Conservancy Board

The Conservancy Board advises the Board of Supervisors, the Planning Commission, the Park and Recreation Commission and other agencies, officials and employees of East Goshen Township on matters dealing with conservation, management, protection and use of natural resources in the Township of East Goshen.

Meetings are on the 2nd Wednesday of the month at 7:00 P.M. In addition the Conservancy Board will conduct site inspections the following Saturday at 9:00 AM; as needed.

Board Members Term Expiration Dates
Vacant, Chair 2026
Walter Wujcik, Vice Chair 2027
Jackie Ahlborn 2027
Julieta Calmon 2027
Erich Meyer 2028
Sandy Snyder 2026
Susan Vanesse 2028
Ann Duffield, BOS Liaison
Ashley Nowak,  Staff Liaison

 

Articles of Interest

 

Related News

The Goshen250 Nature Challenge: We Have a Winner!

Wednesday, November 4, 2026

This neighborly challenge between West Goshen and East Goshen townships began as the brainchild of East Goshen Township’s (EGT) Conservancy Board. Jason Lang, EGT’s Parks and Recreation director, contacted his West Goshen peer Ken Lehr, who shared the idea with the Sustainability Advisory Committee, and the idea became a reality. Planning for the iNaturalist-inspired “BioBlitz” […]

View Article

East Goshen Township Receives Bird Town PA Recognition!

Wednesday, October 7, 2026

  The Conservancy Board and Environmental & Sustainability Advisory Council have worked together to have East Goshen Township recognized as a Bird Town PA. The program encourages municipalities to work towards four key strategies: Creating and Protecting Habitat, Threats to Birds, Education and Engagement and Sustainability.         Here are just some of […]

View Article

“Leave the Leaves”

Friday, October 2, 2026

Take a break from the rake and help your yard and the planet. Did you know that the leaves that fall from your trees can act as a natural mulch to improve the soil and retain moisture through the winter? Leaves provide nutrients to your yard as they decompose naturally. They also provide valuable habitat […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA EAST GOSHEN TOWNSHIP CONSERVANCY BOARD MEETING

April 11, 2018

7:00 PM

F:\Data\Shared Data\Agendas\Conservancy Board\2018\2018-4-11 - Conservancy Board Agenda.doc

1. CALL TO ORDER / PLEDGE OF ALLEGIANCE / MOMENT OF SILENCE

2. APPROVAL OF MINUTES

March 14, 2018

3. CHAIRMAN’S REPORT

4. OLD BUSINESS

a. Continue discussing plans for “Keep East Goshen Beautiful” Day

b. Spring Planting Recap - March 17

5. SUB DIVISION REVIEW

a. 1506 Meadowbrook Drive

6. NEW BUSINESS

a. Marydell Pond (7:30 PM)

i. Consider improvements to Marydell Pond ii. Consider organization of Marydell Pond Committee

7. VARIANCES

8. BOARD MEMBER CONCERNS

9. LIAISON REPORTS

10. CORRESPONDENCE

11. DATES OF IMPORTANCE

April 12, 2018 Historical Commission 07:00 pm April 16, 2018 Futurist Committee 07:00 pm April 17, 2018 Board of Supervisors 07:00 pm April 21, 2018 Keep EGT Beautiful Day ----------- April 25, 2018 Zoning Hearing Board 07:00 pm May 01, 2018 Board of Supervisors 07:00 pm May 02, 2018 Planning Commission 07:00 pm May 03, 2018 Park and Rec Commission 07:00 pm

F:\Data\Shared Data\Agendas\Conservancy Board\2018\2018-4-11 - Conservancy Board Agenda.doc

May 08, 2018 Pension Committee 10:00 am 12. PUBLIC COMMENT

13. ADJOURNMENT

1 Draft 2 EAST GOSHEN TOWNSHIP 3 CONSERVANCY BOARD MEETING 4 March 14, 2018 5 6 7 The East Goshen Township Conservancy Board held a regularly scheduled meeting on 8 Wednesday, March 14, 2018 at 7:00 p.m. at the Township Building. In attendance were: 9 Chairman Erich Meyer, Andy Tyler, Walter Wujcik and Scott Sanders. Others in attendance: 10 Mike Lynch and Janet Emanuel, Township Supervisors; Mark Miller, Director of Public 11 Works; and Jon Altshul, Director of Finance. 12 13 14 Call to Order 15 Erich called the meeting to order at 7:00 p.m. 16 17 18 Pledge of Allegiance & Moment of Silence 19 Erich led those present in the Pledge of Allegiance and then asked for a moment of silence to 20 remember those who serve in our military and our first responders. 21 22 23 Minutes 24 The minutes of the February 14, 2018 meeting were approved. 25 26 2 7 New Business 28 1. Pond Study- Rick Ttrailes, Sr. Director of Landscape Planning at Natural Lands and Mike 29 Toth of Toth Brothers were present to discuss the pond study. Mike Toth commented that, 30 since the ponds are under 100 acres, they are not regulated by the state. He reviewed the 31 ponds and the results of his inspections. Some materials/mud can be dredged and kept on 32 site rather than trucked away. He described the process they would use to dredge a pond. 33 Work on site would be at least a month. Landscaping could take a year. The ponds with 34 aeration are in better condition. Mike Lynch mentioned that the Board of Supervisors will 35 review the study and set priorities. Mike Toth will make a priority list and get it to the 36 supervisors. 37 The Board continued their discussion. Janet mentioned that some residents of Marydell 38 have volunteered to be on a pond committee. Scott mentioned that the Board was thinking 39 of selecting a pond as a test site so the residents can understand what needs to be done and 40 why. Also, they could put signs around the pond explaining what is being done. 41 42 Old Business 43 1. Keep East Goshen Beautiful - The YMCA wants to help with approximately 20 people. 44 Walter will check with Sandy about emails to the existing list. 45 2. Spring Planting- On Saturday March 17, 2018 the Board members will meet at the 46 boardwalk in the historic area at 9:00 am and walk the area along E. Boot Road to check the 4 7 trees and see what needs to be done. 48 49 Liaison Reports 50 Municipal Authority - Walter reported that the plant is running well. They may have to 51 look at sewer rates.

CB 3-14-18 draft 1

1 Board of Supervisors - Mike mentioned that yesterday East Goshen was in court with 2 Sunoco about noise violations. Sunoco was found guilty of several of the violations. He feels 3 they will probably appeal. The BOS is working on the police contract, which expires the end 4 of this year. The Planning Commission is looking at residential open space in the ordinance. 5 The Zoning Hearing Board and BOS took at tour of Malvern Institute. 6 7 8 Adjournment 9 There being no further business, Scott moved to adjourn the meeting. Walter seconded the 10 motion. The meeting was adjourned at 8:45 p.m. The next meeting will be April 11, 2018 at 11 7:00 pm. 12 13 Respectfully submitted, 14 15 16 17 Ruth Kief er 18 Recording Secretary

CB 3-14-18 draft 2

East Goshen Township Conservancy Board

"KEEP EAST GOSHEN BEAUTIFUL DAY"

Saturday, April 21, 2018

'

I I

The East Goshen Township Conservancy Board has scheduled the townships annual

"Keep East Goshen Beautiful Day" for Saturday, April 21, 2018. This is the 33rct year for this

event and it is a great way to jump-start spring-cleaning efforts in our neighborhoods and

throughout the Township.

WHO: East Goshen Township Conservancy Board

WHAT: Annual "Keep East Goshen Beautiful Day".

WHEN: Saturday, April 21, 2018

WHERE: East Goshen Township, Chester County, Pennsylvania

WHY: To clean up litter from our roadsides and open spaces.

What to do:

J

• Please come to the East Goshen Township Building located at 1580 Paoli Pike in West Chester, PA on Saturday, April 21, 2018 between 8:00 & 9:00 AM to register, get refreshments, and to pick up supplies (gloves, trash bags and vests.)

• Let us know if April 21st does not work for you and/or your group and we can leave supplies at the township building's front desk.

• Also, please let us know what day you will be performing the cleanup. So, when we do the street assignments on Saturday, we can save that stretch of road for you and/or your group and we can inform public works when to pick up the trash bags.

Please call the Township at 610-692-7171 for more information, to let us know you will help, and/or to reserve a particular stretch of road for your

group, organization or family.

Memorandum

East Goshen Township 1580 Paoli Pike West Chester, PA 19380 Voice: 610-692-7171 610-692-8950 mgordon@eastgoshen.org Fax: E-mail:

Date: 4/5/2018 To: Conservancy Board ,, ~ · From: Mark Gordon, Township Zoning Officer fl/ ,b

1506 Meadowbrook Dr. Re:

Conservancy Board Members:

The Township has received a Subdivision and Land Development application for 1506

Meadowbrook Dr. The parcel is approximately 2 acres and the applicant proposes to subdivide the lot creating one new building lot for a single family home.

I do not have enough copies to send everyone however the plan is attached electronically to the agenda.

The applicant has provided a plan sheet showing the proposed buffer plantings required by the Zoning Variance Decision however they have not provided a landscape plan as outlined in the ordinance and will require a waiver from that requirement.

Recommendation: Staff has no object to the Conservancy Board taking action on the plan at this time.

Draft Motion:

Mr. Chairman, I move that the Conservancy Board recommend that the Planning Commission support the requested waiver from §205-36 (Landscape Plan) and approve the Preliminary I Final Subdivision Plan for 1506 Meadowbrook Drive dated 8/1/2017, last revised 2/20/2018 with the following conditions:

1. The evergreen buffer planting shall be extended the entire length of the property along the rear property line to create a "Complete evergreen landscape buffer'' as required by the ZHB decision. 2. The evergreen buffer plantings shall be a minimum of 8' at time of planting. 3. A mix of at least three deer resistant species shall be used. 4. Tree Protection fencing shall be installed to protect all trees that are proposed to be saved including the row of mature Hemlock trees along the easterly property line.

F:\Data\Shared Data\Property Management\53-4\53-4-23 (1506 Meadowbrook Ln.)\2018 SD & LD\Memo to CB 04052018.doc

5. The applicant shall submit a detailed foundation planting plan when building permits are applied for. 6. All notes and plans shall be revised to address these conditions prior to approval of the plan. 7. The applicant shall address all outstanding engineering comments to the satisfaction of the Planning Commission, staff and the Township Engineer.

F:\Data\Shared Data\Property Management\53-4\53-4-23 (1506 Meadowbrook Ln.)\2018 SD & LD\Memo to CB 04052018.doc

I I

5.05'

SEIERAL NOTES:

1. Both proposed lots will be served bY public sewer and on-lot water. 2. Lot f 2 is currently connected to public sewer end hes en an-lat water well. Lot I 1 will be connected to the existing public sewer vie en easement in Lot f 2. 3. A well permit from the Chester county Health Department is required before an occupancy

~- Iron pine shell be set et property corners. permit is iauued.

