY COMPANY SPECIFICATIONS. WHEN THE PROJECT DOES NOT HAVE GEOTECHNICAL RECOMMENDATIONS, FILL AND COMPACTION MUST, AT A MINIMUM, COMPLY WITH THE STATE DOT REQUIREMENTS AND SPECIFICATIONS AND CONSULTANT SHALL HAVE NO LIABILITY OR RESPONSIBILITY FOR OR
AS RELATED TO FILL, COMPACTION AND BACKFILL.
12. THE CONTRACTOR MUST COMPLY, TO THE FULLEST EXTENT, WITH THE LATEST OSHA STANDARDS AND REGULATIONS, AND/OR ANY OTHER AGENCY WITH JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE "MEANS AND METHODS" REQUIRED TO MEET THE INTENT AND PERFORMANCE CRITERIA OF OSHA, AS WELL AS ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION AND/OR TRENCHING PROCEDURES AND CONSULTANT SHALL HAVE NO RESPONSIBILITY FOR OR AS RELATED TO EXCAVATION AND TRENCHING PROCEDURES.
13. PAVEMENT MUST BE SAW CUT IN STRAIGHT LINES, AND EXCEPT FOR EDGE OF BUTT JOINTS, MUST EXTEND TO THE FULL DEPTH OF THE EXISTING PAVEMENT. ALL DEBRIS FROM REMOVAL OPERATIONS MUST BE REMOVED FROM THE SITE AT THE TIME OF EXCAVATION. STOCKPILING OF DEBRIS WILL NOT BE PERMITTED.
14. THE TOPS OF EXISTING MANHOLES, INLET STRUCTURES, UTILITY VALVES, AND SANITARY CLEANOUTS MUST BE ADJUSTED, AS NECESSARY, TO MATCH PROPOSED GRADES IN ACCORDANCE WITH ALL APPLICABLE STANDARDS, REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES.
15. DURING THE INSTALLATION OF SANITARY SEWER, STORM SEWER, AND ALL UTILITIES, THE CONTRACTOR MUST MAINTAIN A CONTEMPORANEOUS AND THOROUGH RECORD OF CONSTRUCTION TO IDENTIFY THE AS-INSTALLED LOCATIONS OF ALL UNDERGROUND INFRASTRUCTURE. THE CONTRACTOR MUST CAREFULLY NOTE ANY INSTALLATIONS THAT DEVIATE FROM THE INFORMATION CONTAINED IN THE UTILITY PLAN. THIS RECORD MUST BE KEPT ON A CLEAN COPY OF THESE PLANS, WHICH CONTRACTOR MUST PROMPTLY PROVIDE TO THE OWNER
AT THE COMPLETION OF WORK.
16. THE CONTRACTOR IS FULLY RESPONSIBLE FOR VERIFICATION OF EXISTING TOPOGRAPHIC INFORMATION AND UTILITY INVERT ELEVATIONS PRIOR TO COMMENCING ANY CONSTRUCTION. CONTRACTOR MUST CONFIRM AND ENSURE 0.75% MINIMUM SLOPE AGAINST ALL ISLANDS, GUTTERS, AND CURBS; 1.0% ON ALL CONCRETE SURFACES; AND 1.5% MINIMUM ON ASPHALT (EXCEPT WHERE ADA REQUIREMENTS LIMIT GRADES), TO PREVENT PONDING. CONTRACTOR MUST IMMEDIATELY IDENTIFY, IN WRITING TO THE ENGINEER, ANY DISCREPANCIES THAT MAY OR COULD AFFECT THE PUBLIC SAFETY, HEALTH OR GENERAL WELFARE, OR PROJECT COST. IF CONTRACTOR PROCEEDS WITH CONSTRUCTION WITHOUT PROVIDING PROPER NOTIFICATION, THIS SHALL BE AT THE CONTRACTOR'S OWN RISK AND, FURTHER, CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS THE DESIGN ENGINEER FOR ANY DAMAGES, COSTS, INJURIES, ATTORNEY'S FEES AND THE LIKE WHICH RESULT FROM SAME.
17. PROPOSED TOP OF CURB ELEVATIONS ARE GENERALLY 6" ABOVE EXISTING LOCAL ASPHALT GRADE UNLESS OTHERWISE NOTED. IT IS CONTRACTOR'S OBLIGATION TO ENSURE THAT DESIGN ENGINEER APPROVES FINAL CURBING CUT SHEETS PRIOR TO INSTALLATION OF SAME.
