Conservancy Board
The Conservancy Board advises the Board of Supervisors, the Planning Commission, the Park and Recreation Commission and other agencies, officials and employees of East Goshen Township on matters dealing with conservation, management, protection and use of natural resources in the Township of East Goshen.
Meetings are on the 2nd Wednesday of the month at 7:00 P.M. In addition the Conservancy Board will conduct site inspections the following Saturday at 9:00 AM; as needed.
| Board Members | Term Expiration Dates |
| Vacant, Chair | 2026 |
| Walter Wujcik, Vice Chair | 2027 |
| Jackie Ahlborn | 2027 |
| Julieta Calmon | 2027 |
| Erich Meyer | 2028 |
| Sandy Snyder | 2026 |
| Susan Vanesse | 2028 |
| Ann Duffield, BOS Liaison | |
| Ashley Nowak, Staff Liaison |
Articles of Interest
Related News
The Goshen250 Nature Challenge: We Have a Winner!
Wednesday, November 4, 2026
This neighborly challenge between West Goshen and East Goshen townships began as the brainchild of East Goshen Township’s (EGT) Conservancy Board. Jason Lang, EGT’s Parks and Recreation director, contacted his West Goshen peer Ken Lehr, who shared the idea with the Sustainability Advisory Committee, and the idea became a reality. Planning for the iNaturalist-inspired “BioBlitz” […]
View ArticleEast Goshen Township Receives Bird Town PA Recognition!
Wednesday, October 7, 2026
The Conservancy Board and Environmental & Sustainability Advisory Council have worked together to have East Goshen Township recognized as a Bird Town PA. The program encourages municipalities to work towards four key strategies: Creating and Protecting Habitat, Threats to Birds, Education and Engagement and Sustainability. Here are just some of […]
View Article“Leave the Leaves”
Friday, October 2, 2026
Take a break from the rake and help your yard and the planet. Did you know that the leaves that fall from your trees can act as a natural mulch to improve the soil and retain moisture through the winter? Leaves provide nutrients to your yard as they decompose naturally. They also provide valuable habitat […]
View ArticleDocuments
Back to the list | Open the original PDF
Notice: this accessible version was created automatically from the original document. The transcription may not be 100% accurate. It is provided for searching and for screen readers; please refer to the original document for the official version.
AGENDA EAST GOSHEN TOWNSHIP CONSERVANCY BOARD MEETING
1580 Paoli Pike, 2nd Floor June 14, 2023 - 7:00 PM
F:\Data\Shared Data\Agendas\Conservancy Board\2023\2023-6-14_CB Agenda.docx
1. CALL TO ORDER / PLEDGE OF ALLEGIANCE / MOMENT OF SILENCE
2. APPROVAL OF MINUTES
a. 5/10/2023
3. CHAIRMAN’S REPORT 4. Tree City USA a. Any Maintenance Tasks 5. Educational Workshops a. New idea for the Fall
6. OLD BUSINESS:
a. Supplee Valley Preserve Planting b. Street Tree Ordinance Discussion c. Beaver Dams Discussion
7. NEW BUSINESS:
a. Summer schedule
8. SUBDIVISION / LAND DEVELOPMENT REVIEW a. 1010 Hershey Mill Road/Millstone Meadows
9. VARIANCES/CONDITIONAL USES – None
10. LIAISON REPORTS
11. CORRESPONDENCE
12. DATES OF IMPORTANCE
Date Meeting Time June 15 Futurist Committee - CANCELED 7:00pm June 19 Township Office Closed-Juneteenth June 20 Board of Supervisors 7:00pm June 24 Community Day 5:00pm June 26 ESAC 6:30pm June 27 Planning Commission 7:00pm July 4 Township Office Closed – 4th of July July 6 Park & Rec Commission 7:00pm July 10 Municipal Authority 7:00pm July 12 Conservancy Board 7:00pm July 13 Pipeline Task Force 5:30pm July 18 Pension Committee 10:00am July 18 Board of Supervisors 7:00pm July 20 Futurist Committee 7:00pm July 24 ESAC 6:30pm July 25 Planning Commission 7:00pm
AGENDA EAST GOSHEN TOWNSHIP CONSERVANCY BOARD MEETING
1580 Paoli Pike, 2nd Floor June 14, 2023 - 7:00 PM
F:\Data\Shared Data\Agendas\Conservancy Board\2023\2023-6-14_CB Agenda.docx
13. BOARD MEMBER CONCERNS
14. PUBLIC COMMENT
15. ADJOURNMENT
Memorandum
East Goshen Township
1580 Paoli Pike
West Chester, PA 19380
Voice: 610-692-7171
Fax: 610-692-8950
E-mail: dbrady@eastgoshen.org
Date: May 19, 2023
To: Sandra Snyder (Chair)
From: Duane J. Brady Sr., Township Zoning Officer
Re: 1010 Hershey Mill Road/Millstone Meadows SD
Preliminary/Final SD Plan.
Dear Conservancy Board,
The Township staff has received an SD application for 1010 Hershey Mill Road, Millstone Meadows (Miller Property). The proposal is to create a subdivision tract for 14 single-family homes using the Open Space Development Option (Zoning Ordinance section 240-36). A Conditional Use was granted by the Board of Supervisors on March 8, 2023, for a 15 Lot subdivision under the single-family open space development option with 19 conditions. The application has been reviewed for completeness and was accepted by Township Staff on May 16, 2023.
Things to note:
- The property is approximately 16 acres.
- The property is in the R-2 Low Density Residential District.
- The property contains two (2) Class II historic resources that are currently detailed in the East Goshen Township Historic Resource Inventory (Existing house and barn).
- The property has a stream which is a tributary of Ridley Creek and is classified as a High-Quality Stream and has wetlands.
Please complete your review and provide comments by July 25, 2023.
Thank you,
[signature: Duane J. Brady Sr.]
Duane J. Brady Sr.
East Goshen Township
Zoning Officer
[logo: East Goshen Township Chester County, Pennsylvania Incorporated 1817]
[seal: TOWNSHIP OF EAST GOSHEN CHESTER COUNTY, PENNSYLVANIA INCORPORATED 1817]
EAST GOSHEN TOWNSHIP
CHESTER COUNTY, PA
SUBDIVISION AND / OR LAND DEVELOPMENT APPLICATION
Date Filed: 5-16-23
Application for (Circle one):
Subdivision Land Development Subdivision & Land Development (circled)
A. Application is hereby made by the undersigned for approval of a Subdivision and or Land Development Plan, more particularly described below.
- Applicant's name: Grove Meadow Developers, LLC. Address: 1171 Lancaster Avenue, Suite 201, Berwyn, PA 19312 Phone: 610-725-0812 Fax: Email: tr@moserhomes.com
- Name and address of present owner (if other than 1. above) Name: Mark & Christine Miller Address: 210 N. Aberdeen Avenue, Wayne, PA 19087 Phone: Fax: Email:
- Location of plan: Hershey Mill Road at intersection of Tanglewood drive
- Proposed name of plan: Millstone Meadows Subdivisions
- County Tax Parcel No.: 53-1-19 Zoning District: R-2
- Area of proposed plan (ac.): 16.128 Number of lots: 14 Single Family
- Area of open space (ac.): 9.25
- Type of structures to be constructed: Single Family Dwellings
- What provisions are to be made for water supply and sanitary sewer? Public
- Linear feet of road to be constructed: 1,500 ft
- Name of Engineer: Michael Hartman, dH Enterprises Phone Number: 484-663-3487 Fax: Email address: mhartman@dh-enterprises.net
f:\data\shared data\code dept\application & forms\current forms and applications\subdivision and land dev application.doc
EAST GOSHEN TOWNSHIP, CHESTER COUNTY PA
SUBDIVISION AND/OR LAND DEVELOPMENT APPLICATION
- Name of Land Planner: Nave Newell Phone Number: 610-265-8523 Fax: Email address: plepard@navenewell.net
B. I/We agree to reimburse the Township of East Goshen for such fees and expenses the Township may incur for the services of an Engineer(s) in investigations, tests, and review in relation to the Subdivision Plan.
C. I/We agree to post financial security for the improvements depicted on the Subdivision and or land Development Plan pursuant to the Subdivision and Land Development Ordinance.
D. I/We agree to reimburse the Township of East Goshen for all inspection fees at the actual cost to Township.
NOTICE
The Township requires an Occupancy Permit before any building can be occupied; no Occupancy Permit will be issued until final inspection and approved by the Zoning Officer and Building Inspector.
[signature]
[Owner Signature crossed out]
APPLICANT
[signature: Christine S. Miller]
[Applicant Signature crossed out]
OWNER
Administrative Use
Fees received from applicant $_______ basic fee, plus $_______ per lot
For _______ lots = $_______ .
Application and plan received by: _____________________ Date: _________________
(Signature)
Application accepted as complete on: _____________________
(Date)
F:\Data\Shared Data\Code Dept\Application & Forms\Current Forms and Applications\Subdivision and Land Dev Application.doc
2
LAMB MCERLANE PC
ATTORNEYS AT LAW
William R. Christman III
Voice 610-430-8000
Fax 610-692-6210
bchristman@lambmcerlane.com
March 8, 2023
EMAIL AND FIRST CLASS MAIL
Grove Meadow Developers, LLC
1171 Lancaster Avenue, Suite 201
Berwyn, PA 19312
Email: tr@moserhomes.com
Re: Conditional Use Application of Grove Meadow Developers, LLC
Dear Mr. Moser:
Enclosed please find the Decision and Order of the Board of Supervisors of East Goshen Township approved at its public meeting of last evening.
Please kindly signify your acceptance of the conditions of approval within fifteen (15) days of the date of this letter.
Very truly yours,
LAMB MCERLANE PC
By: [signature: W. R. Christman III]
William R. Christman III
Enclosure
cc:
Derek Davis, Township Manager (via email only)
Duane Brady, Zoning Officer (via email only)
Alyson Zarro, Esq. (via email only)
Natlie McManus
Alison Oshop
Lillian Fedor
Ron McGill
24 E. Market Street | PO Box 565 | West Chester, PA 19381 | Phone: 610.430.8000 | Fax: 610.692.0877
One South Broad Street | Suite 1500 | Philadelphia, PA 19107 | Phone: 215.609.3170 | Fax: 610.692.0877
3405 West Chester Pike | Newtown Square, PA 19073 | Phone: 610.353.0740 | Fax: 610.353.0745
www.lambmcerlane.com
The evidentiary record was closed at the conclusion of the hearing on January 17, 2023. By email dated February 17, 2023, from the Applicant’s counsel, the Applicant granted the Township an extension of time to render its decision on the Application through March 7, 2023, pursuant to Section 913.2(b)(2) of the Pennsylvania Municipalities Planning Code (the “Pa MPC”).
From the testimony and exhibits presented at the hearing, the Board makes the following:
FINDINGS OF FACT
- All facts set forth in the introductory paragraphs above are incorporated herein by reference and are deemed to be factual findings of the Board.
- Applicant is a Pennsylvania limited liability company.
- The Property, consisting of approximately 16 acres within the R-2 Low Density Residential District, is owned by Mark Miller and Christine Miller.
- By Agreement of Sale dated March 15, 2022, the Applicant is the equitable owner of the Property. See Exhibit A-3.
- The Property contains two (2) Class II historic resources that are currently detailed in the East Goshen Township Historic Resource Inventory (a house and a barn), as well as a stream (a tributary to Ridley Creek, which is classified as a High Quality Stream) and wetlands.
- The first conditional use hearing, which was held on January 17, 2023, was advertised in the Daily Local News on October 13, 2022, and November 7, 2022. See Exhibit B-5.
- All required notices of the hearing were made.
2
- The Applicant has indicated its willingness to provide a sanitary sewer and pedestrian access easement from the proposed cul-de-sac to adjoining Township property between Lots 6 and 7.
- Each lot will be served by public sewer and water. Both the East Goshen Municipal Authority (sanitary sewer) and Aqua Pennsylvania, Inc. (water) have indicated that service is available for the proposed development. See Exhibit A-7.
- Certain improvements will be required to sanitary sewer equipment in order to accommodate the proposed development, which the Applicant has agreed to pay.
- Approximately fifty-eight percent (58%) of the Property will be qualifying open space, which will be preserved in a conservation easement with a homeowners’ association responsible for maintenance.
- The “central green” within the proposed cul-de-sac is intended to be used for passive and active recreation.
- The Applicant has proposed certain landscaping around the perimeter of the site and street trees along the proposed road, although the specifics of the proposed landscaping will be reviewed during the subdivision/land development process.
- The homeowners’ association documentation will include a specific section regulating street trees and landscaping, which will be maintained by the homeowners’ association.
- Each single-family dwelling would be separated by at least 30 feet and would provide a minimum of three (3) off-street parking spaces.
4
B-3 Email dated September 13, 2022, from Applicant’s counsel granting an extension of all deadlines relating to the time in which the Board must hold its first hearing on the Application
B-4 Form of Public Notice
B-5 Proof of Publication of Public Notice
B-6 Pennoni Review Letter dated September 21, 2022
B-7 Revised Sketch Plan dated October 5, 2022
B-8 Applicant’s Response Letter to Pennoni Review dated October 5, 2022
B-9 Historic Resource Impact Study dated October 2022
B-10 Pennoni Revised Review Letter dated October 27, 2022
B-11 Pipeline Awareness Study dated November 11, 2022
B-12 Zoning Officer’s Memorandum dated November 7, 2022
B-13 Updated Pipeline Awareness Study dated January 10, 2023
30. The following hearing exhibits were introduced by the Applicant and admitted by the Board at the January 17, 2023 hearing:
A-1 Conditional Use Application
A-2 East Goshen Township Zoning Ordinance
A-3 Redacted Agreement of Sale for 1010 Hershey Mill Road
A-4 Open Space Development Layout Sketch Plan dated October 5, 2022
A-5 Historic Resource Impact Study dated October, 2022
A-6 C.V. of Michael Hartman, P.E.
A-7 Will Serve Letter dated July 13, 2022
A-8 Pipeline Awareness Study dated January 10, 2023
31. If this conditional use is granted for the proposed development, the Board, in order to protect the surrounding neighborhood and insure that the health, safety and welfare of the community and the Township are protected, will impose certain conditions on Applicant’s home occupation.
6
applicable conditions and criteria imposed by the Ordinance and reasonable conditions of approval imposed by the Board. A conditional use is not a use which the Board has the unfettered discretion to approve or deny. Rather, the Board is governed by the objective criteria and standards enunciated in the Ordinance when determining whether to grant an application.
If the Applicant can prove that they comply with the terms of the Ordinance authorizing a conditional use, the Board must grant the conditional use unless substantial evidence indicates that the use will result in substantial injury to the public interest. Susquehanna Twp. Board of Commissioners v. Hardee’s Food Systems, Inc., 430 A.2d. 367 (Pa. Cmwlth. 1981); Appeal of Estate of Achey, 484 A.2d. 874 (Pa. Cmwlth. 1984), aff’d 501 A.2d. 249 (Pa. 1985); Joseph v. North Whitehall Township, 16 A.3d. 1209 (Pa. Cmwlth. 2011).
The fact that a use is permitted by conditional use evidences a legislative determination that such use would not have an adverse impact on public interests in normal circumstances. Joseph v. North Whitehall Township, 16 A.2d 1209 (Pa. Cmwlth. 2011).
In a conditional use hearing, an applicant has the burden of establishing that its proposed use complies with the specific and objective criteria of the zoning ordinance. Id. Once the applicant has met its burden, the conditional use must be granted unless a protestant presents “sufficient evidence to establish that there is a high degree of probability that the use will cause a substantial threat to the community.” In re Cutler Group, Inc., 880 A.2d 39 (Pa. Cmwlth. 2005). To justify the denial of a conditional use,
8
Here, the East Goshen Township Board of Supervisors has made the decision to grant the Application for conditional use relief, subject to the conditions specified within the Order below.
The additional conditions described in the Order below are imposed and attached pursuant to the authority of the MPC § 603(c) and Section 240-31.B(11) of the Ordinance and are subject to the following general principles. Unless a different mechanism is expressly required, compliance with these conditions shall ordinarily be established in the context of subsequent applications for building and use and occupancy permits and approvals. All conditions shall be complied with to the satisfaction of the Township. Any aspect of the said application or any revision thereto materially inconsistent with these conditions will require re-application to and re-hearing by the Board prior to such approval. Any violation of the conditions during or following construction will be treated as a violation of the Zoning Ordinance, subject to the enforcement mechanisms specifically detailed in MPC §§ 511 and 616-617, 53 P.S. §§ 10511 and 10616-10617.
Most fundamentally, this Decision and Order grants only conditional use approval in accordance with the express terms for the development as described in the Application and by the testimony and exhibits. Nothing contained in this Decision and Order shall be construed to abrogate or limit the obligation of the Applicant to comply with the applicable requirements of all of the Township’s ordinances. Except as expressly augmented and clarified by these conditions, the use shall be in accordance with all of the otherwise applicable standards, specifications, and regulations of the Township and of all other agencies with jurisdiction over the Property, the development, or any aspect thereof. Any proposed development or use of the Property which would deviate from any
10
ORDER
AND NOW, this 7th day of March, 2023, the Board of Supervisors of East Goshen Township hereby ORDERS the following:
- The Application for a single-family open space development is hereby GRANTED , subject to the conditions hereinafter enumerated.
- Pursuant to Section 240-38.6 of the Historic Preservation Ordinance, a modification from Section 210-23.B(2)(b)[2][c], permitting only one flag lot, is GRANTED to allow two (2) flag lots for the historic resources on the Property.
- The Applicant shall comply with all outstanding comments contained in the Pennoni review letter dated October 27, 2022 (Exhibit B-10), to the satisfaction of the Township Engineer, as amended by this Order.
- During the subdivision/land development process, the Applicant shall adequately address stormwater management, to the satisfaction of the Township Engineer, including but not limited to stormwater conveyances through the site from adjacent stormwater management facilities and any necessary stormwater easements.
- The Applicant shall provide to the Township a sanitary sewer and pedestrian access easement approximately located between Lots 6 and 7, to the satisfaction of the Township. The pedestrian access easement shall be demarcated by post-and-rail fencing, stones, mulch, grass pavers, or the like. The pedestrian access easement shall be maintained by the homeowners’ association and will be adequately addressed in the association’s Declaration of Covenants, Conditions and Restrictions (the “Declaration”) to the satisfaction of the Township. Notice of the easement shall also be provided to any prospective buyers of Lots 6 and 7 prior to execution of an agreement of sale. The Applicant shall complete the demarcation of the pedestrian access prior to the issuance of building permits for lots immediately adjacent to the easement area.
- The “central green” located within the cul-de-sac shall be graded and maintained to allow for active recreation.
- The Applicant shall preserve as much of the existing perimeter vegetation as possible. Any vegetation replaced pursuant to the Ordinance and/or the Township’s Subdivision and Land
12
- Any future residential reuse of the historic barn shall require further approvals from the Township, pursuant to the Historic Preservation provisions of the Ordinance (Sections 240-38.1 through 240-38.11). During its ownership of the historic barn, the Applicant shall ensure that it is well maintained and does not fall into disrepair.
- Prior to final plan approval, a Phase I Environmental Site Assessment for the Property shall be provided to the Township.
- The use of the Property shall be in substantial conformity with the Applicant’s application and the testimony and exhibits presented at the hearing on the application as determined by the Township, as amended by this Order.
- The Applicant’s conditional use shall be subject to compliance with all terms and provisions of the Ordinance and all other Township Ordinances and Regulations.
- The attached Findings of Fact, Conclusions of Law, and Discussion are incorporated into this Order.
- The Applicant shall execute and provide to the Township a recordable, notarized copy of a memorandum containing a metes and bounds description of the Property in question and stipulating the terms and conditions of this approval and shall consent to the recording by the Township in the office of the Recorder of Deeds of Chester County no later than the recording of the approved final plan. All recording costs shall be reimbursed by the Applicant within 30 days of receipt of an invoice from the Township.
- The Applicant shall express to the Board in writing, delivered to the Township Office within 15 days of the Applicant’s receipt of this Decision, its full and complete consent to the conditions specified herein above or the Application for conditional use approval is denied; the Board expressly finding and concluding that the Application, in the absence of compliance with the said conditions, is inconsistent with the standards, criteria, purposes and policies codified in Section 240-31 of the Ordinance.
BOARD OF SUPERVISORS
EAST GOSHEN TOWNSHIP
[signature: John Hertzog]
John Hertzog, Chair
14
Millstone SD Flood Plain Area 5-4-23
COUNTY OF CHESTER, PENNSYLVANIA
Aerial GIS map of East Goshen Township centered on tax parcel 53-1-19 (16.1 AC., outlined in red) on the west side of Hershey Mill Road, showing mapped flood plain areas shaded in blue/green and red along the stream corridor, adjacent roads, and surrounding tax parcels with an inset Chester County locator map (N arrow) and scale bar (1 inch = 400 feet; 0, 200, 400, 800 Feet).
Find Address Information
| Field | Value |
|---|---|
| PARID | 5301 00190000 |
| UPI | 53-1-19 |
| Owner1 | MILLER MARK S & |
| Owner2 | CHRISTINE S |
| Mail Address 1 | 210 N ABERDEEN AVE |
| Mail Address 2 | WAYNE PA |
| Mail Address 3 | |
| ZIP Code | 19087 |
| Deed Book | 3587 |
| Deed Page | 895 |
| Deed Recorded Date | 07/01/1993 |
| Legal Desc 1 | WS OF HERSHEY MILL RD |
| Legal Desc 2 | 16.1 AC FARM |
| Acres | 16.1 |
| LUC | F-10 |
| Lot Assessment | 100410 |
| Property Assessment | 215400 |
| Total Assessment | 315810 |
| Assessment Date | 12/16/2022 7:49:49 AM |
| Property Address | 1010 HERSHEY MILL RD |
| Municipality | EAST GOSHEN |
| School District | West Chester Area |
Map Labels and Surrounding Parcels
- Municipality and Roads: East Goshen Township, Millstream DR, Hershey Mill RD, Tanglewood DR, Bell Flower LA, Jackson LA, Hadleigh DR, Blanford LA
- Subject Parcel: 53-1-19 (16.1 AC.)
- Surrounding Parcels: 42-6-49.40 (1 AC.), 42-6-49.1 (2.3 AC.), 53-1-18 (1.6 AC.), 53-1-18.3 (34.7 AC.), 53-1-18.3A (1.4 AC.), 53-1-19.2 (6 AC.), 53-1-22 (15.1 AC.), 53-2-9.27 (1 AC.), 53-2-9.25 (1 AC.), 53-2-9.24 (1 AC.), 53-2-9.23 (1 AC.), 53-2-9.22 (1 AC.), 53-2-9.21 (1 AC.), 53-2-9.20 (1 AC.), 53-2-9.19 (1 AC.), 53-2-9.18 (1 AC.), 53-2E-102 (24.3 AC.), 53-2-9.4 (1.4 AC.), 53-2-9.5 (1 AC.), 53-2-9.6 (1 AC.), 53-2-9.7 (1 AC.), 53-2-9.8 (1 AC.), 53-2-9.10 (2 AC.), 53-2-9 (1.3 AC.), 53-2J-132 (2.7 AC.), 53-2J-18 (2.8 AC.), 53-2J-131 (1.22 AC.), 53-2J-30 (4 AC.), 53-2J-130.1 (6.4 AC.), 53-2J-31 (3.4 AC.), 53-2J-37 (2.9 AC.), 53-1-57.25 (8.76 AC.), 53-2-2 (2.38 AC.), 53-1-56 (4.4 AC.), 53-1M-19 (1 AC.), 53-1M-20 (1 AC.), 53-1M-17 (1.2 AC.), 53-1M-22 (1 AC.), 53-1M-16 (1.2 AC.), 53-1-16 (10 AC.), 53-1M-14 (1 AC.), 53-1M-13 (1 AC.), 53-1M-36 (1.1 AC.), 53-1M-35 (1.1 AC.), 53-1M-38 (1 AC.), 53-1M-34 (1 AC.), 53-1M-24 (1 AC.), 53-1M-25 (1.4 AC.), 53-1M-26 (1.3 AC.)