[i'l.i]~[Q)@\'l,i'll[IDIJ\l@@~ 11L!.\OO~

"' • Ii!. -~ ruO

33' WlDE -----

151.94'

N 49'31'00• E 226.60'

110.31'

N 49'31'00• E 110.31' -I~ ----=·~·o~·~'·_·_

N 49'31'00- E 110.32'

PROPERTY Ol'll£R'S CERTIFICATION: l J J The land owner acknowledges the per the provisions of the East Gosha Township Stormwater Manage ent Ordinance, it is unlawful to modify, remov • fill, landscape, alter or i11Pair th effectiveness of, or plac any structure. other vegetation, yard waste, brush cuttings, or other waste or debris into any permanent stor11Water managemant BNP or conveyance described in this O&M plan or to allow tha BMP conveianca to exist in a condition, whicn doas not conform to this O&M plan. without written approval from the Towneh p. The individual lot owner. hie/her heirs. assigns or successors shall be responsible for the perpetual llBintenance of the said facilities. A blanket stor11Weter manage11ent ease11ent is provided over and across the property in favor of East Goshen Township to allow the Township and its agents and designeee access to the proposed etor11Water facilities. The Township is granted the right, but not the duty, to access and conduct periodic inspections and to undertake other actions that may be necessary to enforce the requireinents of the Township's Stormwater Management Ordinance or of anI applicable OGM plan or OGM agreement. If the property owner. his/her heirs. assigns or successors. fails in anI way to 118 ntain the said facilities, or ceusee these facilities to be altered or removed, upon written notificat on by the Township, the defects ehall promptly be corrected by the property owner. Upon the owner's failure to correct the defects within time specified by the Township, the owner, hislhar hairs, assigns or successors, do hereby authorize the Township and/or its contractor to enter upon the said property and cause the repair, llBintenance, and/or correction to be 11Bde. A lien llBY be filed against the property for the cost of all corrections, including applicable engineering and/or attorney's fees. The Township is under no obligation to take any action. All subsequent real estate transactions. the existence of these stormwater facilities and their maintenance rasponsibilitias shall be disclosed to the new owners. Any revision to the approved SWM site plan shall be submitted to the Township along with an Erosion G Bedi11entation control Plan for review and approval.

Signature Dllte ....

N 49'31'00• E 250.00'

,~ I

EP

~ 49'31'00"' w 110.32' EP N 49"31'00"' E 110.32'

N49.31 '00"E-~ 25.05'

FLAG

OVERLAP

16.50'

POLE WIDTH

2s.oo·

8.50'

N/L HAMM DANIEL G

& SHEILA A 1510 MEADOWBROOK LN . DBt9103, PGf106

0· ru~ . ru ru . "°' ..... C0"1

I I

~o /·o"' coN !ii

N55 '02 '40 "E 193.29· N/L MATCHICA STRATTON N '

& ANGELA N I

EX.DRIVEWAY TO BE WIDENED TO 12'

N/L DORN ARTHUR

1508 MEADOWBROOK LN. 08#8113, PGf1271 I

!ii .. !; S55 "02, 40"W ~ 194.62'

~ ~~~~~~~~~~~~~~~~~~~~~~~~~~"

10' ill z

AREA• 3,879.11 SF

NIL LIM LUVIMINO 0 & LUZ S

1500 llEADOWBROOK LN. UPI 53-4-8

N49'31'00"E 401.94'

(EX.)

N49°31'00"E 399.94'

I

I

N/L DOHERTY NOEL G SHEILA I 1502 MEADOWBROOK LN. DBf6236, PGf1192

UPI 53-4-8.1

S49 '31 '00"W 2.00' 100.00' PROP.IP

I I

1504 MEADOWBROOK LN. 08#8465, PG#605

53-4-23. 31

PRDP.20' WIDE SAN.LATERAL EASEMENT

UPI

I I 549 "31 '00"W 192.35'

110.31'

UPI 53-4-23.2

PROP. IP N49'31'00"E 330.95"

110.

1UPI 53-4- .1

1

llJ'ii1i liUllL.

TOP OF

IRON PIN ELEV.438.05 I I

N49"31'00"E 138.60' 110.32'

AREA • 400.00 SF

25.05'- l ___ _ ---- _, "" EP ' ' I ~Q~i

0~§~~~~~.1~

r--f-f-r.-;;.HE~M~L~O".°'CK HILL ROW ' 33.oo· ,

EP

"" ' ' I

I N/L GROSSMAN EDWARD R G ROCHELLE B I 707 1-EMPLOCK HILL LN. 0815341. PGf1040 I

UPI 53-4-25. 1

,....__EX. HEMLOCK HILL LANE I I I

UPI 53-4-24

I I

I

O· ruo . 0 ru • ~g

IU • O· ruo . 0 ru . "O • 0 ~cu mcu

S49"31'00" 2.00'

AREA • 6, 271.00 SF

IU • o. Oo ·o 01 • !"., oN ;)!j

400

WEST CHESTER, PA

SCALE: 1.. • 600"

QUAD

S51"55'45"W 25.00'

S49 "31 'OO"W 138.60'

N49'31'00"E 162.00'

"' • Ii!· . co ru"' .., . ..... co"' !ii

1 .

1;l--.l.:\.....pROP. 25 ' WIDE ACCESS EASEMENT TOLOTf2

I I REVIEWED BY THE PLAMllING COlitlISSION CF EAST GOStEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA

IU • O· ruo ·o ru . "O • 0 CON "' "'

FY 60. I I

BAKER PROPERTY

UPI 53-4-7

N/L GABLE MARY VIRGINIA

1431 BOOT RD 0Bf58, PGf553

'----

S49"31'00"W 399.94'

~ PROP.BOUNDARY LINE~ -

PROP.REAR YARD LINE

PROP.2.00 FT WIDE 200.00 FT LONG STRIP OF LAND TO BE CONVEYED TO UPI 53-4-23

----......,

I

IU • li!c. . 0 ~· .g 111ru UI

RY 50.

0 ru ru :r co !ii

SY 20·

N/L ABRAHAM JENSEN & CitlJY 919 CONTINENTAL DR. S49'31'00"W 401.94' (EX.) UPI

PROP.IP

53-4-211 IMPERVIOUS SURFACE:

LOTfi - PROPOSED BUILDING• 2,6667.37 SF IMPERVIOUS AREA IN LOTf1 • 4,47.38 SF

UPI 53-4-210

PLUS 501 CF JOINT DRIVEWAY WITHIN L0Tf1 • 1,255.08 SF TOTAL IMPERVIOUS AREA IN LOTt1 • ~ 402.46 SF

LOTt2 - EXISTING BUILDINB • 2.662.45 SF IMPERVIOUS AREA IN LOTf2 • 6, 726.28 SF PLUS 501 CF JOINT DRIVEWAY WITHIN LOTt1 • 1,255.0B SF TOTAL IMPERVIOUS AREA IN LOTt2 • 7.981.33 SF

I

I I

N/L SOLLECITOTHOMAS P G CAROLYN 8 920 CONTINENTAL DR. DBf4679, PG#1B97

PROP.LOT#

_J

UPI

N49"31'00"E 208.75' 53-4-217 N/L LU HUE SHIANG 917 NATHANIEL DR. DBt2075, PGt3BB

\

REl&ESTED WAIVERS FROM TIE SUIJIYISION NIJ LAN> DEYELIFMENT CRJINANCE: LOT

SY 20·

\

•

20

s49•31·oo·w

149.26'

s 49'31'00" w

(EX.)

356.00'

SY 20·

I I I I I

EX.PAVEMENT TO BE REMOVED

N/L TUBMAN EDWARD P & JOAN E 705 HEMPLOCK HILL LN. 08#3725, PG#1435

EX.DRIVEWAY TD BE WIDENED TO 12'

I I

I I I

I

~~.~::~~~A~~-!---

I 7 ----

PROP.IP PROP.SUBDIVISION LINE UPI 53-4-218

/ / N/L KASHEHAGEN LEO

19 NATHANIEL DR. Bt7919, PGt207B

\

G CHRISTIANE M SURVEYOR'S CERTIFICATION:

I hereby certifies that the boundary shown hereon was calculated by me end that the plan and survey accuracy ie in conformance with all East Goshen Township Ordinances.

Signature bate

COl"40NlllEALTH OF PEMllSYLVANIA COi.MTV OF CHESTER

On this the day of , before 11e,

THIS --- DAY OF ---

CHAIRPERSON MEMBER MEMBER llEMBER

VICE CHAIR MEtiEER MEteER

APPROVED BY THE SUPERVISORS OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA

THIS ---- DAY OF ----

CHAIRPERSON SUPERVISOR SUPERVISOR

VICE CHAIR SUPERVISOR

REVIEWED BY THE CHESTER COUNTY Pl.ANNIN& COMMISSION

THIS --- DAY OF ---

SECRETARY

REVIE~ED BY THE EAST GOSHEN TO~NSHIP ENGINEER

THIS ---- DAY OF ----

TOWNSHIP ENGINEER

RECOROED IN THE OFFICE OF TtE RECORDER OF DEEDS OF CHESTER COUNTY AT NEST CHESTER, PENNSYLVANIA.

IN PLAN BOOK ---- PAGE --- THIS ----DAY OF ----

EAST GOSHEN TOWNSHIP ZONING HEARING BOARD DECISION OF 10/3/2017 GRANTING THE FOLLOWING VARIANCES: 1. A variance from the minimum lot width at the street line requirements of Section 240-9G for Proposed Lotet1 and t2; 2. A variance in the street frontage requirement of Section 240-23.BC2l lal for Proposed Lotsfi and t2; and 3. A variance from the minimum pole width requirement of Section 240-23.B(2) lb) [2] [e] for Proposed Lott2.

