Conservancy Board

The Conservancy Board advises the Board of Supervisors, the Planning Commission, the Park and Recreation Commission and other agencies, officials and employees of East Goshen Township on matters dealing with conservation, management, protection and use of natural resources in the Township of East Goshen.

Meetings are on the 2nd Wednesday of the month at 7:00 P.M. In addition the Conservancy Board will conduct site inspections the following Saturday at 9:00 AM; as needed.

Board Members Term Expiration Dates
Vacant, Chair 2026
Walter Wujcik, Vice Chair 2027
Jackie Ahlborn 2027
Julieta Calmon 2027
Erich Meyer 2028
Sandy Snyder 2026
Susan Vanesse 2028
Ann Duffield, BOS Liaison
Ashley Nowak,  Staff Liaison

 

Articles of Interest

 

Related News

The Goshen250 Nature Challenge: We Have a Winner!

Wednesday, November 4, 2026

This neighborly challenge between West Goshen and East Goshen townships began as the brainchild of East Goshen Township’s (EGT) Conservancy Board. Jason Lang, EGT’s Parks and Recreation director, contacted his West Goshen peer Ken Lehr, who shared the idea with the Sustainability Advisory Committee, and the idea became a reality. Planning for the iNaturalist-inspired “BioBlitz” […]

View Article

East Goshen Township Receives Bird Town PA Recognition!

Wednesday, October 7, 2026

  The Conservancy Board and Environmental & Sustainability Advisory Council have worked together to have East Goshen Township recognized as a Bird Town PA. The program encourages municipalities to work towards four key strategies: Creating and Protecting Habitat, Threats to Birds, Education and Engagement and Sustainability.         Here are just some of […]

View Article

“Leave the Leaves”

Friday, October 2, 2026

Take a break from the rake and help your yard and the planet. Did you know that the leaves that fall from your trees can act as a natural mulch to improve the soil and retain moisture through the winter? Leaves provide nutrients to your yard as they decompose naturally. They also provide valuable habitat […]

View Article

More News

Documents

Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.

AGENDA
EAST GOSHEN TOWNSHIP
CONSERVANCY BOARD MEETING
March 13, 2019
7:00 PM

  1. CALL TO ORDER / PLEDGE OF ALLEGIANCE / MOMENT OF SILENCE
  2. APPROVAL OF MINUTES February 13, 2019
  3. CHAIRMAN'S REPORT
  4. OLD BUSINESS a. Continue discussing plans for "Keep East Goshen Beautiful Day" i. Transportation Management Association of Chester County (TMACC) Volunteer b. Spring Planting – Dates and Location ideas
  5. SUB DIVISION REVIEW a. ESKE Duckling Land Development
  6. NEW BUSINESS a. CRC Stream Cleanup
  7. VARIANCES/CONDITIONAL USES a. PECO Conditional Use / Public Utility Facility
  8. BOARD MEMBER CONCERNS
  9. LIAISON REPORTS
  10. CORRESPONDENCE
  11. DATES OF IMPORTANCE Mar 14, 2019 Historical Commission 07:00 pm Mar 19, 2019 Board of Supervisors 07:00 pm Mar 25, 2019 Futurist Committee 07:00 pm Mar 25, 2019 Sustainability Advisory Committee 07:00 pm Mar 28, 2019 Pipeline Task Force 05:00 pm Apr 02, 2019 Board of Supervisors 07:00 pm Apr 03, 2019 Planning Commission 07:00 pm Apr 08, 2019 Municipal Authority 07:00 pm Apr 09, 2019 Board of Supervisors 07:00 pm Apr 10, 2019 Conservancy Board 07:00 pm

F:\Data\Shared Data\Agendas\Conservancy Board\2019\2019-03-13_Conservancy Board Agenda.doc

Apr 11, 2019Park and Rec Commission07:00 pm
Apr 11, 2019Historical Commission07:00 pm
Apr 13, 2019Keep East Goshen Beautiful08:00 am
  1. PUBLIC COMMENT
  2. ADJOURNMENT

F:\Data\Shared Data\Agendas\Conservancy Board\2019\2019-03-13_Conservancy Board Agenda.doc

Draft
EAST GOSHEN TOWNSHIP
CONSERVANCY BOARD MEETING
February 13, 2019

The East Goshen Township Conservancy Board held a regularly scheduled meeting on Wednesday, February 13, 2019 at 7:00 p.m. at the Township Building. In attendance were: Chairman Erich Meyer, Walter Wujcik, and Andy Tyler.

Call to Order

Erich called the meeting to order at 7:00 p.m.

Pledge of Allegiance & Moment of Silence

Erich led those present in the Pledge of Allegiance and then asked for a moment of silence to remember those who serve in our military and our first responders.

Minutes

The minutes of the January 9, 2019 meeting were approved as amended.

Chairman’s Report

Erich reported on the status of the Marydell Pond rehab project.

New Business

1. Boy Scout Day of Service – Their Day of Service is April 13, 2019. Erich will call the Boy Scouts about Keep East Goshen Beautiful Day.
2. Spring Planting - Two tentative dates are April 27th or May 4th. Possible locations are 1) Applebrook Park and 2) wetlands near the Blacksmith Shop. A location will be selected at the March meeting.
3. Keep East Goshen Beautiful Day - Email notifications will be sent after the March meeting.
4. Penn State Extension Letter – Andy is interested.

Board Member Concerns

The board has two vacancies. They need more members.

Liaison Report

1. BOS – Erich reported that they voted not to move forward with the proposed zoning change (Lewis property).
2. Municipal Authority – Walter reported that the plant met permit requirements for January. Hopefully the Talmadge Drive project will be done this week.

Adjournment

There being no further business, Walter moved to adjourn the meeting. Andy seconded the motion. The meeting was adjourned at 8:20 p.m. The next meeting will be March 13, 2019 at 7:00 pm.

Respectfully submitted,

Ruth Kiefer, Recording Secretary
With notes provided by Walter Wujcik

CB 1-9-19 draft 1

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 3/8/2019
To: Conservancy Board
From: Mark Gordon, Township Zoning Officer
Re: Land Development Application / ESKE Development LLC / Ducklings Early Learning Center

Conservancy Board Members,

The Township has received a Land Development Application and plans for 1302 Wilson Drive. This parcel is located in the I-1 Light Industrial zoning district, has an area of 4 acres and received Conditional Use Approval in 2018 for a Child Daycare Center use.

The applicant proposes to construct +/- 14000 s.f. building with associated playground area, parking, and driveway to accommodate the use.

The Township has received the Township Engineers review, The Fire Marshal's review and the CCPC Review letter for the project. The applicant is in the process of addressing the comments outlined in the review letters and revising their plans accordingly and staff is in the process of scheduling a plan review meeting with the applicant to address the outstanding engineering issues.