Map Created: Thursday, May 4, 2023
County of Chester
Limitations of Liability and Use: County of Chester, Pennsylvania makes no claims to the completeness, accuracy, or content of any data contained herein, and makes no representation of any kind, including, but not limited to, the warranties of merchantability or fitness for a particular use, nor are any such warranties to be implied or inferred with respect to the information or data furnished herein. For information on data sources visit the GIS Services page listed at www.chesco.org/gis.
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
1010 HERSHEY MILL ROAD - SKETCH PLAN - OPEN SPACE DEVELOPMENT LAYOUT PLAN / "MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - SUBDIVSION PLAN
Redline comparison overlay drawing superimposing the Preliminary/Final Subdivision Plan ("Millstone Meadows", Sheet 2 of 17, Plan No. 22-001-F-D-2.0, shown in red) over the Sketch Plan Open Space Development Layout Plan (1010 Hershey Mill Road, Sheet 1 of 2, Plan No. 22-001-S-D-1.0, shown in black and blue), depicting proposed residential lots around Millstone Circle, Open Space Parcels 100, 101, and 102, Infiltration Basins #1 and #2, Hershey Mill Road, and Tanglewood Drive.
VICINITY MAP
SCALE: 1"=800' (Showing Project Site, Hershey Mill Road, Millstream Drive, Anthony Drive, and Upton Circle)
Project Information and Zoning Data Tabulation
APPLICANT & EQUITABLE RECORD OWNER:
GROVE MEADOW DEVELOPERS LLC
1171 LANCASTER AVE. SUITE 201
BERWYN PA 19312
RECORD OWNER:
MARK S. & CHRISTINE S. MILLER
210 N. ABERDEEN AVENUE
WAYNE, PA 19087
SOURCE OF TITLE:
PIN# 53-1-19, DBV 3587 PAGE 895
| Category | Value |
|---|---|
| SCOPE | SINGLE FAMILY OPEN SPACE DEVELOPMENT |
| TOTAL UNITS | 14 SINGLE FAMILY LOTS (15 on Sketch Plan) |
| TOTAL AREA | 16.128 ACRES (GROSS AREA) / 15.93 ACRES (NET AREA) |
| PROPOSED DENSITY | 0.948 UNITS/ACRE |
| WATER SERVICE | PUBLIC |
| SEWER SERVICE | PUBLIC |
| ZONING DISTRICT | LOW DENSITY RESIDENTIAL DISTRICT (R-2) |
| LOT AREA | 1 ACRE (10,000 SQ. FT. min.) |
| LOT WIDTH | 150 FT. (AT BUILDING LINE), 60 FT. (AT STREET LINE) |
| FRONT YARD | 45 FT. MINIMUM, 60 FT. AVERAGE |
| SIDE YARD | 20 FT. EACH |
| REAR YARD | 50 FT. |
| BUILDING HEIGHT | 3 STORIES OR 30 FT. |
| MAX. BLDG. COVERAGE | 25 % |
| MAX. IMP. COVERAGE | 30 % |
| REQUIRED OPEN SPACE (55% OF TRACT) | 8.70 ACRES |
| PERIMETER OPEN SPACE (PARCEL 100) | 8.09 ACRES |
| CENTRAL GREEN SPACE (PARCEL 101) | 1.04 ACRES |
| QUALIFYING OPEN SPACE | 9.13 ACRES (58 %) |
| LESS THAN 50' IN WIDTH (PARCEL 102) | 0.28 ACRES |
| TOTAL PROVIDED OPEN SPACE | 9.41 ACRES |
GENERAL NOTES
- 1. THE PROPOSED OPEN SPACE MAY NOT BE SEPARATELY SOLD, NOR SHALL SUCH LAND BE FURTHER DEVELOPED OR SUBDIVIDED.
- 2. THE OPEN SPACE AREA DESIGNATED AS PARCEL 100 AND 102 SHALL BE CONSIDERED A PASSIVE OPEN SPACE.
- 3. THE OPEN SPACE AREA DESIGNATED AS PARCEL 101 SHALL BE CONSIDERED AN ACTIVE OPEN SPACE AREA AND AVAILABLE FOR THE COMMUNITY USE.
- 4. THE OPEN SPACE AREAS SHALL BE PROTECTED BY A CONSERVATION EASEMENT. OWNERSHIP
- 5. FOR THE OPEN SPACE AREA SHALL BE BY A HOMEOWNER'S ASSOCIATION.
- 6. THE HOMEOWNER'S ASSOCIATIONS SHALL MANAGE THE OPEN SPACE.
- 7. THE PLANTINGS SHOWN ON THIS PLAN ARE TO SHOW GENERAL COMPLIANCE WITH THE TOWNSHIP ORDINANCES. FORMAL PLANTING PLANS SHALL BE PROVIDED WITH THE SUBDIVISION AND LAND DEVELOPMENT PLANS.
- 8. STORAGE SHEDS ARE NOT A PERMITTED ACCESSORY USE.
PROPERTY LINE CURVE TABLE
| CURVE # | LENGTH | RADIUS | DELTA | CH. BEARING & DIST. |
|---|---|---|---|---|
| C1 | 1.16' | 775.00' | 000°05'08" | N46°53'40"W 1.16' |
| C2 | 189.43' | 1100.00' | 009°52'01" | S37°39'17"E 189.20' |
| C6 | 31.82' | 20.00' | 091°08'51" | S12°51'09"W 28.57' |
| C7 | 30.41' | 20.00' | 087°07'46" | S76°02'09"E 27.57' |
| C8 | 263.44' | 320.00' | 047°10'05" | N82°00'32"E 256.06' |
| C9 | 109.62' | 89.00' | 070°34'15" | N70°14'32"E 102.82' |
| C10 | 112.45' | 270.00' | 023°51'44" | N46°57'16"E 111.64' |
| C11 | 188.50' | 120.00' | 090°00'00" | S76°06'52"E 169.71' |
| C12 | 235.62' | 150.00' | 090°00'00" | S13°53'08"W 212.13' |
| C13 | 209.62' | 220.00' | 054°35'29" | S86°10'53"W 201.78' |
| C14 | 269.03' | 280.00' | 055°03'03" | S85°57'06"W 258.80' |
| C15 | 39.71' | 29.00' | 078°27'05" | S10°14'35"E 36.68' |
| C16 | 120.04' | 230.00' | 029°54'11" | S43°56'02"W 118.68' |
| C17 | 125.66' | 80.00' | 090°00'00" | N76°06'52"W 113.14' |
| C18 | 172.79' | 110.00' | 090°00'00" | N13°53'08"E 155.56' |
| C19 | 171.50' | 180.00' | 054°35'29" | N86°10'53"E 165.09' |
| C20 | 32.74' | 180.00' | 010°25'15" | S53°59'45"E 32.69' |
| C21 | 20.56' | 89.00' | 013°14'14" | S85°01'28"E 20.52' |
| C22 | 89.06' | 89.00' | 057°20'01" | N63°41'25"E 85.39' |
| C23 | 44.03' | 270.00' | 009°20'36" | N39°41'42"E 43.98' |
| C24 | 68.42' | 270.00' | 014°31'08" | N51°37'34"E 68.24' |
| C25 | 38.75' | 120.00' | 018°30'10" | N48°08'13"E 38.58' |
| C26 | 73.47' | 120.00' | 035°04'37" | S85°04'24"E 72.32' |
| C27 | 76.28' | 120.00' | 036°25'13" | S49°19'28"E 75.00' |
| C28 | 15.18' | 150.00' | 005°47'57" | S28°12'54"E 15.18' |
| C29 | 94.53' | 150.00' | 036°06'25" | S07°15'42"E 92.97' |
| C30 | 40.00' | 150.00' | 015°16'44" | S18°25'52"W 39.88' |
| C31 | 85.91' | 150.00' | 032°48'54" | S42°28'41"W 84.74' |
| C32 | 84.05' | 220.00' | 021°53'21" | S69°49'48"W 83.54' |
| C33 | 96.05' | 220.00' | 025°00'53" | N86°43'04"W 95.29' |
| C34 | 29.52' | 220.00' | 007°41'15" | N70°22'00"W 29.50' |
| C35 | 75.39' | 280.00' | 015°25'40" | N74°14'13"W 75.17' |
| C36 | 40.14' | 280.00' | 008°12'48" | N86°03'26"W 40.10' |
| C37 | 40.14' | 280.00' | 008°12'48" | S85°43'46"W 40.10' |
| C38 | 113.36' | 280.00' | 023°11'48" | S70°01'28"W 112.59' |
LEGEND & HATCH LEGEND
- EXISTING LIGHT STANDARD
- EXISTING CURB
- PROPOSED CURB
- SOIL LINE
- RIPARIAN BUFFER
- WETLAND DELINEATION
- EXISTING WETLANDS
- EXISTING STREET SIGN
- SLANTED TEXT: EXISTING FEATURES ARE LABELED WITH SLANTED TEXT
- EXISTING DECIDUOUS TREE
- EXISTING CONIFEROUS TREE
- EXISTING EDGE OF WOODS
- PROPOSED CONCRETE MONUMENT
- PROPOSED IRON PIN (TYP.)
- PROPOSED CURB TAPER
- PROPOSED HANDICAPPED RAMP
- RETAINING WALL
- HATCH LEGEND: STEEP SLOPES - 15-25%, STEEP SLOPES - 25%+
Title Block
Engineer: MICHAEL DUAIN HARTMAN, PE, dh Enterprises, a civil engineering design & management firm, 2815 PENN AVENUE, WEST LAWN, PA, 610-927-4242
Sketch Plan: 1010 HERSHEY MILL ROAD - SKETCH PLAN - OPEN SPACE DEVELOPMENT LAYOUT PLAN, Drawn By: M.D.HARTMAN, Scale: 1" = 50', Sheet 1 of 2, Plan No. 22-001-S-D-1.0
Subdivision Plan Overlay: "MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - SUBDIVSION PLAN, Client: GROVE MEADOW DEVELOPERS LLC, Location: EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA, Drawn By / Checked By: M.D.HARTMAN, Scale: 1" = 50', Sheet 2 OF 17, Plan No. 22-001-F-D-2.0
PRELIMINARY/FINAL SUBDIVISION AND LAND DEVELOPMENT PLANS FOR "MILLSTONE MEADOWS"
ONECALL NOTES
PENNSYLVANIA ONE CALL SYSTEM INC. 1-800-242-1776 - STOP-CALL BEFORE YOU DIG!
PENNSYLVANIA ACT 287, AS AMENDED BY ACT 121 REQUIRES NOTIFICATION OF EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE COMMONWEALTH.
ACT 287 UNDERGROUND UTILITY PROTECTION ACT, AS AMENDED BY ACT 121
ACT 287 UNDERGROUND UTILITY PROTECTION ACT, AS AMENDED BY: ACT 172 OF 1986, ACT 38 OF 1991, ACT 187 OF 1996, ACT 199 OF 2004, ACT 181 OF 2006, ACT 121 OF 2008
PA ONE CALL SYSTEM INFORMATION:
PENNSYLVANIA ACT 287, AS AMENDED, REQUIRES THREE (3) WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND FIVE (5) WORKING DAYS NOTICE IN DESIGN STAGE.
PA ONE CALL PHONE NUMBER: 1-800-242-1776
ONE CALL SYSTEM SERIAL NO. NOTIFICATION BY NAVE NEWELL, INC.
DATE: 11/07/22
ONE CALL SYSTEM SERIAL NUMBER: 20223113472
UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE AND WERE DETERMINED FROM VISIBLE LOCATION, ACT 287 OF 1974, AS AMENDED, UTILITY RESPONSES AND/OR BEST AVAILABLE PLAN INFORMATION.
LIST OF RESPONDERS:
AQUA PENNSYLVANIA INC, COMCAST CABLE COMMUNICATIONS INC, EAST GOSHEN TOWNSHIP, PECO ENERGY, TEXAS EASTERN TRANSMISSION LP, VERIZON PENNSYLVANIA LLC
SURVEY NOTES
- 1. SITE FEATURES SHOWN HEREON OBTAINED BY A FIELD SURVEY PERFORMED BY NAVE NEWELL, INC. COMPLETED ON DECEMBER 12, 2022.
- 2. THE SURVEY WAS PREPARED WITH THE BENEFIT OF A TITLE REPORT, AS REFERENCE HEREIN, AND IS SUBJECT TO THE INFORMATION CONTAINED THEREIN. NO DOCUMENTS OTHER THAN AS NOTED ON THE SURVEY WERE REVIEWED IN THE COURSE OF COMPLETING THE SURVEY.
- 3. THE SURVEY REPRESENTS CONDITIONS AS OF THE DATE OF THE SURVEY EXCEPT SUCH IMPROVEMENTS OR EASEMENTS, IF ANY, THAT MAY BE LOCATED BELOW THE SURFACE OF THE LANDS, ON THE SURFACE OF THE LANDS OR ABOVE THE SURFACE OF THE LAND AND NOT VISIBLE.
- 4. BEARING BASIS FOR THE SURVEY IS BASED ON THE DEED OF REFERENCE THEREIN. BEARINGS NOTED AS NAD 83, REFERENCE THE PENNSYLVANIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE AS DERIVED FROM GPS OBSERVATIONS. THE NAD 83 BEARINGS ARE ROTATED 1°45'52" COUNTERCLOCKWISE FROM THE DEED BEARINGS. VERTICAL DATUM IS NAVD 1988 DATUM.
- 5. PROPERTY FALLS WITHIN ZONE "A", "AE" AREA DETERMINED TO BE INSIDE THE 0.1% ANNUAL CHANCE OF FLOODING AS DEPICTED ON THE FEDERAL EMERGENCY MANAGEMENT AGENCY FLOOD INSURANCE RATE MAP, MAP NO. 42029C0355G/42029C0360G DATED SEPTEMBER 29, 2017.
- 6. LOCATIONS OF EXISTING UTILITIES AS SHOWN HEREIN HAVE BEEN DEVELOPED FROM EXISTING UTILITY RECORDS, PLANS BY OTHERS AND/OR ABOVE GROUND EXAMINATION OF SITE. THIS PLAN ILLUSTRATES UTILITIES OF RECORD PROVIDED BY OR BEFORE THE DATE THIS SURVEY. THIS MAY OR MAY NOT COMPRISE ALL THE UTILITY INFORMATION FOR THIS PROPERTY. THE COMPLETENESS OR ACCURACIES OF THE LOCATIONS ARE NOT GUARANTEED. SHOULD ANY NEW CONSTRUCTION BE PROPOSED, THE CONTRACTOR MUST VERIFY LOCATIONS AND DEPTHS OF ALL UTILITIES BEFORE START OF WORK.
- 7. UNIT AND BLOCK NUMBERS REFER TO THE OFFICIAL TAX MAPS OF THE TOWNSHIP OF EAST GOSHEN, PENNSYLVANIA.
- 8. REFERENCE PLANS: 8.1. OFFICIAL TAX MAPS OF EAST GOSHEN, CHESTER COUNTY, PA.; 8.2. PLAN ENTITLED, "FINAL SUBDIVISION PLAN" - MADE FOR JOHN F. III AND BETTY C. LEWIS, PREPARED BY YERKES ASSOCIATES, INC. DATED OCTOBER 11, 1988 AND RECORDED IN THE CHESTER COUNTY COURTHOUSE AS PLAN BOOK 8746 PAGE 1.; 8.3. PLAN ENTITLED, "GOSHEN DOWNS" "FINAL TITLE PLAN" - PREPARED BY S.W.K. LTD. DATED JUNE 20, 1978 AND RECORDED IN THE CHESTER COUNTY COURTHOUSE AS PLAN BOOK 1746 PAGE 1.
GENERAL NOTES
- 1. THE WETLAND INFORMATION SHOWN HEREON IS BASED ON A WETLAND DELINEATION PERFORMED BY LIBERTY ENVIRONMENTAL, INC. IN JUNE 2022.
- 2. THE RIGHT-OF-WAY FOR THE PROPOSED ROAD (MILLSTONE CIRCLE) IS INTENDED TO BE DEDICATED TO EAST GOSHEN TOWNSHIP.
- 3. THE PROPOSED OPEN SPACE AREAS ARE NOT FOR DEDICATION AND WILL REMAIN PRIVATELY OWNED. THE HOMEOWNERS ASSOCIATION SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE PARCEL. THE CENTRAL OPEN SPACE IS INTENDED TO BE USED OF ACTIVE RECREATION AND TO BE MAINTAINED IN A GRASS/MOWED COVER. THE PERIMETER OPEN SPACE IS INTENDED TO BE USED FOR PASSIVE RECREATION AND TO BE MAINTAINED IN A NATURALISTIC MEADOW/WOODED COVER CONDITION.
- 4. ALL STORM WATER MANAGEMENT FACILITIES LOCATED OUTSIDE OF THE ROAD RIGHT-OF-WAY SHALL BE OWNED PRIVATELY BY THE HOMEOWNER'S ASSOCIATION. THE HOMEOWNERS ASSOCIATION SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE STORM WATER MANAGEMENT FACILITIES.
- 5. THE PROPOSED SANITARY SEWER SYSTEM IS INTENDED TO BE DEDICATED TO EAST GOSHEN TOWNSHIP.
- 6. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED ALL PLANS AND OTHER DOCUMENTS BY ALL OF THE PERMITTING AUTHORITIES.
- 7. THE IMPROVEMENTS SHOWN WITHIN THE LOTS HAS BEEN PROVIDED TO SHOWN GENERAL COMPLIANCE WITH THE EAST GOSHEN TOWNSHIP'S ORDINANCES. FINAL BUILDING DIMENSIONS SHALL ULTIMATELY CONFORM TO ALL APPLICABLE ZONING SETBACKS, IMPERVIOUS SURFACE COVERAGE RATIOS, ETC. INDIVIDUAL LOT PLOT PLANS DOCUMENTING COMPLIANCE ARE TO BE PROVIDED WITH THE SUBMISSION OF THE BUILDING PERMIT APPLICATIONS.
- 8. ALL CONSTRUCTION SHALL COMPLY WITH THE TOWNSHIP OF EAST GOSHEN, CHESTER COUNTY AND PENNDOT STANDARDS.
- 9. MONITORING AND COMPACTION VERIFICATION FOR ALL SITE FILL PLACEMENT WILL NEED TO BE COMPLETED BY THE CONTRACTOR'S GEOTECHNICAL ENGINEER.
- 10. ALL SIGNS SHALL CONFORM TO THE REQUIREMENTS OF THE EAST GOSHEN TOWNSHIP ZONING ORDINANCE. PRIOR TO SIGN CONSTRUCTION, ALL NECESSARY SIGN AND/OR ZONING PERMITS SHALL BE ACQUIRED.
- 11. PERMANENT CONCRETE MONUMENTS SHALL BE SET AT ALL POINTS OF CURVATURE AND AT ALL POINTS OF TANGENCY ON A RIGHT-OF-WAY FOR ALL PUBLIC STREETS. MONUMENTS SHALL BE OF CONCRETE, WITH A FLAT TOP HAVING A MINIMUM WIDTH OR DIAMETER OF FOUR (4) INCHES AND A MINIMUM LENGTH OF THIRTY (30) INCHES.
- 12. LOT MARKERS SHALL BE PLACED AT ALL LOT CORNERS. MARKERS SHALL CONSIST OF IRON PIPES OR STEEL BARS AT LEAST 30 INCHES LONG AND NOT LESS THAN (3/4) INCH DIAMETER.
- 13. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSTALLATION OF ALL STREET MONUMENTS, BOUNDARY PINS AND/OR MONUMENTS AND LOT CORNER PINS INDICATED ON THE PLANS. ALL MARKERS MUST BE INSTALLED PRIOR TO CLOSE OUT OF THE PROJECT WITH EAST GOSHEN TOWNSHIP.
- 14. THE SPEED LIMIT FOR THE PROPOSED ROADWAYS IS 25 MPH.
- 15. NO DEBRIS SHALL BE BURIED ON THIS SITE. ALL DEBRIS SHALL BE DISPOSED OF OFF-SITE IN ACCORDANCE WITH ALL APPLICABLE TOWNSHIP, COUNTY, STATE AND FEDERAL LAWS AND REQUIREMENTS.
- 16. IT SHALL BE THE RESPONSIBILITY OF THE OWNER TO COMPLY WITH ALL APPLICABLE ADA REQUIREMENTS FOR SITE ACCESS AND ACCESS TO PUBLIC WAYS WHETHER SHOWN ON THESE PLANS OR NOT. IT SHALL BE THE OWNER'S RESPONSIBILITY TO CONSTRUCT SAID FACILITIES AND TO MAINTAIN SAID FACILITIES IN GOOD CONDITION. ALL APPLICABLE PROPOSED STRUCTURES AND FACILITIES SHALL COMPLY WITH "THE AMERICAN DISABILITIES ACT", "ACCESSIBILITY GUIDELINES FOR BUILDING AND FACILITIES", AND "THE PENNSYLVANIA UNIVERSAL ACCESSIBILITY ACT".
- 17. ALL REQUIRED AGREEMENTS AND FINANCIAL SECURITY IN A FORM ACCEPTABLE TO EAST GOSHEN TOWNSHIP SHALL BE PROVIDED.
TRAFFIC CONTROL NOTES
- 1. TRAFFIC CONTROL SIGNS MUST BE POSTED ON PENNDOT-APPROVED BREAKAWAY POSTS IN ACCORDANCE WITH THE MOST RECENT VERSION OF THE TC-8700 SERIES IN PENNDOT PUBLICATION 111M.
- 2. ALL TRAFFIC CONTROL SIGNS SHALL BE POSTED IN ACCORDANCE WITH THE 2009 MUTCD AND THE MOST RECENT VERSIONS OF PENNDOT PUBLICATION 236M, "HANDBOOK OF APPROVED SIGNS."
- 3. CLEAR SIGHT TRIANGLES (C.S.T.) HAVE BEEN ESTABLISHED BY MEASURING 75' ALONG THE CENTERLINE OF EACH STREET FROM THE POINT OF INTERSECTION OF THE CENTERLINES OF THE STREETS. WITHIN SUCH TRIANGLES, NO WALL, FENCE OR OTHER OBSTRUCTION SHALL BE ERECTED, ALLOWED OR MAINTAINED, AND NO HEDGE, TREE, SHRUB OR OTHER GROWTH SHALL BE PLANTED OR EXIST ABOVE THE HEIGHT OF 30 INCHES AND BELOW THE HEIGHT OF 10 FEET MEASURED FROM THE CENTER LINE GRADES OF THE INTERSECTING STREETS.
- 4. ALL SIGHT DISTANCE OBSTRUCTIONS (INCLUDING BUT NOT LIMITED TO EMBANKMENTS AND VEGETATION) SHALL BE REMOVED BY THE APPLICANT TO PROVIDE A MINIMUM OF 300 FEET OF SIGHT DISTANCE TO BOTH THE LEFT AND RIGHT FOR A DRIVER EXITING ROAD A ONTO FOREST LANE. THE DRIVER MUST BE CONSIDERED TO BE POSITIONED 15' FROM THE NEAR EDGE OF THE CLOSEST HIGHWAY THROUGH TRAVEL LANE AT AN EYE HEIGHT OF THREE FEET-SIX INCHES (3'-6") ABOVE THE PAVEMENT SURFACE. THE POINT SIGHTED BY THE EXITING DRIVER SHALL BE THREE FEET-SIX INCHES (3'-6") ABOVE THE PAVEMENT SURFACE LOCATED IN THE CENTER OF THE CLOSEST HIGHWAY TRAVEL LANE DESIGNATED FOR USE BY APPROACHING TRAFFIC. THIS SIGHT DISTANCE SHALL BE MAINTAINED BY THE APPLICANT AND/OR THE APPLICANT'S SUCCESSORS AND ASSIGNORS.