18. REFER TO SITE PLAN FOR ADDITIONAL NOTES.
19. IN THE EVENT OF DISCREPANCIES AND/OR CONFLICTS BETWEEN PLANS OR RELATIVE TO OTHER PLANS, THE SITE PLAN WILL TAKE PRECEDENCE AND CONTROL. CONTRACTOR MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER, IN WRITING, OF ANY DISCREPANCIES AND/OR CONFLICTS.
20. CONTRACTOR IS REQUIRED TO SECURE ALL NECESSARY AND/OR REQUIRED PERMITS AND APPROVALS FOR ALL OFF SITE MATERIAL SOURCES AND DISPOSAL FACILITIES. CONTRACTOR MUST SUPPLY A COPY OF APPROVALS TO ENGINEER AND OWNER PRIOR TO INITIATING ANY WORK.
21. TOP AND BOTTOM OF WALL ELEVATIONS (TW & BW) REPRESENT THE PROPOSED FINISHED GRADE AT THE FACE OF WALL AND DO NOT REPRESENT THE ELEVATION OF THE PROPOSED WALL (INCLUDING THE CAP UNIT OR FOOTING). WALL FOOTINGS/FOUNDATION ELEVATIONS ARE NOT IDENTIFIED HEREIN AND ARE TO BE SET/DETERMINED BY THE CONTRACTOR BASED ON FINAL STRUCTURAL DESIGN SHOP DRAWINGS PREPARED BY THE APPROPRIATE PROFESSIONAL LICENSED IN THE STATE WHERE THE CONSTRUCTION OCCURS. THE CONTRACTOR MUST ENSURE ALL WALLS SHOWN HEREON MUST BE DESIGNED BY A LICENSED STRUCTURAL ENGINEER AND THAT SIGNED AND SEALED SHOP DRAWINGS ARE APPROVED BY THE MUNICIPALITY PRIOR TO THEIR CONSTRUCTION. FURTHER THE CONTRACTOR SHALL ENSURE THAT FENCING, GUIDERAIL, UTILITIES, AND OTHER SITE AMENITIES IN THE VICINITY OF THE RETAINING WALL(S), PROPOSED SCHEMATICALLY IN THESE PLANS, SHALL BE CONSIDERED AND INCORPORATED INTO THE RETAINING WALL DESIGN (BY OTHERS).
22. STORM DRAINAGE PIPE:
UNLESS INDICATED OTHERWISE, ALL STORM SEWER PIPE MUST BE REINFORCED CONCRETE PIPE (RCP) CLASS III WITH JOINTS. WHEN HIGH-DENSITY POLYETHYLENE PIPE (HDPE) IS CALLED FOR ON THE PLANS, IT MUST CONFORM TO AASHTO M294 AND TYPE S ( SMOOTH INTERIOR WITH ANGULAR CORRUGATIONS) WITH GASKET FOR WATERTIGHT JOINT. PVC PIPE FOR ROOF DRAIN CONNECTION MUST BE SDR 26 OR SCHEDULE 40 UNLESS INDICATED OTHERWISE.
23. SANITARY SEWER MAIN MUST BE POLYVINYL CHLORIDE (PVC) SDR 35 EXCEPT WHERE INDICATED OTHERWISE. SANITARY LATERALS MUST BE PVC SCHEDULE 40 OR PVC SDR 26 UNLESS INDICATED, IN WRITING, OTHERWISE.
24. STORM AND SANITARY SEWER PIPE LENGTHS INDICATED ARE NOMINAL.
25. SEWERS CONVEYING SANITARY FLOW, COMBINED SANITARY, AND STORMWATER FLOW OR INDUSTRIAL FLOW MUST BE SEPARATED FROM WATER MAINS BY A DISTANCE OF AT LEAST 10 FEET HORIZONTALLY. IF SUCH LATERAL SEPARATION IS NOT POSSIBLE, THE PIPES MUST BE IN SEPARATE TRENCHES WITH THE SEWER AT LEAST 18 INCHES BELOW THE BOTTOM OF THE WATER MAIN, OR SUCH OTHER SEPARATION AS APPROVED BY THE GOVERNMENT AGENCY WITH JURISDICTION OVER SAME.