STAFF RECOMENDATION

The applicant has conducted survey of the trees and It appears that the parcel does not meet the definition of wooded lot due to the number of viable trees counted. These calculations and a tree removal plan need to be provided to confirm this. The applicant has submitted a significant landscape plan; however, the question of street tress is still unresolved.

Staff does not believe the trees and scrub vegetation within the front yard area of this parcel along Wilson drive should be considered a substitute for planned street tree plantings in accordance with the ordinance. The vegetation along the frontage of the property in inundated with invasive vines and undergrowth. There are a number of trees there however it is not clear that they are viable. Staff is of the opinion that if the trees identified on the plans are to be preserved, all understory and invasive plants

F:\Data\Shared Data\Property Management\53-3\53-3-1.2C (1302 Wilson Dr.)\LD 2019 - Ducklings Early Learning Center\Memo to CB Re. LD App 03082019.doc

shall be removed and supplemental tree planting added so that the street tree requirement can be met along the frontage of the property. I have provided pictures of the frontage along Wilson drive for your use. The purpose of this ordinance section is to provide a planned landscaped frontage for the development.

DRAFT MOTION:

Mr. Chairman, I move that the Planning Commission consider the following recommendations for the landscaping for the Ducklings Daycare Land Development Plan:

  1. The applicant shall provide a plan that identifies the trees to be removed for the entire parcel and show the appropriate tree protections for those trees that are not being removed.
  2. To receive "street tree" credit for the tress along Wilson Dr. frontage, the applicants LS architect shall evaluate the viability of the trees to be preserved and shall remove all the understory plants from the vicinity of the trees. Additional street tress shall be added to meet the street tree ordinance requirement so as to provide for a planned landscaped appearance along the frontage of the property. All these changes shall be shown on the LS plan.

F:\Data\Shared Data\Property Management\53-3\53-3-1.2C (1302 Wilson Dr.)\LD 2019 - Ducklings Early Learning Center\Memo to CB Re. LD App 03082019.doc

[Two winter roadside photographs labeled with handwritten circled numbers 1 and 2, showing a paved road with double yellow lines, snow-covered ground, deciduous trees, evergreens, and dense roadside brush.]

1

2

[Two winter roadside photographs labeled with handwritten circled numbers 3 and 4, showing snow-covered roadsides, bare trees, dense brush, a yellow utility flag, and a split-rail fence along a paved road.]

3

4

[Two winter roadside photographs labeled with handwritten circled numbers 5 and 6, showing a two-lane paved road with double yellow lines, concrete curbs, snow-covered shoulders, bare deciduous trees, and evergreens.]

5

6

N

S

W E

S33°23'09"E 707.53'

S56°41'12"W 209.03'

PLANT SCHEDULE Quantity Symbol Scientific Name Common Name Size

TREES

205-61. EXISTING TREES - REPLACEMENT

GINKGO BILOBA 'PRINCETON SENTRY' GINGKO 'PRINCETON SENTRY' 3" CAL., 14-16' HT., B&B 10

CORNUS FLORIDA FLOWERING DOGWOOD 8-10' HT. MIN., B&B 15

CERCIS CANADENSIS EASTERN REDBUD 9

19 PICEA ABIES NORWAY SPRUCE 8' HT. MIN., B&B

PICEA OMORIKA SERBIAN SPRUCE 18

8-10' HT. MIN., B&B

8' HT. MIN., B&B

DO NOT PRUNE TREE EXCEPT AS DIRECTED BY OWNERS REPRESENTATIVE

3 - (2" x 2" x 8'-0") WOOD STAKES

BASKET FROM ROOT BALL

FINISHED GRADE

3" MAX. MULCH OVER ENTIRE PLANTING HOLE, KEEP AWAY FROM TRUNK

CROWN OF ROOT BALL TO BE SET EVEN WITH FINISH GRADE

EXISTING SUB GRADE, TO AVOID SETTLING DO NOT EXCAVATE

CUT AND REMOVE TOP 1/2 OF BURLAP, TWINE AND WIRE

CREATE RAISED SAUCER AROUND EDGE OF ROOT BALL

3. REMOVE STAKES TWO YEARS OR LESS AFTER INSTALLATION.

1. DO NOT DAMAGE MAIN ROOTS OR ROOT BALL WHEN INSTALLING TREE STAKE.

TYPICAL DECIDUOUS TREE PLANTING DETAIL

LIMIT OF MULCH

x x

BENEATH ROOT BALL

4. CONTRACTOR IS NOT TO USE TREE WRAP.

2. WATER THOROUGHLY AFTER INSTALLATION.

NOT TO SCALE

NOTES:

WIDTH OF BALL

1/3 OF STAKE IN GROUND B&B ROOT BALL

BACKFILL WITH TOPSOIL

WIDTH OF BALL WIDTH OF BALL

GUY WIRES (3)

DO NOT PRUNE TREE EXCEPT AS DIRECTED BY OWNERS REPRESENTATIVE

DO NOT DAMAGE OR CUT LEADER

TO AVOID SETTLING, DO NOT EXCAVATE BENEATH ROOT BALL

CREATE RAISED SAUCER AROUND EDGE OF ROOT BALL,

3" MAX. MULCH OVER ENTIRE PLANTING HOLE, KEEP AWAY FROM TRUNK

CROWN OF ROOT BALL TO BE SET EVEN WITH FINISHED GRADE

CUT AND REMOVE TOP 1/2 OF BURLAP, TWINE AND WIRE

FINISHED GRADE

BASKET FROM ROOT BALL

3 - (2" x 2" x 8'-0") WOOD STAKES

1. DO NOT DAMAGE MAIN ROOTS OR DESTROY ROOT BALL WHEN INSTALLING TREE STAKE.

TYPICAL EVERGREEN TREE PLANTING DETAIL

3. REMOVE STAKES TWO YEARS OR LESS AFTER INSTALLATION.

LIMIT OF MULCH

WIDTH OF ROOT BALL

2. WATER THOROUGHLY AFTER INSTALLATION.

SPECIFICATIONS:

NOT TO SCALE

X X

BACKFILL WITH TOPSOIL

B & B ROOT BALL

WIDTH OF BALL WIDTH OF BALL

(3) GUY WIRES

TYPICAL SHRUB PLANTING DETAIL

NOTES:

NOT TO SCALE

2. FOR PLANTING BED INSTALLATION EXCAVATE ENTIRE SHRUB BED AS SHOWN ON PROJECT DRAWINGS. 1. WATER THOROUGHLY AFTER INSTALLATION.