UTILITY NOTES
- 1. THIS PLAN PROPOSES PUBLIC WATER SUPPLY AND PUBLIC SEWER. PUBLIC WATER WILL BE PROVIDED BY AQUA PENNSYLVANIA.
- 2. ALL WATER MAINS SHALL MEET THE REQUIREMENTS OF AND BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS, STANDARDS AND DETAILS OF AQUA PENNSYLVANIA.
- 3. WATER SUPPLY: ALL WATER SERVICES, INCLUDING DOMESTIC AND FIRE PROTECTION, SHALL MEET THE REQUIREMENTS OF AND BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS, STANDARDS AND DETAILS OF EAST GOSHEN TOWNSHIP. SHOP DRAWINGS AND/OR CATALOG CUTS FOR ALL PROPOSED MATERIALS SHALL BE SUBMITTED TO EAST GOSHEN TOWNSHIP AS PART OF THE APPLICATION FOR A PLUMBING PERMIT.
- 4. SANITARY SEWERAGE: ALL SANITARY SEWER MAINS SHALL MEET THE REQUIREMENTS OF AND BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS, STANDARDS AND DETAILS OF THE EAST GOSHEN TOWNSHIP.
- 5. SANITARY SEWERAGE: ALL SEWER LATERALS SHALL MEET THE REQUIREMENTS OF AND BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS, STANDARDS AND DETAILS OF EAST GOSHEN TOWNSHIP. SHOP DRAWINGS AND/OR CATALOG CUTS FOR ALL PROPOSED MATERIALS SHALL BE SUBMITTED TO EAST GOSHEN TOWNSHIP.
- 6. THE SANITARY SEWER SHALL BE INSTALLED AT LEAST 10 FEET HORIZONTALLY AND AT LEAST 18 INCHES VERTICALLY FROM OTHER UTILITIES.
- 7. THE SANITARY SEWER MAINS AND LATERALS SHALL BE BURIED A MINIMUM OF 4 FEET DEEP.
- 8. OTHER UTILITIES: ALL OTHER UTILITIES (ELECTRIC, COMMUNICATIONS, GAS, ETC.) SHALL BE INSTALLED IN ACCORDANCE WITH THE UTILITY COMPANY'S REQUIREMENTS AND SHALL BE INSTALLED AS TO NOT CONFLICT WITH THE WATER, SANITARY SEWER AND/OR STORM FACILITIES PROPOSED AS PART OF THIS PLANS.
- 9. BACKFILL OF ALL UTILITY TRENCHES WITHIN EXISTING AND/OR PROPOSED RIGHT-OF-WAY SHALL BE DONE IN ACCORDANCE WITH THE SPECIFICATIONS, STANDARDS AND DETAILS OF EAST GOSHEN AND BE SUBJECT TO THE APPROVAL OF EAST GOSHEN TOWNSHIP OR THEIR DESIGNEE.
STORM WATER NOTES
- 1. THE STORM WATER MANAGEMENT FACILITIES HAVE BEEN DESIGNED ASSUMING AN AMOUNT OF IMPERVIOUS COVERAGE BASED ON THE IMPROVEMENTS SHOWN PLUS AN ADDITIONAL 2,000 SQUARE FEET PER LOT TO ACCOUNT FOR FUTURE IMPROVEMENTS BY THE HOMEOWNERS.
- 2. THE PROPOSED TREE PLANTINGS ARE PART OF THE OVERALL SITE STORM WATER MANAGEMENT SYSTEM.
- 3. ROOF LEADERS SHALL BE DISCHARGED ONTO SPLASH BLOCKS AND DIRECTED TOWARDS VEGETATED SURFACES (AS PRACTICABLE).
- 4. ALL STORM CONVEYANCE PIPE SHALL BE SMOOTH LINED DOUBLE WALLED HIGH DENSITY POLYETHYLENE PIPE (HDPE), UNLESS OTHERWISE SPECIFIED.
- 5. END WALLS AND END SECTIONS SHALL BE REQUIRED ON ALL OPEN PIPES, SHALL BE OF CONCRETE CONSTRUCTION, AND SHALL BE SET ON A MINIMUM OF TWELVE (12) INCHES OF AASHTO NO. 57 (PENNDOT 2B) COARSE AGGREGATE.
CONDITIONAL USE APPROVAL BY EAST GOSHEN TOWNSHIP
CONDITIONAL USE APPLICATION OF GROVE MEADOW DEVELOPERS, LLC
DATED MARCH 7, 2023
DECISION AND ORDER CONDITIONS
AND NOW, THIS 7TH DAY OF MARCH, 2023, THE BOARD OF SUPERVISORS OF EAST GOSHEN TOWNSHIP HEREBY ORDERS THE FOLLOWING:
- 1. THE APPLICATION FOR A SINGLE-FAMILY OPEN SPACE DEVELOPMENT IS HEREBY GRANTED, SUBJECT TO THE CONDITIONS HEREINAFTER ENUMERATED.
- 2. PURSUANT TO SECTION 240-38.6 OF THE HISTORIC PRESERVATION ORDINANCE, A MODIFICATION FROM SECTION 240-23.B(2)(B)[2](C), PERMITTING ONLY ONE FLAG LOT, IS GRANTED TO ALLOW TWO (2) FLAG LOTS FOR THE HISTORIC RESOURCES ON THE PROPERTY.
- 3. THE APPLICANT SHALL COMPLY WITH ALL OUTSTANDING COMMENTS CONTAINED IN THE PENNONI REVIEW LETTER DATED OCTOBER 27, 2022 (EXHIBIT B-10), TO THE SATISFACTION OF THE TOWNSHIP ENGINEER, AS AMENDED BY THIS ORDER.
- 4. DURING THE SUBDIVISION/LAND DEVELOPMENT PROCESS, THE APPLICANT SHALL ADEQUATELY ADDRESS STORMWATER MANAGEMENT, TO THE SATISFACTION OF THE TOWNSHIP ENGINEER, INCLUDING BUT NOT LIMITED TO STORMWATER CONVEYANCES THROUGH THE SITE FROM ADJACENT STORMWATER MANAGEMENT FACILITIES AND ANY NECESSARY STORMWATER EASEMENTS.
- 5. THE APPLICANT SHALL PROVIDE TO THE TOWNSHIP A SANITARY SEWER AND PEDESTRIAN ACCESS EASEMENT APPROXIMATELY LOCATED BETWEEN LOTS 6 AND 7, TO THE SATISFACTION OF THE TOWNSHIP. THE PEDESTRIAN ACCESS EASEMENT SHALL BE DEMARCATED BY POST-AND-RAIL FENCING, STONES, MULCH, GRASS PAVERS, OR THE LIKE. THE PEDESTRIAN ACCESS EASEMENT SHALL BE MAINTAINED BY THE HOMEOWNERS' ASSOCIATION AND WILL BE ADEQUATELY ADDRESSED IN THE ASSOCIATION'S DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS (THE "DECLARATION") TO THE SATISFACTION OF THE TOWNSHIP. NOTICE OF THE EASEMENT SHALL ALSO BE PROVIDED TO ANY PROSPECTIVE BUYERS OF LOTS 6 AND 7 PRIOR TO EXECUTION OF AN AGREEMENT OF SALE. THE APPLICANT SHALL COMPLETE THE DEMARCATION OF THE PEDESTRIAN ACCESS PRIOR TO THE ISSUANCE OF BUILDING PERMITS FOR LOTS IMMEDIATELY ADJACENT TO THE EASEMENT AREA.
- 6. THE "CENTRAL GREEN" LOCATED WITHIN THE CUL-DE-SAC SHALL BE GRADED AND MAINTAINED TO ALLOW FOR ACTIVE RECREATION.
- 7. THE APPLICANT SHALL PRESERVE AS MUCH OF THE EXISTING PERIMETER VEGETATION AS POSSIBLE. ANY VEGETATION REPLACED PURSUANT TO THE ORDINANCE AND/OR THE TOWNSHIP'S SUBDIVISION AND LAND DEVELOPMENT ORDINANCE (THE "SALDO") SHALL BE REPLACED WITH NATIVE AND DEER-RESISTANT MATERIALS, WHEREVER POSSIBLE. LANDSCAPING PLANS SHALL BE REVIEWED BY THE EAST GOSHEN TOWNSHIP CONSERVANCY BOARD AND THE TOWNSHIP ENGINEER TO ENSURE COMPLIANCE WITH THE ORDINANCE AND SALDO. FURTHERMORE, THE PERIMETER OF THE PROPERTY SHALL CONTAIN A TRADITIONAL POST-AND-RAIL OR EQUIVALENT FENCE THAT REUSES THE EXISTING CONCRETE POSTS, WHERE POSSIBLE.
- 8. THE APPLICANT SHALL DESIGN AND INSTALL A 150' WIDE RIPARIAN FOREST BUFFER IN ACCORDANCE WITH THE RIPARIAN BUFFER REQUIREMENTS OUTLINED IN 25 PA. CODE § 102.14 FOR THE PORTION OF STREAM WITHIN THE SUBJECT PROPERTY. SHOULD THE APPLICANT DEMONSTRATE TO THE TOWNSHIP THAT CREATION AND MAINTENANCE OF THE ENTIRE 150' RIPARIAN BUFFER AREA IS NOT POSSIBLE FOR ANY PORTION OF THE PROPERTY, THEN THE WIDTH OF THE BUFFER MAY BE REDUCED BY THE BOARD OF SUPERVISORS, IN THEIR SOLE DISCRETION, DURING THE SUBDIVISION/LAND DEVELOPMENT PROCESS. AREAS OF EXISTING WOODLAND MAY BE UTILIZED TO MEET THE RIPARIAN BUFFER REQUIREMENTS; HOWEVER, THESE AREAS SHALL BE REVIEWED BY AN ARBORIST OR QUALIFIED PROFESSIONAL TO ENSURE THAT THE COMPOSITION OF PLANT LIFE MEETS THE REQUIREMENTS OUTLINED. A PLAN SHALL BE ESTABLISHED TO REMOVE INVASIVE SPECIES WITHIN THE EXISTING WOODED AREAS AND ANY AREAS OF THE RIPARIAN BUFFER. AN OPERATION & MAINTENANCE PLAN SHALL BE DEVELOPED FOR THE RIPARIAN BUFFER TO ENSURE THAT THIS BUFFER IS MAINTAINED FREE OF INVASIVE SPECIES IN PERPETUITY, WITH SUCH PLAN BEING RECORDED WITH THE APPROVED FINAL PLANS.
- 9. MAINTENANCE OF ALL LANDSCAPING ON HOA-OWNED PROPERTY, AS WELL AS ALL STREET TREES, SHALL BE THE RESPONSIBILITY OF THE HOMEOWNERS' ASSOCIATION AND WILL BE ADDRESSED IN THE DECLARATION, TO THE SATISFACTION OF THE TOWNSHIP. ALL STREET TREES SHALL BE LOCATED OUTSIDE OF ANY ROAD RIGHT-OF-WAY.
- 10. PRIOR TO RECORDING THE PLANS, THE APPLICANT SHALL PREPARE AND SUBMIT TO THE TOWNSHIP A SHARED ACCESS EASEMENT, AS APPROVED BY THE TOWNSHIP SOLICITOR, FOR THE SHARED DRIVEWAY SERVICING THE TWO (2) FLAG LOTS.
- 11. THE APPLICANT SHALL COMPLY WITH THE TOWNSHIP'S ORDINANCES REGARDING CARTWAY WIDTH (SECTION 205-44) AND SIDEWALKS/PATHS (SECTION 205-54). ANY WAIVER REQUESTS FROM THESE PROVISIONS WILL BE CONSIDERED BY THE BOARD OF SUPERVISORS DURING THE SUBDIVISION/LAND DEVELOPMENT PROCESS.
- 12. THE APPLICANT SHALL PROVIDE AN OFFER OF DEDICATION OF ADDITIONAL PROPERTY ALONG HERSHEY MILL ROAD FOR A POTENTIAL FUTURE SIDEWALK OR PATHWAY.
- 13. ANY FUTURE RESIDENTIAL REUSE OF THE HISTORIC BARN SHALL REQUIRE FURTHER APPROVALS FROM THE TOWNSHIP, PURSUANT TO THE HISTORIC PRESERVATION PROVISIONS OF THE ORDINANCE (SECTIONS 240-38.1 THROUGH 240-38.10). DURING ITS OWNERSHIP OF THE HISTORIC BARN, THE APPLICANT SHALL ENSURE THAT IT IS WELL MAINTAINED AND DOES NOT FALL INTO DISREPAIR.
- 14. PRIOR TO FINAL PLAN APPROVAL, A PHASE I ENVIRONMENTAL SITE ASSESSMENT FOR THE PROPERTY SHALL BE PROVIDED TO THE TOWNSHIP.
- 15. THE USE OF THE PROPERTY SHALL BE IN SUBSTANTIAL CONFORMITY WITH THE APPLICANT'S APPLICATION AND THE TESTIMONY AND EXHIBITS PRESENTED AT THE HEARING ON THE APPLICATION AS DETERMINED BY THE TOWNSHIP, AS AMENDED BY THIS ORDER.
- 16. THE APPLICANT'S CONDITIONAL USE SHALL BE SUBJECT TO COMPLIANCE WITH ALL TERMS AND PROVISIONS OF THE ORDINANCE AND ALL OTHER TOWNSHIP ORDINANCES AND REGULATIONS.
- 17. THE ATTACHED FINDINGS OF FACT, CONCLUSIONS OF LAW, AND DISCUSSION ARE INCORPORATED INTO THIS ORDER.
- 18. THE APPLICANT SHALL EXECUTE AND PROVIDE TO THE TOWNSHIP A RECORDABLE, NOTARIZED COPY OF A MEMORANDUM CONTAINING A METES AND BOUNDS DESCRIPTION OF THE PROPERTY IN QUESTION AND STIPULATING THE TERMS AND CONDITIONS OF THIS APPROVAL AND SHALL CONSENT TO THE RECORDING BY THE TOWNSHIP IN THE OFFICE OF THE RECORDER OF DEEDS OF CHESTER COUNTY NO LATER THAN THE RECORDING OF THE APPROVED FINAL PLAN. ALL RECORDING COSTS SHALL BE REIMBURSED BY THE APPLICANT WITHIN 30 DAYS OF RECEIPT OF AN INVOICE FROM THE TOWNSHIP.
- 19. THE APPLICANT SHALL EXPRESS TO THE BOARD IN WRITING, DELIVERED TO THE TOWNSHIP OFFICE WITHIN 15 DAYS OF THE APPLICANT'S RECEIPT OF THIS DECISION, ITS FULL AND COMPLETE CONSENT TO THE CONDITIONS SPECIFIED HEREIN ABOVE OR THE APPLICATION FOR CONDITIONAL USE APPROVAL IS DENIED; THE BOARD EXPRESSLY FINDING AND CONCLUDING THAT THE APPLICATION, IN THE ABSENCE OF COMPLIANCE WITH THE SAID CONDITIONS, IS INCONSISTENT WITH THE STANDARDS, CRITERIA, PURPOSES AND POLICIES CODIFIED IN SECTION 240-31 OF THE ORDINANCE.
Project Summary, Zoning Data Tabulation & Soils
APPLICANT & EQUITABLE RECORD OWNER:
GROVE MEADOW DEVELOPERS LLC
1171 LANCASTER AVE. SUITE 201
BERWYN PA 19312
RECORD OWNER:
MARK S. & CHRISTINE S. MILLER
210 N. ABERDEEN AVENUE
WAYNE, PA 19087
SOURCE OF TITLE:
PIN# 53-1-19, DBV 3587 PAGE 895
DATUM:
BENCHMARK: EXISTING SANITARY SEWER MANHOLE IN TANGLEWOOD DRIVE
TOP OF MANHOLE=459.50
DATUM IS BASED ON NAVD DATUM OF 1988
| Item | Value |
|---|---|
| SCOPE | SINGLE FAMILY OPEN SPACE DEVELOPMENT |
| TOTAL UNITS | 14 SINGLE FAMILY LOTS |
| TOTAL AREA | 16.128 ACRES (GROSS AREA) / 15.729 ACRES (NET AREA) |
| PROPOSED DENSITY | 1.123 UNITS/ACRE |
| WATER SERVICE | PUBLIC |
| SEWER SERVICE | PUBLIC |
| AREA TO BE DEDICATED - HERSHEY MILL ROAD | 0.399 ACRES |
| AREA TO BE DEDICATED - PROPOSED ROAD (MILLSTONE CIRCLE) | 1.400 ACRES |
| ZONING DISTRICT | LOW DENSITY RESIDENTIAL DISTRICT (R-2) |
| LOT AREA | 1 ACRE |
| LOT WIDTH | 150 FT. (AT BUILDING LINE), 60 FT. (AT STREET LINE) |
| FRONT YARD | 45 FT. MINIMUM, 60 FT. AVERAGE |
| SIDE YARD | 20 FT. EACH |
| REAR YARD | 50 FT. |
| BUILDING HEIGHT | 3 STORIES OR 30 FT. |
| MAX. BLDG. COVERAGE | 25 % |
| MAX. IMP. COVERAGE | 30 % |
| REQUIRED OPEN SPACE (55% OF TRACT) | 8.651 ACRES |
| PERIMETER OPEN SPACE (PARCEL 100) | 8.205 ACRES |
| CENTRAL GREEN SPACE (PARCEL 101) | 1.045 ACRES |
| QUALIFYING OPEN SPACE | 9.250 ACRES (58.8 %) |
ZONING NOTES
- 1. THE PROPOSED OPEN SPACE MAY NOT BE SEPARATELY SOLD, NOR SHALL SUCH LAND BE FURTHER DEVELOPED OR SUBDIVIDED.
- 2. THE OPEN SPACE AREA DESIGNATED AS PARCEL 100 AND 102 SHALL BE CONSIDERED A PASSIVE OPEN SPACE.
- 3. THE OPEN SPACE AREA DESIGNATED AS PARCEL 101 SHALL BE CONSIDERED AN ACTIVE OPEN SPACE AREA AND AVAILABLE FOR THE COMMUNITY USE.
- 4. THE OPEN SPACE AREAS SHALL BE PROTECTED BY A CONSERVATION EASEMENT, OWNERSHIP AND OWNED, MANAGED AND MAINTAINED BY A HOMEOWNER'S ASSOCIATION.
- 5. THE PLANTINGS SHOWN ON THIS PLAN ARE TO SHOW GENERAL COMPLIANCE WITH THE TOWNSHIP ORDINANCES. FORMAL PLANTING PLANS SHALL BE PROVIDED WITH THE SUBDIVISION AND LAND DEVELOPMENT PLANS.
- 6. STORAGE SHEDS ARE NOT A PERMITTED ACCESSORY USE.
SOILS
- Co – CODORUS SILT LOAM
- Ha – HATBORO SILT LOAM
- GgB – GLENELG SILT LOAM, 3 TO 8 PERCENT SLOPES
- MaB – MANOR LOAM, 3 TO 8 PERCENT SLOPES
- MaC – MANOR LOAM, 8 TO 15 PERCENT SLOPES
- MaD – MANOR LOAM, 15 TO 25 PERCENT SLOPES
- MaE – MANOR LOAM, 25 TO 35 PERCENT SLOPES
- UugB – URBAN LAND – UDORTHENTS SCHIST AND GNEISS COMPLEX, 0 TO 8 PERCENT SLOPES
VICINITY MAP
SCALE: 1"=800' (Showing Project Location, Hershey Mill Rd, Millstream Dr, Anthony Dr, Upton Cir, Tanglewood Dr, Blanford Ln, Hadleigh Dr, Greenhill Rd, and zoning districts R-2 and R-3)
PLAN SET INDEX
| Sheet Title | Plan Number | Sheet |
|---|---|---|
| COVER SHEET | 22-001-F-D-1.0 | 1 OF 17 |
| SUBDIVISION PLAN | 22-001-F-D-2.0 | 2 OF 17 |
| EXISTING CONDITIONS AND DEMOLITION PLAN | 22-001-F-D-3.0 | 3 OF 17 |
| GRADING & UTILITY PLAN | 22-001-F-D-4.0 | 4 OF 17 |
| LANDSCAPING PLAN (RESERVED) | 22-001-F-D-5.0 | 5 OF 17 |
| PROFILES | 22-001-F-D-6.1 | 6 OF 17 |
| PROFILES | 22-001-F-D-6.2 | 7 OF 17 |
| EROSION AND SEDIMENT CONTROL PLAN | 22-001-F-D-7.1 | 8 OF 17 |
| E&SC NOTES SHEET | 22-001-F-D-7.2 | 9 OF 17 |
| E&SC DETAILS SHEET | 22-001-F-D-7.3 | 10 OF 17 |
| E&SC DETAILS SHEET (RESERVED) | 22-001-F-D-7.4 | 11 OF 17 |
| POST-CONSTRUCTION STORM WATER MANAGEMENT PLAN | 22-001-F-D-8.1 | 12 OF 17 |
| PCSM NOTES SHEET | 22-001-F-D-8.2 | 13 OF 17 |
| PCSM DETAILS SHEET | 22-001-F-D-8.3 | 14 OF 17 |
| RIPARIAN BUFFER MANAGEMENT PLAN (RESERVED) | 22-001-F-D-8.4 | 15 OF 17 |
| CONSTRUCTION DETAILS – SITE | 22-001-F-D-9.0 | 16 OF 17 |
| CONSTRUCTION DETAILS – SANITARY (RESERVED) | 22-001-F-D-9.1 | 17 OF 17 |
Certificates and Approvals
CERTIFICATE OF OWNERSHIP
COMMONWEALTH OF PENNSYLVANIA
COUNTY OF CHESTER
ON THIS ___ THE DAY OF _________, 20___, BEFORE ME THE UNDERSIGNED OFFICER, PERSONALLY APPEARED T.R. MOSER WHO BEING DULY SWORN ACCORDING TO LAW, DEPOSES AND SAYS THAT HE IS THE PRESIDENT OF GROVE MEADOW DEVELOPERS LLC, WHICH IS THE OWNER OF THE PROPERTY SHOWN ON THIS PLAN, THAT HE ACKNOWLEDGES ITS ACT AND DESIRES THE SAME TO BE RECORDED AS SUCH ACCORDING TO LAW.
T.R. MOSER, PRESIDENT / NOTARY
CHESTER COUNTY RECORDER OF DEEDS
RECORDED IN THE OFFICE OF THE RECORDER OF DEEDS OF CHESTER COUNTY AT WEST CHESTER, PENNSYLVANIA, IN PLAN BOOK ___ PAGE ___, ON THE ___ DAY OF _________, 20___.
DEPUTY RECORDER OF DEEDS
CERTIFICATE OF ACCURACY – SURVEY
I HEREBY CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE, ALL SURVEY INFORMATION AND COMPUTATIONS SHOWN AND DESCRIBED HEREON ARE TRUE AND CORRECT TO THE ACCURACY REQUIRED BY WILLISTOWN TOWNSHIP SUBDIVISION AND LAND DEVELOPMENT ORDINANCE. (BOUNDARY LINES CLOSE WITH AN ERROR OF LESS THAN ONE FOOT IN 10,000 FEET).
ADAM R. FRY, PLS LIC. NO. SU-055315-E / DATE
CERTIFICATE OF MUNICIPAL APPROVAL – BOARD OF SUPERVISORS
APPROVED BY THE BOARD OF SUPERVISORS OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA, THIS ___ DAY OF _________, 20___.
CHAIRMAN / VICE CHAIRMAN / MEMBER / MEMBER / MEMBER
TOWNSHIP ENGINEER
REVIEWED BY THE EAST GOSHEN TOWNSHIP TOWNSHIP ENGINEER, THIS ___ DAY OF _________, 20___.