26. WHERE APPROPRIATE SEPARATION FROM A WATER MAIN IS NOT POSSIBLE, THE SEWER MUST BE ENCASED IN CONCRETE, OR CONSTRUCTED OF DUCTILE IRON PIPE USING MECHANICAL OR SLIP-ON JOINTS FOR A DISTANCE OF AT LEAST 10 FEET ON EITHER SIDE OF THE CROSSING. IN ADDITION, ONE FULL LENGTH OF SEWER PIPE SHOULD BE LOCATED SO BOTH JOINTS WILL BE AS FAR FROM THE WATER LINE AS POSSIBLE. WHERE A WATER MAIN CROSSES UNDER A SEWER, ADEQUATE STRUCTURAL SUPPORT FOR THE SEWER MUST BE PROVIDED.
27. WATER MAIN PIPING MUST BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS AND SPECIFICATIONS OF THE LOCAL WATER AUTHORITY ABSENCE OF SUCH REQUIREMENTS, WATER MAIN PIPING MUST BE CEMENT}LINED DUCTILE IRON (DIP) MINIMUM CLASS 52 THICKNESS. ALL PIPE AND APPURTENANCES MUST COMPLY WITH THE APPLICABLE AWWA STANDARDS IN EFFECT AT THE TIME OF APPLICATION.
28. CONTRACTOR MUST ENSURE THAT ALL UTILITY TRENCHES LOCATED IN EXISTING PAVED ROADWAYS INCLUDING SEWER, WATER AND STORM SYSTEMS, MUST BE REPAIRED IN ACCORDANCE WITH REFERENCED MUNICIPAL, COUNTY AND/OR DOT DETAILS AS APPLICABLE. CONTRACTOR MUST COORDINATE INSPECTION AND APPROVAL OF COMPLETED WORK WITH THE AGENCY WITH JURISDICTION OVER SAME.
29. CONSULTANT IS NEITHER LIABLE NOR RESPONSIBLE FOR ANY SUBSURFACE CONDITIONS AND FURTHER, SHALL HAVE NO LIABILITY FOR ANY HAZARDOUS MATERIALS, HAZARDOUS SUBSTANCES, OR POLLUTANTS ON, ABOUT OR UNDER THE PROPERTY.
GENERAL GRADING & UTILITY NOTES
CHESTER ROAD
(A.K.A. N. CHESTER ROAD)
(A.K.A. T.R. 352)
(A.K.A. S.R. 0352)
(40' WIDE R.O.W.)
10
10
13
4
4
11
6
9
15
5 6
PROPOSED BUILDING ADDITION
(3,412 S.F.)
131'
204'
111'
134.1'
CO
PROP. 6" PVC SANITARY LATERAL
INV = 398.15
INV = 397.90
PROP. 155 LF 6"
PVC @ 1%
CONNECT TO EXISTING 6" PVC
F
F
F F F F F F
F
F F
F F
F F F F F F F F
F F F F F
PROP. CONNECTION TO EXISTING 12" WATER MAIN
PROP. 6' X 9'
METER PIT
PROP. 6" DIP FIRE SERVICE
REFER TO MEP PLANS FOR EXACT CONNECTION LOCATION TO BUILDING
RD
RD
PROP. UTILITY CROSSING
BOTTOM STORM = 396.90 TOP SANITARY = 394.55 ±
(CALC'D; NOT FIELD
VERIFIED CLEARANCE = 2.35' ±
SL
58 LF 8" PVC @ 0.75%
66 LF 6" PVC @ 2.65%
PROP. SANITARY MANHOLE RIM = 402.00 INV IN = 397.09 INV OUT = 396.92
PROP. SANITARY MANHOLE RIM = 401.38 INV IN = 396.66 (8") INV IN = 396.83 (6") INV IN = 396.86 (4") INV OUT = MATCH EXISTING ( =395.21 ±)
34 LF 8" PVC @ 0.75%
PROP. 4" PVC SANITARY @ 2% LATERAL INV = 397.50
83.7'
54'
10.5'
14'
73.2'
39'
70'
10'
10 LF CONC. ENCASEMENT ON SANITARY SEWER; BOTH
SIDES OF CROSSING
UTILITIES:
UTILITY COMPANY PHONE NUMBER
THE FOLLOWING COMPANIES WERE NOTIFIED BY PENNSYLVANIA ONE-CALL SYSTEM (1-800-242-1776) AND REQUESTED TO MARK OUT UNDERGROUND FACILITIES AFFECTING AND SERVICING THIS SITE. THE UNDERGROUND UTILITY INFORMATION SHOWN HEREON IS BASED UPON THE UTILITY COMPANIES RESPONSE TO THIS REQUEST. SERIAL NUMBER: 20163131545
AQUA PENNSYLVANIA, INC.