FINISHED GRADE

3" MIN. MULCH OVER ENTIRE PLANTING HOLE, KEEP AWAY FROM STEMS

CREATE SAUCER AROUND ROOT BALL

ORGANIC REMOVE COMPLETELY)

OR CONTAINER (IF CONTAINER IS NON-

CAREFULLY REMOVE TOP 1/3 OF BURLAP

BACKFILL WITH 1/2 TOPSOIL AND 1/2 NATIVE SOIL

TO FACILITATE ROOT PENETRATION

EXISTING SUBGRADE, TO AVOID SETTLING DO NOT EXCAVATE DEEPER THAN ROOTS

CUT SEVERAL SLITS IN ORGANIC CONTAINER

AND/OR WEAK BRANCHES

PLANT TO BE SET EVEN WITH FINISHED GRADE

CLEANLY PRUNE ONLY DAMAGED, DISEASED

EAST GOSHEN TOWNSHIP LANDSCAPE REQUIREMENTS ZONING DISTRICT : I-1 (LIGHT INDUSTRIAL DISTRICT)

CODE LANGUAGE - SALDO REQUIRED PROPOSED

205-61. EXISITING TREES

D. A MAXIMUM OF 50% OF THE TREES ON A WOODED LOT MAY BE REMOVED IF ALL THE FOLLOWING REQUIREMENTS ARE MET: (1) THE TREES REMOVED THAT ARE IN EXCESS OF THE 20% PERMITTED PURSUANT TO 205-61 SHALL BE REPLACED ON AN INCH-FOR-INCH BASIS. (3) ALL REPLACEMENT TREES SHALL BE A MINIMUM 3" CAL. (4) TOTAL DIA. OF THE REPLACEMENT TREES SHALL EQUAL THE TOTAL DIA. OF TREES BEING REMOVED.

167 TOTAL TREES

73 TREES TO BE REMOVED - 20% REMOVAL PERMITTED = 15 TREES 50% 43.7% REMOVAL

58 TREES BEING REMOVED REQUIRE TREE REPLACEMENT (TOTAL CAL. = 517") 173 TREES* 10 SHADE TREES * 35 EVERGREEN TREES* 26 FLOWERING* 205-62. STREET TREES

STREET TREES SHALL BE INSTALLED ON 40 FOOT CENTERS ON THE SAME SIDE OF STREET.

WILSON DRIVE: 333 LF / 40 LF = 8.3 STREET TREES 8 STREET TREES EXISTING TREES SATISFY STREET TREE REQ.

PLANTING NOTES:

1. ALL PLANTS SHALL BE OF SPECIMEN QUALITY. 2. ALL PLANTS SHALL CONFORM WITH THE MOST CURRENT VERSION OF THE "AMERICAN STANDARD FOR NURSERY STOCK" OF THE AMERICAN NURSERY AND LANDSCAPE ASSOCIATION. 3. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF (18) EIGHTEEN MONTHS. 4. ALL LINES AND GRADE WORK NOT PRESENTLY ESTABLISHED AT THE SITE SHALL BE LAID OUT BY A REGISTERED LAND SURVEYOR OR PROFESSIONAL CIVIL ENGINEER EMPLOYED BY THE CONTRACTOR IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 5. BASE PLAN INFORMATION PROVIDED FROM D.L. HOWELL ENGINEERING DATED, 08/13/2018. 6. THIS PLAN IS TO BE USED FOR LANDSCAPING SITE IMPROVEMENTS PURPOSES ONLY. 7. ALL TREES SHALL BE PROVIDED WITH A 3" DEEP SAUCER, CONSISTING OF SHREDDED OAK BARK MULCH. 8. ALL PLANTS SHALL BE THOROUGHLY WATERED BY THE CONTRACTOR AT LEAST (3) THREE TIMES. FURTHER WATERING SHALL BE REQUIRED IN THE ABSENCE OF NATURAL RAINFALL. 9. ALL TREES AND SHRUBS SHALL BE INSPECTED AND APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO PLANTING. ALL PLANT MATERIAL SHALL BE LAID OUT IN THE FIELD BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 10.LOCATION OF ALL UNDERGROUND UTILITIES SHALL BE VERIFIED AND MARKED IN THE FIELD PRIOR TO ANY DIGGING OPERATIONS. 11.CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING EXISTING TREES AND PLANT MATERIAL WITHIN THE AREA OF PROPOSED IMPROVEMENTS. 12.CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSING OF ALL DEBRIS OFF-SITE, CLEAN-UP OF ALL PAVED AREAS (ROADWAYS, SIDEWALKS, ETC.) AND RESTORATION OF ALL DISTURBED LAWN AREAS. 13.CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGE TO UNDERGROUND UTILITIES. 14.CONTRACTOR SHALL PROVIDE SCREENED PLANTING SOIL WHERE PLANTING IS TO OCCUR. 36" DEPTH. 6" DEPTH AT LAWN AREAS. 15.NO TREE SHALL BE PLANTED THAN 10 FEET FROM AND UNDERGROUND UTILITY. 16.ALL LINES ARE PARALLEL OR PERPENDICULAR UNLESS SHOWN OTHERWISE. 17.VERIFY LAYOUT OF ALL PROPOSED WORK TO EXISTING CONDITIONS. REPORT DISCREPANCIES BEFORE ANY CLEARING OR EXCAVATION IS DONE. 18.PROVIDED STAKED LAYOUT ON SITE FOR OWNER AND LANDSCAPE ARCHITECTS REVIEW PRIOR TO COMMENCING WORK. 19.ALL DIMENSIONS SHOWN ARE TO FACE OF MATERIALS, UNLESS SHOWN OTHERWISE. 20.V.I.F. = VERIFY IN FIELD.

*APPLICANT'S SURVEYOR LOCATED ALL TREES 6" DBH AND GREATER, THE SURVEYOR DID NOT EVALUATE WHETHER THE EXISTING TREES WERE VIABLE AND NONINVASIVE PER THE DEFINITION IN SALDO SECTION 205-7. THE APPLICANT WOULD LIKE TO FURTHER EVALUATE THE EXISTING TREES WITH PARTICIPATION FROM THE TOWNSHIP'S PROFESSIONAL CONSULTANTS.

Civil Engineering Land Planning Environmental

DLHowell

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

N

S

W E

WILSON DRIVE

N25°31'12"E 339.00'

R=988.17' D=3°28'44" L=60.00' CH=59.99' N27°15'34"E

S33°23'09"E 707.53'

S56°41'12"W 209.03'

N48°15'40"W 520.22'

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

LEGEND

GEB2

N LOCATION MAP

SCALE: 1" = 2,000' Copyright ADC The Map People ® Permitted Use Number 20910184

N

S

W E

WILSON DRIVE

N25°31'12"E 339.00'

R=988.17' D=3°28'44" L=60.00' CH=59.99' N27°15'34"E

S33°23'09"E 707.53'

S56°41'12"W 209.03'

N48°15'40"W 520.22'

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

LEGEND

GEB2

N

S

W E

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

LEGEND

GEB2

N

S

W E

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

LEGEND

GEB2

N LOCATION MAP

SCALE: 1" = 2,000' Copyright ADC The Map People ® Permitted Use Number 20910184

·

· · · · · · ·

· ·

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

.