TOWNSHIP ENGINEER / WITNESS
CHESTER COUNTY PLANNING COMMISSION
REVIEWED BY THE CHESTER COUNTY PLANNING COMMISSION THIS ___ DAY OF _________, 20___.
SECRETARY
CERTIFICATE OF ACCURACY
THESE PLANS ARE PREPARED IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF THE COMMONWEALTH OF PENNSYLVANIA, CHESTER COUNTY, AND WILLISTOWN TOWNSHIP.
MICHAEL DUAIN HARTMAN, P.E. LIC. NO. PE058987 / DATE
CERTIFICATE OF REVIEW – PLANNING COMMISSION
REVIEWED BY THE PLANNING COMMISSION OF EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA, THIS ___ DAY OF _________, 20___.
CHAIRMAN / VICE CHAIRMAN / MEMBER / MEMBER / MEMBER
Title Block
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN – COVER SHEET
CLIENT: GROVE MEADOW DEVELOPERS LLC
LOCATION: EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA
DATE: APRIL 20, 2023
DRAWN BY: M.D.HARTMAN | CHECKED BY: M.D.HARTMAN | SCALE: 1" = 50' | SHEET: 1 OF 17 | PLAN NO.: 22-001-F-D-1.0
Engineer: MICHAEL DUAIN HARTMAN, PE, dh Enterprises, 2815 PENN AVENUE, WEST LAWN, PA, 610-927-4242
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - SUBDIVSION PLAN
Subdivision plan drawing (Sheet 2 of 17, Plan No. 22-001-F-D-2.0) showing the layout of 14 residential lots around Millstone Circle, Open Space Parcels 100 and 101, Infiltration Basins #1 and #2, boundary bearings and distances, curve numbers, and adjoining property owners.
Subdivision Lots and Open Space Parcels
| Lot / Parcel | Area |
|---|---|
| Lot 1 | 14,105 SQ.FT. |
| Lot 2 | 11,750 SQ.FT. |
| Lot 3 | 11,959 SQ.FT. |
| Lot 4 | 18,691 SQ.FT. |
| Lot 5 | 16,292 SQ.FT. |
| Lot 6 | 14,708 SQ.FT. |
| Lot 7 | 18,450 SQ.FT. |
| Lot 8 | 13,659 SQ.FT. |
| Lot 9 | 12,697 SQ.FT. |
| Lot 10 | 12,551 SQ.FT. |
| Lot 11 | 12,218 SQ.FT. |
| Lot 12 | 13,291 SQ.FT. |
| Lot 13 | 30,946 SQ.FT. |
| Lot 14 | 20,691 SQ.FT. |
| Open Space Parcel 100 | 1.04 AC. |
| Open Space Parcel 101 | 8.70 AC. |
PROPERTY LINE CURVE TABLE
| CURVE # | LENGTH | RADIUS | DELTA | CH. BEARING & DIST. |
|---|---|---|---|---|
| C1 | 1.16' | 775.00' | 000°05'08" | N46°53'40"W 1.16' |
| C2 | 189.43' | 1100.00' | 009°52'01" | S37°39'17"E 189.20' |
| C6 | 31.82' | 20.00' | 091°08'51" | S12°51'09"W 28.57' |
| C7 | 30.41' | 20.00' | 087°07'46" | S76°02'09"E 27.57' |
| C8 | 263.44' | 320.00' | 047°10'05" | N82°00'32"E 256.06' |
| C9 | 109.62' | 89.00' | 070°34'15" | N70°14'32"E 102.82' |
| C10 | 112.45' | 270.00' | 023°51'44" | N46°57'16"E 111.64' |
| C11 | 188.50' | 120.00' | 090°00'00" | S76°06'52"E 169.71' |
| C12 | 235.62' | 150.00' | 090°00'00" | S13°53'08"W 212.13' |
| C13 | 209.62' | 220.00' | 054°35'29" | S86°10'53"W 201.78' |
| C14 | 269.03' | 280.00' | 055°03'03" | S85°57'06"W 258.80' |
| C15 | 39.71' | 29.00' | 078°27'05" | S10°14'35"E 36.68' |
| C16 | 120.04' | 230.00' | 029°54'11" | S43°56'02"W 118.68' |
| C17 | 125.66' | 80.00' | 090°00'00" | N76°06'52"W 113.14' |
| C18 | 172.79' | 110.00' | 090°00'00" | N13°53'08"E 155.56' |
| C19 | 171.50' | 180.00' | 054°35'29" | N86°10'53"E 165.09' |
| C20 | 32.74' | 180.00' | 010°25'15" | S53°59'45"E 32.69' |
| C21 | 20.56' | 89.00' | 013°14'14" | S85°01'28"E 20.52' |
| C22 | 89.06' | 89.00' | 057°20'01" | N63°41'25"E 85.39' |
| C23 | 44.03' | 270.00' | 009°20'36" | N39°41'42"E 43.98' |
| C24 | 68.42' | 270.00' | 014°31'08" | N51°37'34"E 68.24' |
| C25 | 38.75' | 120.00' | 018°30'10" | N48°08'13"E 38.58' |
| C26 | 73.47' | 120.00' | 035°04'37" | S85°04'24"E 72.32' |
| C27 | 76.28' | 120.00' | 036°25'13" | S49°19'28"E 75.00' |
| C28 | 15.18' | 150.00' | 005°47'57" | S28°12'54"E 15.18' |
| C29 | 94.53' | 150.00' | 036°06'25" | S07°15'42"E 92.97' |
| C30 | 40.00' | 150.00' | 015°16'44" | S18°25'52"W 39.88' |
| C31 | 85.91' | 150.00' | 032°48'54" | S42°28'41"W 84.74' |
| C32 | 84.05' | 220.00' | 021°53'21" | S69°49'48"W 83.54' |
| C33 | 96.05' | 220.00' | 025°00'53" | N86°43'04"W 95.29' |
| C34 | 29.52' | 220.00' | 007°41'15" | N70°22'00"W 29.50' |
| C35 | 75.39' | 280.00' | 015°25'40" | N74°14'13"W 75.17' |
| C36 | 40.14' | 280.00' | 008°12'48" | N86°03'26"W 40.10' |
| C37 | 40.14' | 280.00' | 008°12'48" | S85°43'46"W 40.10' |
| C38 | 113.36' | 280.00' | 023°11'48" | S70°01'28"W 112.59' |
LEGEND
- EXISTING LIGHT STANDARD
- EXISTING CURB
- PROPOSED CURB
- SOIL LINE
- RIPARIAN BUFFER
- WETLAND DELINEATION
- EXISTING WETLANDS
- EXISTING STREET SIGN
- SLANTED TEXT: EXISTING FEATURES ARE LABELED WITH SLANTED TEXT
- EXISTING DECIDUOUS TREE
- EXISTING CONIFEROUS TREE
- EXISTING EDGE OF WOODS
- PROPOSED CONCRETE MONUMENT
- PROPOSED IRON PIN (TYP.)
- PROPOSED CURB TAPER
- PROPOSED HANDICAPPED RAMP
- RETAINING WALL
Title Block
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN – SUBDIVSION PLAN
CLIENT: GROVE MEADOW DEVELOPERS LLC
LOCATION: EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA
DATE: APRIL 20, 2023
DRAWN BY: M.D.HARTMAN | CHECKED BY: M.D.HARTMAN | GRAPHIC SCALE: 1" = 50' | SHEET: 2 OF 17 | PLAN NO.: 22-001-F-D-2.0
Engineer: MICHAEL DUAIN HARTMAN, PE, dh Enterprises, 2815 PENN AVENUE, WEST LAWN, PA, 610-927-4242
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - EXISTING CONDITIONS AND DEMOLITION PLAN
Existing Conditions and Demolition Plan drawing (Sheet 3 of 17, Plan No. 22-001-F-D-3.0) showing existing topography and contours, soil boundaries (MaB, MaC, MaD, MaE, Ha, Co, UugB), existing house, historic barn, garage, pool, shed, springhouse, tennis court, driveways, grass and wooded areas, wetlands, 150' riparian buffer, steep slope hatched areas (15%–25% and 25%+ slopes), Hershey Mill Road, and Tanglewood Drive.
DEMOLITION NOTES
- 1. CONTRACTOR TO DEMOLISH ALL ITEMS NECESSARY TO CONSTRUCT PROPOSED BUILDING AND SITE FEATURES WHETHER OR NOT INDICATED IN THE CONSTRUCTION DOCUMENTS. ADEQUATE AND PROPER PROTECTION SHALL BE PROVIDED TO EXISTING FEATURES NOT BEING REMOVED.
- 2. EXCAVATIONS THAT ARE LEFT OPEN DURING THE DEMOLITION PROCESS SHALL BE COVERED OR FENCED OFF. THE AREA SHALL BE ADEQUATELY MARKED TO ENSURE WORKER AND PUBLIC SAFETY.
- 3. THE CONTRACTOR IS RESPONSIBLE FOR TERMINATING ALL APPLICABLE UTILITIES WHERE ITEMS ARE BEING REMOVED IN A SAFE AND CODE CONFORMING MANNER.
- 4. UNUSABLE MATERIALS AND RUBBISH SHALL BE IMMEDIATELY REMOVED FROM THE SITE. MATERIALS TO BE REUSED WILL BE STOCKPILED IN A SAFE AND SECURE LOCATION. MATERIAL THAT REQUIRES PROTECTION FROM THE WEATHER SHALL BE STORED IN A SECURE DRY LOCATION.
- 5. DAMAGE CAUSED TO EXISTING FEATURES DURING THE DEMOLITION PROCESS SHALL BE REPAIRED AND RESTORED TO PREDEMOLITION CONDITIONS. IF DAMAGE CANNOT BE REPAIRED ADEQUATELY THAN THE DAMAGED ITEM SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.
- 6. FEATURES SHOWN IN BOLD INDICATE ITEMS THAT MUST AT A MINIMUM BE REMOVED. ALSO SEE NOTE 1.
EXISTING NATURAL FEATURES
- 1. TOPOGRAPHY AND CONTOURS: THE EXISTING TOPOGRAPHY AND CONTOURS HAVE BEEN SHOWN ON PLANS.
- 2. SITE BENCHMARK AND DATUM: BENCHMARK: EXISTING SANITARY SEWER MANHOLE IN TANGLEWOOD DRIVE. TOP OF MANHOLE=459.50. DATUM IS BASED ON NAVD DATUM OF 1988.
- 3. STEEP SLOPES: THE STEEP SLOPES HAVE BEEN DELINEATED ON THE PLANS FOR 15%–25% AND GREATER THAN 25% SLOPES.
- 4. WATERCOURSES, PONDS AND FLOOD HAZARD DISTRICT: THERE IS AN EXISTING PERENNIAL STREAM CHANNEL ON-SITE. THE PROPOSED LAYOUT HAS LIMITED DISTURBANCE TO A ROADWAY CROSSING OF THE STREAM CHANNEL TOWARDS THE SOUTH-EASTERN CORNER OF THE SITE. THERE IS AN EXISTING STREAM CROSSING THAT SHALL BE REMOVED AS PART OF THE DEVELOPMENT. THE SITE IS LOCATED WITHIN THE FLOOD HAZARD DISTRICT "A".
- 5. SOIL DATA: Co – CODORUS SILT LOAM; Ha – HATBORO SILT LOAM; GgB – GLENELG SILT LOAM, 3 TO 8 PERCENT SLOPES; MaB – MANOR LOAM, 3 TO 8 PERCENT SLOPES; MaC – MANOR LOAM, 8 TO 15 PERCENT SLOPES; MaD – MANOR LOAM, 15 TO 25 PERCENT SLOPES; MaE – MANOR LOAM, 25 TO 35 PERCENT SLOPES; UugB – URBAN LAND – UDORTHENTS SCHIST AND GNEISS COMPLEX, 0 TO 8 PERCENT SLOPES
- 6. GEOLOGIC FORMATION: "GLENARM WISSAHICKON" FORMATION QUARTZ, ALBITE, MUSCOVITE, AND CHLORITE.
- 7. SOIL PERCOLATION TESTS: SOIL TEST AND PROBE LOCATIONS ARE SHOWN ON THE PLANS.
- 8. WETLANDS: THE WETLAND INFORMATION SHOWN HEREON IS BASED ON A WETLAND DELINEATION PERFORMED BY LIBERTY ENVIRONMENTAL, INC. IN JUNE 2022.
- 9. EXISTING VEGETATION: THE SITE VEGETATION IS PREDOMINATELY MEADOWS/PASTURE COVER, WITH AREAS OF MAINTAINED LAWN AND WOODED AREAS. THE WOODLANDS AND INDIVIDUAL TREES ARE SHOWN ON THE PLANS.
- 10. EXISTING STRUCTURES AND OTHER IMPROVEMENTS: THE EXISTING IMPROVEMENTS ARE SHOWN ON THE PLANS.
- 11. HISTORIC RESOURCES: THE EXISTING DWELLING AND BARN ARE CONSIDERED HISTORIC RESOURCES AND WILL NOT BE ALTERED AS PART OF THIS PLAN. PER THE CONDITIONAL USE DECISION, ANY FUTURE RESIDENTIAL REUSE OF THE HISTORIC BARN SHALL REQUIRE FURTHER APPROVALS FROM THE TOWNSHIP, PURSUANT TO THE HISTORIC PRESERVATION PROVISIONS OF THE ORDINANCE (SECTIONS 240-38.1 THROUGH 240-38.10). DURING ITS OWNERSHIP OF THE HISTORIC BARN, THE APPLICANT SHALL ENSURE THAT IT IS WELL MAINTAINED AND DOES NOT FALL INTO DISREPAIR.
- 13. EXISTING PATHS AND TRAILS: THERE ARE NO EVIDENCE OF PATHS OR TRAILS ON SITE.
- 14. EXISTING EROSION AND SEDIMENTATION CONTROL MEASURES: THERE ARE NO EXISTING EROSION AND SEDIMENTATION CONTROL MEASURES ON SITE.
- 15. ANY OTHER SIGNIFICANT EXISTING NATURAL OR MAN-MADE FEATURES: THERE ARE NO OTHER SIGNIFICANT EXISTING NATURAL OR MAN-MADE FEATURES ON SITE.
- 16. DELINEATION OF THOSE PORTIONS OF THE LOT VISIBLE FROM ADJACENT PUBLIC ROADS: DUE TO THE SURROUNDING DEVELOPED PROPERTIES AND EXISTING VEGETATION, THE VISIBILITY OF THE PROPERTY FROM HERSHEY MILL ROAD AND TANGLEWOOD DRIVE IS VERY LIMITED.
LEGEND
- EXISTING CURB
- EXISTING CONTOURS
- EXISTING SPOT ELEVATION
- SOIL LINE
- RIPARIAN BUFFER
- WETLAND DELINEATION
- EXISTING WETLANDS
- EXISTING STREET SIGN
- SLANTED TEXT: EXISTING FEATURES ARE LABELED WITH SLANTED TEXT
- EXISTING DECIDUOUS TREE
- EXISTING CONIFEROUS TREE
- EXISTING EDGE OF WOODS
- (TBR): TO BE REMOVED
- EXISTING SANITARY SEWER & MANHOLE
- EXISTING WATER LINE & VALVE
- 15% - 25% SLOPES
- 25%+ SLOPES
Title Block
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN – EXISTING CONDITIONS AND DEMOLITION PLAN
CLIENT: GROVE MEADOW DEVELOPERS LLC
LOCATION: EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA
DATE: APRIL 20, 2023
DRAWN BY: M.D.HARTMAN | CHECKED BY: M.D.HARTMAN | GRAPHIC SCALE: 1" = 50' | SHEET: 3 OF 17 | PLAN NO.: 22-001-F-D-3.0
Engineer: MICHAEL DUAIN HARTMAN, PE, dh Enterprises, 2815 PENN AVENUE, WEST LAWN, PA, 610-927-4242
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - GRADING & UTILITY PLAN
Grading & Utility Plan drawing (Sheet 4 of 17, Plan No. 22-001-F-D-4.0) showing existing and proposed contours, proposed house footprints and spot elevations on lots around Millstone Circle, Sanitary Sewer Easement, Storm Sewer Easement, Infiltration Basin #1 (Bottom 474.00, Top of Berm 478.00), Infiltration Basin #2 (Bottom 481.00, Top of Berm 484.00), proposed water main, sanitary sewer, and storm sewer alignments, Hershey Mill Road, and Tanglewood Drive.
GENERAL CONSTRUCTION NOTES
- 1. AREAS WHICH ARE TO BE FILLED SHALL BE COMPACTED TO A MINIMUM DENSITY OF 98% MAXIMUM DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST (ASTM D-698) IN THE BUILDING, PAVED AND SIDEWALK AREAS, AND 92% IN OTHER AREAS.
- 2. UNDERGROUND FACILITIES HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND PLANS OF OTHERS AND THEREFORE THEIR ELEVATIONS AND LOCATION MUST BE CONSIDERED AS APPROXIMATE ONLY. THE VERIFICATION OF EACH FACILITY SHOWN OR NOT SHOWN, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
- 3. CONTRACTOR TO VERIFY LOCATION AND FLOW OF EXISTING UTILITIES PRIOR TO INSTALLATION OF PLUMBING. ALL SERVICES TO BE CONNECTED IN ACCORDANCE WITH LOCAL CODES AND/OR UTILITY COMPANIES REQUIREMENT.
- 4. PAVEMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH PENNDOT SPECIFICATIONS PUBLICATION 408, LATEST EDITION.
- 5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE LOCAL AUTHORITY OR GOVERNING AGENCY OF THE BEGINNING DATE OF CONSTRUCTION AND IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO SEE THAT NO WORK IS DONE WITHOUT THE PROPER INSPECTIONS BY LOCAL AUTHORITY OR GOVERNING AGENCY.
- 6. CONTRACTOR TO NOTIFY ENGINEER AS SOON AS POSSIBLE IF CONDITIONS ON GROUND DIFFER FROM THOSE SHOWN ON THE PLANS.
- 7. ALL AREAS OTHER THAN PAVED AREAS SHALL HAVE A MINIMUM DEPTH OF SIX INCHES (6") OF TOPSOIL PRIOR TO SEEDING. THE SURFACE SHALL BE SCARIFIED AND CLEARED OF ALL TRASH, DEBRIS, ROOTS AND OTHER OBJECTS THAT WOULD INTERFERE WITH PLANTINGS, FERTILIZING OR MAINTENANCE OPERATIONS.
- 8. SEEDING AND MULCHING SHALL BE IN ACCORDANCE WITH PENNDOT PUBLICATION 408.
- 9. ALL SPOT ELEVATIONS SHOWN AT THE CURBLINE ARE THE BOTTOM OF CURB, UNLESS OTHERWISE NOTED.
CONSTRUCTION INSPECTION SCHEDULE
INSPECTIONS SHALL BE REQUIRED AS FOLLOWS:
- 1. AT THE COMPLETION OF PRELIMINARY SITE PREPARATION.
- 2. AT THE COMPLETION OF ROUGH GRADING, BUT PRIOR TO PLACEMENT OF TOPSOIL.
- 3. DURING THE CONSTRUCTION OF PERMANENT STORMWATER FACILITIES, OR AS DEEMED NECESSARY BY THE MUNICIPAL ENGINEER.
- 4. UPON COMPLETION OF PERMANENT STORMWATER FACILITIES.
- 5. UPON COMPLETION OF FINAL GRADING AND PERMANENT VEGETATIVE CONTROLS.
LEGEND
- EXISTING CURB
- PROPOSED CURB
- EXISTING CONTOURS
- PROPOSED CONTOURS
- EXISTING SPOT ELEVATION
- PROPOSED SPOT ELEVATION
- SOIL LINE
- EXISTING STREET SIGN
- SLANTED TEXT: EXISTING FEATURES ARE LABELED WITH SLANTED TEXT
- (TBR): TO BE REMOVED
- EXISTING DECIDUOUS TREE
- PROPOSED SANITARY SEWER & MANHOLE
- PROPOSED STORM SEWER & CATCH BASIN
- EXISTING WATER LINE & VALVE
- PROPOSED WATER LINE & VALVE
- PROPOSED FIRE HYDRANT
- PROPOSED GRINDER PUMP
- PROPOSED WATER LATERAL
- PROPOSED CURB TAPER
Title Block
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN – GRADING & UTILITY PLAN
CLIENT: GROVE MEADOW DEVELOPERS LLC
LOCATION: EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA
DATE: APRIL 20, 2023
DRAWN BY: M.D.HARTMAN | CHECKED BY: M.D.HARTMAN | GRAPHIC SCALE: 1" = 50' | SHEET: 4 OF 17 | PLAN NO.: 22-001-F-D-4.0
Engineer: MICHAEL DUAIN HARTMAN, PE, dh Enterprises, 2815 PENN AVENUE, WEST LAWN, PA, 610-927-4242
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - PROFILES
Engineering profile drawing sheet 6 of 17 showing roadway, storm sewer and sanitary sewer profiles on gridded elevation-versus-station charts. Small pipe, structure and elevation annotations are too fine to read reliably: [illegible].
STORM AND SANITARY SEWER NOTES
- 1. STORM SEWERS AND SANITARY SEWERS SHALL BE CONSTRUCTED IN ACCORDANCE WITH ALL APPLICABLE MUNICIPAL AND AUTHORITY DETAILS AND SPECIFICATIONS.
- 2. GRATE ELEVATIONS FOR INLETS ALONG CURB ARE COMPUTED TO THE CENTER OF THE INLET AT THE GUTTERLINE.
- 3. GRATE ELEVATIONS FOR INLETS IN NON-CURBED AREAS ARE COMPUTED TO THE CENTER OF THE INLET IN BOTH DIMENSIONS.
- 4. SANITARY SEWER AND STORM SEWER MANHOLE RIM ELEVATIONS ARE COMPUTED TO CENTER OF THE LID.
- 5. PROTECTION OF PIPES - THE CONTRACTOR MUST PROVIDE AND MAINTAIN A MINIMUM OF 18" OF COVER OVER ALL STORM SEWER AND SANITARY SEWER PIPES DURING CONSTRUCTION STAGES UNTIL THE BINDER PAVING COURSE IS PLACED.
- 6. DEPTH OF STORM SEWERS - ALL STORM SEWER PIPE MUST BE PLACED AT A SUFFICIENT DEPTH TO ALLOW FOR THE FULL DEPTH OF PAVING, INCLUDING THE BASE COURSE, TO BE PLACED ABOVE THE TOP OF PIPE.
Profile titles
- MILLSTONE CIRCLE (LOOP), stations 0+00 to 9+50, elevations 480 to 520
- OFFSITE SANITARY SEWER, stations 0+00 to 8+00, elevations 445 to 490
- OS-2 - EW-1, stations 0+00 to 3+00, elevations 440 to 480
Title block
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN PROFILES
CLIENT: GROVE MEADOW DEVELOPERS LLC
LOCATION: EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA
DATE: APRIL 20, 2023
DRAWN BY: M.D.HARTMAN
CHECKED BY: M.D.HARTMAN
SCALE: 1" = 50'
SHEET: 6 OF 17
PLAN NO.: 22-001-F-D-6.1
GRAPHIC SCALE 1"=50'
2815 PENN AVENUE, WEST LAWN, PA, 610-927-4242. Engineer seal: MICHAEL DUAIN HARTMAN, Professional Engineer, Pennsylvania.
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - PROFILES
Engineering profile drawings showing four profiles with grids of stations and elevations, each with pipe and structure callouts [callout text too small to read reliably].