AT & T COMCAST CABLE COMMUNICATIONS, INC.
COMCAST CABLEVISION EAST GOSHEN TOWNSHIP
INTERSTATE ENERGY
PECO SUNOCO PIPELINE TRANS CONTINENTAL GAS PIPE CORP.
VERIZON
610-525-1400 215-233-3474 215-918-3137 215-961-3800 610-692-7171 610-933-4300 610-292-8057 215-669-3232 610-644-7373 800-479-1919
STATUS
RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED
RECEIVED NOT RECEIVED NOT RECEIVED NOT RECEIVED
COMMENTS
SHOWN NOT SHOWN NOT SHOWN NOT SHOWN NOT SHOWN NOT SHOWN
SHOWN NOT SHOWN NOT SHOWN NOT SHOWN
1"= 30'
0 30 7.5 15 30
R:\16\PC161321\_CAD\LAND DEV\REV-0\PC161321BASE-0----->LAYOUT: 03-GRADING-UTILITY SD
1515 MARKET STREET, SUITE 920 PHILADELPHIA, PENNSYLVANIA 19102
Phone: (267) 402-3400 Fax: (267) 402-3401 www.BohlerEngineering.com
CONSTRUCTION NOT APPROVED FOR
REVISIONS
REV DATE COMMENT BY
FOR
SHEET NUMBER:
SHEET TITLE:
PROJECT:
OF
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
19380
5
REVISION 0 - 2017.04.28
1-800-242-1776 P 1
SYSTEM, INC. A
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10
WORKING DAYS IN DESIGN
STAGE - STOP CALL
POCS SERIAL NUMBER
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: PC161321BASE-0
PC161321 E.N.P./S.R.D. G.J.H. 2017.04.28
NEW ENGLAND UPSTATE NEW YORK
NEW YORK, NY
PHILADELPHIA, PA
LEHIGH VALLEY, PA
BALTIMORE, MD
REHOBOTH BEACH, DE WASHINGTON, DC
NORTHERN VIRGINIA
RALEIGH, NC CENTRAL VIRGINIA
SOUTHERN MARYLAND
NORTHERN NEW JERSEY SOUTHEASTERN, PA
CHARLOTTE, NC
BOSTON, MA
SOUTHERN NEW JERSEY
NEW YORK METRO
TAMPA, FL
SOUTH FLORIDA
DALLAS, TX
ATLANTA, GA
PITTSBURGH, PA
TM
SUSTAINABLE DESIGN LANDSCAPE ARCHITECTURE SITE CIVIL AND CONSULTING ENGINEERING
LAND SURVEYING PROGRAM MANAGEMENT
PERMITTING SERVICES TRANSPORTATION SERVICES
2017 BOHLER ENGINEERING
20163131545
PROFESSIONAL ENGINEER
1"=30'
GRADING/
UTILITY
PLAN
3
DRAWING LEGEND
PROPERTY LINE RIGHT-OF-WAY LINE
ADJACENT PROPERTY LINE
10
EXISTING FENCE LINE
EXISTING TREE LINE
EXISTING PARKING SPACE COUNT
EXISTING AREA LIGHT
EXISTING SANITARY MANHOLE
EXISTING STORMWATER MANHOLE
EXISTING INLET
EXISTING WATER VALVE
EXISTING ROOF DRAIN
EXISTING CLEAN OUT
EXISTING UTILITY POLE
EXISTING SIGN
EXISTING FIRE HYDRANT
EXISTING TREE
EXISTING CONTOUR INDEX
EXISTING CONTOUR INTERVAL
EXISTING STORMWATER PIPE
EXISTING SANITARY SEWER PIPE EXISTING ELECTRIC LINE
EXISTING GAS LINE
EXISTING OPTIC LINE
EXISTING GAS LINE
EXISTING WATER LINE
EXISTING OVERHEAD LINE
PROPOSED STORMWATER PIPE
PROPOSED SANITARY SEWER PIPE
PROPOSED SANITARY MANHOLE
PROPOSED ROOF DRAIN
PROPOSED CLEAN OUT CO
RD
PROPOSED LIMIT OF DISTURBANCE
CHESTER ROAD
(A.K.A. N. CHESTER ROAD)
(A.K.A. T.R. 352)
(A.K.A. S.R. 0352)
(40' WIDE R.O.W.)