’

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

.

’

BMP 6.6.4: WATER QUALITY FILTERS

FRONT SIDE

BMP 6.4.3: SUBSURFACE INFILTRATION BED

’

·

·

····

· ·

*

N

S

W E

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

LEGEND

GEB2

N LOCATION MAP

SCALE: 1" = 2,000' Copyright ADC The Map People ® Permitted Use Number 20910184

· · · ·

EROSION CONTROL LEGEND

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

-

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

STANDARD CONSTRUCTION DETAIL #3-1 ROCK CONSTRUCTION ENTRANCE

STANDARD CONSTRUCTION DETAIL #3-16 PUMPED WATER FILTER BAG

STANDARD CONSTRUCTION DETAIL #11-1 EROSION CONTROL BLANKET INSTALLATION STANDARD CONSTRUCTION DETAIL #4-15 FILTER BAG INLET PROTECTION - TYPE C INLET

OUTLET NO.

PIPE DIA Pd (IN)

RIPRAP APRON

SIZE R-_

THICK. Rt (IN)

LENGTH Al (FT)

INITIAL WIDTH Aiw (FT)

TERMINA L WIDTH Atw (FT)

EW5 15 3 9 6 3 9 EW14 15 3 9 6 3 9

STANDARD CONSTRUCTION DETAIL #4-16 FILTER BAG INLET PROTECTION - TYPE M INLET

STANDARD CONSTRUCTION DETAIL #3-15 SANDBAG DIVERSION DAM OR COFFERDAM

420

430

440

450

420

430

440

450

420

430

440

450

420

430

440

450

420

430

440

450

-0+25

442.75

0+00

440.04

436.02

0+64.94

439.41

-0+25

441.17

0+00

438.18

433.89

0+58.50

433.37

-0+25

446.73

0+00

446.97

442.99

0+67.84

440.75

-0+25

449.71

0+00

447.55

0+40.11

443.99

-0+25

434.76

0+00

434.07

433.34

0+61.28

434.44

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

N

S

W E

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

2'-0" MIN. 8" 12"

6" MIN.

3"

4'-0" DIA.

1'-0"

2'-0"

8"

N

S

W E

E-ONE HP95 Mid Mount

S-BUS-36 - Conventional School Bus (65 pass.)

47.75

7.917 18.417 4.833

E-ONE HP95 Mid Mount Overall Length 47.750ft Overall Width 8.333ft Overall Body Height 11.000ft Min Body Ground Clearance 1.393ft Track Width 8.333ft Lock-to-lock time 6.00s Max Wheel Angle 45.00°

35.8

2.5 21.3

S-BUS-36 - Conventional School Bus (65 pass.) Overall Length 35.800ft Overall Width 8.000ft Overall Body Height 9.063ft Min Body Ground Clearance 1.184ft Track Width 8.000ft Lock-to-lock time 5.00s Max Steering Angle (Virtual) 37.60°

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

LEGEND

GEB2

N

S

W E

K4B MH: 28

K4B MH: 28

K4B MH: 28

K4B MH: 28

K2 MH: 28

K2 MH: 28

K4B MH: 28

K4B MH: 28

0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.4 0.5 0.5 0.6 0.7 0.9 1.1 1.1 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0

0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.3 0.5 0.5 0.6 0.7 2.3 1.5 1.2 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.5 0.8 0.9 0.9 2.4 2.4 2.3 0.8 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.5 1.0 1.5 3.4 2.7 1.3 0.4 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.5 0.9 3.3 2.3 0.8 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.7 2.8 2.0 0.9 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 1.7 1.1 0.3 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.6 2.3 1.6 0.7 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.8 0.4 0.3 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.8 0.5 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 1.1 0.3 0.4 0.6 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.4 1.8 2.1 1.1 0.4 0.8 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.3 0.4 0.5 2.6 1.8 1.3 0.3 0.5 0.7 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.4 0.5 2.6 2.1 1.6 0.4 0.7 1.2 0.9 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.5 2.0 1.9 1.7 0.7 0.5 0.8 1.5 1.1 0.6 0.3 0.1 0.1 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.4 2.4 2.2 1.2 0.4 1.2 2.0 1.3 0.7 0.3 0.1 0.1 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 2.5 1.8 1.2 0.3 1.9 1.8 2.1 1.7 1.8 1.2 0.5 0.2 0.1 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.5 0.7 1.9 1.9 0.8 0.2 0.1 0.8 1.7 1.9 1.6 1.8 1.8 1.2 0.6 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.4 0.6 2.2 1.7 0.8 0.2 0.1 0.5 0.9 0.9 0.7 0.6 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.3 0.5 0.8 2.1 2.0 1.3 0.3 0.1 0.1 0.2 0.1 0.1 0.1 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.8 1.1 1.4 2.0 1.8 1.4 1.0 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.4 1.0 1.2 0.9 1.0 1.4 1.5 0.6 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 1.3 2.5 1.3 0.9 0.7 0.7 0.4 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 1.2 3.1 1.8 1.4 0.8 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.6 2.9 1.7 1.7 1.4 0.5 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 2.1 3.0 2.9 2.0 0.8 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.8 2.9 3.0 3.1 1.8 0.4 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 1.3 2.9 3.4 2.7 0.9 0.3 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.6 1.5 2.3 2.5 1.3 0.4 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.8 1.8 1.7 1.2 0.4 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.6 1.6 1.5 1.2 0.4 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.7 1.1 0.9 0.4 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.4 0.8 0.9 0.7 0.4 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 1.0 0.9 0.5 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.1 0.2 1.0 2.5 1.5 0.9 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.1 0.2 0.7 2.9 1.8 1.6 1.0 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.1 0.4 2.4 1.8 1.6 0.7 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.1 0.2 1.3 3.1 2.4 1.2 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.1 0.5 2.2 2.8 3.3 2.4 0.6 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.1 0.3 0.9 2.4 3.5 2.9 1.3 0.3 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.1 0.2 0.4 1.0 2.3 1.9 2.3 1.6 0.5 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.1 0.1 0.2 0.5 1.1 1.6 1.7 1.6 1.3 0.4 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.1 0.1 0.3 0.5 0.7 1.0 1.3 1.2 0.5 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.1 0.1 0.2 0.3 0.4 0.6 0.7 0.7 0.5 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.1 0.1 0.1 0.2 0.3 0.4 0.4 0.3 0.1 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.5 fc