- MILLSTONE CIRLCE (MAIN DRIVE), stations 0+00 to 7+00, elevations 440 to 500
- OS-1 - ES-1
- I-17 - ES-2
- JB-14 - I-12
- PROPOSED CULVERT (aluminum arch pipe) near the lower right of the main profile
- Pipe labels include SLCPP pipes (e.g. 24" SLCPP, 36" SLCPP, 15" SLCPP) with lengths and grades
Title Block
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN PROFILES
CLIENT: GROVE MEADOW DEVELOPERS LLC
LOCATION: EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA
DATE: APRIL 20, 2023
DRAWN BY: M.D.HARTMAN | CHECKED BY: M.D.HARTMAN | SCALE: 1" = 50' | SHEET 7 OF 17 | 22-001-F-D-6.2
2815 PENN AVENUE, WEST LAWN, PA, 610-927-4242
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - EROSION AND SEDIMENT CONTROL PLAN
Erosion and Sediment Control Plan drawing (Sheet 8 of 17, Plan No. 22-001-F-D-7.1) showing project site boundary, limit of disturbance, Filtrexx Siltsoxx barriers, diversion swales, topsoil stockpile (TSS), concrete wash area (CWA), rock construction entrance, Sediment Basin #1 (Temporary Riser with Skimmer, Bottom 474.00), Infiltration Basin #2 (Bottom 481.00), Hershey Mill Road, and Tanglewood Drive.
ONECALL NOTES
PENNSYLVANIA ONE CALL SYSTEM INC. 1-800-242-1776 – STOP-CALL BEFORE YOU DIG!
PENNSYLVANIA ACT 287, AS AMENDED BY ACT 121 REQUIRES NOTIFICATION OF EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE COMMONWEALTH.
ACT 287 UNDERGROUND UTILITY PROTECTION ACT, AS AMENDED BY ACT 121
ACT 287 UNDERGROUND UTILITY PROTECTION ACT, AS AMENDED BY: ACT 172 OF 1986, ACT 38 OF 1991, ACT 187 OF 1996, ACT 199 OF 2004, ACT 181 OF 2006, ACT 121 OF 2008
PA ONE CALL SYSTEM INFORMATION:
PENNSYLVANIA ACT 287, AS AMENDED, REQUIRES THREE (3) WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND FIVE (5) WORKING DAYS NOTICE IN DESIGN STAGE.
PA ONE CALL PHONE NUMBER: 1-800-242-1776
ONE CALL SYSTEM SERIAL NO. NOTIFICATION BY NAVE NEWELL, INC.
DATE: 11/07/22
ONE CALL SYSTEM SERIAL NUMBER: 20223113472
UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE AND WERE DETERMINED FROM VISIBLE LOCATION, ACT 287 OF 1974, AS AMENDED, UTILITY RESPONSES AND/OR BEST AVAILABLE PLAN INFORMATION.
LIST OF RESPONDERS:
AQUA PENNSYLVANIA INC, COMCAST CABLE COMMUNICATIONS INC, EAST GOSHEN TOWNSHIP, PECO ENERGY, TEXAS EASTERN TRANSMISSION LP, VERIZON PENNSYLVANIA LLC
Site Area & Avoidance Measure
PROJECT SITE BOUNDARY AREA = 16.00 ACRES
LIMIT OF DISTURBANCE AREA = 8.83 ACRES
U.S. FISH AND WILDLIFE SERVICE AVOIDANCE MEASURE:
DO NOT CONDUCT THIS PROJECT/ACTIVITY WITHIN 50 FEET OF ANY STREAMS, RIVERS, CREEKS, OR TRIBUTARIES. THIS INCLUDES BOTH PERENNIAL AND INTERMITTENT WATERWAYS.
VICINITY MAP
SCALE: 1"=800' (Showing Project Location, Hershey Mill Rd, Millstream Dr, Anthony Dr, Upton Cir, Tanglewood Dr, Blanford Ln, Hadleigh Dr, Greenhill Rd, and zoning districts R-2 and R-3)
LEGEND & E&SPC LEGEND
- EXISTING CURB
- PROPOSED CURB
- EXISTING CONTOURS
- PROPOSED CONTOURS
- EXISTING SPOT ELEVATION
- PROPOSED SPOT ELEVATION
- SOIL LINE
- EXISTING STREET SIGN
- SLANTED TEXT: EXISTING FEATURES ARE LABELED WITH SLANTED TEXT
- (TBR): TO BE REMOVED
- EXISTING DECIDUOUS TREE
- PROPOSED SANITARY SEWER & MANHOLE
- PROPOSED STORM SEWER & CATCH BASIN
- EXISTING WATER LINE & VALVE
- PROPOSED WATER LINE & VALVE
- PROPOSED FIRE HYDRANT
- PROPOSED GRINDER PUMP
- PROPOSED WATER LATERAL
- PROPOSED CURB TAPER
- INLET FILTER PROTECTION
- FILTREXX SILTSOXX
- FILTREXX SILTSOXX 12" SILT SOXX (UNLESS SPECIFIED) (INDIVIDUAL LOT CONTROL)
- ROCK CONSTRUCTION ENTRANCE
- MOUNTABLE STONE FILTER BERM
- ROCK CONSTRUCTION ENTRANCE (INDIVIDUAL LOT CONTROL)
- TSS: TOPSOIL STOCKPILE WITH 12" SILT SOXX (UNLESS SPECIFIED) (INDIVIDUAL LOT CONTROL)
- CWA: CONCRETE WASH AREA
- EROSION CONTROL BLANKET NAG S75 (or approved equal)
- LIMIT OF DISTURBANCE
- PROJECT SITE BOUNDARY & LIMIT OF DISTURBANCE
- PROJECT SITE BOUNDARY
- ORANGE CONSTRUCTION SAFETY FENCING
- RIPARIAN BUFFER – 150'
Title Block
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN – EROSION AND SEDIMENT CONTROL PLAN
CLIENT: GROVE MEADOW DEVELOPERS LLC
LOCATION: EAST GOSHEN TOWNSHIP, CHESTER COUNTY, PENNSYLVANIA
DATE: APRIL 20, 2023
DRAWN BY: M.D.HARTMAN | CHECKED BY: M.D.HARTMAN | GRAPHIC SCALE: 1" = 50' | SHEET: 8 OF 17 | PLAN NO.: 22-001-F-D-7.1
Engineer: MICHAEL DUAIN HARTMAN, PE, dh Enterprises, 2815 PENN AVENUE, WEST LAWN, PA, 610-927-4242
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - CONSTRUCTION DETAIL & NOTES - E&SC
Client: Grove Meadow Developers LLC | Location: East Goshen Township, Chester County, Pennsylvania | Date: April 20, 2023 | Drawn By / Designed/Checked: M.D. Hartman | Scale: N.T.S. | Sheet: 9 of 17 | File No.: 22-001-F-D-7.2 | Engineer: Michael Duain Hartman, P.E., dh Enterprises, 2815 Penn Avenue, West Lawn, PA, 610-927-4242
CONSTRUCTION SEQUENCE
PRE-CONSTRUCTION ACTIVITIES
- ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. EACH STAGE SHALL BE COMPLETED IN COMPLIANCE WITH CHAPTER 102 REGULATIONS BEFORE ANY FOLLOWING STAGE IS INITIATED. CLEARING AND GRUBBING SHALL BE LIMITED ONLY TO THOSE AREAS DESCRIBED IN EACH STAGE.
- AT LEAST 7 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, THE OPERATOR SHALL INVITE ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES, THE LANDOWNER, ALL APPROPRIATE MUNICIPAL OFFICIALS, THE E&S CONTROL PLAN PREPARER, AND A REPRESENTATIVE OF THE CHESTER COUNTY CONSERVATION DISTRICT TO SCHEDULE AN ON-SITE PRE-CONSTRUCTION MEETING. IN ADDITION, AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY PENNSYLVANIA ONE CALL SYSTEM INC. AT 1-800-242-1776 FOR BURIED UTILITIES LOCATION.
- BEFORE INITIATING ANY REVISION TO THE APPROVED EROSION AND SEDIMENT CONTROL PLAN OR DRAINAGE/GRADING PLANS WHICH MAY AFFECT THE EFFECTIVENESS OF THE APPROVED E&S CONTROL PLAN, THE OPERATOR MUST RECEIVE APPROVAL OF THE REVISIONS FROM THE CHESTER COUNTY CONSERVATION DISTRICT. DETERMINATIONS WILL REMAIN THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY IMPLEMENTED IN ACCORDANCE WITH THE APPROVED PLAN AND PERMIT CONDITIONS. SHOULD AN EVALUATION SHOW THAT THIS IS NOT THE CASE, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO ELIMINATE POTENTIAL FOR ACCELERATED EROSION AND SEDIMENTATION IMMEDIATELY.
- THE ANTICIPATED WASTES ARE GENERAL CONSTRUCTION WASTES. THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ. THE CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIAL OR WASTES AT THE SITE.
- A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. EARTH DISTURBANCE MAY NOT COMMENCE UNTIL THE E&S CONTROL PLAN HAS BEEN PREPARED, AND HAS BEEN APPROVED BY THE CHESTER COUNTY CONSERVATION DISTRICT BECAUSE IT IS PREPARED IN ACCORDANCE WITH CHAPTER 102 RULES & REGULATIONS, AND IS BEING IMPLEMENTED AND MAINTAINED FOR THE DURATION OF THE PROJECT UNTIL SITE STABILIZATION IS ACHIEVED.
MAIN SITE DEVELOPMENT
- INSTALL ROCK CONSTRUCTION ENTRANCE AS SHOWN ON THE PLAN.
- FIELD DELINEATE THE LIMIT OF DISTURBANCE (LOD) PRIOR TO DISTURBANCE ACTIVITIES WITH TREE PROTECTION FENCING AND/OR HIGH VISIBILITY ORANGE CONSTRUCTION SAFETY FENCING IN THE LOCATIONS AS SHOWN ON THE E&S CONTROL PLAN.
- STREAM CROSSING REMOVAL AND INSTALLATION OF CULVERT SHALL BE IN ACCORDANCE WITH DEP PERMIT REQUIREMENTS.
- THE CONVERSION OF THE RIPARIAN BUFFER AREA TO A FORESTED RIPARIAN BUFFER AREA MAY TAKE PLACE ANY TIME IN ACCORDANCE WITH THE SEQUENCES SHOWN ON THE FORESTED RIPARIAN BUFFER MANAGEMENT PLANS.
- INSTALL PERIMETER BERMS, IMMEDIATELY STABILIZE AND INSTALL EROSION CONTROL BLANKET.
- INITIATE INSTALLATION OF THE SEDIMENT BASINS BY CONSTRUCTING EMBANKMENTS, EMERGENCY SPILLWAYS, SKIMMER DEWATERING DEVICES, BAFFLES, CLEANOUT STAKES, DEWATERING FACILITIES AND PERMANENT OUTLET STRUCTURE WITH TRASH RACK ON TOP.
- GRADE AREA BEHIND BERM AS SHOWN FOR THE SEDIMENT BASIN ON THE E&S CONTROL PLAN AND IMMEDIATELY STABILIZE EMBANKMENT SLOPES AND TOP WITH EROSION CONTROL BLANKET AND SEED.
- CONCURRENTLY WITH STAGE 5, INSTALL THE STORM SEWER FROM I-4 TO ES-5, INCLUDING OUTLET RIP-RAP APRON.
- INITIATE CLEARING AND GRUBBING OF THE WOODED AREA ALONG MILLSTONE CIRCLE TO THE LIMIT OF DISTURBANCE AS SHOWN ON THE E&S PLAN.
- INITIATE STRIPPING AND STOCKPILING OF TOPSOIL FROM THE RIGHT-OF-WAY OF MILLSTONE CIRCLE AS WELL AS THOSE AREAS WHICH REQUIRE GRADING PRIOR TO CONSTRUCTING HOMES ON THE LOTS. NOTE: ALL RUNOFF FROM THE DISTURBED AREAS SHALL BE DIRECTED TOWARD EITHER SILT SOCK OR THE SEDIMENT BASIN. STOCKPILE HEIGHTS MUST NOT EXCEED 35'. STOCKPILE SLOPES MUST BE 2:1 OR FLATTER. SURPLUS OF TOPSOIL SHALL BE KEPT TO A MINIMUM TO PREVENT EXCESSIVE STOCKPILING OF TOPSOIL ON THE SITE.
- INITIATE ROUGH GRADING ACTIVITIES REQUIRED TO ACHIEVE THE PROPOSED GRADES OF THE STREET AND LOT AREAS WHICH REQUIRE EARTHWORK PRIOR TO HOME CONSTRUCTION.
- BEGIN INSTALLATION OF ALL UNDERGROUND UTILITIES INCLUDING SANITARY SEWER, STORM SEWER AND WATER LINE. INSTALL STONE INLET PROTECTION ON INLETS NOTED ON THE PLANS. NOTE: BERMS ARE REQUIRED FOR ALL INSTALLATIONS. EARTHEN BERMS ARE TO BE MAINTAINED UNTIL ROADWAY IS PAVED. ROAD SUBBASE IS TO BE MAINTAINED WITH STABILIZED STONE. NOTE: INLETS I-14 TO I-17 ARE TO BE BLOCKED AT THIS TIME.
- PLACE STONE SUBBASE ON ROADWAY SUBGRADE.
- BEGIN HOME CONSTRUCTION IN ACCORDANCE WITH THE INDIVIDUAL LOT CONSTRUCTION SEQUENCE. IN THE EVENT THAT HOME CONSTRUCTION IS NOT TO BEGIN IMMEDIATELY, IMPLEMENT TEMPORARY VEGETATIVE STABILIZATION ON THAT LOT.
- INSTALL BITUMINOUS PAVING, CURBING AND SIDEWALK ALONG ROADWAYS.
- COMMENCE AND COMPLETE THE PERMANENT VEGETATIVE STABILIZATION OF ALL DISTURBED AREAS WHICH ARE AT FINAL GRADE. INSTALL PROPOSED TREES AS SHOWN ON THE LANDSCAPING PLAN.
- UPON STABILIZATION OF ALL UP SLOPE DISTURBED AREAS TRIBUTARY TO INFILTRATION BASINS #1 AND #2, INITIATE CONVERSION OF INFILTRATION BASINS #1 AND #2 IN ACCORDANCE WITH THE INDIVIDUAL BMP CONSTRUCTION SEQUENCE AND CRITICAL STAGES OF IMPLEMENTATION PROVIDED IN THE POST-CONSTRUCTION STORMWATER MANAGEMENT PLAN DETAILS.
- UPON STABILIZATION OF ALL UP SLOPE DISTURBED AREAS TRIBUTARY TO INFILTRATION BASIN #2, INITIATE CONVERSION OF THE BASIN FROM A SEDIMENT BASIN TO THE PERMANENT INFILTRATION BASIN IN ACCORDANCE WITH THE INDIVIDUAL BMP CONSTRUCTION SEQUENCE AND CRITICAL STAGES OF IMPLEMENTATION PROVIDED IN THE POST-CONSTRUCTION STORMWATER MANAGEMENT PLAN AND DETAILS.
- UPON STABILIZATION OF ALL DISTURBED AREAS, REMOVE ALL TEMPORARY E&S PRACTICES, INCLUDING SILT SOCK, INLET PROTECTION, ROCK ENTRANCE, ETC. AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING AND OTHER MOVEMENTS.
- WITHIN 30 DAYS AFTER COMPLETION OF EARTH DISTURBANCE ACTIVITIES AUTHORIZED BY THE PERMIT, AND PERMANENT STABILIZATION HAS BEEN ACHIEVED AND E&S BMPS HAVE BEEN REMOVED, THE PERMITTEE SHALL FILE WITH THE DEPARTMENT, OR CONSERVATION DISTRICT, A NOTICE OF TERMINATION FOR THIS PERMIT.
AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENTATION CONTROLS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF CONTROLS MUST BE STABILIZED IMMEDIATELY.
CONSTRUCTION SEQUENCE - INDIVIDUAL LOTS
- INSTALL TEMPORARY ROCK CONSTRUCTION ENTRANCE AND SILT SOCK AS SHOWN ON THE PLAN BEFORE ANY LOT EARTH DISTURBANCE BEGINS.
- LIMIT THE DISTURBANCE TO ONLY THE AREA REQUIRED FOR LOT IMPROVEMENTS.
- STRIP TOPSOIL AND STOCKPILE ON THE LOT IN DESIGNATED LOCATION. IMMEDIATELY SEED AND MULCH THE STOCKPILE.
- CONSTRUCT HOUSE AND OTHER LOT IMPROVEMENTS.
- LANDSCAPE LAWN AREAS TO FINISHED GRADE, IMMEDIATELY REPLACE TOPSOIL AND PERMANENTLY SEED AND MULCH ALL DISTURBED AREAS. INSTALL PERMANENT EROSION CONTROL BLANKET AS SHOWN ON THE PLANS FOR ALL SLOPES 3:1 AND STEEPER.
- REMOVE THE SILT SOCK ONLY AFTER PERMANENT GRASS COVER IS WELL ESTABLISHED ON ALL DISTURBED AREAS.
CONSTRUCTION SEQUENCE - OFFSITE UTILITIES
- INITIATE INSTALLATION OF UTILITY LINE. IMMEDIATELY IMPLEMENT TEMPORARY VEGETATIVE STABILIZATION. THE LENGTH OF TRENCH SHOULD BE LIMITED TO THE AMOUNT THAT CAN BE INSTALLED AND BACKFILLED IN A DAY.
- COMMENCE AND COMPLETE THE PERMANENT VEGETATIVE STABILIZATION OF ALL DISTURBED AREAS WHICH ARE AT FINAL GRADE.
- UPON STABILIZATION OF ALL DISTURBED AREAS, REMOVE ALL OTHER E&S FACILITIES AND TEMPORARY CONTROLS (SILT SOCK, INLET BMPS, ETC.). AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING AND OTHER MOVEMENTS.
UTILITY LINE TRENCH EXCAVATION NOTES
- LIMIT OPEN EXCAVATION IN UTILITY LINE INSTALLATIONS TO A DISTANCE EQUAL TO TWO TIMES THE LENGTH OF PIPE INSTALLATION THAT CAN BE COMPLETED IN ONE DAY.
- IMMEDIATELY IMPLEMENT CONTROLS TO DIRECT RUNOFF AWAY FROM TRENCH EXCAVATION AND STOCKPILED SOIL. SEPARATE EXCAVATED TRENCH SPOIL FROM TOPSOIL FROM CLEARING AND GRUBBING AND SITE RESTORATION AND STABILIZATION OPERATIONS.
- ALL SOIL EXCAVATED FROM THE TRENCH WILL BE PLACED ON THE UPHILL SIDE OF THE TRENCH.
- LIMIT DAILY TRENCH EXCAVATION TO THE LENGTH OF PIPE PLACEMENT, PLUG INSTALLATION AND BACKFILLING THAT CAN BE COMPLETED THE SAME DAY.
- WATER THAT ACCUMULATES IN THE OPEN TRENCH WILL BE COMPLETELY REMOVED BY PUMPING BEFORE PIPE PLACEMENT AND BACKFILLING OPERATIONS. WATER REMOVED FROM THE TRENCH SHALL BE PUMPED THROUGH A FILTER BAG DEVICE.
- ON THE DAY FOLLOWING PIPE PLACEMENT AND TRENCH BACKFILLING, THE DISTURBED AREA WILL BE GRADED TO FINAL CONTOURS AND IMMEDIATELY STABILIZED.
GENERAL NOTES
- ONLY LOCAL DISTURBANCE WILL BE PERMITTED TO PROVIDE ACCESS FOR E&S CONTROL INSTALLATION. PRIOR TO INITIATING ANY EARTH DISTURBANCE FOR CLEARING, GRUBBING OR GRADING FOR SITE IMPROVEMENTS, THE PERIMETER E&S CONTROLS MUST BE INSTALLED AND FUNCTIONING. AREAS TO BE STABILIZED WITH PERMANENT VEGETATION SHALL BE LIMITED TO PREVENT OVER COMPACTION OF SOILS.
- EROSION AND SEDIMENTATION CONTROLS MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE BEGINS WITHIN THE TRIBUTARY AREA TO THOSE CONTROLS.
- THE SIZE AND DURATION OF DISTURBANCE SHALL BE LIMITED TO THAT WHICH IS NECESSARY TO PERFORM THE WORK AS SHOWN ON THIS PLAN. STABILIZE ANY DISTURBED AREAS WHERE WORK MUST CEASE FOR FOUR (4) DAYS OR MORE.
- AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENTATION CONTROLS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE BMPS MUST BE STABILIZED IMMEDIATELY.
- AT THE END OF EACH WORKING DAY, ANY SEDIMENT TRACKED OR DEPOSITED ONTO A PUBLIC ROADWAY MUST BE IMMEDIATELY REMOVED AND RETURNED TO THE CONSTRUCTION SITE. REMOVAL CAN BE COMPLETED THROUGH USE OF MECHANICAL OR HAND TOOLS, BUT MUST NEVER BE WASHED OFF INTO A DRAINAGE FACILITY OR WATERWAY.
- TOPSOIL OR OTHER EXCAVATED MATERIAL SHALL NOT BE STOCKPILED IN WETLAND AREAS, FLOODWAY OR FLOODPLAIN AREAS, DRAINAGE CHANNELS OR WITHIN 50 FEET OF STREAMS OR OTHER SURFACE WATERS.
- ALL PUMPED EXCAVATION WATER SHALL BE DISCHARGED THROUGH A SILT BAG FILTRATION DEVICE, LOCATED IN A WELL-VEGETATED AREA A MINIMUM OF 50 FEET FROM ANY SURFACE WATER. DISCHARGE POINTS SHOULD BE ESTABLISHED TO PROVIDE FOR MAXIMUM DISTANCE TO ACTIVE WATERWAYS.
- UNDERDRAIN WILL BE PROVIDED WHERE SPRINGS OR SEEPAGE ARE ENCOUNTERED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
- FILL EXCHANGES FOR UTILITY LINE INSTALLATION SHALL BE LIMITED TO THE AMOUNT THAT CAN BE INSTALLED AND BACKFILLED IN A DAY. OPEN TRENCHES SHALL NOT REMAIN OPEN OVERNIGHT.
- SHOULD UNFORESEEN EROSION CONDITIONS DEVELOP DURING CONSTRUCTION, THE CONTRACTOR SHALL TAKE ACTION TO REMEDY SUCH CONDITIONS AND TO PREVENT DAMAGE TO ADJACENT PROPERTIES AS A RESULT OF INCREASED RUNOFF AND/OR SEDIMENT DISPLACEMENT. RESERVES OF COMMERCIAL SILT FENCE, HAY BALES AND RIP-RAP SHALL BE HELD ON PROJECTS TO DEAL IMMEDIATELY WITH EMERGENCY PROBLEMS OF EROSION.
- ALL EARTH DISTURBANCE ACTIVITIES MUST BE DONE IN ACCORDANCE WITH THE PROVISIONS OF THE CLEAN STREAMS LAW, ACT 394 AS AMENDED AND PA CODE TITLE 25, DEPARTMENT OF ENVIRONMENTAL PROTECTION, SUBPART C, PROTECTION OF NATURAL RESOURCES, ARTICLE II, WATER RESOURCES, CHAPTER 102 EROSION CONTROL.
- A COPY OF THIS EROSION AND SEDIMENTATION CONTROL REPORT AND PLANS MUST BE POSTED AT THE CONSTRUCTION SITE.
- BEFORE DISPOSING OF SOIL OR RECEIVING BORROW FOR THE SITE, THE OPERATOR MUST ASSURE THAT AN E&S CONTROL PLAN HAS BEEN APPROVED BY THE CONSERVATION DISTRICT AND IS BEING FULLY IMPLEMENTED FOR THE OFF-SITE DISPOSAL/BORROW AREA ACCORDING TO DEP CHAPTER 102 REGULATIONS. ALL RECYCLING OR DISPOSAL OF MATERIALS SHALL BE IN FULL COMPLIANCE WITH DEP CHAPTER 102 REGULATIONS.
NPDES PERMIT NOTES
- UPON REDUCTION, LOSS OR FAILURE OF ANY BMP, THE PERMITTEE AND/OR CO-PERMITTEE SHALL TAKE IMMEDIATE ACTION TO RESTORE, REPAIR OR REPLACE THE BMP OR PROVIDE AN ALTERNATIVE METHOD OF TREATMENT.