Conditions: A. Applicants shall create the greatest possible sight triangle at the top of the driveway near the existing home, which ie at the northeast corner of Proposed Lotfi where the driveway takes a 45-degrse turn toward Hemlock Hill Lane: B. Applicants shall provide a complete evergreen landscape buffer for properties adjacent to the property that are located along Nathaniel Drive:

AREA [SF] AREA [AC] 1. SECTIONS 205.2B G 205.31: COMBINE THE PRELIMINARY AND FINAL REVIEW AND APPROVAL PROCESS. the subscriber. a notary public of the commonwealth of Pennsylvania, personally appeared who acknowledges RECORDER OF DEEDS

C. Applicants shall provide a large pull-off area along Hemlock Hill Lane to ensure safety for pedestrians and motorists using the lane: such pull-off area shall equal or exceed the area shown on Exhibit A-5; PEtff3YL VANIA LAW AEQUIFES

3 wa:!Klrf3 DAYS NlTICE Fm CONSTFLICTIDN PHASE MD 10 wa:!Klrf3 DAYS IN DESIGN PHASE - STOP CALL Pennsylvania One Call System, Inc

1-800-242-inB SERIAL No.20170472360 DATE: 02/16/2017

EXISTING B7, 491.21 UPI 53-4-23 B7,077.89 PROP.LOT.1 43,995.00 43, 5B1.67 PROP.LOT.2 43,896.21 B5, 213. 70 BO. 213. 70 B4. 813. 70 7B, 813. 70

EXISTING UPI 53-4-7 PROPOSED UPI 53-4-7

2.00B5 1. 9990 1.0100 1.0005 1.0077 1. 9562 1.8415 1. 9471 1.8323

UPI ADDRESS OWNERS DEED BK PAGE 53-4-23 53-4-7 i506 MEADOWBROOK LA LEGENSTEIN STEPEH G DENISE i431 BOOT RD GABLE MARY VIRGINIA

5051 P5B

THIS PLAN HAS BEEN PREPARED BASED ON THE FOLLOWING INFORMATION SOURCES: BOUNDARY G TOPOGRAPHIC SURVEY PLAN, PREPARED BY R.H. SMITH SURVEYORS, WEST CHESTER. PA. DATED 7/29/2017: EAST GOSHEN TOWNSHIP ZONING MAP: A PLAN ENTITLED "PLAN OF SUBDIVISION FOR ANTHONY D'AMBROSIO" PREPARED BY HENRY S.CONREY INC., DATED B/i40/1977:

2296 553

A PLAN ENTITLED "FINAL TITLE PLAN" PREPARED BY D.L.HOWELL G ASSOSCIATES. INC., DATED i0/30/200i, LAST REVISED 3/11/2002; A PLAN ENTITLED "FINAL SUBDIVISION PLAN FOR BRUCE G AUDREY A.ATKINS" PREPARED BY JOHN O.STAPLETON Ill, DATED ii/3/i992; CHESTER COUNTY CHESCO VIEWS WEBSITE FOR DEEDS ANO OWNERSHIP ltf'"ORMATION; CHESTER COUNTY RECORDER OF DEEDS: GUY ENGINEERING ASSOCIATES, INC. HAS NOT PERFORMED ANY FIB..D SURVEY OF THE PROPERTY AND IS NOT RESPONSIBLE FDR ANY ERRORS, INACCRURACIES OR OMMISSIONS OF INFORMATION SHOWN ON THIS PLAN.

(GROSS) (NET) (GROSS) (NET)

(GROSS) (NET) (GROSS) (NET)

AREA ISFl

{PEA OEEOl

87, 120 82, 764

R-2: LOW-DENSITY RESIDENTIAL DISTRICT

EX.PROPERTY AREA= B7.491.21 SF (GROSS). B7.077.B9 SF (NET) SECTION 240-9.B Cil 240-9.G

240-23.8(2) la] 240-23.8(2) (bl [2] [b] 240-23.8(2) lbl [2] [e]

DESCRIPTION PERMITTED USES: MIN. LOT AREA

MIN. LOT WIDTH

MAX.LOT COVERAGE

MAX.BUILDING HEIGHT

MIN.FRONT YARD

AVE . FRONT YARD MIN.SIDE YARD MIN.REAR YARD STREET FRONTAGE MAX.POLE LENGTH MIN. POLE WIDTH

REQUIRED PROVIDED SINGLE FAMILY DETACHED DWELLING 43, 560 SF

150 FT

60 FT

25•

35•

3 30 FT 45 FT

60 FT 20 FT 50 FT EACH LOT 400 FT 40 FT

LOTf1: LOTf2: LOTf1: LOTf2: LOTf1: LOTt2:

43, 581.67 SF 43, B96.21 SF 159.69 FT 198.32 FT 25.05 FT 0 FT

(NET)

LOTf1: LOTf2: LOTf1: LOTf2: 3

6. 11 PROPOSED 6. 11 EXISTING 12.41 PROPOSED 1B.21 EXISTING

30 FT LOTf1: 60 FT LOTf2: 60 FT 60 FT 20 FT 50 FT LOTf1 YES. LOT#2 NO 379. 21 FT 25 FT

VARIANCE

NO

NO NO NO NO llAANTEll

NO

NO

NO NO NO NO NO NO NO llAANTEll

NO llAANTEll

COMMENTS

AT BLDG.LINE AT BLDG.LINE AT STREET LINE AT STREET LINE BUILDINGS

TOTAL IMPERVIOUS COVER STORIES FEET

TO LOTt1 CORNER EX. CONDITIONS PROP.LOTf1

NOTES

'

2 3

3

himeelf/herself to be owner and/or equitable owner of the progerty shown on this plan. and that he/she acknowledge& the se11e to e his/her act end plan and desires the same to be recorded as such according to Jew.

(Yg@J~[QJ

EX.PROPERTY LINE Notary Pub] ic

My co11111ieeion Expires:

UTILITY NOTES: 1. PROPOSED LOTS TO BE SERVED BY PUBLIC SEWER. 2. EACH LOT WILL HAVE AN ON-LOT WATER SUPPLY WELL. 3. LOTf1 WILL ACCESS PUBLIC SEWER THROUGH AN EASEMENT IN LOT#2.

ZONING NOTES: 1. THE TOTAL AFEA OF THE LOT TO BE SUBDIVIDED WILL INCREASE Tl-flOUGH THE PURCHASE OF A STRIP OF LAND FROM THE ADJACENT PROPERTY UPI 53-4-7 AND ADDED TO THE SUBJECT PROPERTY. Tl-E AFEA OF THE LAND TD BE PURCHASED IS 400.00 SF. 2. THE EXISTING UPI 53-4-23 PROPERTY HAS A FRONTAGE OF 25.05 FT AT THE STREET LINE. THE DRIVEWAY TO THE PROPERTY IS KNOWN ALSO AS HEMLOCK HILL LANE. A PRIVATE ROAD THAT PROVIDES ACCESS TO THIS PROPERTY, AS WELL AS 4 ADDITIONAL PROPERTIES. 3. THE DRIVEWAY OF PROPOSED LOT # 2 WILL ACCESS FROM THE EXISTING HEMLOCK HILL LANE AND AN ACCESS EASEtiENT THROUGH PROPOSED LOT f 1 AND WILL NOT HAYE A SEPARATE FRONTAGE ON A PUBLIC ROAD.

ADJACENT.PROPERTY LINE

EX.ROAD R.O.W. EX.TITLE LINE

EX.BUILDING

EX.PAVEMENT

PROP.LOT LINE

PROP.DRIVEWAY EASEMENT PROP.SANITARY LATERAL EASEMENT

PROP.BUILDING

PROP.DRIVEWAY

N90"00'00"W 61.87'

N90 'OQ.' 00 "W -~~ITT .87°"' ~-

D

N90 ·oo • o::? 61.87' ~ ~

I I

D. Applicants shall pave the pull-off area with porous pavers an widen the shared driveway serving Lotsti and t2 to be i2 feet. and add Proposed Lotti into the existing Shared Driveway Easement Maintenance Agreement; E. Applicants shell finalize the subdivision with Mrs. Baker, so that both Proposed Lotti and Lott2 will comply with the one-acre lot area requirement. F. Applicants shall comply with all representations

made during the hearing and as set forth in the exhibits.

PROPERTY OWNER:

STEPHEN & DENISE LEGENSTEIN DEED RECORDED: DB.5051, PG.2296

TMP # 53-4-23

GRAPHIC SCALE --- -

1"•50" --- - 0 50 100 150

THIS PLAN IS THE PROPERTY OF GUY ENGINEERING ASSOCIATES. INC. ALL RIGHTS RESERVED. NO ALTERATIONS, REPRODUCTIONS OR USE OF ANY PARTS OF ITS CONTENTS MAY BE MADE WITHOUT THE EXPFESSED WRITTEN PERMISSION BY THE AUTHOR.

i5 .... .... ll. .... a: u UI l!l

IU .... £!!

>-m

~

0 a: ll. .... m - - I "" Ol IL > .......

u " m <D ·- ::> 0 "' L ll.

z "' .... "' UJ " "' z UJ ll. 0 a: ll.

"' ~ ' "' ru ' ~ 0

"' "'

~

" "' u ll. ll. 0 a: ll.

"' ~ ' 0 ru ' ru 0

"' "'

ru

0 on I •

m - m u "'

J

"' "'

n m " u m .o= u

"' "'

i m L "

.... ~ 0 ru ' - 0 ' <D

m ... m "

LL 0

I I

N 49'31'00• E 226.60'

N 49'31'00• E 250.00'

\

\

______ 33'_Wl_DE_

\-~ \,.

125.0 •

I "' I

UJ •

z

UPI 53-4-8

BAKER PROPERTY

UPI 53-4-7

I I

I

O· CIJO ·o "' . "'O • 0 IDCIJ EX. PLANTING I I I I I

"' "'

- - s49·3i:oo·w 401.94-:-1- cEx. J UPI 53-4-210

SURVEY DATUM: NAVO 1988

UPI ADDRESS OWNERS 53-4-23 1506 MEADOWBROOK LA LEGENSTEIN STEPEH & DENISE 53-4-7 1431 BOOT RD GABLE MARY VIRGINIA 53-4-25.1 707 HEMLOCK HILL LA GROSSMAN EDWARD R & RDCHELLE B 53-4-23.1 1510 MEADOWBROOK LA HAMM DANIEL G & SHEILA A 53-4-23.2 150B MEADOWBROOK LA DORN ARTHUR 53-4-23.3 1504 MEADOWBROOK LA MATCHICA STRATTON N & ANGELA N 53-4-B.1 1502 MEADOWBROOK LA DDHERTY NOEL & SHEILA 53-4-B 1500 MEADOWBROOK LA LIM LUVIMIND D & LUZ S 53-4-210 919 CDNTINENTAL DR ABRAHAM JENSEN & CINDY

I

I I

DEED BK

5051 P5B 5341 9103 8113 8465 6236

PAGE 2296 553 1040 106 1271 605 1192

53-4-211 920 CONTINENTAL DR SDLLECITO THOMAS P & CAROLYN B 4679 1B97 53-4-217 917 NATHANIEL DR LU HUE SHIANG 2075 3BB 53-4-218 919 NATHANIEL DR KASHEHAGEN LEO & CHRISTIANE M 7919 2078 53-4-24 705 HEMLOCK HILL LA TUBMAN EDWARD P & JOAN E 3725 1435 THIS PLAN HAS BEEN PREPARED BASED ON THE FOLLOWING INFORMATION SOURCES: BDUNDARY & TOPOGRAPHIC SURVEY PLAN, PREPARED BY R.H. SMITH SURVEYDRS, WEST CHESTER, PA, DATED 7/29/2017; EAST GOSHEN TOWNSHIP ZONING MAP; A PLAN ENTITLED '"PLAN OF SUBDIVISION FOR ANTHONY D'AMBRDSIO'" PREPARED BY HENRY S.CONREY INC .. DATED B/140/1977; A PLAN ENTITLED '"FINAL TITLE PLAN"" PREPARED BY D. L. HOWELL & ASSOSCIATES, INC., DATED 10/30/2001, LAST REVISED 3/11/2002; A PLAN ENTITLED ""FINAL SUBDIVISION PLAN FOR BRUCE & AUDREY A.ATKINS" PREPARED BY JOHN D.STAPLETDN III, DATED 11/3/1992; CHESTER COUNTY CHESCD VIEWS WEBSITE FOR DEEDS AND OWNERSHIP INFORMATION; CHESTER COUNTY RECORDER OF DEEDS; GUY ENGINEERING ASSOCIATES, INC. HAS NOT PERFORMED ANY FIELD SURVEY OF THE PROPERTY AND IS NOT RESPONSIBLE FOR ANY ERRORS, INACCRURACIES DR OMMISSIDNS OF INFORMATION SHOWN ON THIS PLAN.