0.5 fc

0.5 fc

0.5 fc

0.5 fc

0.5 fc

0.5 fc

0.5 fc

0.5 fc

0.5 fc

0.5 fc

0.5

0.8 0.9 0.9 1.0 1.3 2.0

0.9 1.0 1.1 1.2 1.4 2.0 2.6 2.3

1.4 1.1 1.3 1.4 1.5 2.2 3.0 3.2 2.9 3.4 3.2

1.8 2.3 2.0 1.8 2.0 2.7 3.5 3.4 3.3 2.7 3.1 4.1 4.1

1.1 1.9 2.6 2.7 2.3 2.4 3.2 3.3 2.6 2.2 2.4 2.7 4.0 3.9 4.0 3.8

0.8 1.4 2.3 2.3 2.6 3.1 3.2 2.8 2.6 2.6 2.2 2.5 3.1 4.5 5.0 4.3 3.5 3.2

0.7 1.0 1.8 2.9 2.5 2.3 2.5 2.5 2.4 2.7 2.7 2.2 2.2 2.5 3.0 3.7 2.8 2.7 3.2 2.1

0.6 0.8 1.0 1.1 1.8 2.7 2.1 1.9 2.2 2.1 1.7 1.8 1.8 1.7 1.7 1.8 2.1 2.6 2.3 2.2 2.9 2.3 2.0 1.3

0.6 0.8 1.0 1.0 1.1 1.7 2.3 1.6 1.2 0.9 0.5 0.7 0.8 1.0 1.3 1.7 1.8 1.8 1.7 2.4 2.3 1.5 1.1 0.8 0.5

0.6 0.8 1.0 1.0 1.2 1.5 2.2 2.5 2.0 1.6 0.5 0.7 0.9 1.3 1.5 1.4 1.3 1.9 2.1 1.4 1.1 0.9 0.7 0.7

0.6 0.9 1.1 1.1 1.2 1.6 1.7 2.3 2.4 0.5 0.6 0.9 1.1 1.3 1.2 1.6 2.0 1.4 1.1 1.0 1.1 1.1

0.6 0.9 1.4 1.8 1.8 2.1 2.3 2.4 2.4 0.6 0.9 1.1 1.3 1.4 1.5 1.4 1.2 1.1 1.6 1.6

0.7 0.9 1.1 1.8 2.3 2.1 2.5 2.5 2.6 1.6 1.7 1.5 1.7 1.6 1.8 2.4 1.7

0.7 0.9 1.0 1.1 1.9 2.3 1.9 2.1 2.4 2.3 2.6 1.9 1.9 2.4 2.2 1.8

0.6 0.9 0.9 1.1 1.4 2.4 2.6 2.3 2.1 2.0 2.3 2.9 2.5 2.9 1.9

0.5 0.7 0.9 1.1 1.5 1.7 2.3 2.3 2.3 2.3 2.4

1.0 1.2 1.4 1.8 2.0 2.7 2.6

1.0 1.4 1.8 2.4 2.6 2.9 2.6

0.9 1.1 1.4 1.9 2.0 2.0

1.1 0.9 1.0

1.7 1.7 1.3

2.7 2.0 1.7

2.7 2.3 1.8

2.6 3.2 2.3

3.2 3.4 2.4

2.7 3.5 2.6

3.0 2.5 2.3

2.7 2.1 1.6

1.5 1.9 1.9

0.9 1.1 1.3 1.6

0.9 0.9 1.1

1.2 1.2 1.0

1.7 2.1 1.6 1.3

2.9 2.4 1.8

2.8 2.5 1.8

2.8 3.1 2.9 1.8

3.2 2.8 3.5 2.6

0.5 2.2 2.7 3.2 2.9

0.9 2.4 2.4 2.0 2.2

1.0 2.3 2.1 1.7

1.1 1.6 1.7

1.0 1.3

0.5 fc

Luminaire Schedule Symbol Qty Label Arrangement LMF Lum. Lumens Lum. Watts Part Number 2 K2 SINGLE 1.000 17291 130 OSQ-A-NM-2ME-K-40K-xx-xx + OSQ-DAxx 6 K4B SINGLE 1.000 13286 130 OSQ-A-NM-4ME-K-40K-xx-xx + OSQ-DAxx + OSQ-BLSMF

Calculation Summary (Footcandles calculated using predicted lumen values @ 50K hrs of operation) Label Units Avg Max Min Avg/Min Max/Min Off Paved Area Fc 0.26 3.5 0.0 N.A. N.A. Paved Area Fc 1.90 5.0 0.5 3.80 10.00

Pole Schedule (8) PS4S25C1xx (25' X 4" X .125" STEEL SQUARE POLE) Proposed poles meet 110 MPH sustained winds.

Additional Equipment: (8) OSQ-DAxx (Direct Arm Mount)

*** CUSTOMER TO VERIFY ORDERING INFORMATION AND CATALOGUE NUMBER PRIOR TO PLACING ORDER ***

OSQ Series

3'

25'

Civil Engineering Land Planning Environmental

DLHowe

www.DLHowell.com

1250 Wrights Lane West Chester, PA 19380 Phone: (610) 918-9002 Fax: (610) 918-9003

Susan D'Amore

From: Sent: To: Cc: Subject:

Hi Erich:

Jon Altshul <jaltshul@eastgoshen.org> Thursday, February 14, 2019 9:22 AM

April 13 CRC Stream Cleanup

I know this date conflicts with KEGBD, but I wanted to let you know that EGT is again sponsoring CRC's annual stream clean-up event on the morning of April 13th• Grateful if you could get the word out at the next CB meeting. We'll post something on our website about a month from now as well.

Jon Altshul

Director of Finance & Assisl,ml Township Manager Easl Goshen Twp jaltshul@caslgoshen.org

610-692-7171 Get all the latest news on East Goshen. Sign up for Constant Contact™ today!

1

Memorandum

East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: mgordon@eastgoshen.org

Date: 3/8/2019
To: Planning Commission
From: Mark Gordon, Township Zoning Officer
Re: Conditional Use Application / PECO Energy CO.

Conservancy Board Members,

The Township has received a Conditional Use Application and plans for the un addressed Hershey's Mill property at the north corner of the intersection of N. Chester Rd. and Wineberry Ln., West Chester PA 19380. Conditional Use approval for a Public Utility Facility was granted for this property in 1997, to PECO Energy Co.

PECO Energy is seeking to modify the Conditional Use approval from 1997 by adding a 10' x 16' building to the site. PECO proposes to upgrade the existing communications equipment for the facility and house it inside this new building.

The property is situated in the R-1, (Low Density Suburban Residential) Zoning District of East Goshen Township. Public Utility Facilities are permitted in the R-1 Zoning District as a Conditional Use.

STAFF RECOMMENDATION:

Staff has reviewed the application and plans and has identified a few items to be addressed:

  1. How is the storm water for the new building going to be managed?
  2. Will the facility be seen from N. Chester rd. or Wineberry Ln.? If so, how do you plan to screen it from the adjacent properties?