- WHERE E&S BMPS ARE FOUND TO BE INOPERATIVE OR INEFFECTIVE DURING AN INSPECTION, OR ANY OTHER TIME, THE PERMITTEE AND CO-PERMITTEE SHALL NOTIFY THE CHESTER COUNTY CONSERVATION DISTRICT, BY PHONE OR PERSONAL CONTACT, FOLLOWED BY THE SUBMISSION OF A WRITTEN REPORT WITHIN 5 DAYS OF THE INITIAL CONTACT.
- PERMITTEES REQUESTING A RENEWAL OF COVERAGE UNDER INDIVIDUAL PERMIT MUST SUBMIT TO THE DEPARTMENT A COMPLETE AND ACCEPTABLE APPLICATION AT LEAST 180 DAYS BEFORE THE EXPIRATION DATE OF THIS PERMIT, UNLESS PERMISSION FOR SUBMISSION AT A LATER DATE HAS BEEN GRANTED BY THE DEPARTMENT.
- PERMITTEES AND CO-PERMITTEES ARE RESPONSIBLE FOR ENSURING THAT A LICENSED PROFESSIONAL IS ON-SITE DURING CRITICAL STAGES OF IMPLEMENTATION OF THE APPROVED PCSM PLAN TO OVERSEE CONSTRUCTION OF ALL STRUCTURAL PCSM BMPS IDENTIFIED IN THE PCSM PLAN PRIOR TO THE SUBMISSION OF A NOTICE OF TERMINATION. THE LICENSED PROFESSIONAL SHALL ENSURE THAT THE BMPS ARE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH THE APPROVED PLAN.
- NOTICE OF TERMINATION: UPON PERMANENT STABILIZATION OF THE EARTH DISTURBANCE ACTIVITY UNDER A RESTORATION OR RECLAMATION PLAN AND PERMANENT INSTALLATION OF BMPS IN ACCORDANCE WITH AN APPROVED PLAN PREPARED AND IMPLEMENTED IN ACCORDANCE WITH PA CODE §102.4 AND §102.8 (RELATING TO E&S CONTROL REQUIREMENTS; AND PCSM REQUIREMENTS), THE PERMITTEE OR CO-PERMITTEE SHALL SUBMIT A NOTICE OF TERMINATION TO THE DEPARTMENT OR CONSERVATION DISTRICT. THE NOTICE OF TERMINATION MUST INCLUDE: 1) THE FACILITY NAME, ADDRESS AND LOCATION.; 2) THE OPERATOR NAME AND ADDRESS.; 3) THE PERMIT NUMBER.; 4) THE REASON FOR PERMIT TERMINATION.; 5) IDENTIFICATION OF THE PERSONS WHO HAVE AGREED TO AND WILL BE RESPONSIBLE FOR LONG-TERM OPERATION AND MAINTENANCE OF THE PCSM BMPS IN ACCORDANCE WITH §102.8(m) AND PROOF OF COMPLIANCE WITH §102.8(m)(2). PRIOR TO ACCEPTING THE NOT, THE DEPARTMENT AND/OR CONSERVATION DISTRICT STAFF WILL CONDUCT A FINAL INSPECTION AND APPROVE OR DENY THE NOTICE OF TERMINATION.
MAINTENANCE NOTES
- STOCKPILE HEIGHTS MUST NOT EXCEED 35'. STOCKPILE SLOPES MUST BE 2:1 OR FLATTER.
- UPON COMPLETION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY, THE SITE SHALL IMMEDIATELY BE SEEDED, MULCHED OR OTHERWISE PROTECTED FROM ACCELERATED EROSION. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT THE RECOMMENDED RATES. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE RE-DISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN ACCORDANCE WITH TEMPORARY VEGETATIVE STABILIZATION SPECIFICATIONS. DISTURBED AREAS WHICH ARE EITHER AT FINISHED GRADE OR WILL NOT BE RE-DISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN ACCORDANCE WITH PERMANENT SEEDING SPECIFICATIONS.
- LIME AND FERTILIZER SHALL BE INCORPORATED INTO THE SOIL.
- HAY OR STRAW MULCH MUST BE APPLIED AT RATES OF AT LEAST 3.0 TONS PER ACRE.
- UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENTATION CONTROL BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY.
- AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING AND OTHER MOVEMENTS. WITHIN 4 DAYS AFTER EARTH DISTURBANCE ACTIVITIES CEASE, THE OPERATOR SHALL STABILIZE ANY AREAS DISTURBED BY THE ACTIVITIES. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT RECOMMENDED RATES. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE REDISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY VEGETATIVE STABILIZATION SPECIFICATIONS. DISTURBED AREAS WHICH ARE AT FINISHED GRADE OR WHICH WILL NOT BE REDISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE PERMANENT VEGETATIVE STABILIZATION SPECIFICATIONS.
- EROSION CONTROL MATS OR MULCH CONTROL NETTING OR EROSION CONTROL BLANKETS MUST BE INSTALLED ON ALL SLOPES EQUAL TO OR GREATER THAN 3:1.
- UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENTATION BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL INSPECTIONS SHALL BE DOCUMENTED IN AN INSPECTION LOG KEPT FOR THIS PURPOSE. THE COMPLIANCE ACTIONS AND DATES OF IMPLEMENTATION OF THE NEEDED REPAIRS WILL BE DOCUMENTED. THE INSPECTION LOG WILL BE KEPT ON SITE AT ALL TIMES AND MADE AVAILABLE TO THE DISTRICT UPON REQUEST.
- ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF EROSION AND SEDIMENTATION BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED. WHERE BMPS ARE FOUND TO FAIL TO ACHIEVE EROSION OR SEDIMENT POLLUTION CONTROL, THE PERMITTEE OR CO-PERMITTEE SHALL INCLUDE THE FOLLOWING INFORMATION: a. THE LOCATION AND SEVERITY OF THE BMP'S FAILURE AND ANY POLLUTION EVENTS.; b. ALL STEPS TAKEN TO REDUCE, ELIMINATE AND PREVENT THE RECURRENCE OF THE NON-COMPLIANCE.; c. THE TIME FRAME TO CORRECT THE NON-COMPLIANCE, INCLUDING THE EXACT DATES WHEN THE ACTIVITY WILL RETURN TO COMPLIANCE. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE BMPS MUST BE STABILIZED IMMEDIATELY.
SEEDING AND SURFACE STABILIZATION
GENERAL SEEDING AND SURFACE STABILIZATION CRITERIA
- DISTURBED AREAS ON WHICH ACTIVITIES HAVE BEEN COMPLETED OR WILL BE CEASED FOR MORE THAN 4 DAYS OR ANY STAGE THEREOF SHALL BE IMMEDIATELY STABILIZED WITH THE APPROPRIATE TEMPORARY OR PERMANENT SEEDING SPECIFICATIONS.
- DURING NON-GERMINATION PERIODS, MULCH MUST BE APPLIED AT THE RATE SPECIFIED UNDER "STABILIZATION DURING NON-GERMINATION PERIODS."
- DISTURBED AREAS WHICH ARE NOT FINISHED GRADE AND WILL BE REDISTURBED WITHIN 1 YEAR MAY BE SEEDED AND MULCHED WITH A QUICK GROWING TEMPORARY SEED MIXTURE AND MULCH AS SPECIFIED UNDER "TEMPORARY VEGETATIVE SURFACE STABILIZATION."
- DISTURBED AREAS WHICH ARE FINISHED GRADE OR WHICH WILL NOT BE REDISTURBED WITHIN ONE YEAR MUST BE SEEDED WITH A PERMANENT SEED MIXTURE AND MULCHED AS SPECIFIED UNDER "PERMANENT VEGETATIVE SURFACE STABILIZATION."
- DIVERSION CHANNELS, TERRACES, INTERCEPTOR CHANNELS, CHANNELS OF CONVEYANCE, SEDIMENT BASINS, SEDIMENT TRAPS AND STOCKPILES MUST BE SEEDED AND MULCHED IMMEDIATELY UPON CONSTRUCTION WITH EITHER AN APPROPRIATE SEEDING MIXTURE AND MULCH, LINED OR PROTECTED AS SHOWN ON THE PLANS AND DETAILS.
- TOPSOIL MUST BE APPLIED TO ALL AREAS TO BE SEEDED AT A MINIMUM DEPTH OF 4 INCHES (8 TO 12 INCHES ON COMPACTED SOILS) PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED MUST HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING, 6" YARDS.
STABILIZATION DURING NON-GERMINATION PERIODS
STRAW MULCH AT THE MINIMUM RATE OF 3 TONS/ACRE MUST BE APPLIED TO DISTURBED AREAS AT A RATE OF 3 TONS/ACRE. THE NON-GERMINATING PERIOD VARIES IN LENGTH ACCORDING TO LOCAL WEATHER CONDITIONS; IT IS GENERALLY THE PERIOD FROM OCTOBER 15 TO MARCH 15. AREAS SEEDED DURING NON-GERMINATION PERIODS MUST BE LIMED, FERTILIZED, SEEDED AND MULCHED IMMEDIATELY.
TEMPORARY VEGETATIVE SURFACE STABILIZATION
IMPLEMENT ALL STEPS OUTLINED BELOW AS REQUIRED TO ACHIEVE TEMPORARY STABILIZATION OF ALL EXPOSED AND DISTURBED SOIL AREAS AS INDICATED OR DIRECTED:
- TILLING - UPON SUSPENSION OF GRADING ACTIVITIES IN DISTURBED AREAS, SURFACE SOIL SHALL BE TILLED TO A DEPTH OF 2 TO 4 INCHES. TILLING MAY BE OMITTED IF SOIL IS SUFFICIENTLY LOOSE TO PERMIT SEEDING ACTIVITIES.
- LIME APPLICATION - PULVERIZED AGRICULTURAL LIMESTONE SHALL BE APPLIED TO THE LOOSENED SOIL AT A UNIFORM RATE OF 46 POUNDS PER 1000 SQUARE FEET. THIS RATE IS IN POUNDS OF AGRICULTURAL GRADE LIMESTONE PER 1,000 SQUARE FEET. IF THE WORK IS TEMPORARY (LESS THAN 6 MONTHS), LIME APPLICATION IS NOT REQUIRED.
- FERTILIZER APPLICATION - 5-5-5 FERTILIZER SHALL BE APPLIED TO THE LOOSENED SOIL AT A UNIFORM RATE OF 10 POUNDS PER 1000 SQUARE FEET.
- TEMPORARY SEEDING - THE FOLLOWING SEED MIXTURE SHALL BE APPLIED TO THE PREPARED SOIL SURFACE BY BROADCAST SPREADERS OR HYDRAULIC APPLICATION ACCORDING TO THE FOLLOWING RATE: SPRING OATS OR ANNUAL RYEGRASS: PURE SEED 97%, GERMINATION PERCENTAGE 85%, PURE LIVE SEED PERCENTAGE 82%, SEEDING RATE 1.0 LBS PLS PER 1000 SQUARE FEET. AFTER BROADCAST SEEDING, SEED SHALL BE COVERED BY MEANS OF LIGHT RAKING TO A DEPTH OF ONE-QUARTER INCH OF SOIL.
- MULCH: HAY OR STRAW MULCH SHALL BE APPLIED AT A RATE OF 3 TONS/ACRE. HAY MULCH SHOULD BE ANCHORED IMMEDIATELY AFTER APPLICATION TO PREVENT BEING WIND BLOWN. A TRACTOR-DRAWN IMPLEMENT MAY BE USED TO "CRIMP" THE HAY INTO THE SOIL. THIS METHOD IS LIMITED TO SLOPES NO STEEPER THAN 3:1. THE MACHINERY SHOULD BE OPERATED ON THE CONTOUR. CRIMPING OF HAY OR STRAW BY RUNNING OVER IT WITH TRACKED MACHINERY IS NOT RECOMMENDED.; ASPHALT, EITHER EMULSIFIED OR CUT-BACK, CONTAINING NO SOLVENTS OR OTHER DILUTING AGENTS TOXIC TO PLANT OR ANIMAL LIFE, UNIFORMLY APPLIED AT A RATE OF 35 GALLONS PER 100 SQUARE YARDS MAY BE USED TO TACK MULCH.; SYNTHETIC BINDERS (CHEMICAL BINDERS) MAY BE USED AS RECOMMENDED BY THE MANUFACTURER TO ANCHOR MULCH, PROVIDED SUFFICIENT DOCUMENTATION IS PROVIDED TO SHOW NON-TOXIC AND POLLUTION-FREE QUALITIES.; LIGHTWEIGHT PLASTIC, FIBER OR PAPER NETS MAY BE STAPLED OVER MULCH ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS.
PERMANENT VEGETATIVE SURFACE STABILIZATION
IMPLEMENT ALL STEPS OUTLINED BELOW AS REQUIRED TO ACHIEVE PERMANENT STABILIZATION OF ALL EXPOSED AND DISTURBED SOIL AREAS AS INDICATED OR DIRECTED:
- TILLING - UPON COMPLETION OF GRADING ACTIVITIES IN DISTURBED AREAS, SURFACE SOIL SHALL BE TILLED TO A DEPTH OF 4 INCHES. TILLING MAY BE OMITTED IF SOIL IS SUFFICIENTLY LOOSE TO PERMIT SEEDING ACTIVITIES.
- LIME APPLICATION - PULVERIZED AGRICULTURAL LIMESTONE SHALL BE APPLIED TO THE LOOSENED SOIL AT A UNIFORM RATE OF 184 POUNDS PER 1000 SQUARE FEET. THIS RATE IS IN POUNDS OF AGRICULTURAL GRADE LIMESTONE PER 1,000 SQUARE FEET.
- FERTILIZER APPLICATION - A COMPLETE COMMERCIAL FERTILIZER SHALL BE APPLIED TO THE SOIL AT THE RATE ESTABLISHED BY SOIL TESTING AS REQUIRED TO ACCOMMODATE PROPER GROWTH OF THE SEED MIXTURE. AS A MINIMUM, 10-20-20 FERTILIZER SHALL BE APPLIED AT A UNIFORM RATE OF 25 POUNDS PER 1,000 SQUARE FEET.
- MIXING - APPLIED LIME AND FERTILIZER SHALL BE MIXED WITH THE SOIL TO A DEPTH OF FOUR INCHES THROUGH USE OF SUITABLE EQUIPMENT.
- SEEDING - SEED MIXTURE SHALL BE APPLIED TO THE PREPARED SOIL SURFACE BY BROADCAST SPREADERS OR HYDRAULIC APPLICATION ACCORDING TO THE FOLLOWING RATES: INFILTRATION BASIN BOTTOMS: RETENTION BASIN FLOOR MIX: ERNMX-126. APPLY PER MANUFACTURER'S SPECIFICATIONS.; WITHIN RAIN GARDENS: RAIN GARDEN MIX: ERNMX-180. APPLY PER MANUFACTURER'S SPECIFICATIONS.; ALL OTHER DISTURBED AREAS: KENTUCKY 31 TALL FESCUE: PURE SEED 97%, GERMINATION PERCENTAGE 85%, PURE LIVE SEED PERCENTAGE 82%, SEEDING RATE 2 LBS PLS PER 1000 SQUARE FEET. REDTOP OR PERENNIAL RYEGRASS: PURE SEED 95%, GERMINATION PERCENTAGE 80%, PURE LIVE SEED PERCENTAGE 76%, SEEDING RATE 0.25 LBS PLS PER 1000 SQUARE FEET. CROWNVETCH: PURE SEED 97%, GERMINATION PERCENTAGE 76%, PURE LIVE SEED PERCENTAGE 74%, SEEDING RATE 0.25 LBS PLS PER 1000 SQUARE FEET.; KENTUCKY 31 TALL FESCUE: PURE SEED 97%, GERMINATION PERCENTAGE 85%, PURE LIVE SEED PERCENTAGE 82%, SEEDING RATE 2 LBS PLS PER 1000 SQUARE FEET.; REDTOP OR PERENNIAL RYEGRASS: PURE SEED 95%, GERMINATION PERCENTAGE 80%, PURE LIVE SEED PERCENTAGE 76%, SEEDING RATE 0.25 LBS PLS PER 1000 SQUARE FEET.; CROWNVETCH: PURE SEED 97%, GERMINATION PERCENTAGE 76%, PURE LIVE SEED PERCENTAGE 74%, SEEDING RATE 0.25 LBS PLS PER 1000 SQUARE FEET. AFTER SEEDING, SEED SHALL BE COVERED BY MEANS OF LIGHT RAKING TO A DEPTH OF ONE-QUARTER INCH OF SOIL.
- HAY OR STRAW MULCH SHALL BE APPLIED AT A RATE OF 3 TONS/ACRE (ANCHORED BY CRIMPING ON SLOPES NO STEEPER THAN 3:1, ASPHALT TACK AT 35 GALLONS PER 100 SQUARE YARDS, SYNTHETIC BINDERS, OR LIGHTWEIGHT PLASTIC/FIBER/PAPER NETS).
CRITICAL VEGETATIVE AREA (CVA) SURFACE STABILIZATION (ALL SLOPES GREATER THAN 3:1)
AFTER EMBANKMENT SLOPES HAVE BEEN COMPACTED AND CUT SLOPES ROUGH GRADED, AREA SHALL BE TOPSOILED AND SEEDED. THE FOLLOWING SEED MIXTURE SHALL BE APPLIED TO THE PREPARED SOIL SURFACE BY HYDRAULIC APPLICATION ACCORDING TO THE FOLLOWING SUGGESTED RATES OF APPLICATION:
- PERENNIAL RYEGRASS: PURE SEED 98%, GERMINATION PERCENTAGE 90%, PURE LIVE SEED PERCENTAGE 88%, SEEDING RATE 1 LBS PLS PER 1000 SQUARE FEET.
- CROWNVETCH: PURE SEED 99%, GERMINATION PERCENTAGE 70%, PURE LIVE SEED PERCENTAGE 69%, SEEDING RATE 0.5 LBS PLS PER 1000 SQUARE FEET.
- CREEPING RED FESCUE: PURE SEED 98%, GERMINATION PERCENTAGE 85%, PURE LIVE SEED PERCENTAGE 83%, SEEDING RATE 1.5 LBS PLS PER 1000 SQUARE FEET.
AFTER SEEDING APPLICATION HAS BEEN COMPLETED, INSTALL NORTH AMERICAN GREEN EROSION CONTROL BLANKET SC-150 USING STAPLE PATTERN C.
SOILS LEGEND
- Co - CODORUS SILT LOAM
- Ha - HATBORO SILT LOAM
- GgB - GLENELG SILT LOAM, 3 TO 8 PERCENT SLOPES
- MaB - MANOR LOAM, 3 TO 8 PERCENT SLOPES
- MaC - MANOR LOAM, 8 TO 15 PERCENT SLOPES
- MaD - MANOR LOAM, 15 TO 25 PERCENT SLOPES
- MaE - MANOR LOAM, 25 TO 35 PERCENT SLOPES
- UugB - URBAN LAND - UDGARTHENTS SCHIST AND GNEISS COMPLEX, 0 TO 8 PERCENT SLOPES
SOILS RESOLUTIONS
- CUTBACKS / CAVE-IN: CAUTION SHOULD BE TAKEN TO LIMIT THE AMOUNT OF TRENCH THAT IS OPEN AT ANY GIVEN TIME. SHORING SHOULD BE USED AS RECOMMENDED BY THE RESPECTIVE GOVERNMENTAL SAFETY AGENCIES.
- DEPTH OF WATER TABLE / SEASONAL HIGH WATER TABLE: IF GROUNDWATER IS ENCOUNTERED DURING GRADING OR TRENCHING, THE AREA WILL BE DE-WATERED BY PUMPING THE GROUNDWATER INTO A PUMPED WATER FILTER BAG E&S CONTROL SYSTEM.
- LOW STRENGTH / UNSUITABLE SUBGRADE: IF SUBGRADE SOILS ARE UNSUITABLE FOR THE SPECIFIC ONSITE APPLICATION, AS DETERMINED BY INSPECTION BY THE CONTRACTOR, THEN SUITABLE SOIL SHALL BE IMPORTED OR THE EXISTING SUBGRADE SHALL BE STABILIZED.
- PIPING: THE DETENTION BASIN BERMS SHALL BE PROVIDED WITH A CLAY CORE AND COMPACTED TO 95% DENSITY, PLUS ANTI-SEEP COLLARS WILL BE INSTALLED ON THE OUTFLOW PIPE TO PREVENT PIPING IN THE EMBANKMENT.
- SHRINK-SWELL / FROST ACTION: IF WINTER GRADING IS UNAVOIDABLE, EXCAVATION SHALL TAKE PLACE WHEN THE TEMPERATURE IS ABOVE FREEZING AND THE SOIL IS DRY.
- POOR SOURCE OF TOPSOIL (SLOPE): ERODED AREAS SHALL BE IMMEDIATELY STABILIZED AND COVERED WITH AN EROSION CONTROL BLANKET.
- POOR SOURCE OF TOPSOIL (TOO ACID): A REPRESENTATIVE SOIL TEST SHALL BE PERFORMED TO DETERMINE THE NECESSARY AMOUNT OF LIME TO BE USED.
CLEAN FILL AND ENVIRONMENTAL DUE DILIGENCE
IF THE SITE WILL NEED TO IMPORT OR EXPORT MATERIAL FROM THE SITE, THE RESPONSIBILITY FOR PERFORMING ENVIRONMENTAL DUE DILIGENCE AND DETERMINATION OF CLEAN FILL WILL REST WITH THE CONTRACTOR (RESPONSIBLE PARTY).
CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. (THE TERM "USED ASPHALT" DOES NOT INCLUDE MILLED ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED FOR RE-USE.)
TO DETERMINE IF FILL HAS BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE: FILL AREAS AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE STILL QUALIFIES AS CLEAN FILL PROVIDED TESTING REVEALS THAT THE FILL MATERIAL CONTAINS CONCENTRATIONS OF REGULATED SUBSTANCES THAT ARE BELOW THE RESIDENTIAL LIMITS IN TABLE FP-1a AND b FOUND IN THE DEPARTMENT'S POLICY "MANAGEMENT OF FILL". ANY PERSON PLACING FILL MATERIAL WHICH WAS AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE MUST USE FORM FP-001 TO CERTIFY THE ORIGIN OF THE FILL MATERIAL AND THE RESULTS OF ANALYTICAL TESTING TO QUALIFY THE MATERIAL AS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
ENVIRONMENTAL DUE DILIGENCE: THE APPLICANT MUST PERFORM ENVIRONMENTAL DUE DILIGENCE TO DETERMINE IF THE FILL MATERIALS ASSOCIATED WITH THE PROJECT QUALIFY AS CLEAN FILL.
ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF A REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT QUALIFIES AS CLEAN FILL. TESTING SHOULD BE PERFORMED IN ACCORDANCE WITH APPENDIX A OF THE DEPARTMENT'S POLICY "MANAGEMENT OF CLEAN FILL". FILL MATERIAL THAT DOES NOT QUALIFY AS CLEAN FILL IS REGULATED FILL. REGULATED FILL IS WASTE AND MUST BE MANAGED IN ACCORDANCE WITH THE DEPARTMENT'S MUNICIPAL OR RESIDUAL WASTE REGULATIONS BASED ON 25 PA CODE CHAPTERS 287 RESIDUAL WASTE MANAGEMENT OR 271 MUNICIPAL WASTE MANAGEMENT, WHICHEVER IS APPLICABLE. THESE REGULATIONS ARE AVAILABLE ON-LINE AT WWW.PACODE.COM.
NOTES FOR PROJECTS DISCHARGING TO SPECIAL PROTECTION WATERSHEDS &/OR EXCEPTIONAL VALUE WETLANDS
- THIS PROJECT IS IN A SPECIALLY PROTECTED HIGH QUALITY OR EXCEPTIONAL VALUE WATERSHED; EXTREME CARE SHOULD BE EXERCISED BY ALL DISTURBANCE ACTIVITIES TO PREVENT DEGRADATION TO THE WATERS OF THE COMMONWEALTH.