UPI

AREA [SF) (PER DEED)

B7, 120 B2, 764 49,614 43.560 43,560 43,560 56,628 60.984 30,866 26,556 34,542 28.248 69,696

-...._

'

FLOOD HAZARD NOTE:

' \

\

I

I

UPI 53-4-217

\

\ UPI 53-4-218 \

\

THE SITE IS LOCATED IN ZONE X - AREA OF MINIMAL FLOOD HAZARD. PER FEMA FIRM NUMBER 42029C0215G EFFECTIVE 09/29/2017, FOR EAST GOSHEN, PA, PANEL NUMBER 420277.

EXISTING SOILS ON SITE;

GdB: GdC: UrcB: UrlB:

Gladstone Gravely Loam, 3 - Bl slopes, HSG "BM Gladstone Grave1v Loam. B - 15% slopes. HSG "B" Urban Land - Califon Complex. O - 8% slopes. HSG "B" (assumed) Urban Land - Gladstone Complex, a - 8% slopes, HSG "B" (assumed)

/ /

UPI 53-4-24

..

-----

' ' I

I I I

I I

I I I

I I I

I

- -

~~[ii)

EX.PROPERTY LINE

ADJACENT.PROPERTY LINE

EX.ROAD R.O.W. EX.TITLE LINE EX.PAVEMENT EX.BUILDING

EX.TREE

EX.SANITARY SEWER EX.GAS LINE EX.CONTOUR SOILS BOUNDARY EX.DRAINAGE AREA BOUNDARY

N90 "OQ..' 00. W _ ___,,. in .87'

Nso_:.oo_: oo • w ----'"" 61. 87.

D 0 --s ---<0-----{l -----11------ - - -··-··-··

400

~™'lnlmMM

WEST CHESTER, PA QUAD

SCALE: 1.. • 600"

PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN PHASE - STOP CALL Pennsylvania One Call System, Inc

1-800-242-1776 SERIAL No. 20170472360 DATE: 02/16/2017

PROPERTY OWNER:

STEPHEN & DENISE LEGENSTEIN DEED RECORDED: 08.5051, PG.2296

TMP # 53-4-23

GRAPHIC SCALE --- -

1"•50" --- - 0 50 100 150

THIS PLAN IS THE PROPERTY OF GUY ENGINEERING ASSOCIATES, INC. ALL RIGHTS RESERVED. NO ALTERATIONS, REPRODUCTIONS OR USE OF ANY PARTS OF ITS CONTENTS MAY BE MADE WITHOUT THE EXPRESSED WRITTEN PERMISSION BY THE AUTHOR.

i5 .... .... a. .... a: u ., l!l

w .... £!!

> m

~

0 a: "-... m - ~ I "" m IL > .......

u " m m ·- ::> 0 "' L a.

z "' .... "' UJ " "' z UJ "- 0 a: "- m - ' co "' ' - 0

"' "' -

" "' u a. "- 0 a: "- m - ' 0 "' ' "' 0

"' "'

"'

0 on I '

m - m u "'

J

"' "'

n m " u m .i= u

"' "'

i m L "

... - 0 "' ' - 0 ' m

m ... m "

LL 0

I

I I

5.0 •

z

UJ • O· rue ·a C\J • "" • a coru "' "'

EX.UTIL.POLE ~ BT090FPA

[i'l.i]~[Q)@\'l,i'll[ID[j\l@@~ 11L!.\OO~ & MH fo~.\ii."' 2 33' WlDE -----

~.INLET ~

:----:~~~E~P~~~~~~~,~~{~~~E~X··~IN~'".1. .... s 49'31'00"' w J ...... ~~407.91

· · - · · - · · .-49'31'00-. -E ~s.-.o-· · · - · · - I; _· ___ ·_·_,-._.-._ 94 ~ - - · · - 1r ... " .. :~·:-:o.31· -1~·-.-.-.. -,,-.::;:·:-"-,-,0-.• -2· - - 10i -N- 49-'.3-,.~::~:-~p-,,o. ~~ 0 =__,='::s:. :;;;::~-~-- 1 -·

I I I I ,, '\_ -----

I

N 49'31'00" E 250.00'

UPI 53-4-8

N49'31'00"E 401.94"

(EX.)

N49°31'00"E 399.94'

BAKER PROPERTY

UPI 53-4-7

I / / N49"31"00"E '\_ I

25 05. .... ' 1-~·- \ \,,.- ' I I I . ,, ":: ' .... :'.' '

;,. OVERLAP ' ~ ~ 16 ~EX.DRIVEWAY TO /:;j .so· .. , ' - UPI 53-4-25. 1 J... / I / FLAG POLE WIDTH "'rt "'- HEMLOCK HILL ROW '

=-- I I I 25.oo· 33.oo· '

I

~ I I I a.so· '' ', --- '\_ ~ ' ~j~ '\_ ........ ' ":.Cl 1z (T) {\J ...., '-..' -~ '' ' Cf ' ~ ' ~ ' ~ ', <++"" ,.--..,,,~~~~. ~~~~2 ~p~~~~c~~~ /

\

\

\-~ \,.

EX.MH.

~ J; ; J; ; J; ; ~~ ~~ i~= (PERMEABLE PAVERS)

0 0 0 "" " --->@ ~ I~ H I~ H I~ H ~ '- ' t' fi:;;j ~ ~ ,~ Q_ ,~ Q_ '':f" a_ 0· ...... ,., => ,., => ~ => ?J ru '' ' l

z lz f z ~oi "" ' ', -·iii~

I I

• " ' [!!YJ EX.DRIVEWA TO BE lfl"' ..,, ' °"" WIDENED TO 12' z " ' °"" .... , ' I JCJo--EP ... ' E/k<.if I

111111! llUlll. TOP OF

IRON PIN ELEV.43B.05

' ' .... "' 1-j~'i'f~J':,,-- ' ,,

UPI 53-4-25.1

PROP.SAN.MH AT END OF EX.SEWER RIM 454.00

I I

PROP.20' WIDE SAN.LATERAL EASEMENT I I

PROP.1.25"" PE SAN.FORCE LINE

PROP. IP

/EX.TREES TO '"--EX. HEMLOCK HILL LANE

I BE TRIMMED

TO IMPROVE VISIBILITY ~,, 'i>::"'""

,,. fl UPI 53-4-24

RIM 454.88 <>-- ~ .... ~~•

PROP.BOUNDARY

EX. BOUNDARY LINE-f'::". ;t"'->:_:.;;i

"""-+'-"-PROP. 25 ' WIDE

\ \ ~

\ I \ I .. ,

~ I

ACCESS EASEMENT TOLOTf2 EX.PAVEMENT TO BE REMOVED

PROP. 6 "' PVC CLEANOUT W/LIO

I I I

I I

I I I

I I I g EX. PLANTING~-

~n;H-PROP. TRM

"

EX.DRIVEWAY TO BE WIDENED TO 12'

I

- -

FLOOD HAZARD NOTE:

400

'ft • ~'"50 ::__, ~

~™'lnlmMM

WEST CHESTER, PA QUAD

SCALE: 1" • 600"

UTILITY NOTES:

1. PROPOSED LOTS TO BE SERVED BY PUBLIC SEWER . 2. EACH LOT WILL HAVE AN ON-LOT WATER SUPPLY WELL. 3. LOT#1 WILL ACCESS PUBLIC SEWER THROUGH AN EASEMENT IN LOT#2. 4. THE END OF THE PUBLIC SANITARY SEWER AT THE WEST CORNER OF LOT # 2 SHALL BE EXCAVATED AND THE EXISTING CLEANOUT SHALL BE REPLACED WITH A SANITARY MANHOLE. THE INVERT ELEVATION OF THE MANHOLE WILL BE DETERMINED AT THE TIME OF CONSTRUCTION TO MATCH THE INVERT ELEVATION OF THE EXISTING PIPE. THE EXISTING LATERAL SERVING LOT f 2 WILL BE CONNECTED TO THE MANHOLE. THE NEW FORCE LINE FROM LOT # 1 WILL BE CONNECTED TO THE MANHOLE AS WELL. ALL WORK SHALL BE PERFORMED WITHIN THE EXISTING PUBLIC SANITARY SEWER EASEMENT.

ZONING NOTES: 1. THE TOTAL AREA OF THE LOT TO BE SUBDIVIDED WILL INCREASE THROUGH THE PURCHASE OF A STRIP OF LAND FROM THE ADJACENT PROPERTY UPI 53-4-7 AND ADDED TO THE SUBJECT PROPERTY. THE AREA OF THE LAND TO BE PURCHASED IS 400.00 SF. 2. THE EXISTING UPI 53-4-23 PROPERTY HAS A FRONTAGE OF 25.05 FT AT THE STREET LINE. THE DRIVEWAY TO THE PROPERTY IS KNOWN ALSO AS HEMLOCK HILL LANE, A PRIVATE ROAD THAT PROVIDES ACCESS TO THIS PROPERTY. AS WELL AS 4 ADDITIONAL PROPERTIES. 3. THE DRIVEWAY OF PROPOSED LOT # 2 WILL ACCESS FROM THE EXISTING HEMLOCK HILL LANE AND AN ACCESS EASEMENT THROUGH PROPOSED LOT # 1 AND WILL NOT HAVE A SEPARATE FRONTAGE ON A PUBLIC ROAD. 4. THE SUBJECT PROPERTY AND ALL ADJACENT PROPERTIES ARE ZONED R-2, LOW DENSITY RESIDENTIAL DISTRICT.