DRAFT MOTION:

Mr. Chairman, I move that the Planning Commission consider the following recommendations for the PECO Energy Conditional Use application for the fiber optic shelter proposed at the Gas Gate Location at the intersection of Wineberry Ln and N. Chester Rd.:

  1. The applicant shall provide Storm water management for the new impervious area proposed and shown the design on the plans. The SWM design shall meet the Township SWM ordinance requirements.
  2. Evergreen landscape screening shall be installed to conceal the new structure from the adjacent residential properties if determined necessary by the Township Zoning Officer.

F:\Data\Shared Data\Property Management\53-2\53-2-25.3 (Hershey's Mill Spray Irrigation Field)\PECO GAS GATE\CU Application Feb. 2019\Memo to CB Re. CU App 03082019.doc

Dilworth Paxson LLP

DIRECT DIAL NUMBER: 215-575-7353
Neil Sklaroff
nsklaroff@dilworthlaw.com

February 25, 2019

[Stamp: RECEIVED FEB 26 2019 By]

VIA OVERNIGHT DELIVERY

Mark A. Gordon, CFM
Director of Code Enforcement /Zoning Officer
East Goshen Township
1580 Paoli Drive
West Chester, PA 19380

Re: Conditional Use Application

Dear Mr. Gordon:

As you and I have discussed, we represent PECO Energy Company in its effort to redevelop a portion of a parcel at Hersey's Mills. We submit the enclosed Conditional Use Application and related materials for the Township's review. A check to cover the fees will arrive under separate cover.

We look forward to presenting our Application to the Board of Supervisors. If you have any questions, please contact me directly.

Thank you for your courtesies in this matter.

Very truly yours,
Neil Sklaroff

1500 Market Street • Suite 3500E • Philadelphia, PA 19102-2101 • tel: 215-575-7000 • Fax: 215-575-7200
www.dilworthlaw.com • Cherry Hill, NJ • Harrisburg, PA • Princeton, NJ • Wilmington, DE • New York, NY

120789491_1

Conditional Use Application and Checklist

East Goshen Township

To: Township Zoning Officer

Name of Applicant: PECO ENERGY CO. BY MALCOLM FRIDAY
Applicant Address: 2301 MARKET STREET, PHILADELPHIA, PA 19103
Telephone Number: 804 307-3703 Fax:         
Email Address: MALCOLM.FRIDAY@EXELONCORP.COM
Property Address: SS CHANDLER ROAD ADJACENT TO 1588 WINEBERRY RD.
Tax Parcel Number: 13-07-00007-00 Zoning District: R-1 Acreage:         

Description of proposed use:
PECO LEASES A PORTION OF THE PROPERTY FROM HERSHEY'S MILL HOMEOWNERS ASSOCIATION. BY A 1997 CONDITIONAL USE APPROVAL, PECO DEVELOPED THE PROPERTY WITH EQUIPMENT TO SUPPORT TELECOMMUNICATIONS ACTIVITY. BY THIS APPLICATION, PECO SEEKS REPLACE OUTDATED COPPER WIRING WITH FIBER OPTICS. IN ORDER TO DO SO, PECO NEEDS TO PLACE AND FIT OUT A PREFABRICATED BUILDING MEASURING 10 FEET IN WIDTH, 16 FEET IN LENGTH AND 12 FEET IN HEIGHT. THE PROJECT WILL ENHANCE SERVICES IN E. GOSHEN

Conditional Use is provided in Zoning Ordinance Section: 240-8(D)(2)(B)

We hereby acknowledge that we have read this application and state that the above is correct and agree to comply with all provisions of the East Goshen Township Zoning Ordinance applicable to this project and property.

Signature of Applicant: [Signature] Attn for PECO Energy    Date: 2/25/19

Attest:                                 

* Review the formal Planning Commission review procedure on page three.

F:\Data\Shared Data\Website\Forms\Conditional Use App and Checklist rev 102406.doc - 1 -

Conditional Use Application and Checklist

Township Administration use only:

This checklist outlines the steps and items needed to insure completeness of the application and to insure the application follows the process and conforms to the timeframe outlined by the state of Pennsylvania and East Goshen Township. This checklist is broken into two parts, the Application process and the Review Process. The application process must be completed in its entirety prior to the applications advancement into the Review Process.

Application Checklist:

Item Date Complete
1. Completed Township Application Form: ...................................___________
2. All related materials submitted: ................................................___________
3. Township application and review fees paid: .............................___________

Application accepted as complete on _____________ by __________________________
Official Signature: __________________________ Title: __________________________

Review Process Checklist

Item Date
1. Start date: .....................................................................................___________
2. Date of first formal Planning Commission Meeting following
Submission of complete application: ..........................................
___________
3. Sent to Twp. Engineer: ..............................................................___________
4. Date presented to Planning Commission: ....................................___________
5. Abutting Property Letter sent: .....................................................___________
6. Date sent to CB: ..........................................................................___________
7. Date sent To MA: ..........................................................................___________
8. Date sent to HC: ..........................................................................___________
9. Date sent to PRB: .........................................................................___________
10. Date sent to TAB: ........................................................................___________
11. Date by which the PC must act: ...................................................___________
12. Date by which Board of Supervisors must act: .............................___________
13. Drop Dead Date; (Day 60): .........................................................___________
14. Conditional Use Hearing Date: ...................................................___________
15. Dates of hearing advertisement:.................................... ________ &___________
16. Property Posted: ..........................................................................___________

F:\Data\Shared Data\Website\Forms\Conditional Use App and Checklist rev 102406.doc - 2 -

Conditional Use Application and Checklist

East Goshen Township Planning Commission

Procedure for processing Subdivision, Land Development, Conditional Use, Variance, and Special Exception Applications
August 19, 2002
2nd Revision: March 2, 2006

  1. In order for any application to be considered by the Planning Commission it must be submitted to the Township with all required documentation as per the Township Code and with all applicable fees paid. The Township will use a checklist to verify all required documentation has been submitted. Until the application is complete the application will not be considered "filed" by the Township staff. The Planning Commission will acknowledge receipt of the application at their next regularly scheduled meeting.
  2. All materials to be considered at the next regular meeting of the Planning Commission must be submitted with at least eleven (11) copies to the Township Staff by not later than close of business the previous Tuesday. Any materials submitted after that time will be held for the following meeting and not provided to the Commission at the upcoming meeting.
  3. The application review cycle for Subdivision and Land Development Applications shall begin with the next regular meeting of the Commission after the complete application is filed. The application review cycle for Conditional Use, Variance, and Special Exception Applications shall begin the day a complete application is filed with the Township.
  4. Applicants should not distribute material to the Commission during a meeting unless it is directly related to the initial presentation of the application. All materials for the Planning Commission, including any material to be used at a meeting, must be delivered to the Township Staff not later than close of business the previous Tuesday.
  5. The burden of supplying necessary materials to the Planning Commission in a timely manner is on the applicant. Late delivery of material may require an extension on the part of the applicant or a recommendation for denial of the application by the Planning Commission.
  6. Formal application presentations to the Planning Commission will only be made at the regular meeting after the complete application is submitted and accepted by the Township staff.
  7. The application will remain on the Planning Commission's agenda until such time as the Commission has made its recommendation to the Board of Supervisors and or Zoning Hearing Board.
  8. Applicants are encouraged to attend each Planning Commission meeting in order to answer questions or address issues concerning their application.
  9. Applications will be voted on only during the regular Planning Commission meetings.
  10. The Chairman, in his sole discretion, may waive or modify any of this procedure.