- BECAUSE THIS PROJECT IS IN A SPECIALLY PROTECTED HIGH QUALITY OR EXCEPTIONAL VALUE WATERSHED, UPON COMPLETION OR TEMPORARY CESSATION OF EARTH DISTURBANCE ACTIVITIES, THE PROJECT SITE MUST BE IMMEDIATELY STABILIZED WITH THE APPROPRIATE TEMPORARY OR PERMANENT STABILIZATION.
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - CONSTRUCTION DETAIL & NOTES - E&SC
Client: Grove Meadow Developers LLC | Location: East Goshen Township, Chester County, Pennsylvania | Date: April 20, 2023 | Drawn By / Designed/Checked: M.D. Hartman | Scale: N.T.S. | Sheet: 10 of 17 | File No.: 22-001-F-D-7.3
STANDARD CONSTRUCTION DETAIL #4-1: COMPOST FILTER SOCK
Engineering diagram showing Section and Plan View of Compost Filter Sock with blown/placed filter media between disturbed area and undisturbed area, anchored by 2 in. x 2 in. wooden stakes placed 10 ft on center across existing contours.
TABLE 4.1: COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
| MATERIAL TYPE | 3 MIL HDPE | 5 MIL HDPE | 5 MIL HDPE | MULTI-FILAMENT POLYPROPYLENE (MFPP) | HEAVY DUTY MULTI-FILAMENT POLYPROPYLENE (HDMFPP) |
|---|---|---|---|---|---|
| MATERIAL CHARACTERISTICS | PHOTODEGRADABLE | PHOTODEGRADABLE | BIODEGRADABLE | PHOTODEGRADABLE | PHOTODEGRADABLE |
| SOCK DIAMETERS | 12", 18" | 12", 18", 24", 32" | 12", 18", 24", 32" | 12", 18", 24", 32" | 12", 18", 24", 32" |
| MESH OPENING | 3/8" | 3/8" | 3/8" | 3/8" | 1/8" |
| TENSILE STRENGTH | 26 PSI | 26 PSI | 44 PSI | 202 PSI | |
| ULTRAVIOLET STABILITY % ORIGINAL STRENGTH (ASTM G-155) | 23% AT 1000 HR. | 23% AT 1000 HR. | 100% AT 1000 HR. | 100% AT 1000 HR. | |
| MINIMUM FUNCTIONAL LONGEVITY | 6 MONTHS | 9 MONTHS | 6 MONTHS | 1 YEAR | 2 YEARS |
TWO-PLY SYSTEMS: Inner Containment Netting: HDPE biaxial net, continuously wound fusion-welded junctures, 3/4" x 3/4" max. aperture size. Outer Filtration Mesh: Composite polypropylene fabric (woven layer and non-woven fleece mechanically fused via needle punch), 3/16" max. aperture size. Sock fabrics composed of burlap may be used on projects lasting 6 months or less.
TABLE 4.2: COMPOST STANDARDS
| PARAMETER | STANDARD |
|---|---|
| ORGANIC MATTER CONTENT | 80% - 100% (DRY WEIGHT BASIS) |
| ORGANIC PORTION | FIBROUS AND ELONGATED |
| pH | 5.5 - 8.0 |
| MOISTURE CONTENT | 30% - 60% |
| PARTICLE SIZE | 98% PASS THROUGH 1" SCREEN |
| SOLUBLE SALT CONCENTRATION | 5.0 dS/m (mmhos/cm) MAXIMUM |
- SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL. COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION CONTROL MANUAL.
- COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN BARRIER ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE OF THE SOCK AND THE SLOPE OF ITS TRIBUTARY AREA.
- TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.
- ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT OF THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
- COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION.
- BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
- UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
- SHEET FLOW SHALL BE MAINTAINED TO COMPOST SOCKS DURING CONSTRUCTION. IF OVERTOPPING OR CONCENTRATED FLOW OCCURS, A ROCK FILTER OUTLET SHALL BE INSTALLED AT THAT LOCATION.
PUMPED WATER FILTER BAG
Plan View and Elevation View diagrams of Pumped Water Filter Bag surrounded by 35' diameter mulch filter sock in a well-vegetated grassy area, showing intake hose, pump, clamp, discharge hose, filter bag, and heavy duty lifting straps.
| PROPERTY | TEST METHOD | MINIMUM STANDARD |
|---|---|---|
| AVG. WIDE WIDTH STRENGTH | ASTM D-4884 | 60 lb/in |
| GRAB TENSILE | ASTM D-4632 | 205 lb |
| PUNCTURE | ASTM D-4833 | 110 lb |
| MULLEN BURST | ASTM D-3786 | 350 psi |
| UV RESISTANCE | ASTM D-4355 | 70% |
| AOS % RETAINED | ASTM D-4751 | 80 (#100) |
- LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE ABOVE STANDARDS.
- A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES MUST BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
- BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
- NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
- THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
- THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED.
- FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
TYPICAL VEGETATED SWALES
Channel cross-section diagram showing bottom width 'B', depth 'D', top width 'T', side slopes Z1 and Z2, and lining.
| CHANNEL NO. | SECTION | BOTTOM WIDTH 'B' (FT) | DEPTH 'D' (FT) | Z1 | Z2 | PERMANENT LINING | TEMPORARY LINING |
|---|---|---|---|---|---|---|---|
| DIVERSION | 1 | 4.0 | 1.45 | 3.0 | 3.0 | VEGETATED | NAG S75 |
- HORIZONTAL STAPLE SPACING SHALL BE ALTERED IF NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL POINTS ALONG THE CHANNEL SURFACE.
- WHERE GRAVEL OR ROCKS ARE ENCOUNTERED DURING SWALE EXCAVATION, UNDERCUT ROCK OR GRAVEL TO 4" BELOW FINISHED GRADE, COVER ROCK WITH 4" OF COMPACTED TOPSOIL.
- SUBGRADE SURFACE SHALL BE FREE OF OBSTRUCTIONS SUCH AS TREE ROOTS, FALLEN LEAVES AND WOODY DEBRIS, PROJECTING STONES LARGER THAN 1 INCH, AND LUMPS OF HARD SOIL AND OTHER FOREIGN MATTER, AND BE VOID OF ALL WEEDY, BRUSHY OR WOODY GROWTH. ANY UNDERGROUND UTILITIES RUNNING ACROSS OR THROUGH THE CHANNEL(S) SHALL BE BACKFILLED AND COMPACTED TO A MINIMUM OF 90% STANDARD PROCTOR DENSITY PRIOR TO SWALE CONSTRUCTION.
- VEGETATED CHANNELS SHALL BE CONSTRUCTED FREE OF ROCKS, TREE ROOTS, STUMPS OR OTHER PROJECTIONS THAT WILL INTERFERE WITH MOWING OR OTHER MAINTENANCE OPERATIONS. IN ROCKY AREAS, THE CHANNEL SHALL BE INITIALLY OVER EXCAVATED TO ALLOW FOR THE PLACEMENT OF TOPSOIL.
TYPE M INLET PROTECTION DETAIL & TYPE C INLET PROTECTION DETAIL
Engineering diagrams for Type M Inlet Protection (storm inlet with 15 in. dia. min. pipe, grate, wire mesh galvanized 16 ga. 1/4 in. max. opening, filter bag, and earthen berm) and Type C Inlet Protection (curb inlet with 4" min. PVC pipe 10" dia. min., AASHTO #57 stone, filter fabric, wire mesh, and earthen berm), with installation and sediment removal notes.
SLOPE PROTECTION INSTALLATION DETAIL, ECB CHANNEL INSTALLATION & STAPLE PATTERN GUIDE
Diagrams and step-by-step installation notes for rolled erosion control blankets on slopes (6"x6" anchor trench, stapling, overlapping) and channels, plus Staple Pattern Guide diagrams C (1.7 staples per sq. yd.), D (3.4 staples per sq. yd.), and E (3.4 staples per sq. yd.).
ROCK CONSTRUCTION ENTRANCE (NOT TO SCALE)
Plan View and Section A-A showing 100' min. length, 20' min. width of driveway, flared intersection area to allow for turns, 8" min. AASHTO #1 rock over Typar 3401 fabric, and maintenance note requiring continuous maintenance of thickness and immediate removal of sediment tracked onto public roadways at the end of each construction day.
TEMPORARY STOCKPILE DETAIL
Cross-section diagram showing stockpile with 2:1 slope or flatter, 35 ft max height, and downslope filter fabric fence or silt sock. Notes: 1) Stockpiles to be stabilized immediately. 2) Stockpile heights must not exceed 35'. 3) Stockpile slopes must be 2:1 or flatter.
COMPOST SOCK CONCRETE WASHOUT DETAIL
Section A-A and Plan View showing 24" diameter compost filter sock ring staked with 2"x2"x36" wooden stakes placed 5' O.C. over impervious geomembrane. Notes: 1) Install on flat grade for optimum performance. 2) 18" diameter filter sock may be stacked onto double 24" diameter socks in pyramidal configuration for added height. 3) A suitable impervious geomembrane shall be placed at the location of the washout prior to installing the socks.
TYPICAL ON-LOT BMPs FOR LOTS
Three Plan View diagrams and notes for Typical On-Lot BMPs For Lot Along Ascending or Descending Roadway, Typical On-Lot BMPs For Lot Below Roadway, and Typical On-Lot BMPs For Lot Above Roadway, showing House, Driveway, Top Soil, Rock Construction Entrance, Diversion Swale, Outlet Swale to Stable Area or Adequate Drainageway, and Filter Fabric Fence / Compost Filter Sock / Sediment Filter Log (Typ.).
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - POST-CONSTRUCTION STORMWATER MANAGEMENT PLAN
Client: Grove Meadow Developers LLC | Location: East Goshen Township, Chester County, Pennsylvania | Date: April 20, 2023 | Drawn By / Designed/Checked: M.D. Hartman | Scale: 1" = 50' | Sheet: 12 of 17 | File No.: 22-001-F-D-8.1
ONE CALL NOTES
PENNSYLVANIA ONE CALL SYSTEM, INC. (1-800-242-1776) - CALL BEFORE YOU DIG! PENNSYLVANIA ACT 287, AS AMENDED BY ACT 121 REQUIRES NOTIFICATION OF EXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE COMMONWEALTH.
ACT 287 UNDERGROUND UTILITY PROTECTION ACT, AS AMENDED BY ACT 121: ACT 287 UNDERGROUND UTILITY PROTECTION ACT, AS AMENDED BY: ACT 172 OF 1986, ACT 38 OF 1991, ACT 187 OF 1996, ACT 199 OF 2004, ACT 181 OF 2006, ACT 121 OF 2008.
PA ONE CALL SYSTEM INFORMATION: PENNSYLVANIA ACT 287, AS AMENDED, REQUIRES THREE (3) WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND FIVE (5) WORKING DAYS NOTICE IN DESIGN STAGE. PA ONE CALL PHONE NUMBER: 1-800-242-1776. ONE CALL SYSTEM SERIAL NO. NOTIFICATION BY NAVE NEWELL, INC. DATE: 11/07/22. ONE CALL SYSTEM SERIAL NUMBER: 20223113472.
UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE AND WERE DETERMINED FROM VISIBLE LOCATION, ACT 287 OF 1974, AS AMENDED, UTILITY RESPONSES AND/OR BEST AVAILABLE PLAN INFORMATION.
LIST OF RESPONDERS: AQUA PENNSYLVANIA INC, COMCAST CABLE COMMUNICATIONS INC, EAST GOSHEN TOWNSHIP, PECO ENERGY, TEXAS EASTERN TRANSMISSION LP, VERIZON PENNSYLVANIA LLC.
OWNER AND APPLICANT & SITE DATA
OWNER AND APPLICANT: GROVE MEADOW DEVELOPERS LLC, 1171 LANCASTER AVE. SUITE 201, BERWYN, PA 19312
PROJECT SITE BOUNDARY AREA: 16.00 ACRES | LIMIT OF DISTURBANCE AREA: 8.83 ACRES
RECEIVING WATERCOURSE: THE RECEIVING WATERCOURSE FROM THE PROJECT AREA IS A TRIBUTARY TO RIDLEY CREEK. THE WATERCOURSE IS LOCATED ON THE PROJECT TRACT BUT OUTSIDE OF THE LIMIT OF DISTURBANCE. THE WATERCOURSE HAS A CHAPTER 93 CLASSIFICATION OF HQ-CWF, HIGH QUALITY - COLD WATER FISHES. THE RECEIVING STREAM IS LISTED AS HAVING A SILTATION IMPAIRMENT DUE TO URBAN RUNOFF.
RIPARIAN BUFFER MEASUREMENT PER PENNSYLVANIA CODE SECTION 102.14(a)(1)(ii): RIPARIAN BUFFERS MUST BE MEASURED HORIZONTALLY AND PERPENDICULARLY TO THE BANK WITH NO MORE THAN A 10% VARIATION BELOW THE NORMAL HIGH WATER MARK, OR NORMAL POOL ELEVATION FOR LAKE, POND OR RESERVOIR AND FROM TOP OF STREAMBANK.
PROPOSED TREE PLANTINGS: THE PROPOSED TREE PLANTINGS AND REFORESTATION AREAS AS SHOWN ON THE LANDSCAPING PLAN ARE TO BE CONSIDERED PART OF THE STORM WATER MANAGEMENT SYSTEM FOR THE PROPOSED DEVELOPMENT AND ARE NOT TO BE REMOVED WITHOUT PRIOR APPROVAL FROM EAST GOSHEN TOWNSHIP, CHESTER COUNTY CONSERVATION DISTRICT AND DEP.
SOILS LEGEND
- Co - CODORUS SILT LOAM
- Ha - HATBORO SILT LOAM
- GgB - GLENELG SILT LOAM, 3 TO 8 PERCENT SLOPES
- MaB - MANOR LOAM, 3 TO 8 PERCENT SLOPES
- MaC - MANOR LOAM, 8 TO 15 PERCENT SLOPES
- MaD - MANOR LOAM, 15 TO 25 PERCENT SLOPES
- MaE - MANOR LOAM, 25 TO 35 PERCENT SLOPES
- UugB - URBAN LAND - UDORTHENTS SCHIST AND GNEISS COMPLEX, 0 TO 8 PERCENT SLOPES
PLAN DRAWING, VICINITY MAP & LEGENDS
Vicinity Map (Scale: 1"=800') showing Project Location along Hershey Mill Rd near Millstream Dr, Tanglewood Dr, Upton Cir, and Greenhill Rd in R-2 / R-3 zoning districts.
Post-Construction Stormwater Management Plan drawing (Scale: 1"=50') showing Millstone Circle cul-de-sac off Hershey Mill Road opposite Tanglewood Drive, residential lots 1 through 12, Infiltration Basin #1 (Bottom 435.00, Top of Berm 438.00), Infiltration Basin #2 (Bottom 434.00, Top of Berm 438.00), storm sewer and roof drain piping, limit of disturbance, project site boundary, and riparian buffer conversion area ("SEE PLAN NO. 8.4 FOR CONVERSION OF THE RIPARIAN BUFFER AREA TO A FORESTED RIPARIAN BUFFER").
PCSM HATCH LEGEND: Infiltration Basin; Reforestation/Landscape Restoration; Amended Soils; Riparian Buffer; Forested Riparian Buffer Conversion Area.
LEGEND: Existing Curb, Proposed Curb, Existing Contours, Proposed Contours, Existing Spot Elevation, Proposed Spot Elevation, Soil Line, Existing Street Sign, Existing Features Are Labeled With Slanted Text, To Be Removed, Existing Deciduous Tree, Proposed Sanitary Sewer & Manhole, Proposed Storm Sewer & Catch Basin, Existing Water Line & Valve, Proposed Water Line & Valve, Proposed Fire Hydrant, Proposed Grinder Pump, Proposed Water Lateral, Proposed Trail Network (Paved), Riparian Buffer, Project Site Boundary, Project Site Boundary & Limit of Disturbance, Limit of Disturbance, Drainage Area to BMP.
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - PCSM DETAILS
Client: Grove Meadow Developers LLC | Location: East Goshen Township, Chester County, Pennsylvania | Date: April 20, 2023 | Drawn By / Designed/Checked: M.D. Hartman | Scale: 1" = 50' | Sheet: 13 of 17 | File No.: 22-001-F-D-8.2
INFILTRATION BASIN OUTLET STRUCTURES (OS-1 & OS-2)
Isometric diagrams of Infiltration Basin Outlet Structure (OS-1) (Top Elev. 461.00, 8" Dia. Orifice Inv. 455.00, Structural Steel Grate, Inlet Grate Frame Cast in Top of Box, 2'x4' Precast Inlet Box) and Infiltration Basin Outlet Structure (OS-2) (Top Elev. 436.50, Structural Steel Grate, Inlet Grate Frame Cast in Top of Box, 2'x4' Precast Inlet Box).
- PROVIDE MANHOLE STEPS IN ACCORDANCE WITH PennDOT RC-39.
- OUTLET STRUCTURE MANUFACTURED BY TERRE HILL CONCRETE PRODUCTS (800) 242-1509, OR APPROVED EQUAL.
INFILTRATION BASIN #1 & #2 CROSS-SECTIONS
Cross-section diagrams for Infiltration Basin #1 (Top Elev. 436.50, Berm Elev. 438.00, Spillway Inv. 436.80, Top of Core Elev. 436.50, Basin Bottom Elev. 435.00, 15" RCP @ 4.11% L=45', Inv Out 432.16, 2 Anti-Seep Collars, Amended Soils Mixture 12" Depth: 50% Topsoil, 30% Compost, 20% Coarse Sand) and Infiltration Basin #2 (Top Elev. 436.50, Berm Elev. 438.00, Spillway Inv. 437.00, Top of Core Elev. 436.50, Basin Bottom Elev. 434.00, 24" RCP @ 0.85% L=71', Inv Out 430.69, 3 Anti-Seep Collars, Amended Soils Mixture 12" Depth: 50% Topsoil, 30% Compost, 20% Coarse Sand).
RETENTION BASIN FLOOR MIX - LOW MAINTENANCE (ERNMX-126, SEEDING RATE: 20 - 40 LBS. PER ACRE)
| PERCENT | BOTANICAL NAME | COMMON NAME |
|---|---|---|
| 20.0% | PUCCINELLIA DISTANS, 'FULTS' | (ALKALIGRASS, 'FULTS') |
| 19.0% | PANICUM CLANDESTINUM, 'TIOGA' | (DEERTONGUE, 'TIOGA') |
| 18.0% | AGROSTIS STOLONIFERA | (CREEPING BENTGRASS) |
| 18.0% | ELYMUS VIRGINICUS, PA ECOTYPE | (VIRGINIA WILDRYE, PA ECOTYPE) |
| 15.0% | POA PALUSTRIS | (FOWL BLUEGRASS) |
| 5.0% | CAREX VULPINOIDEA, PA ECOTYPE | (FOX SEDGE, PA ECOTYPE) |
| 3.0% | JUNCUS EFFUSUS | (SOFT RUSH) |
| 2.0% | CAREX SCOPARIA, PA ECOTYPE | (BLUNT BROOM SEDGE, PA ECOTYPE) |
BASIN EMERGENCY SPILLWAY
Plan View, Section 'A'-'A', and Embankment Section 'B'-'B' Along Emergency Spillway showing upstream and downstream sidewalls, top of berm, weir, and erosion control blanket lining.
| BASIN | Z3 | Z4 | WEIR TOP ELEV. WTE (FT) | WEIR CREST ELEV. WCE (FT) | WIDTH Ww (FT) | ECB LINING MAT'L & STAPLE PATTERN | LINING DEPTH DL (FT) | Z1 | Z2 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 3 | 3 | 438.00 | 436.80 | 100' | P550/E | 1.0' | 3 | 3 |
| 2 | 3 | 3 | 438.00 | 437.00 | 100' | P550/E | 1.0' | 3 | 3 |
INFILTRATION BASIN CONSTRUCTION NOTES
- EMBANKMENT MATERIAL SHALL CONSIST OF SUITABLE MATERIAL FREE OF ALL ROOTS, SOD, FROZEN SOIL, ROCK OVER 6" IN DIAMETER, AND ANY OTHER MATERIAL NOT APPROVED BY THE ENGINEER. FILL SHALL BE COMPACTED IN 8" LIFTS TO AT LEAST 95% OF STANDARD MAXIMUM DRY DENSITY PER ASTM D698. STANDARD PROCTOR PRIOR TO PLACEMENT OF A NEW LIFT, THE TOP 2" OF THE PREVIOUS LIFT SHALL BE SCARIFIED.
- CORE MATERIAL TO BE CLAYEY SOIL (UNIFIED CLASS GC, SC OR CL-ML) COMPACTED TO 95% MAXIMUM DRY DENSITY.
- EMBANKMENT CORE MAY BE ELIMINATED IF THE ENTIRE EMBANKMENT CONFORMS TO NOTE 2. KEY TRENCH CORE IS STILL REQUIRED.
- AFTER SITE IS PERMANENTLY STABILIZED, REMOVE SEDIMENT, EXCAVATE TO FINAL SUBGRADE, SPREAD 6" OF TOPSOIL INSIDE BASIN BELOW CLEANOUT ELEVATION AND PERMANENTLY STABILIZE PER SEEDING AND MULCHING SPECIFICATIONS.
- UPON COMPLETION OF EARTHWORK FOR BASINS, ALL SLOPES AND BERMS SHALL BE SEEDED AND MULCHED PER SEEDING AND MULCHING SPECIFICATIONS.
- RCP OUTLET PIPE SHALL BE PROVIDED WITH WATERTIGHT COUPLINGS.
- DO NOT PROVIDE STONE BEDDING OR BACKFILL AROUND THE OUTLET PIPES.
- PIPE LENGTH IS MEASURED TO THE OVERALL END OF THE END SECTION, WHERE APPLICABLE.
TYPICAL ANTI-SEEP COLLAR & BASIN 1 OUTLET PLATE DETAIL
Diagrams of Typical Anti-Seep Collar (6" min. Class C concrete, 3000 psi, #3 rebars 12" O.C. both ways) and Basin 1 Outlet Plate Detail (Plan View and Front View showing 8" dia. orifice, trash rack steel frame, and 1" compacted AASHTO #57 stone).
| BASIN NO. | BARREL DIA. (IN.) | S (FT.) | # OF COLLARS |
|---|---|---|---|
| 1 | 15 | 6.2 | 2 |
| 2 | 24 | 6.2 | 3 |
RIP RAP APRON DETAIL
Plan View, Section 1-1, and Section 2-2 showing rip-rap apron over geotextile at pipe end section.
| END SECTION NO. | PIPE DIA. (IN) | La (FT) | W (FT) | W1 (FT) | PENNDOT CLASSIFICATION |
|---|---|---|---|---|---|
| EW-1 | 24 | 12.00 | 18.00 | 6.00 | R-4 |
| ES-1 | 36 | 9.00 | 23.00 | [illegible] | R-6 |
| ES-2 | 15 | 10.00 | 13.75 | 3.75 | R-5 |
INLETS, GRATES, PIPE BEDDING, CONCRETE END SECTION & PRECAST CONCRETE BOXES
Engineering detail drawings and dimensions for Type C Inlet, Type M Inlet, Grade Adjust Ring (Precast), Structural Steel Bicycle Safe Grate, Storm Sewer Pipe Bedding (Note: Do not provide stone bedding or backfill around detention basin outlet pipes), Concrete End Section (Dimensions for End Section Concrete Pipe table for 15", 18", 21", and 24" pipes), and Precast Concrete Boxes for Storm Inlets and Junction Boxes (Standard Box Type 1 & Type 2, Details A, B, C, Sections A-A through H-H, Cover Adjustment Slabs, and construction notes 1–5).