I

PROP.2.00 FT WIDE 200.00 FT LONG STRIP OF LAND TO BE CONVEYED TO UPI 53-4-23

'l' I x PROP.STORMWATER MANAGEMENT BMP I :-Je--,.__PROP. 12 "' WIDE CONC. I

THE SITE IS LOCATED IN ZONE X - AREA OF MINIMAL FLOOD HAZARD. PER FEMA FIRM NUMBER 42029C0215G EFFECTIVE 09/29/2017. FOR EAST GOSHEN, PA, PANEL NUMBER 420277. , .. ,

' I '---- _J ... \ ----- ' \ \ \

\

) ) ( \ S49"31'00"W 399 .. 94'

S49'31'00"W 401.94" (EX.) UPI 53-4-210

PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN PHASE - STOP CALL Pennsylvania One Call System, Inc

1-800-242-1776 SERIAL No. 20170472360 DATE: 02/16/2017

SURVEY DATUM: NAVO 19BB

W'ii'~

I

I I

LOT AREA [SF] AREA [AC] EXISTING B7. 491.21 2.00B5 (GROSS)

B7, 077. B9 1. 9990 PROP. 1 43. 995. 00 1. 0100 (GROSS) 43, 5B 1. 67 1. 0005 (NET) PROP.2 43. B96.21 1.0077

THIS PLAN HAS BEEN PREPARED BASED ON THE FOLLOWING INFORMATION SOURCES: BOUNDARY & TOPOGRAPHIC SURVEY PLAN, PREPARED BY R.H. SMITH SURVEYORS, WEST CHESTER, PA, DATED 7/29/2017; EAST GOSHEN TOWNSHIP ZONING MAP; A PLAN ENTITLED ""PLAN OF SUBDIVISION FOR ANTHONY D'AMBROSIO" PREPARED BY HENRY S.CONREY INC .. DATED B/140/1977; A PLAN ENTITLED ""FINAL TITLE PLAN"" PREPARED BY D. L. HOWELL & ASSOSCIATES, INC., DATED 10/30/2001, LAST REVISED 3/11/2002; A PLAN ENTITLED ""FINAL SUBDIVISION PLAN FOR BRUCE & AUDREY A.ATKINS" PREPARED BY JOHN O.STAPLETON III, DATED 11/3/1992; CHESTER COUNTY CHESCO VIEWS WEBSITE FOR DEEDS ANO OWNERSHIP INFORMATION; CHESTER COUNTY RECORDER OF DEEDS; GUY ENGINEERING ASSOCIATES, INC. HAS NOT PERFORMED ANY FIELD SURVEY OF THE PROPERTY AND IS NOT RESPONSIBLE FOR ANY ERRORS, INACCRURACIES OR OMMISSIONS OF INFORMATION SHOWN ON THIS PLAN.

' I \ PROP. P UPI 53- -~11 I

N49"31'00"E 208.75' UPI 53-4-217

\

I

I \

\

~m ©IRlMIMlli!OO'ii'a l!.ii\OO~OO®i (PER TOWNSHIP REQUIREMENTS)

I

\

\

TYPE KEY BOTANICAL NAME COMMON NAME SIZE ROOT QTY ORNAMENTAL MV TREE DECIDUOUS hq SHRUB DECIDUOUS cs SHRUB EVERGREEN im SHRUB EVERGREEN tm SHRUB

NOTE:

MAGNOLIA SWEET BAY 1.5"" CAL. B&B VIRGINIANA MAGNOLIA HYDRANGEA OAKLEAF 24 "" HT B&B QUERCIFOLIA HYDRANGEA CORNUS SERICEA YELLOW TWIG 24 .. HT B&B "FLAVIRAMEA" DOGWOOD ILEX X CHINA GIRL 24 .. HT B&B MESERVEAEA HOLLY TAXUS X 24"" HT B&B MEDIA HICKSII HICKS YEW

2

5

5

5

5

ORNAMENTAL LANDSCAPING TO BE PLANTED BY THE HOMEOWNERS AROUND SITE PER THEIR PREFERENCE.

~ rnllYJll'lffillm Wllb/A\00ii1IOO®l

TYPE KEY BOTANICAL NAME COMMON NAME SIZE ROOT QTY EVERGREEN CL CUPRESSUS LEYLAND 4' -5" HT B&B B TREE LEYLANDII CYPRESS EVERGREEN td TAXUS DENSE 24"-30" HT B&B 10 SHRUB OENSIFORMIS SPREADING YEW

LEVEL SPREADER I ~~.~::~~~A~~ ----

- -PROP/C-CLEANOUI li/LI·~o---'- - --

NOTE:

/ /

PROP.EVERGREEN BUFFER PLANTING

TAM, SUCH AS NORTH AMERICAN GREEN P300 OR EQUAL SHALL BE PLACED ON THE GROUND DOWNSLOPE FROM THE LEVEL SPREADER TO THE EAST PROPERT LINE.

~IID'llID

EX.PROPERTY LINE

ADJACENT.PROPERTY LINE

EX.ROAD R.O.W. EX.TITLE LINE EX.PAVEMENT

EX.BUILDING

EX.TREE

N90_:.QQ_.'. 00" W -~~ 61.87"

N90'00"00"W -~~ 61.B7'

D 0

EX.DEAD TREE TO BE REMOVED ~

EX.SANITARY SEWER EX.GAS LINE EX.CONTOUR

--s----s-- --<G G-- ____ .....,._ ___ _

PROP.LOT LINE PROP.DRIVEWAY

PROP.DRIVEWAY EASEMENT PROP.PULL-OFF AREA PERMEABLE PAVERS PROP.SANITARY LATERAL EASEMENT

PROP.TRIMMED VEGETATION

PROP.BUILDING

PROP.CONTOUR PROP.SANITARY LATERAL PROP.TREE

~

1~'~'~'~'~'~1 ~

~ I I

PROPERTY OWNER:

STEPHEN & DENISE LEGENSTEIN DEED RECORDED: DB.5051, PG.2296

TMP # 53-4-23

GRAPHIC SCALE --- -

1"•50" --- - 0 50 100 150

THIS PLAN IS THE PROPERTY OF GUY ENGINEERING ASSOCIATES, INC. ALL RIGHTS RESERVED. NO ALTERATIONS, REPRODUCTIONS OR USE OF ANY PARTS OF ITS CONTENTS MAY BE MADE WITHOUT THE EXPRESSED WRITTEN PERMISSION BY THE AUTHOR.

i5 .... .... a. .... a: u ., l!l

w .... £!!

>-m

~

0 a: a. .... m - ~ I "" m IL > .......

u " m m ·- ::> 0 "' L a.

z "' .... "' w " "' z w a. 0 a: a.

m - ' "' C\J ' - 0

"' "' -

" "' u a. a. 0 a: a.

m - ' 0 C\J ' C\J 0

"' "'

C\J

a on

I '

m - m u "'

J

"' "'

n m " u m " u

"' "'

i m L "

.... - 0 C\J ' - a ' m

m ... m "

LL 0

R

151.94' 110.31'

EX. UTIL. POLE BT090FPA

[MJ~[Q)@~rn1@@~ 11&~1:§

& MH

33' WIDE EP ------ ------

~

! {

- - --- - -

CONSTRUCTION SEQUENCE:

1. INSTALL ORANGE CONSTRUCTION FENCE AND COMPOST TUBES WHERE INDICATED ON THE PLAN. 2. DELINEATE AND MARK THE LIMIT OF DISTURBANCE IN THE FIELD. 3. INSTALL CRUSHED STONE CONSTRUCTION ENTRANCE. 4. STRIP TOSOIL AND STOCKPILE WHERE INDICATED ON THE PLAN. SURROUND STOCKPILE WITH COMPOST TUBES. 5. CONSTRUCT HOUSE AND DRIVEWAY BASE COURSE. 6. EXCAVATE AND INSTALL STORMWATER MANAGEMENT BMP. INSTALL ROOF DRAIN PIPES AND CONNECT TO BMP. 7. INSTALL SANITARY MANHOLE AT THE END OF THE EXISTING SANITARY SEWER AT CORNER OF UPI 53-4-7 AND UPI 53-4-B.1. ANY AND ALL DISTURBANCE IN ADJACENT PROPERTIES SHALL BE RESTRICTED TO WITHIN THE SANITARY SEWER EASEMENT OF EAST GOSHEN TOWNSHIP. CONNECT LOT # 2'S LATERAL TO THE NEW MANHOLE. N 49"31'00" E 226.60" I ----- N 49"31'00" E 110.31'

-/~ ____ 1_10_.3_2_· _

N 49"31'00" E 110.32' B. INSTALL SANITARY SEWER FORCE LINE AND CONNECT TO MANHOLE.

I

C!l

C!l

• 0 ·°' N :t" Ill z

lLJ O· C\Jo ·a (\J . -to •a <O (\J CT) rn I

I

l -

N 49"31'00" E 250.00'

UPI 53-4-8

N49"31'00"E 401.94' (EX.)

BAKER PROPERTY

UPI 53-4-7

I

I

I"

PROP.BOUNDARY

PROP.REAR YARD LINE

EX. PLANTING

ClJ

I ~

I (T) lD

H Q. :::i

PROP.SAN.MH AT END OF EX.SEWER RIM 454.00

PROP.2.00 FT WIDE 200.00 FT LONG STRIP OF LAND TO BE CONVEYED TO UPI 53-4-23 , .........

" __J"', \\

S49'31'00'W 399.94'

S49"31'00"W 401.94' (EX.) UPI 53-4-210

\ \ \ PROP. P UPI 53-i4-~11

I

I (T)

(T) (\j

I

""'" I (T) ID

H Q. :::i

I TEMP.B" DIA. I COMPOST TUBE

I

I E ,HE

I

I (\j

(T) (\j

I

""'" I (T) ID

I

I

I.

I

~ ~ ,.,

31:

'

~ H "' o._ I :t- :::i Ill

EX.ORIVEWAf zTO BE WIDENED TO 12' TEMP.ORANGE CONSTRUCTION! FENCE

I

JS.so·-,"

FLAG POLE WIDTH "" '-'-

25. oo ·

-........ "

(T) (\j

I

""'" I (T) ID

H 3: Q. :::i

' '

ld+~:=rrPROP. B ' x 22 ' PULL -OFF

~ AREA WITH APPROACHES ..,.g §!/ (PERMEABLE PAVERS)

~-' g i~~ --~@

I-~~ )> -~~

I!!!!] 2S UPI 53-4-25. 1 ~@tlt7/j]

WU'li lil.IML

TOP OF

' ~

1:-t;~~-.--- - - ---

PROP. 1. 25" PE SAN.FORCE LINE

IRON PIN ELEV.438.05 I EX.TREES TO I BE TRIMMED

TO IMPROVE

EX.HEMLOCK HILL LANE

'

UPI 53-4-24 . 1 ~~~-\~;--TEMP. 50' MIN.