10
10
13
4
4
11
6
9
15
5 6
PROPOSED BUILDING ADDITION
(3,412 S.F.)
131'
204'
111'
134.1'
CO
PROP. 6" PVC SANITARY LATERAL
INV = 398.15
INV = 397.90
PROP. 155 LF 6"
PVC @ 1%
CONNECT TO EXISTING 6" PVC
F
F
F F F F F F
F
F F
F F
F F F F F F F F
F F F F F
PROP. CONNECTION TO EXISTING 12" WATER MAIN
PROP. 6' X 9'
METER PIT
PROP. 6" DIP FIRE SERVICE
REFER TO MEP PLANS FOR EXACT CONNECTION LOCATION TO BUILDING
RD
RD
PROP. UTILITY CROSSING
BOTTOM STORM = 396.90 TOP SANITARY = 394.55 ±
(CALC'D; NOT FIELD
VERIFIED CLEARANCE = 2.35' ±
SL
58 LF 8" PVC @ 0.75%
66 LF 6" PVC @ 2.65%
PROP. SANITARY MANHOLE RIM = 402.00 INV IN = 397.09 INV OUT = 396.92
PROP. SANITARY MANHOLE RIM = 401.38 INV IN = 396.66 (8") INV IN = 396.83 (6") INV IN = 396.86 (4") INV OUT = MATCH EXISTING ( =395.21 ±)
34 LF 8" PVC @ 0.75%
PROP. 4" PVC SANITARY @ 2% LATERAL INV = 397.50
LOD AREA = 3,301 S.F.
LOD AREA = 6,380 S.F.
LOD AREA = 1,941 S.F.
83.7'
54'
10.5'
14'
73.2'
39'
70'
10'
10 LF CONC. ENCASEMENT ON SANITARY SEWER; BOTH
SIDES OF CROSSING
B
DESCRIPTION SOIL
- GLADSTONE GRAVELLY LOAM, 3 TO8 PERCENT SLOPES GdB
HYDROLOGIC SOIL GROUP SOIL DESCRIPTIONS
B/D - HATBORO SILT LOAM Ha
A. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING
SEQUENCE. EACH STAGE SHALL BE COMPLETED IN COMPLIANCE WITH CHAPTER 102 REGULATIONS BEFORE ANY FOLLOWING STAGE IS INITIATED. CLEARING AND GRUBBING SHALL BE LIMITED ONLY TO THOSE AREAS DESCRIBED IN EACH STAGE. UPON COMPLETION OR TEMPORARY CESSATION OF THE EARTH DISTURBANCE ACTIVITY THAT WILL EXCEED FOUR (4) DAYS, OR ANY STAGE THEREOF, THE PROJECT SITE SHALL BE IMMEDIATELY STABILIZED WITH THE APPROPRIATE TEMPORARY OR PERMANENT STABILIZATION.
B. AT LEAST SEVEN (7) DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, THE
OPERATOR SHALL INVITE ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES INCLUDING, BUT NOT LIMITED TO: THE LANDOWNER, ALL APPROPRIATE MUNICIPAL OFFICIALS AND A REPRESENTATIVE OF THE CHESTER COUNTY CONSERVATION DISTRICT FOR AN ON-SITE PRE-CONSTRUCTION MEETING. ALSO, AT LEAST THREE (3) DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM INC. AT 1-800-242-1776 FOR BURIED UTILITIES LOCATION.
C. BEFORE INITIATING ANY REVISION TO THE APPROVED EROSION AND SEDIMENT CONTROL PLAN
OR REVISIONS TO OTHER PLANS WHICH MAY AFFECT THE EFFECTIVENESS OF THE APPROVED E&S CONTROL PLAN, THE OPERATOR MUST RECEIVE APPROVAL OF THE REVISIONS FROM THE CHESTER COUNTY CONSERVATION DISTRICT. THE OPERATOR SHALL ASSURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY IMPLEMENTED. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO ELIMINATE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION.