F:\Data\Shared Data\Website\Forms\Conditional Use App and Checklist rev 102406.doc - 3 -

SUPPLEMENTAL DESCRIPTION OF PROPOSED USE

PECO Energy Company (“PECO”) leases a portion of the Property from Hershey’s Mill Homeowners Association. Following a 1997 grant of conditional use approval, PECO developed the leased area for a Gas Gate station. PECO and the Hershey’s Mill Homeowner’s Association have agreed to an easement on this site to serve the purpose of the shelter installation. A Gas Gate station serves to add an odor to gas used for residential purposes as a safety measure before sending the gas through distribution pipelines to PECO’s customers.

Inside these Gas Gate stations are copper wiring services (circuits) leased from Verizon. Equipment placed in the new shelter will help in the transition from leased services operated on the Verizon network to a PECO owned and operated network. The proposed project does not change the use.

The proposed use of the site will not result in disruption to any of the functions or the integrity of the Gas Gate station located inside of the existing fencing. The proposed shelter will be installed and placed outside of the existing fencing to the rear of the existing fencing. The shelter will house fiber optic communications equipment that is necessary to support this ongoing project. The shelter will measure 10 feet in width, 16 feet in length and 12 feet in height. The shelter is monitored remotely.

The fenced area will measure 20 feet by 14 feet. The finished fence height will be 7 feet and 5/8 inches. The fence will be a chain link fence with barbed wire for another 1 foot. The fence is necessary for the security of this unmanned shelter.

There will only be minor changes to the existing trees and shrubbery. A condition to the 1997 Conditional Use approval provided for PECO to reassess screening in the event that local residents stated that the screening was insufficient. PECO will agree to the same condition added to any grant of approval for this application.

120793676_2

ENGINEER’S RENDERING OF PROPOSED BUILDING

EQUIPMENT SHELTER ELEVATION EXHIBIT FOR HERSHEY'S MILL

[Photo rendering of a proposed brown aggregate equipment shelter with a central door behind a chain-link fence in a gravel utility yard, alongside an existing utility cabinet, ground access hatches, yellow bollards, and background trees.]

PECO An Exelon Company EXELON FIBER OPTIC SYSTEM
ENEngineering
1630 ROBIN CIRCLE
FOREST HILL, MD. 21050
TEL. 443-652-6458
FAX 410-838-1811
WWW.ENENGINEERING.COM
Drawn: SPM | Design: KB | Date: 02/25/19 | Scale: NTS | Job No: F813050.03

EXISTING SITE CONDITIONS

[Color photograph taken from a paved road with double yellow center lines and a white shoulder line, looking across a grassy verge toward a chain-link fence, overhead utility wires, and evergreen and deciduous trees.]

[Photograph: Outdoor view along a tall chain-link fence with angled top brackets, beside a grassy/gravel swale with white painted ground markings, bordered by bare shrubs and evergreen trees.]

[Color photograph of an existing gravel utility yard showing a metal utility cabinet on a concrete pad on the left, ground vault covers and yellow bollards in the foreground, and a chain-link fence with trees behind it.]

[Photograph: Ground-level view of a white painted line marked on grass and brush, leading into dense dry brambles and wooded vegetation.]

[Photograph: View of ground vegetation, moss, and pine branches with a white painted marking line running through grassy and brushy terrain towards woods.]

[Photograph: Woodland area showing tree trunks marked with paint bands among dense dry vines and brush, with wetland or snow/ice patches visible in the background.]

EXISTING STRUCTURES AT OTHER SITES

[Color photograph of a brown aggregate equipment shelter enclosed by a chain-link fence with green privacy screening and barbed wire on a gravel lot, with trees and an open field in the background.]

08/22/2018 10:36

[Photograph of an equipment shelter building enclosed by a green slatted chain-link fence topped with barbed wire, with a worker wearing a hard hat standing beside the fence along a gravel path and a communications tower in the background.]

Note: some text on this page could not be read reliably. Please see the original PDF for this page.

[Site plan drawing: Conditional Use Site Plan for Hershey's Mill Shelter, showing N. Chester Road, Wineberry Lane, existing buildings, residences, treelines, fences, and proposed shelter and fencing.]

PROJECT SUMMARY:

1. PROPERTY OWNER: HERSHEY'S MILL HOMEOWNERS ASSOCIATION
2. SITE ADDRESS: UNADDRESSABLE PARCEL
3. CONSTRUCTION REPRESENTATIVE:
4. APPLICANT: PECO
2301 MARKET STREET
PHILADELPHIA, PA 19103
5. POINT OF CONTACT: MATT LUONGO
646-998-9218
6. ENGINEER: EN ENGINEERING LLC
STEPHEN KEITH NOLAN
1630 ROBIN CIRCLE
FOREST HILL, MD 21050
(443) 652-6101
7. JURISDICTION: EAST GOSHEN TOWNSHIP
8. COUNTY: CHESTER COUNTY
9. PROPERTY ID: XX
10. CURRENT ZONING: C-91 RECREATION (PRIVATE)
11. CURRENT USE OF PROPERTY: C-91 RECREATION (PRIVATE)

MAP LABELS:

  • N. CHESTER ROAD
  • WINEBERRY LANE
  • EX. RESIDENCE
  • EX. TREES
  • DRIVEWAY
  • UTILITY POLE #80795
  • 4' CHAIN LINK FENCE
  • PROPOSED FENCE
  • START 9' CHAIN LINK FENCE
  • END 9' CHAIN LINK FENCE
  • PROPOSED SHELTER
  • PROPOSED ELECTRIC & FIBER OPTIC IN COMMON TRENCH
  • END 9' WOOD FENCE
  • START 9' WOOD FENCE
  • 9' WOOD FENCE
  • BOLLARD (TYP.)
  • CONCRETE PAD
  • ACCESS PANEL (TYP.)
  • GATE LOCATION TO BE COORDINATED WITH PECO
  • GATE
  • GRAVEL
  • EXISTING BUILDING
  • TREELINE (TYP.)
  • MEADOW
  • SCALE: 1" = 30' (0, 30', 60')

SAFETY NOTE:

STOP - CALL BEFORE YOU DIG! 1-800-242-1776

A TAILBOARD CONFERENCE SHALL BE CONDUCTED BEFORE THE START OF EACH JOB, THE PRE-JOB TAILBOARD CONFERENCE SHALL COVER AT LEAST THE FOLLOWING SUBJECTS:

HAZARDS ASSOCIATED WITH THE JOB.
WORK PRACTICES INVOLVED.
SPECIAL PRECAUTIONS ASSOCIATED WITH THE JOB.
ENERGY CONTROL SOURCES.
PERSONAL PROTECTIVE EQUIPMENT.