CONSTRUCTION ENTRANCE EX.PAVEMENT TO BE REMOVED

PRDP.6"

~@@

®@@

:.-J"i~-PROP. TAM

PVC CLEANDUT W/LID

EX.DRIVEWAY TO BE ... WIDENED TO 12'

TEMP.12" DIA.COMPOST TUBE

' ' I

I

1"'-1-PROP. STORMWATER MANAGEMENT BMP I f:---,__PROP. 12" WIDE CONC. I

I I I I I

LEVEL SPREADER I ~~.~-~:~~~A~(§ ----

~ • ! ' i OCK! & PINE il<EE ROW

N49'31'00"E 208.75' \

\

- - PROP·~" C-CLEANOO I -w;o~o--- ' TEMP.ORANG CONSTRUCT N FENCE

/ /

9. DIG AND INSTALL WATER WELL. 10. FINE GRADE SITE. 11. PLANT BUFFER TREES AND SHRUBS. PLANT OTHER TREES AND SHRUBS PER PLAN. 12. INSTALL PERMEABLE PAVERS PULL-OFF AREA ALONG DRIVEWAY. 13. INSTALL TOPSOIL IN AREAS TD BE VEGETATED. PLANT, SEED AND MULCH WHERE NECESSARY. 14. REMOVE CRUSHED STONE ENTRANCE FROM EXISTING DRIVEWAY. 15. INSTALL NEW DRIVEWAY WITH POROUS ASPHALT. REPAIR EXISTING DRIVEWAY. REPAVE WHERE NECESSARY. 16. AFTER THE ENTIRE DISTURBED ARE HAS BEEN STABILIZED, REMOVE ALL TEMPORARY E~S MEASURES. ANY AREA THAT IS DISTURBED DURING SUCH OPERATIONS SHALL BE REPAIRED AND STABILIZED IMMEDIATELY.

EROSION G SEDIMENTATION CONTROL NOTES:

1.Erosion and sedimentation controls must be constructed, stabilized and functional before site disturbance within the tributary areas of these controls. 2.After the final site stabilization has been achieved. temporary erosion and sedimentation controls must be removed. Areas disturbed during removal of the controls must be stabilized immediately. 3.Sediment traps must be protected from unauthorized acts of third parties. 4.Filter compost tubes must be installed at level grade. Both ends of each tube section must extend at least ten feet upslope at 45 degrees to the main tube alignment. 5.Sediment must be removed when accumulations reach half the above ground height of the tube. 6.Any tube section which has been undermined or topped must be immediately replaced or strengthened with additional tubes. 7. Stockpile heights must not exceed 35 feet. Stockpile slopes must be 2: 1 or flatter. B.Any disturbed area, on which activity has ceased, and which will remain exposed must be stabilized immediately. During non-germinating periods, mulch must be applied at the recommended rates. Disturbed areas which are not at finished grade and which will be redisturbed within on year, may be stabilized in accordance with temporary seeding specifications. Disturbed areas which are either at finished grade or will not be disturbed in one year, must be stabilized in accordance with permanent seeding specifications. 9.0iversions. channels. sedimentation basins. sedimentation traps and stockpiles must be stabilized immediately. 10.Hay or straw mulch must be applied at rates of at least 3.0 tons per acre. 11.Until the site is stabilized, all erosion and sedimentation controls must be maintained properly. Maintenance must include inspections of all erosion and sedimentation controls after each runoff event and on a weekly basis. All preventative and remedial maintenance work, including clean out, repair, replacement, regrading, reseeding, remulching, and renetting, must be performed immediately.

I

I UPI 53-4-217 \

PROP.EVERGREEN BUFFER PLANTING LIMIT OF DISTURBANCE AREA = 2B, 796 SF = 0.661 AC \

COMPOST TUBE NOTE: COMPOST TUBES TO BE PLACED DOWNSLOPE OF CONSTRUCTION ACTIVITIES ON SITE SHALL BE B" DIA., EXCEPT ALONG THE EAST PROPERTY LINE OF LDT 1. WHERE THE COMPOST TUBE SHALL BE 12" DIA.

EXISTING SOILS ON SITE:

Gd~ Gladstone Gravely Loam, 3 - B% slopes, HSG "B" GdC: Gladstone Gravely Loam, B - 15% slopes, HSG "B" UrcB: Urban Land - Califon Complex, o - B% slopes, HSG "B" (assumed) UrlB: Urban Land - Gladstone Complex, o - B% slopes, HSG "B" (assumed)

SURVEY DATUM: NAVO 19BB THIS PLAN HAS BEEN PREPARED BASED ON THE FOLLOWING INFORMATION SOURCES: BOUNDARY ~ TOPOGRAPHIC SURVEY PLAN, PREPARED BY R.H. SMITH SURVEYORS, WEST CHESTER, PA, DA TED 7/29/2017; EAST GOSHEN TOWNSHIP ZONING MAP; A PLAN ENTITLED "PLAN OF SUBDIVISION FOR ANTHONY D'AMBRDSIO" PREPARED BY HENRY S.CONREY INC .. DATED 8/140/1977: A PLAN ENTITLED "FINAL TITLE PLAN" PREPARED BY D.L.HDWELL & ASSDSCIATES, INC., DATED 10/30/2001, LAST REVISED 3/11/2002; A PLAN ENTITLED "FINAL SUBDIVISION PLAN FDR BRUCE & AUDREY A.ATKINS" PREPARED BY JOHN D. STAPLETON III. DATED 11/3/1992: CHESTER COUNTY CHESCO VIEWS WEBSITE FDR DEEDS AND OWNERSHIP INFORMATION: CHESTER COUNTY RECORDER OF DEEDS: GUY ENGINEERING ASSOCIATES, INC. HAS NOT PERFORMED ANY FIELD SURVEY OF THE PROPERTY AND IS NOT RESPONSIBLE FOR ANY ERRORS, INACCRURACIES DR OMMISSIDNS OF INFORMATION SHOWN ON THIS PLAN.

PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN PHASE - STOP CALL Pennsylvania One Call System. Inc

1-800-242-1776 SERIAL No.20170472360 DATE: 02/16/2017

\

~l§~[Q)

EX.PROPERTY LINE

ADJACENT.PROPERTY LINE

EX.ROAD R.O.W. EX.TITLE LINE EX.PAVEMENT

N90_:0Q.: 00" W --~61.B7""' ---

N90"00'00"W --~ 61.87"'' ---

EX.BUILDING c::::::::J

EX.TREE 0

EX.DEAD TREE TO BE REMOVED ~

EX.SANITARY SEWER EX.GAS LINE EX.CONTOUR SOILS BOUNDARY

--s----:s-- --G G-- ----""""4011-------

PROP.LOT LINE PROP.DRIVEWAY PROP.PULL-OFF AREA PERMEABLE PAVERS

PROP.BUILDING

PROP.TRIMMED VEGETATION

PROP.CONTOUR PROP.SANITARY LATERAL PROP.TREE

--S----:S--

-~sr----·sr-- PROP.DRAINAGE PIPE

TEMP.CONSTRUCTION ENTRANCE ~

TEMP.TREE PROTECTION FENCE 0 TEMP.CONSTRUCTION ORANGE FENCE TEMP.COMPOST TUBE

TEMP.LIMIT OF DISTURBANCE

_,_,_,~_,_,_,_,_

--- ~

PROPERTY OWNER:

STEPHEN & DENISE LEGENSTEIN DEED RECORDED: DB.5051, PG.2296

TMP # 53-4-23

GRAPHIC SCALE

0 50 100

1 "=50'

150

THIS PLAN IS THE PROPERTY OF GUY ENGINEERING ASSOCIATES, INC. ALL RIGHTS RESERVED. NO ALTERATIONS, REPRODUCTIONS OR USE OF ANY PARTS OF ITS CONTENTS MAY BE MADE WITHOUT THE EXPRESSED WRITTEN PERMISSION BY THE AUTHOR.

z 0 .... I- D.. .... a: tJ en w c

w I- "' c

>- Cll

> w a:

a a: o._ " QJ ..... ...... I ..... <Il LL > .µ H u D QJ <Il ....... =i o rn '- 0..

z C!l H rn lLJ D

C!l z lLJ

o._ a a: a_

<Il ..... ' <O (\J ' ..... a

C!l rn

.....

:::E rn u o._

o._ a a: a_

<Il ..... ' a (\J ' (\J a

C!l rn

(\J

a ID

II -.....

OJ ......

"' u UJ

i -

a .I Ul ~

ai rn QJ "C ..... c m ru ·r-1 0-<C tO 1

c. a <

Cl> a: D.. <Il c 0 IJ.Jc:.I

OJ OJI!) - .c. C.... I.Cl ._.. m re (1') c 0 ::J ·r-1 t!) C" - +' enc ...... <Il ..... :::J 0 C:lO Ul ID :;i:- C CTl o .... ,.T, 0 3: ii-ii C.J QJ g. z

~

C!l rn

"C

OJ .>I. u OJ .i:: u

C!l rn

i:: 3: m '- 0

" ..... a (\J ' ..... a ' <Il

OJ ....

"' D

[)=

LL 0

EX. UTIL. POLE BT090FPA

EAST GOSHEN D&M NOTES

1. The person or entity responsible for the operation and maintenance of a BMP or conveyance shall make records of the installation and of all maintenance and repairs. and shall retain the records far at least 2 years. A copy of these records shall be submitted to the Township.

[MJ~[Q)@~rn1@@~ 11&~1:§

& MH

{

2. Upon final inspection. the Municipality shall inform the person responsible far the operation and maintenance whether the submission of periodic (annual or other frequency) inspections and maintenance reports will be required. 3. The owner of each BMP and conveyance shall keep on file with the Township the name. address and telephone number of the person responsible for maintenance activities and implementation of the O&M plan. In the event of a change, new information shall be submitted by the BMP or conveyance owner ta the Township within 10 days of the change.

N 49"31'00" E 226.60'

N 49"31'00" E 250.00'

I~ _____ 15_1_.9_4· I

ClJ

I ~

I (T) lD

I

I

110.31'

N 49"31'00" E 110.31'

(T)

(T) C\I

I "<:J"

I (T) ID

33' WIDE ------

~ -/~ ____ 1_10_.3_2_· _

N 49"31'00" E 110.32'

I

I C\I

(T) C\I

I "<:J"

I (T) ID

______ EP

I JS.so·-,"

FLAG POLE WIDTH "" '-'-

25. 00'

-..,,,,,,, " " I

(T) I. C\I

I

~ ~ /:; I

31: (T) ' ID . ...

!

i;x.INLET LG=407.91

' '

-----

' ' I

4. All stormwater management structures shall be inspected at least 2 times per year. The overlying vegetation should be maintained in goad condition. and care should be taken to avoid excessive compaction by mowers.

INFILTRATION BED CONSTRUCTION NOTES i. Excavation shall be performed with equipment that will not compact the bottom of the bed. Equipment shall not be allowed on excavated area of the infiltration bed at any time during its construction. 2. The bottom of the bed shall be scarified immediately prior to the placement of the geotextile fabric on the bottom of the bed. 3. The bed shall be protected during construction. Sediment shall not be allowed to be washed back into the bed. both during the time when the bottom of the bed is open. and once the stone is placed. 4. Only uniformly graded, clean aggregate, free of fines, slate, shale. clay, silt. and vegetative material shall be used. The supplier of the stone shall provide certification of the porosity of the stone delivered to the site.