D. THE TERM ‘PERMANENT STABILIZATION’ USED THROUGHOUT THIS SEQUENCE IS MEANT TO
DESCRIBE THE PROPER PLACING, GRADING, CONSTRUCTING, REINFORCING, LINING, AND COVERING OF SOIL, ROCK OR EARTH TO ENSURE THEIR PERMANENT RESISTANCE TO EROSION, SLIDING OR OTHER MOVEMENT. FOR AN EARTH DISTURBANCE TO BE PERMANENTLY STABILIZED, THE DISTURBED AREA SHALL BE COVERED WITH ONE OF THE FOLLOWING: A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION; OR AN ACCEPTABLE BMP THAT PERMANENTLY MINIMIZES ACCELERATED EROSION AND SEDIMENTATION.
1. INSTALL CONSTRUCTION ENTRANCE AS DESIGNATED ON THE PLANS.
2. INSTALL ALL PERIMETER [COMPOST FILTER SOCKS, SILT FENCE, TREE PROTECTION FENCING, CONSTRUCTION FENCING, INLET PROTECTION] WITHIN THE DESIGNATED LIMIT OF DISTURBANCE AS INDICATED ON THE PLANS. ONLY LIMITED CLEARING AND GRUBBING NECESSARY TO INSTALL THE PERIMETER EROSION AND SEDIMENT POLLUTION CONTROLS IS PERMITTED.
3. PERFORM DEMOLITION OF EXISTING FEATURES NOTED TO BE REMOVED.
4. INITIATE BUILDING CONSTRUCTION.
5. INSTALL UTILITIES (SANITARY, STORM, WATER) PRIOR TO CONNECTIONS IN CHESTER ROAD, THE APPROPRIATE TRAFFIC CONTROL MEASURES ARE TO BE IN PLACE.
6. INSTALL BITUMINOUS PAVEMENT AND CONCRETE RESTORATION IN ANY UTILITY TRENCHING AREAS.
7. INSTALL FINAL VEGETATION AND RESTORE LANDSCAPING THAT IS DISTURBED BY UTILITY TRENCHING.
8. UPON PERMANENT STABILIZATION AND NOTIFICATION TO THE CHESTER CONSERVATION DISTRICT, REMOVE ANY REMAINING EROSION AND SEDIMENT CONTROL FACILITIES. ANY AREA DISTURBED DURING THE REMOVAL OF EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE STABILIZED IMMEDIATELY.
9. CLEAR SITE OF DEBRIS AND ALL UNWANTED MATERIALS. OPERATOR SHALL REMOVE FROM SITE, RECYCLE OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT’S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ. THE CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP OR DISCHARGE ANY BUILDING MATERIAL OR WASTE AT THIS SITE.
10. DEMOBILIZE.
SEQUENCE OF CONSTRUCTION
1"= 30'
0 30 7.5 15 30
R:\16\PC161321\_CAD\LAND DEV\REV-0\PC161321BASE-0----->LAYOUT: 04-E&S SD
1515 MARKET STREET, SUITE 920 PHILADELPHIA, PENNSYLVANIA 19102
Phone: (267) 402-3400 Fax: (267) 402-3401 www.BohlerEngineering.com
CONSTRUCTION NOT APPROVED FOR
REVISIONS
REV DATE COMMENT BY
FOR
SHEET NUMBER:
SHEET TITLE:
PROJECT:
OF
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
19380
5
REVISION 0 - 2017.04.28
1-800-242-1776 P 1
SYSTEM, INC. A
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10
WORKING DAYS IN DESIGN
STAGE - STOP CALL
POCS SERIAL NUMBER
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: PC161321BASE-0
PC161321 E.N.P./S.R.D. G.J.H. 2017.04.28
NEW ENGLAND UPSTATE NEW YORK
NEW YORK, NY
PHILADELPHIA, PA
LEHIGH VALLEY, PA
BALTIMORE, MD