[Seal: COMMONWEALTH OF PENNSYLVANIA, REGISTERED PROFESSIONAL, STEPHEN KEITH NOLAN, ENGINEER, PE-072522]
STEPHEN KEITH NOLAN, PE
PA LICENSE # 072522

LEGEND

  • EXISTING TREELINE
  • EXISTING FENCELINE
  • EXISTING BUILDING
  • EXISTING MACADUM
  • PROPOSED BUILDING
  • PROPOSED ELECTRIC & FIBER OPTIC
  • PROPOSED FENCELINE

TITLE BLOCK:

ISSUED FOR CONSTRUCTION
ENengineering | PECO An Exelon Company | EXELON FIBER OPTIC SYSTEM
CONDITIONAL USE SITE PLAN FOR HERSHEY'S MILL SHELTER
DRAWN BY: KJL | DATE: 2/15/19 | SCALE: AS SHOWN
PAGE 1 OF 1 | F813050.03

[Architectural engineering drawing: Floor Plan and Wall/Roof/Floor Sections for 10'-0" X 16'-0" Equipment Shelter.]

NOTE:

  1. ALL ITEMS MARKED FIELDWORK SHALL BE INSTALLED, TESTED, REMOVED, AND PACKED IN BUILDING PRIOR TO SHIPMENT.
  2. DRILL HOLE UNDER HVAC TO ALLOW FOR DRAINAGE.

FLOOR PLAN LABELS:

  • 16'-0" [192"]
  • 14'-11 1/4" [179 1/4"]
  • 10'-0" [120"]
  • 8'-11 1/4" [107 1/4"]
  • A, B, C
  • FLOOR PLAN: 160.0 sq. ft

SECTION "A-A" (SCALE: N.T.S.):

  • THIS SHELTER NOT FOR HUMAN HABITATION
  • TYPICAL ROOF SECTION: ALDO ROOFING SYSTEM; CONCRETE SKIN; EPS FOAM INSULATION; 1 1/2" THERMASHEATH; 1/2" SHEETROCK; 3/8" NUPOLY
  • TYPICAL WALL SECTION: 1 1/2" EPS FOAM INSULATION; CONCRETE SKIN: SEE BUILDING COVERSHEET FOR FINISH; 3/8" NUPOLY; 1/2" SHEETROCK; 1 1/2" THERMASHEATH
  • TYPICAL FLOOR SECTION (EQUIPMENT SIDE): 1/8" TILE; CONCRETE SKIN; EPS FOAM INSULATION

ELEVATION KEY:

A, B, C, D

STAMP & TITLE BLOCK:

JAN 23 2018
[Seal: COMMONWEALTH OF PENNSYLVANIA, REGISTERED PROFESSIONAL, FRANK J. RALEY, ENGINEER, NO. 75434-E]

THESE PLANS ARE THE CONFIDENTIAL PROPERTY AND TRADE SECRETS OF FIBREBOND CORPORATION. ANY USE OF THESE DRAWINGS OR THE INFORMATION CONTAINED HEREIN FOR ANY REASON OTHER THAN AS EXPRESSLY AUTHORIZED BY FIBREBOND CORPORATION IS STRICTLY PROHIBITED. THESE DRAWINGS HAVE BEEN DISTRIBUTED WITH THE UNDERSTANDING THAT ANYONE RECEIVING OR OTHERWISE OBTAINING POSSESSION OF THEM WILL BE EXPRESSLY NOTIFIED OF THEIR CONFIDENTIAL NATURE.

1300 DAVENPORT DRIVE MINDEN, LA. 71055
ph. (800) 824-2614 www.fibrebond.com
FIBREBOND
PECO LEASED LINE OPTIMIZATION PROJECT
10'-0" X 16'-0" EQUIPMENT SHELTER
FLOOR PLAN

DRN. BY: ZD DATE: 09/19/17 APP. BY: ZD DATE: 09/19/17 SCALE: 3/8"=1'-0" SHEET NO.: 1-1
CHK. BY: DATE: APP. BY: PM DATE: 09/19/17 B DWG NO.: D11066

[Architectural engineering drawing: Exterior Elevations "B" & "C" for 10'-0" X 16'-0" Equipment Shelter.]

ELEVATION "C":

  • 16'-4" [196"]
  • 3'-1 1/2" [37 1/2"]
  • 16 1/2"
  • 6 1/2"
  • 11'-6" [138"]
  • 10'-5 1/2" [125 1/2"]
  • 6"
  • 12"
  • Callouts: 41, C, 1, 32

NOTE: SEE FLOOR PLAN SHEET FOR NOTES.

ELEVATION "B":

  • 10'-4" [124"]
  • 60"
  • 26 1/2" [REF]
  • 16 1/2"
  • 3/4" FLEXIBLE NONMETALLIC CONDUIT
  • 1/2" FLEXIBLE NONMETALLIC CONDUIT
  • FIELD WORK
  • Callouts: 41, B, 28, 1, 2, 21, 38, 36, 37, 17, 32

ELEVATION KEY:

A, B, C, D

STAMP & TITLE BLOCK:

JAN 23 2018
[Seal: COMMONWEALTH OF PENNSYLVANIA, REGISTERED PROFESSIONAL, FRANK J. RALEY, ENGINEER, NO. 75434-E]

THESE PLANS ARE THE CONFIDENTIAL PROPERTY AND TRADE SECRETS OF FIBREBOND CORPORATION. ANY USE OF THESE DRAWINGS OR THE INFORMATION CONTAINED HEREIN FOR ANY REASON OTHER THAN AS EXPRESSLY AUTHORIZED BY FIBREBOND CORPORATION IS STRICTLY PROHIBITED. THESE DRAWINGS HAVE BEEN DISTRIBUTED WITH THE UNDERSTANDING THAT ANYONE RECEIVING OR OTHERWISE OBTAINING POSSESSION OF THEM WILL BE EXPRESSLY NOTIFIED OF THEIR CONFIDENTIAL NATURE.

1300 DAVENPORT DRIVE MINDEN, LA. 71055
ph. (800) 824-2614 www.fibrebond.com
FIBREBOND
PECO LEASED LINE OPTIMIZATION PROJECT
10'-0" X 16'-0" EQUIPMENT SHELTER
EXTERIOR ELEVATIONS "B" & "C"

DRN. BY: ZD DATE: 09/19/17 APP. BY: ZD DATE: 09/19/17 SCALE: 3/8"=1'-0" SHEET NO.: 1-3
CHK. BY: DATE: APP. BY: PM DATE: 09/19/17 B DWG NO.: D11066