~. Compaction of the infiltration bed shall be avoided to the fullest extent possible. Heavy equipment and traffic shall be restricted from traveling over the proposed location of the infiltration bed to minimize compaction of the soil. Excavation of the bed shall be completed with relatively light tracked equipment or from outside the bed to avoid compaction of the bed floor. 6. Construction equipment shall only be allowed on the top of the stone after it has been placed to its full depth and to allow completion of the placement of the stone and backfill. 7. Drainage filter fabric shall be placed in accordance with manufacturer's directions, including pipe penetrations and should overlap a minimum of i6 inches. B. During site construction all facility components shall be protected from sedimentation using storm inlet protection in accordance with the PADEP Chapter i02 regulations, as amended, and the Erosion and Sediment Pollution Control Manual, as amended. Inlet protection shall remain until the contributary drainage area has achieved full stabilization.

I

I

H Q. :::i

H Q. :::i

,~ 3: • ~ I~ PROP.~~ jl.

::JEX. DRIVEWAI zT:A~I; ::J • :¥ ru WIDENED TD 12'

PROP.DA-II I

I

C!l

C!l

-

• 0 ·"' N :t' Ill z

O·

rue I -a ru . -to •a <eru CT) rn

UPI 53-4-8

BAKER PROPERTY

UPI 53-4-7

I"

PROP.REAR YARD LINE

EX. PLANTING

PROP.SAN.MH AT END OF EX.SEWER RIM 454.00

I I I

I

I , .........

" __J .... , \\

PRDP.2.00 FT WIDE 200.00 FT LONG STRIP OF LAND TO BE CONVEYED TO UPI 53-4-23

\

\

I .• '\

\~\~~~

l -

S49'31"00"W 399.94"

S49"31'00"W 401.94' (EX.) UPI 53-4-210

PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN PHASE - STOP CALL Pennsylvania One Call System. Inc

1-800-242-1776 SERIAL No. 20170472350 DATE: 02/15/2017

SURVEY DATUM: NAVO 19BB

I

I

\

THIS PLAN HAS BEEN PREPARED BASED ON THE FOLLOWING INFORMATION SOURCES: BOUNDARY & TOPOGRAPHIC SURVEY PLAN, PREPARED BY R.H. SMITH SURVEYORS, WEST CHESTER, PA, DA TED 7/29/2017; EAST GOSHEN TOWNSHIP ZONING MAP; A PLAN ENTITLED "PLAN OF SUBDIVISION FOR ANTHONY D'AMBROSIO" PREPARED BY HENRY S.CONREY INC., DATED B/140/1977: A PLAN ENTITLED "FINAL TITLE PLAN" PREPARED BY D.L.HOWELL & ASSOSCIATES, INC., DATED 10/30/2001, LAST REVISED 3/11/2002; A PLAN ENTITLED "FINAL SUBDIVISION PLAN FOR BRUCE & AUDREY A.ATKINS" PREPARED BY JOHN D. STAPLETON III, DATED 11/3/1992; CHESTER COUNTY CHESCO VIEWS WEBSITE FOR DEEDS AND OWNERSHIP INFORMATION: CHESTER COUNTY RECORDER OF DEEDS:

\ \ \ PROP. P UPI 53-i4-~11

PROPOSED ROOF DRAIN PIPES:

\ \

\

I

I

N49'31'00"E 208.75' UPI 53-4-217

ALL ROOF DRAINS SHALL BE PIPED TO THE PROPOSED STORMWATER MANAEMENT BMP. DRAIN PIPES SHALL BE 4" DIA.PVC AT 0.02 FT/FT MIN.

DOUBLE-RING INFILTRATION TEST RESULTS:

INFILTRATION TESTING WAS PERFORMED BY KATHERINE HEED AND PROVIDED TO GUY ENGINEERING. TEST PIT TP-1:

SURFACE ELEVATION = 441.00 DEPTH = 48" TEST ELEVATION = 437.00

INFILTRATION RATE = 2.50 IN/HR TEST PIT TP-2:

SURFACE ELEVATION = 441.00 DEPTH = 48" TEST ELEVATION = 437.00

INFILTRATION RATE = 6.98 IN/HR MEASURED AVERAGE INFILTRATION RATE= 4.74 IN/HR DESIGN INFILTRATION RATE = 2.37 IN/HR

EXISTING SOILS ON SITE:

GdB: GdC:

Gladstone Gravely Loam. 3 - B% slopes, HSG "B" Gladstone Gravely Loam. B - 15% slopes. HSG "B"

\

~P.DA-I

\

GUY ENGINEERING ASSOCIATES, INC. HAS NOT PERFORMED ANY FIELD SURVEY OF THE PROPERTY AND IS NOT RESPONSIBLE FOR ANY ERRORS. INACCRURACIES OR OMMISSIONS OF INFORMATION SHOWN ON THIS PLAN.

UrcB: UrlB: Urban Land - Califon Complex. a - B% slopes. HSG "B" (assumed) Urban Land - Gladstone Complex. 0 - B% slopes, HSG "B" (assumed)

LOW PATH EP

UPI 53-4-25. 1

EX.HEMLOCK HILL LANE

EX.DRIVEWAY TO BE WIDENED TO 12' I

I I I I I

lb<-....'--PROP.STORMWATER MANAGEMENT BMP I I PROP. 12" WIDE CONC. I LEVEL SPREADER I

I PT~[}Y,l)[J,,@©~ [}{]0[1,[1, ~(§ - - -

25' WIDE - PRIVATE LANE

:'1-l'ROl~.D.A-I I

~~"-'----- - PROP /C-CLEANOO I "W/00

/ /

PROP.EVERGREEN BUFFER PLANTING

~@ll§~IID

EX.PROPERTY LINE

ADJACENT.PROPERTY LINE

EX.ROAD R.O.W. EX.TITLE LINE EX.PAVEMENT EX.BUILDING

N90"00'00"W __ _,,., 61. 87 "'· ---"---

N 90'00'00 "W ---"'" 61 . 87 "'· ----"---

D

PROP.LDT LINE PROP.DRIVEWAY

PROP.DRIVEWAY EASEMENT PROP.PULL-OFF AREA PERMEABLE PAYERS PROP.SANITARY LATERAL EASEMENT

PROP.TRIMMED VEGETATION

PROP.BUILDING

PROP.CONTOUR PROP.SANITARY LATERAL PROP.TREE

~ I : I : I : I : I : I : I ~

I

--S----!S--

EX.TREE 0 PROP. DRAINAGE PIPE --sr----:sr--

EX.DEAD TREE TO BE REMOVED ~

EX. SAN IT ARY SEWER --s----•s-- EX.GAS LINE EX.CONTOUR

G----IG-- --------45Q-----

INFIL TRATIDN TEST LOCATION TP1. TP2() PROP.CRUSHED STONE

INFILTRATION BED

PROP.STORMWATER DISTRIBUTION PIPE PROP.DRAINAGE AREA BOUNDARY -··-··-··

PROPERTY OWNER:

STEPHEN & DENISE LEGENSTEIN DEED RECORDED: DB.5051, PG.2296

TMP # 53-4-23

GRAPHIC SCALE

0 50 100

1 "=50'

150

THIS PLAN IS THE PROPERTY OF GUY ENGINEERING ASSOCIATES, INC. ALL RIGHTS RESERVED. NO ALTERATIONS, REPRODUCTIONS OR USE OF ANY PARTS OF ITS CONTENTS MAY BE MADE WITHOUT THE EXPRESSED WRITTEN PERMISSION BY THE AUTHOR.

QJ ...... ..... LL

z 0 .... I- D.. .... a: tJ en w c

w I- -c c

>- Cll

> w a:

a a: a_

r-- .....

I D:l > .µ H u D OJ ID -~ =i o rn '- a_

z C!l H rn w D

C!l z w a_ a a: D..

CD ..... .....

<O C\J ' ..... a

(.') rn

.....

:::E rn u a_

a_ 0 a: D..

CD ..... ..... a ru ' ru a

(.') rn

ru

0 ITT

II -.....

QJ ......

"' u UJ

i - 1 i Ul ~ c.. 0 ai rn QJ 'C"" c m ru ·r-1 0-<C tO <

Cl> a: D.. IXl

C!l rn

'C

QJ _,,_

u QJ _r;: u

c 0

lJ.J ~ mth

- .c. C.... I.Cl ...... m re (1') c 0 ::J ·r-1 t!) C" - +' enc .-... CD ..-. :::J 0 c:tO Ul I() :;i:- c CT) 0 0 .... C.J ~

C!l rn

i:: 3: m '- 0

z

r-- ..... a ru ' ..... a ' CD

QJ ....

"' D

[)=

LL 0

PRELIMINARY / FINAL CONSTRUCTION NOTES AND DETAILS PLAN — LOT # 1

Engineering plan sheet (Sheet 6 of 6, dated 8/01/2017, Scale 1"=50') prepared by Guy Engineering Associates, Inc. for Proposed Residential Subdivision at 1506 Meadowbrook Lane, West Chester, PA 19380, East Goshen Township, County of Chester, PA (Applicant / Property Owner: Stephen & Denise Legenstein, Deed Recorded: DB. 5051, PG. 2296, TMP # 53-4-23). Includes construction detail drawings and specifications for tree protection, driveway sections, rock construction entrance, temporary and permanent seeding, permeable pavers and stormwater bed, compost filter sock, crushed stone infiltration bed, deciduous and coniferous tree planting, E/One sewer system pump station (Options DH152 / DR152), porous asphalt, and roof drain.

TYPICAL TREE PROTECTION DETAIL DURING CONSTRUCTION (N.T.S.)

  • SHAPE OF TREE IS NOT TYPICAL FOR ALL VARIETIES
  • 3-2"x4" HARDWOOD STAKES ABOVE GROUND TO LOWEST BRANCHES
  • DOUBLE STRAND #12 GAUGE GALV. WIRE TWISTED IN RUBBER HOSE 6" FROM TOP OF STAKE UP TO LOWEST BRANCHES.
  • 1"x1"x57" HIGH #12 GAUGE WIRE STAPLED TO OUTSIDE OF STAKES OR WOOD SLAT SNOW FENCE.
  • WRAP TRUNK AND LARGE BRANCHES WITH WATERPROOF TREE WRAP SECURED WITH TWINE.
  • BOTTOM OF FENCE (3')

TYPICAL DRIVEWAY SECTION DETAIL (N.T.S.)

  • 1.5" ID-2A WEARING COURSE
  • 6" BASE COURSE 3-A CRUSHED STONE
  • COMPACTED SUBGRADE

STANDARD CONSTRUCTION DETAIL #3-1: ROCK CONSTRUCTION ENTRANCE (NOT TO SCALE)

Profile and plan view diagrams showing 50' min. length, 20' min. width (with 10' min. flares to existing roadway), min. 8" AASHTO #1 rock over geotextile, earth fill, pipe as necessary, and mountable berm (6 in. min.).