REHOBOTH BEACH, DE WASHINGTON, DC
NORTHERN VIRGINIA
RALEIGH, NC CENTRAL VIRGINIA
SOUTHERN MARYLAND
NORTHERN NEW JERSEY SOUTHEASTERN, PA
CHARLOTTE, NC
BOSTON, MA
SOUTHERN NEW JERSEY
NEW YORK METRO
TAMPA, FL
SOUTH FLORIDA
DALLAS, TX
ATLANTA, GA
PITTSBURGH, PA
TM
SUSTAINABLE DESIGN LANDSCAPE ARCHITECTURE SITE CIVIL AND CONSULTING ENGINEERING
LAND SURVEYING PROGRAM MANAGEMENT
PERMITTING SERVICES TRANSPORTATION SERVICES
2017 BOHLER ENGINEERING
20163131545
PROFESSIONAL ENGINEER
1"=30'
4
SOIL EROSION &
SEDIMENT POLLUTION CONTROL PLAN
1"=500' SOILS MAP
CHEST
(A
11
6
9
15
6" PVC ROOF DRAIN
NEW MANHOLE
CO
UPGRADE TO 15" OR 18" HDPE
UPGRADE TO
18" HDPE
R:\16\PC161321\_CAD\LAND DEV\REV-0\PC161321BASE-0----->LAYOUT: 05-DETAILS SD
1515 MARKET STREET, SUITE 920 PHILADELPHIA, PENNSYLVANIA 19102
Phone: (267) 402-3400 Fax: (267) 402-3401 www.BohlerEngineering.com
CONSTRUCTION NOT APPROVED FOR
REVISIONS
REV DATE COMMENT BY
FOR
SHEET NUMBER:
SHEET TITLE:
PROJECT:
OF
PROPOSED BUILDING ADDITION (EAST GOSHEN
ELEMENTARY SCHOOL)
WEST CHESTER AREA
SCHOOL DISTRICT
800 N. CHESTER ROAD EAST GOSHEN TOWNSHIP
CHESTER COUNTY
PENNSYLVANIA
19380
5
REVISION 0 - 2017.04.28
1-800-242-1776 P 1
SYSTEM, INC. A
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10
WORKING DAYS IN DESIGN
STAGE - STOP CALL
POCS SERIAL NUMBER
PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: PC161321BASE-0
PC161321 E.N.P./S.R.D. G.J.H. 2017.04.28
NEW ENGLAND UPSTATE NEW YORK
NEW YORK, NY
PHILADELPHIA, PA
LEHIGH VALLEY, PA
BALTIMORE, MD
REHOBOTH BEACH, DE WASHINGTON, DC
NORTHERN VIRGINIA
RALEIGH, NC CENTRAL VIRGINIA
SOUTHERN MARYLAND
NORTHERN NEW JERSEY SOUTHEASTERN, PA
CHARLOTTE, NC
BOSTON, MA
SOUTHERN NEW JERSEY
NEW YORK METRO
TAMPA, FL
SOUTH FLORIDA
DALLAS, TX
ATLANTA, GA
PITTSBURGH, PA
TM
SUSTAINABLE DESIGN LANDSCAPE ARCHITECTURE SITE CIVIL AND CONSULTING ENGINEERING
LAND SURVEYING PROGRAM MANAGEMENT
PERMITTING SERVICES TRANSPORTATION SERVICES
2017 BOHLER ENGINEERING
20163131545
PROFESSIONAL ENGINEER
AS NOTED
DETAILS
5
SCALE: N.T.S. FLEXIBLE PAVEMENT RESTORATION
REV.: 2015.03.09
P
S21
SCALE: N.T.S. TRENCH BEDDING CLASSIFICATION (STORM)
REV.: 2015.03.09
R
S8
SCALE: N.T.S. TRENCH BEDDING CLASSIFICATION (WATER MAIN) W
S4 REV.: 2015.03.09
SCALE: N.T.S. TRENCH BEDDING CLASSIFICATION (SANITARY MAIN)
REV.: 2015.03.09
S
S8
SCALE: N.T.S.
TYPICAL CLEANOUT DETAIL (PAVED AREAS)
REV.: 2015.03.09
S
S12
SECTION
PLAN
SCALE: N.T.S. MANHOLE FRAME DETAIL
REV.: 2015.03.09
S
S6
SECTION
A-A
A
A
SCALE: N.T.S. CONCRETE ENCASEMENT DETAIL
REV.: 2015.03.09
S
S11
WIDTH VARIES - SEE PLAN
SCALE: N.T.S. CONCRETE SIDEWALK DETAIL
REV.: 2015.03.09
P
S6
GRAVEL DETAIL
1"=30'
0 30 7.5 15 30
ALTERNATE STORM DRAINAGE
SCALE: N.T.S. PRECAST SANITARY MANHOLE DETAILS
REV.: 2015.03.09
S
S3