Note: some text on this page could not be read reliably. Please see the original PDF for this page.
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - PCSM DETAILS
Client: Grove Meadow Developers LLC | Location: East Goshen Township, Chester County, Pennsylvania | Date: April 20, 2023 | Drawn By / Designed/Checked: M.D. Hartman | Scale: 1" = 50' | Sheet: 14 of 17 | File No.: 22-001-F-D-8.3
EQUITABLE OWNER AND APPLICANT
GROVE MEADOW DEVELOPERS LLC, 1171 LANCASTER AVE, SUITE 241, BERWYN PA 19312
GENERAL NOTES
- THE PERMITTEE SHALL PROVIDE ENGINEERING CONSTRUCTION OVERSIGHT FOR THE PROPOSED STORMWATER BMPS. ADDITIONAL SOIL TESTING MAY BE REQUIRED PRIOR TO THE INSTALLATION OF INFILTRATION BMPS TO ENSURE PROPER LOCATION AND FUNCTION. A LICENSED PROFESSIONAL KNOWLEDGEABLE IN THE DESIGN AND CONSTRUCTION OF STORMWATER BMPS, PREFERABLY THE DESIGN ENGINEER, MUST OVERSEE KEY ELEMENTS.
- IF UNFAVORABLE CONDITIONS HAVE BEEN ENCOUNTERED DURING THE INSTALLATION OF THE SEEPAGE/INFILTRATION SYSTEMS (I.E. GROUNDWATER AND/OR BEDROCK, ETC.), THE OWNER/ENGINEER SHOULD BE NOTIFIED AND THE PROPOSED INFILTRATION SYSTEM SHOULD BE RELOCATED TO A MORE SUITABLE LOCATION ON THE PROPERTY.
- THE ANTICIPATED WASTES ARE GENERAL CONSTRUCTION WASTES. THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ. THE CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIAL OR WASTES AT THE SITE.
- THE PROPOSED TREE PLANTINGS ARE TO BE CONSIDERED PERMANENT BMPS AND ARE NOT TO BE REMOVED WITHOUT PRIOR CONSENT BY THE TOWNSHIP, CHESTER COUNTY CONSERVATION DISTRICT AND THE DEPARTMENT.
- THE EXISTING FLOW PATTERNS TO DISCHARGE POINTS 2 THROUGH 4 ARE TO BE MAINTAINED AND AND NOT ALTERED BETWEEN THE LIMIT OF DISTURBANCE AND THE PROJECT SITE BOUNDARY. ANY EROSION CAUSED BY DISCHARGES FROM BMPS WITHIN THE SITE WILL BE REPAIRED AND STABILIZED.
- IN THE EVENT OF A FAILURE OF THE PROPOSED BMP'S, THE PERMITTEE SHALL CONTACT A REGISTERED PROFESSIONAL ENGINEER TO DETERMINE THE CAUSE OF THE FAILURE AND REMEDIATIVE MEASURES. FAILURE OF THE BMP'S IS DEFINED AS FOLLOWS: BMP 6.4.2. INFILTRATION BASIN - DRAINAGE OF COLLECTED WATER TAKES LONGER THAN 72 HOURS AFTER A STORM EVENT.; BMP 6.4.3. SUBSURFACE INFILTRATION BED - DRAINAGE OF COLLECTED WATER TAKES LONGER THAN 72 HOURS AFTER A STORM EVENT.
- TO ENSURE THAT THE EXISTING FLOW PATTERNS ARE NOT ALTERED AND MAINTAINED, THE OUTLETS FROM THE PROPOSED BMP'S HAVE BEEN LOCATED A MINIMUM OF 150' FROM THE PROJECT SITE BOUNDARY.
OPERATIONS AND MAINTENANCE RESPONSIBILITIES
THE FOLLOWING ARE LONG TERM STORMWATER BMP'S SHOWN ON THESE PLANS. THE OWNER SHALL INSPECT AND MAINTAIN ALL STORMWATER MANAGEMENT FACILITIES TO ENSURE THAT ALL COMPONENTS ARE SUCCESSFULLY CARRYING OUT THEIR INTENDED FUNCTION. THE OWNER SHALL NOT DUMP GRASS CLIPPINGS, LEAVES, OR OTHER DEBRIS OR ALLOW LAWN CARE CHEMICALS TO BE APPLIED WITHIN ANY DETENTION BASINS OR ANY OTHER BMPS. VEHICLES SHALL NOT BE DRIVEN ACROSS BMPS.
THE OWNER SHALL BE RESPONSIBLE FOR THE SHORT TERM AND LONG TERM OPERATION AND MAINTENANCE MEASURES FOR THE POST CONSTRUCTION STORM WATER MANAGEMENT FACILITIES.
BMP 6.4.3: INFILTRATION BASIN HOMEOWNER'S ASSOCIATION
- CATCH BASINS AND INLETS UPSTREAM OF INFILTRATION BASINS SHOULD BE INSPECTED AND CLEANED AT LEAST TWICE PER YEAR AND AFTER EVERY MAJOR STORM.
- THE VEGETATION ALONG THE SURFACE OF THE INFILTRATION BASIN SHOULD BE MAINTAINED IN GOOD CONDITION, AND ANY BARE SPOTS REVEGETATED AS SOON AS POSSIBLE.
- VEHICLES SHOULD NOT BE PARKED OR DRIVEN ON AN INFILTRATION BASIN, AND CARE SHOULD BE TAKEN TO AVOID EXCESSIVE COMPACTION BY MOWERS.
- INSPECT THE BASIN AFTER RUNOFF EVENTS AND MAKE SURE THAT RUNOFF DRAINS DOWN WITHIN 72 HOURS. MOSQUITOES SHOULD NOT BE A PROBLEM IF THE WATER DRAINS IN 72 HOURS. MOSQUITOES REQUIRE A CONSIDERABLY LONG BREEDING PERIOD WITH RELATIVELY STATIC WATER LEVELS. SHOULD RUNOFF REMAIN IN THE BASIN FOR LONGER THAN 72 HOURS, THE OWNER SHALL CONTACT A REGISTERED PROFESSIONAL TO DETERMINE REMEDIATIVE MEASURES.
- ALSO INSPECT FOR ACCUMULATION OF SEDIMENT, DAMAGE TO OUTLET CONTROL STRUCTURES, EROSION CONTROL MEASURES, SIGNS OF WATER CONTAMINATION/SPILLS, AND SLOPE STABILITY IN THE BERMS.
- MOW ONLY AS APPROPRIATE FOR VEGETATIVE COVER SPECIES.
- REMOVE ACCUMULATED SEDIMENT FROM BASIN AS REQUIRED. RESTORE ORIGINAL CROSS SECTION AND INFILTRATION RATE. PROPERLY DISPOSE OF SEDIMENT.
BMP 5.4.1 PROTECT SENSITIVE/SPECIAL VALUE FEATURES
- SHALL INCLUDE NATURAL AREAS OF FLOODPLAINS, MAPPED WETLANDS, MAPPED WOODLANDS, AND NATURAL SLOPES OVER 15% AND 25%.
- MAY INCLUDE OTHER AREAS OF SIGNIFICANT NATURAL RESOURCES THAT THE APPLICANT DEMONSTRATES ARE OF SPECIAL NATURAL VALUE.
- SHALL NOT BE DISTURBED DURING PROJECT CONSTRUCTION (I.E., CLEARED OR GRADED) EXCEPT FOR TEMPORARY IMPACTS ASSOCIATED WITH MITIGATION AND REFORESTATION EFFORTS. UTILITY DISTURBANCE IS DISCOURAGED AND SHOULD BE KEPT TO A MINIMUM.
- SHALL BE PROTECTED BY HAVING THE LIMITS OF DISTURBANCE CLEARLY SHOWN ON ALL CONSTRUCTION DRAWINGS AND FIELD DELINEATED WITH ORANGE FENCING.
- SHALL BE SET ASIDE THROUGH AN EASEMENT, CONSERVATION OR PRESERVATION AGREEMENT OR OTHER ENFORCEABLE INSTRUMENT, SUCH AS A DEED RESTRICTION, THAT ENSURES PERPETUAL PROTECTION OF THE PROPOSED AREAS. THE PRESERVATION AGREEMENT SHALL CLEARLY SPECIFY HOW THE NATURAL AREA SHALL BE MANAGED AND BOUNDARIES WILL BE MARKED WITH PERMANENT SURVEY MARKERS.
- MANAGED TURF IS NOT CONSIDERED AN ACCEPTABLE FORM OF VEGETATION MANAGEMENT.
- SHALL BE LOCATED ON THE DEVELOPMENT PROJECT.
PCSM LONG TERM OPERATIONS AND MAINTENANCE REQUIREMENTS
- UNTIL THE PERMITTEE OR CO-PERMITTEE HAS RECEIVED WRITTEN APPROVAL OF A NOTICE OF TERMINATION, THE PERMITTEE OR CO-PERMITTEE WILL REMAIN RESPONSIBLE FOR COMPLIANCE WITH THE PERMIT TERMS AND CONDITIONS INCLUDING LONG-TERM OPERATION AND MAINTENANCE OF ALL PCSM BMPS ON THE PROJECT SITE AND IS RESPONSIBLE FOR VIOLATIONS OCCURRING ON THE PROJECT SITE.
- THE PERMITTEE OR CO-PERMITTEE SHALL BE RESPONSIBLE FOR LONG-TERM OPERATION AND MAINTENANCE OF PCSM BMPS UNLESS A DIFFERENT PERSON IS IDENTIFIED IN THE NOTICE OF TERMINATION AND HAS AGREED TO LONG-TERM OPERATION AND MAINTENANCE OF PCSM BMPS.
- FOR ANY PROPERTY CONTAINING A PCSM BMP, THE PERMITTEE OR CO-PERMITTEE SHALL RECORD AN INSTRUMENT WITH THE RECORDER OF DEEDS WHICH WILL ASSURE DISCLOSURE OF THE PCSM BMP AND THE RELATED OBLIGATIONS IN THE ORDINARY COURSE OF A TITLE SEARCH OF THE SUBJECT PROPERTY. THE RECORDED INSTRUMENT MUST IDENTIFY THE PCSM BMP, PROVIDE FOR NECESSARY ACCESS RELATED TO LONG-TERM OPERATION AND MAINTENANCE FOR PCSM BMPS AND PROVIDE NOTICE THAT THE RESPONSIBILITY FOR LONG-TERM OPERATION AND MAINTENANCE OF THE PCSM BMP IS A COVENANT THAT RUNS WITH THE LAND THAT IS BINDING UPON AND ENFORCEABLE BY SUBSEQUENT GRANTEES, AND PROVIDE PROOF OF FILING WITH THE NOTICE OF TERMINATION UNDER § 102.8(m)(2) (RELATING TO PERMIT TERMINATION).
- THE PERSON RESPONSIBLE FOR PERFORMING LONG-TERM OPERATION AND MAINTENANCE MAY ENTER INTO AN AGREEMENT WITH ANOTHER PERSON, INCLUDING A CONSERVATION DISTRICT, NONPROFIT ORGANIZATION, MUNICIPALITY, AUTHORITY, PRIVATE CORPORATION OR OTHER PERSON, TO TRANSFER THE RESPONSIBILITY FOR PCSM BMPS OR TO PERFORM LONG-TERM OPERATION AND MAINTENANCE AND PROVIDE NOTICE THEREOF TO THE DEPARTMENT.
- A PERMITTEE OR CO-PERMITTEE THAT FAILS TO TRANSFER LONG-TERM OPERATION AND MAINTENANCE OF THE PCSM BMP OR OTHERWISE FAILS TO COMPLY WITH THIS REQUIREMENT SHALL REMAIN JOINTLY AND SEVERALLY RESPONSIBLE WITH THE LANDOWNER FOR LONG-TERM OPERATION AND MAINTENANCE OF THE PCSM BMPS LOCATED ON THE PROPERTY.
POST-CONSTRUCTION STORMWATER MANAGEMENT BMP INSPECTION AND MAINTENANCE NOTES
- NO STRUCTURES THAT ARE NOT COMPONENTS OF AN APPROVED BMP SHALL BE PERMITTED WITHIN OR ON TOP OF AN AREA DESIGNATED FOR STORMWATER INFILTRATION.
- INFILTRATION BEDS SHALL BE INSPECTED BY A REGISTERED PROFESSIONAL ENGINEER LICENSED BY THE COMMONWEALTH OF PENNSYLVANIA ON THE FOLLOWING BASIS: ANNUALLY FOR THE FIRST FIVE (5) YEARS.; ONCE EVERY THREE (3) YEARS THEREAFTER.
INDIVIDUAL BMP CONSTRUCTION SEQUENCE AND CRITICAL STAGES OF IMPLEMENTATION
DURING CONSTRUCTION AND IMPLEMENTATION OF THE PROPOSED PERMANENT BMP'S, THE FOLLOWING STAGES OF CONSTRUCTION SHALL BE IMPLEMENTED UNDER THE SUPERVISION OF A LICENSED PROFESSIONAL OR DESIGNATED INDIVIDUAL:
BMP 6.4.2-INFILTRATION BASIN
INFILTRATION BASIN #1: UPON STABILIZATION OF ALL UPSLOPE DISTURBED AREAS, INITIATE CONVERSION OF THE SEDIMENT BASIN TO THE PERMANENT INFILTRATION BASIN.
- FLUSH ACCUMULATED SEDIMENT FROM THE CONTRIBUTING STORM SEWER SYSTEM.
- DEWATER SEDIMENT BASIN.
- REMOVE BAFFLES, CLEANOUT STAKES, DEWATERING FACILITIES AND SEDIMENT RISER.
- INSTALL PERMANENT OUTLET PLATE.
- REMOVE ALL SEDIMENT FROM THE BASIN.
- REPLACE BOTTOM 12" OF SOIL WITH RAIN GARDEN SOIL MIX AND IMMEDIATELY IMPLEMENT PERMANENT VEGETATIVE COVER. LINE BASIN BOTTOM AND SIDES WITH EROSION CONTROL BLANKET.
INFILTRATION BASIN #2:
- INITIATE INSTALLATION OF THE DISCHARGE PIPE OS-2 TO ES-8, INCLUDING ANTI-SEEP COLLARS AND OUTLET RIP-RAP APRON. INSTALL PERMANENT OUTLET STRUCTURE.
- INSTALL PERMANENT OUTLET PLATE AND TRASH RACK.
- IMMEDIATELY IMPLEMENT PERMANENT VEGETATIVE COVER. LINE BASIN BOTTOM AND SIDES WITH EROSION CONTROL BLANKET.
INFILTRATION FACILITY NOTES
- AREAS TO BE USED FOR STORMWATER INFILTRATION (HEREAFTER, "SUBJECT AREAS") SHALL BE DELINEATED WITH ORANGE SAFETY FENCE PRIOR TO START OF CONSTRUCTION.
- COMPACTION OF THE SUBJECT AREAS IS PROHIBITED. EQUIPMENT AND OTHER TRAFFIC SHALL BE PROHIBITED FROM TRAVELING OVER THE SUBJECT AREAS, EXCEPT AS PROVIDED FOR HEREIN. ONLY HAND-HELD EQUIPMENT SHALL BE USED WITHIN SUBJECT AREAS. OTHER EQUIPMENT MAY BE USED AROUND THE PERIMETER - BUT OUTSIDE OF - SUBJECT AREAS FOR PURPOSES OF EXCAVATION AND TO SUPPLY SOILS AND AGGREGATE.
- THE BOTTOM OF INFILTRATION BEDS SHALL BE SCARIFIED IMMEDIATELY PRIOR TO THE PLACEMENT OF AGGREGATE FILL OR GEOTEXTILE FABRIC UNDERDRAIN SEPARATION LAYER, WHICHEVER IS IN CONTACT WITH THE SOIL SUBGRADE AT THE BOTTOM OF THE BED.
- ONLY UNIFORMLY GRADED, CLEAN AGGREGATE, FREE OF FINES, SLATE, SHALE, CLAY, SILT, AND VEGETABLE MATERIAL SHALL BE USED. THE AGGREGATE SHALL HAVE A MINIMUM VOID RATIO OF 40% AND A MAXIMUM VOID RATIO NO GREATER THAN 45%. THESE VALUES APPLY TO BOTH THE AGGREGATE WITHIN THE BED AND ANY AGGREGATE USED AS A SEPARATION LAYER. THE SUPPLIER OF THE AGGREGATE SHALL PROVIDE CERTIFICATION OF THE VOID RATIO OF THE AGGREGATE DELIVERED TO THE SITE. THE DESIGN ENGINEER SHALL VERIFY THAT THE VOID RATIO MEETS OR EXCEEDS THE REQUIREMENTS OF THE DESIGN AND SUBMIT SUCH VERIFICATION TO THE TOWNSHIP.
- WHENEVER DRAINAGE FILTER FABRIC IS SPECIFIED, IT SHALL BE PLACED IN ACCORDANCE WITH THE MANUFACTURER'S DIRECTIONS, INCLUDING PIPE PENETRATIONS, AND SHALL OVERLAP A MINIMUM OF TWELVE (12) INCHES.
- SUBJECT AREAS SHALL BE PROTECTED DURING CONSTRUCTION. SEDIMENT SHALL NOT BE ALLOWED TO BE WASHED INTO OPEN OR BUILT AREAS WHEN THE BOTTOM OF THE FACILITY IS OPEN OR WHEN THE AGGREGATE IS IN PLACE AND EXPOSED. DURING SITE CONSTRUCTION, ALL INFILTRATION FACILITY COMPONENTS SHALL BE PROTECTED FROM SEDIMENT ENTERING STORM INLETS THROUGH CONFORMANCE WITH THE PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP) CHAPTER 102 REGULATIONS, AS AMENDED, AND THE EROSION AND SEDIMENTATION POLLUTION CONTROL MANUAL, AS AMENDED. INLET PROTECTION SHALL REMAIN UNTIL THE CONTRIBUTORY DRAINAGE AREA HAS ACHIEVED FINAL STABILIZATION.
- IF SEDIMENT DOES ENTER INTO A SUBJECT AREA, THE CONTRACTOR SHALL CLEAN OUT THE SEDIMENT TO THE ENGINEER'S SATISFACTION. THIS MAY REQUIRE THE RECONSTRUCTION OF PORTIONS OF OR THE ENTIRETY OF THE FACILITY.
- A MINIMUM TWO (2) FOOT SEPARATION SHALL BE PROVIDED BETWEEN THE SEASONAL HIGH GROUNDWATER TABLE OR BEDROCK (WHICHEVER IS HIGHER) AND THE BOTTOM OF THE INFILTRATION FACILITY. IF GROUNDWATER AND/OR BEDROCK ARE ENCOUNTERED WITHIN AND/OR ABOVE THIS 2-FOOT ZONE DURING CONSTRUCTION, THE DEVELOPER, THE DESIGN ENGINEER, THE TOWNSHIP, AND THE TOWNSHIP ENGINEER SHALL BE NOTIFIED IN WRITING WITHIN TWENTY-FOUR (24) HOURS OF SUCH DISCOVERY. UPON REVIEW OF THE ACTUAL SITE CONDITIONS THE DESIGN ENGINEER SHALL SUBMIT REMEDIAL RECOMMENDATIONS.
PCSM REPORTING AND RECORDKEEPING
THE PCSM PLAN, INSPECTION REPORTS AND MONITORING RECORDS SHALL BE AVAILABLE FOR REVIEW AND INSPECTION BY THE DEPARTMENT OR THE CONSERVATION DISTRICT.
FINAL CERTIFICATION
THE PERMITTEE SHALL INCLUDE WITH THE NOTICE OF TERMINATION "RECORD DRAWINGS" WITH A FINAL CERTIFICATION STATEMENT FROM A LICENSED PROFESSIONAL, WHICH READS AS FOLLOWS:
"I (NAME) DO HEREBY CERTIFY PURSUANT TO THE PENALTIES OF 18 PA.C.S.A. § 4904 TO THE BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF, THAT THE ACCOMPANYING RECORD DRAWINGS ACCURATELY REFLECT THE AS-BUILT CONDITIONS, ARE TRUE AND CORRECT, AND ARE IN CONFORMANCE WITH CHAPTER 102 OF THE RULES AND REGULATIONS OF THE DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THAT THE PROJECT SITE WAS CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PCSM PLAN, ALL APPROVED PLAN CHANGES AND ACCEPTED CONSTRUCTION PRACTICES."
- THE PERMITTEE SHALL RETAIN A COPY OF THE RECORD DRAWINGS AS A PART OF THE APPROVED PCSM PLAN.
- THE PERMITTEE SHALL PROVIDE A COPY OF THE RECORD DRAWINGS AS A PART OF THE APPROVED PCSM PLAN TO THE PERSON IDENTIFIED IN THIS SECTION AS BEING RESPONSIBLE FOR THE LONG-TERM OPERATION AND MAINTENANCE OF THE PCSM BMPS.
SOILS LEGEND
- Ha - HATBORO SILT LOAM
- GgB - GLENELG SILT LOAM, 3 TO 8 PERCENT SLOPES
- GgD - GLENELG SILT LOAM, 15 TO 25 PERCENT SLOPES
- MaC - MANOR LOAM, 8 TO 15 PERCENT SLOPES
- MaE - MANOR LOAM, 25 TO 35 PERCENT SLOPES
- UugB - URBAN LAND-UDORTHENTS, SCHIST AND GNEISS COMPLEX, 0 TO 8 PERCENT SLOPES
"MILLSTONE MEADOWS" PRELIMINARY/FINAL PLAN - CONSTRUCTION DETAIL & NOTES - SITE
Client: Grove Meadow Developers LLC | Location: East Goshen Township, Chester County, Pennsylvania | Date: April 20, 2023 | Drawn By / Designed/Checked: M.D. Hartman | Scale: N.T.S. | Sheet: 16 of 17 | File No.: 22-001-F-D-9.0
TYPICAL STREET CROSS SECTION
Cross-section diagram showing 40' Right-of-Way, 18' Cartway (two 9' lanes at 2.0% cross slope), 11' borders on each side at 2.0% slope, 3:1 (Max.) cut/fill side slopes, Seal Joint With Hot AC-20 (Typ), 1 1/2" ID-2 Wearing Course SRL-M, 2" ID-2 Binder Course, 5" BCBC, and 6" PennDOT No. 2A Stone Subbase.
STANDARD SLANT CURB DETAIL
Cross-section diagram showing a concrete slant curb beside finished pavement, labeled 1/4" radius, 1/2" radius, 1 1/2" reveal, finished pavement and 4" layer AASHTO #57 crushed stone.
DRIVEWAY PAVEMENT DETAIL
Section and Plan diagrams showing 12' wide driveway pavement with 2" bituminous wearing course over 2A modified stone (6" depth) and compacted subgrade, bounded by R/W line, grass, expansion joint, and depressed curb.
BOULDER RETAINING WALL
Cross-section diagram showing boulder retaining wall: 28" min. @ top, 8" min. batter, 2' max. boulder height, 2.80' wall height, 8" min. bury, 8" gravel min., install perf. outlets every 20' O.C., place drainage geotextile behind stones, surround stone with drainage geotextile, install 4" perf. drainage pipe behind wall surrounded with clean AASHTO #57 stone, place rock wall on top of 8" AASHTO #57 stone - extend up back 8".
PROPOSED CULVERT (ARCH PIPE) HEADWALL ELEVATION VIEW
Elevation diagram of Proposed Culvert (Arch Pipe) Headwall: 18'-0" headwall, 17'-3" wale rib, 4 tie backs rods, 25'-0" span nominal, 7'-6" rise nominal, 11'-7" total height (sections: 30.625" (6N), 38.5" (4N), 38.5" (4N), 31.375" (5N)), 3'-4" top depth, Inlet Marked I1, Outlet Marked O1, Filler Rods, X=Deadman, Tie Back Rod to Deadman Anchor.