* MOUNTABLE BERM USED TO PROVIDE PROPER COVER FOR PIPE

NOTES:

REMOVE TOPSOIL PRIOR TO INSTALLATION OF ROCK CONSTRUCTION ENTRANCE. EXTEND ROCK OVER FULL WIDTH OF ENTRANCE.

RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL BMP PRIOR TO ENTERING ROCK CONSTRUCTION ENTRANCE.

MOUNTABLE BERM SHALL BE INSTALLED WHEREVER OPTIONAL CULVERT PIPE IS USED AND PROPER PIPE COVER AS SPECIFIED BY MANUFACTURER IS NOT OTHERWISE PROVIDED. PIPE SHALL BE SIZED APPROPRIATELY FOR SIZE OF DITCH BEING CROSSED.

MAINTENANCE: ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE IMMEDIATELY. IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION ENTRANCE BY 50 FOOT INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK. WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES IS NOT ACCEPTABLE.

TEMPORARY SEEDING & PERMANENT SEEDING

TEMPORARY SEEDING

  • LIME: 190 lbs/1000 sf — Ground limestone incorporated 4 inches into soil.
  • FERTILIZER: 25 lbs/1000 sf — 10-20-20 incorporated 4 inches into soil.
  • SEED: 1.0 lbs/1000 sf — Annual ryegrass
  • MULCH: 140 lbs/1000 sf — Straw mulch

Minimum Standard for Limestone and Fertilizer:

  • Limestone shall be applied at a rate of 1 ton per acre.
  • Fertilizer shall be applied at a rate of: Nitrate nitrogen 30 lbs/acre average; Phosphorous 100 lbs/acre average; Potassium 120 lbs/acre average.

PERMANENT SEEDING

  • LIME: 190 lbs/1000 sf — Ground limestone incorporated 4 inches into soil.
  • FERTILIZER: 25 lbs/1000 sf — 10-20-20 incorporated 4 inches into soil.
  • SEEDING (Lawn and mowed areas): Kentucky Bluegrass - 30 lbs/ac, Redtop - 3 lbs/ac, Perennial Ryegrass - 20 lbs/ac (Total Seeding = 53 lbs/ac) OR Pennlawn fine Fescue - 40 lbs/ac, Redtop - 3 lbs/ac, Perennial Ryegrass - 20 lbs/ac (Total Seeding = 63 lbs/ac).
  • SEEDING (Slopes or unmowed areas): Crown Vetch - 25 lbs/ac, Perennial Ryegrass - 25 lbs/ac (Total Seeding = 50 lbs/ac).
  • Planting date: March 1st to May 15th, and August 15th to October 1st.
  • Mulch Straw at a rate of 140 lbs/1000 sf. Mulch shall be secured by approved methods.

NOTE:

THE SILT FENCES ALONG SCHWAB AND INDUSTRY ROADS SHALL BE ERECTED "SUPER FILTER FABRIC FENCE", AS RECOMMENDED BY THE PADEP HANDBOOK OF BEST MANAGEMENT PRACTICES AND THE MONTGOMERY COUNTY CONSERVATION DISTRICT.

TEMPORARY RISER IN SEDIMENT TRAP SHALL BE 18" PERFORATED CMP WITH 15" CMP OUTLET.

ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFICATIONS OF HATFIELD TOWNSHIP, PA DEPT. OF TRANSPORTATION, HATFIELD TOWNSHIP MUNICIPAL AUTHORITY, OR OTHER GOVERNMENT AUTHORITIES HAVING JURISDICTION. SEE HATFIELD TOWNSHIP SUBDIVISION AND LAND DEVELOPMENT ORDINANCE.

PERMEABLE PAVERS AND STORMWATER BED DETAIL (N.T.S.)

  • TYP. NO. 8 AGGREGATE IN OPENINGS
  • PERMEABLE PAVERS
  • BEDDING COURSE 2" THICK NO. 8 AGGREGATE
  • 4" THICK NO. 57 STONE OPEN-GRADED BASE
  • MIN. 6" THICK NO. 2 STONE SUBBASE
  • NONWOVEN GEOTEXTILE ON BOTTOM, TOP AND SIDES OF OPEN-GRADED BASE (MIRAFI 140N OR EQUAL)
  • UNCOMPACTED SOIL SUBGRADE
  • NOTE: PERMEABLE PAVERS EP HENRY ECO-COBBLE OR EQUAL, 3-1/8" THICK

STANDARD CONSTRUCTION DETAIL #4-1: COMPOST FILTER SOCK (NOT TO SCALE)

Section and plan view diagrams showing compost filter sock (blown/placed filter media), 2 in. x 2 in. wooden stakes placed 10 ft on center, disturbed area, undisturbed area, flow direction, and existing contours.

NOTES:

SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL. COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION CONTROL MANUAL.

COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN BARRIER ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE OF THE SOCK AND THE SLOPE OF ITS TRIBUTARY AREA.

TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.

ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT OF THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.

COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION.

BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.

UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.

CRUSHED STONE INFILTRATION BED DETAIL (1"=30') & SECTION (1"=30' H, 1"=3' V)

  • CRUSHED STONE INFILTRATION BED (45.00', 20.10', 33.82', 90.00', 90.00', 23.00')
  • ROOF DRAIN 6" PIPE CONNECTION INV. 437.90
  • 6" PERFORATED PVC PIPE @ 0.00 INV. 437.90 (CLOSED LOOP)
  • 1' WIDE, 1' DEEP CONC LEVEL SPREADER TOP ELEV. 440.50
  • 6" CLEANOUT LID ELEV. 440.50
  • P300 TRM OR EQUAL TO PROPERTY LINE
  • RAIN GARDEN VEGETATION (440.50, 439.50, 437.00)
  • 1/2"-2" clean washed crushed stone

NOTES:

  • 1. The crushed stone bed shall be wrapped on top, bottom and sides with non-woven drainage fabric, such as Mirafi 140N, or approved equal.
  • 2. Excavation for the infiltration BMP shall be performed with equipment that will not compact the bottom of the facility.
  • 3. The bottom of the BMP shall be scarified prior to placement of fabric and aggregate.
  • 4. Only clean aggregate with documented porosity, free of fines, shall be allowed.
  • 5. The contractor shall contact the Township to have the construction of the infiltration BMP inspected. Inspection of the BMP must start prior to placement of stone.

DECIDUOUS TREE PLANTING DETAIL & CONIFEROUS TREE PLANTING DETAIL

  • PRUNE DAMAGED TWIGS AFTER PLANTING
  • PLACE PLANT IN VERTICAL POSITION
  • 2"x2"x8' CEDAR STAKING / 2"x2"x6' CEDAR STAKING
  • RUBBER HOSE LOOP AND #12 WIRE
  • TREE WRAPPING PAPER: WRAP TO BOTTOM OF BRANCHES, LAP PAPER MIN. 1/3 WIDTH, WRAPPING TO REMAIN MIN. ONE YEAR
  • 2" MULCH
  • BURLAP TO REMAIN LOOSEN FROM TOP OF BALL
  • PREPARED BACKFILL: 1 PART PEAT TO 3 PARTS TOPSOIL
  • TAMP AND SOAK BACKFILL THOROUGHLY AFTER PLANTING
  • COMPACTED OR UNDISTURBED SOIL

E/ONE SEWER SYSTEMS — MODEL DH152 / DR152 DETAIL SHEET (NA0052P02)

  • OPTIONS: DH152 (HARD WIRE LEVEL CONTROLS) / DR152 (WIRELESS LEVEL CONTROLS)
  • FIELD JOINT REQUIRED FOR MODELS, ACCESS WAY VENT, GASKETED LID (HDPE), DUAL WALL CORRUGATED HDPE ACCESSWAY, INTERNAL WELL VENT 2.0" DIA.
  • STRAIN RELIEF CORD CONNECTOR, POWER/ALARM CABLE 6 CONDUCTOR W/GRD, E/ONE EQUALIZER, ELECTRICAL QUICK DISCONNECT NEMA 6P (EQD)
  • DISCHARGE 1 1/4" FPT (304 S.S.), QUICK DISCONNECT ASSY. (304 S.S.), E.S. CAST BALL VALVE, 1 1/4" DISCHARGE LINE (304 S.S.), CHECK VALVE (NORMYL), ANTI-SIPHON VALVE (NORMYL)
  • INLET, GROMMET TO ACCEPT 4.50" O.D. PVC PIPE (STANDARD)
  • HDPE TANK 1/2" NOMINAL WALL THICKNESS 150 GALLON CAPACITY
  • SEMI-POSITIVE DISPLACEMENT TYPE PUMP EACH DIRECTLY DRIVEN BY A 1 HP MOTOR

POROUS ASPHALT DETAIL (N.T.S.), TYPICAL DRIVEWAY SECTION / DRIVEWAY WIDENING DETAIL & ROOF DRAIN DETAIL

  • POROUS ASPHALT DETAIL: 4" POROUS ASPHALT COURSE (3/8"-3/4" AGGREGATE ASPHALT MIX), 2" FILTER COURSE (1/2" CLEAN CRUSHED STONE), 4" RESERVOIR COURSE (1/2"-2" CLEAN CRUSHED STONE), UNCOMPACTED SUBGRADE, NON-WOVEN DRAINAGE FABRIC (MIRAFI 140N OR EQUAL)
  • TYPICAL DRIVEWAY SECTION (10'): 1 1/2" ID-2 BITUMINOUS WEARING COURSE, 6" 3A STONE COMPACTED, COMPACTED SUBGRADE
  • ROOF DRAIN DETAIL: BUILDING DOWNSPOUT, ADAPTER TO RECEIVE DOWNSPOUT, "Y" CONNECTION FOR OVERFLOW, SPLASH BLOCK, 6" PVC ROOF DRAIN, SELECT BACKFILL MATERIAL

REVISIONS

REVBYDATEDESCRIPTION
1SG01/26/18PROP ENG DESIGN
2SG02/20/18PROP PCSM

Sequence

Meet with Pennoni Permitting Draw Down Earth Disturbance Stake out Soil Erosion Order outfall structure Locate utilities Strip topsoil (seed & straw piles)

Marydel! Pond

2018

Cut in driveway and parking area (millings) Draw pond down Capture fish and turtles - Transfer to other ponds Pull out piping to create baffles (dredge) Install new outfall structure Stabilize all disturbed areas Trench in electrical conduit

Finish grade area Plantings (meadows/trees)

Marydel! Pond

2019

Once areas are established then we remove all soil erosion Filter socks and fence

F:\Data\Shared Data\Public Works Dept\Pond Repairs\Marydell Pond.docx